Further Response to FOIA Request for Documents Re Eg&G Rept on Harassment & Intimidation.Forwards App B Documents. Documents Also Available in Pdr.Portions of App C Documents 1-4 Withheld (Ref FOIA Exemptions 4 & 6)
ML20138B980
Person / Time
Site: Waterford, Comanche Peak, 05000000
Issue date: 10/16/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B, Gregory J
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20136F578 List:
References
FOIA-84-751 NUDOCS 8510220125
Download: ML20138B980 (4)


Text

- 4.f jo,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION I

o i

3 E

WASHINGTON, D. C. 20555

,l h

...g SCT 161985 f

i Ms. Billie Garde Mr. John S. Gregory l

Government Accountability Pro,iect 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, DC 20036

~

TO F01A-84-751

Dear Ms. Garde and Mr. Gregory:

This is in further response to your letter dated September 18, 1984, in which you requested, pursuant to the Freedom of Information Act (F0IA), documents in i

connection with a report on the Comanche Peak Steam Electric Station.

In a conversation between Ms. Garde and Carol Ann Reed on October 2, 1984, it was clarified that you were seekino the EG8G report on harassment and i

intimidation and documents concerning the EGaG/NRC contract under which this report was produced.

In my letter to you dated November 13, 1984, I stated that the search for additional documents was continuing. The search has been completed, and the documents listed on the enclosed Appendix B are being placed in the NRC PublicDocumentRoom(PDR), 1717.11 Street, NW, Washington, DC. You may obtain access by presenting a copy of this letter or by requesting POR folder F01A-84-751 in your name.

Portions of tIhe documents 1, 2 and 4 listed on Appendix C are being withheld l

from public disclosure pursuant to Exemption (4) of the FOIA (5 U.S.C.

552(b)(4)) and 10 CFR 9.5(a)(4) of the Commission's regulations. The withheld

.information is confidential business (proprietary) information.

Portions of document 3 listed on Appendix C are being withheld from public disclosure pursuant to Exemption (6) of the F0IA (5 U.S.C. 552(b)(6)) and 10

+

CFR 9.5(a)(6) of the Connission's regulations. Release of this information would cause a clearly unwarranted invasion of personal privacy.

Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its production or disclosure is contrary to the public interest. The persons responsible for this denial are the undersigned and Mr. Harold Denton, Director, Office of Nuclear Reactor Regulation.

85102201P5 051016 NDE 51 PDR I

~

This denial may be appealed t) the Commission's Executive Director for Operations within 30 days fro 1 the receipt of this letter. As provided in 10 l

CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission Washington, DC i

20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."

{

This completes action on your request.

I Si

rely, l

. Felton, Director Division of Rules and Records l

Office of Administration

Enclosures:

As stated

[

r 6

i

}

r k

I b

1 i

i i

q Re: F01A-84-751 APPENDIX B 1.

06/15/84 Note for Michael Kaltman, PPAS from Donohew, subject:

Interoffice Review of FINS A-6819 (Project 2), A-6821 (Project 2) and A-0802, Evaluation of Selected Open NRC Items at Comanche Peak before Plant Fuel Load (2 pages) 2.

07/02/84 Ltr to Wade from Eisenhut, subject: INEL Technical Assistance to the Division of Licensing, NRR, NRC" " Evaluation of Selected NRC Open Items Before Plant Fuel Load" FIN A-6819, Project 2 (15 pages) 3.

07/13/84 Memo for Beckwith from Funches, subject: Request for Senior Contract Review Board (SCRB) Approval of FIN A6819,

" Evaluation of Selected NRC Open Items Before Fuel Load (Program I)" (12 pages) 4.

07/18/84 Ltr to Wade from Eisenhut, subject: INEL Technical Evaluation to the Division of Licensing, NRR, NRC: " Evaluation of Selected NRC Open Items Before Plant Fuel Load" FIN A6819, Project 2 (2 pages) 5.

08/84 Draft, "An Investigation and Assessment of the Work Climate at the Comanche Peak Steam Electric Station" from EG&G Idaho, Inc.

(41 pages) 6.

08/07/84 Note to Crutchfield from Williams, subject: Senior Contract Review Board Meeting #64 (1 page) 7.

08/24/84 Ltr to Sims from Eisenhut, subject: INEL Technical Assistance to the Division of Licensing, NRR, NRC: " Evaluation of Selected NRC Open Items Before Plant Fuel Load" (FIN A-6819, Project 2)

(4 pages)

~

8.

09/05/84 Ltr to Sims from Leach, subject: EG8G Personnel'to Support Cycles 4 & 5 of Comanche Peak Allegations Team (A6819) -

LPL-380-84 (3 pages) 9.

09/06/84 Memo for Ippolito from Williams, subject: TRT Staffing for Cycle 4 at Comanche Peak (3 pages)

10. 09/13/84 Ltr to Wade from Eisenhut, subject: INEL Technical Assistance to the Division of Licensing, NRR, NRC: " Evaluation of Selected NRC Open Items Before Plant Fuel Load" FIN A-6819 (3 pages)
11. 09/20/84 Ltr to Sims from Leach, subject: EG&G Personnel to Support Cycle 5 of Comanche Peak Allegations Team (A6819) -

LPL-393-84 (2 pages)

12. 12/04/84 Memo for Hayes from Eisenhut, subject: Comanche Peak Steam Electric Stations Units 1 and 2 - Intimidation (2 pages) i

Re: F01A-84-751 APPENDIX C 1.

07/17/84 Ltr to Sims from Leach, w/ attachment (3 pages) 2.

07/31/84 Ltr to Sims from Eisenhut, subject: INEL Technical Assistance to the Division of Licensing, NRR, NRC: Evaluation of Selected NRC Open Items Before Plant Fuel Load" (FIN A-6819, Project 2)

(6pages) 3.

07/31/84 Ltr to Sims from Leach, subject: Transmittal of Task Team Description and Qualification, and Task Schedule for Comanche Peak Management Issues Team - LPL-339-84 (35 pages) 4.

09/11/84 t tr to Milam from Marx, subject: Tranmittal of Modifications to-Form 189 Front Pages - FINS A6819 and A6821 - Marx-307-84 (14 pages) t y

5,..,

' OVERNMENT ACCOUNTABILITY PROJECT G

1555 Conneaicut Avenue, N.W., Suite 202 Washington, D.C. 20036 (202)232-8550 Sepba&cr 18, 1984 FREEDOM OF INFORMATK)N ACT REQUEST Director plQ -gg.K l Office of Administration U.S. Nuclear Regulatory Commission Tgig q_ZO 8 Washington, D.C.

20555 To Whom It May Concern:

Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C. 5552, the Government Accountability Project (GAP) requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview re-ports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwrit-ten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, any other data compil-ations, interim and/or final reports, status reports, work pro-duct and any and all other records relevant to and/or generated in connection with the Comanche Peak I.E. Report Documents no.

50-445 and no. 50-446, dated 9/17/1984, and the contract between the N.R.C.

and E.G.&G. of Idaho.

If any records covered by this request have been destroyed and/

or removed, and/or are destroyed and removed after roccipt of this request, please provide all surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken, relevant date (s), individual, office and/or agency-wide policies and/or justification (s) for the action (s), identification of all personnel involved with the action (s), and any and all records relevant to, generated in connection with, and/or issued in order to implement the action (s).

GAP requests that fees be waived, because " finding the informa-tion can be considered as primarily benefitting the general pub-lic."

5 U.S.C.

5552 (a) (4) (A).

The Government Accountability Project is a non-profit, nonpartisan public interest organiza-tion concerned with honest and open government.

Through legal representation, advice, national conferences, films, publica-tions and public outreach, the Project promotes whistleblowers as agents of government accountability.

Through its Citizens Clinic, GAP offers assistance to local public interest and citi-zens groups seeking to ansure the health and safety of their communities.

The Citizens Clinic is currently assisting sever-al citizens groups, local governments and intervenors in the l

Glen Rose area concerning the construction of the Comanche Peak nuclear power plant.

i

-us-6 ' a m.i & Pg P P-

Director of Administration U.S. Nuclear Regulatory Commission September 18, 1984 Page Two We are requesting the above information as part of an ongoing monitoring project on the adequacy of the NRC's efforts to pro-tect public safety and health at nuclear power plants.

For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describ-ing the documents or portions of documents withheld.

The index should provide a detailed justification of your grounds for claiming each exemption, explaining why each exemption is rele-vant to the document or portion of the document withheld.

This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C.

Dir.1973), cert. denied, 415 U.S.

977 (1974).

We look forward to your response to this request within ten days.

Yours truly, i

Billie Gardo (J4 G-)

Citizens Clinic Director ohn S. Gregory Staff Associate l

l