ML20137U263
| ML20137U263 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/07/1997 |
| From: | Neri A, Schopfer D, Warner I SARGENT & LUNDY, INC. |
| To: | |
| Shared Package | |
| ML20137U214 | List: |
| References | |
| CK-MP3-03-04, CK-MP3-3-4, NUDOCS 9704160336 | |
| Download: ML20137U263 (7) | |
Text
..
Northeast Utilities Millstone - Unit 3 Independent Corrective Action Verification Program (ICAVP)
Modification Review Checklist CK4fP3-03-04, Rev. 0 Electrical System Design Dpm A S.uamar
,, 0 Y 47R7 Prepared by: 'IAW' N#4dEd
/> Alm
+'/7/h 1
Name Signature Date i
3 Approved by: A 4.4)E4/
<~
4-7-97 Name Signature Date System Modification No.
Verified by:
Concurrence by:
9704160336 970411 PDR ADOCK 050004 3 G
I Northe:st Utilities CK-MP3-03-04
-l Millstane Unit 3 System Modification No.
Sheet of Electrical System Design. Review l
Instructions This checklist supplements PI-MP3-03 and shall be used to document the electrical design review process for system modifications. Application and use of this checklist shall be as follows:
J
- 1. When the need for a electrical design review is identified by the modification screening checklist (CK-MP3-03-02), the Verifier shall implement this check to verify that electrical system design aspects have been properly addressed in the modification.
- 2. The Verifier shall review each attribute listed in the checklist and shall determine whether the attribute has been properly addressed or is not applicable. The determination shall be documented by checking the appropriate column in the checklist.
- 3. For all "Yes" and "No" responses, the Verifier shall assign a sequential comment number and shall describe the basis for the response on the comment sheet included in this checklist.
Comments may also be provide for "N/A" responses.
- 4. When all attributes have been reviewed, the Verifier shall sign and date the cover sheet
- 5. The Lead Verifier shall indicate his concurrence that the electrical system review has been completed by signing and dating the cover sheet.
The system designation and modification number shall be entered on all sheets of the completed checklist. Pages shall be sequentially numbered. It shall be acceptable to add insert pages numbered as I A, IB,2A, etc.
(CK-MP3-03-04, Rev. O, Page 2)
ELECSYST. DOC
Ncrtherst Utiliti:s CK-MP3-03-04 Millst:ne Unit 3 System Modification No.
Sheet of Electrical System Design Review Attribute Yes No N/A Commen 1.
Performance requirements such as capacity, rating, output, are clearly identified and addressed.
2 2.
The scope of the design document defmes the basis / reason for the design / design change and provides an adequately detailed description of the design change. The content of the design 4
document fulfills the stated scope.
3.
Codes, standards and regulatory requirements are documented, including applicable issue date and/or addenda. Exceptions are highlighted.
4.
Assumptions necessary to perform the design activity are adequately described and reasonable and the design method used was appropriate.
5.
Failure modes are identified and considered, e.g., loss of air, loss of power, loss of function (start, stop, open and close control).
~
6.
Interface requirements are specified and addressed.
7.
Operational requirements including mode restrictions are identified; effect on all system operating alignments.
8.
Redundancy and separation requirements are addressed.
I 9.
Assumptions necessary to perform the design actisity are adequately described and' reasonable and the design method used was appropriate.
10.
Breached barrier requirements, including mode restrictions, are clearly stated.
1 l
l' 11.
The effects of design changes, issued or in-process, have been reviewed for impact on the design document. 'Ihere is a process for identifying open modifications against proposed design i
changes.
1 12.
Industry Experience was factored into design where necessary.
1 13.
Component temperature / voltage rating are reconciled with the system design temperature / voltage.
)
14.
Overcurrent protection and voltage drop considerations are factored into the design.
(CK-MP3-03-04, Rev. O, Page 3)
ELECSYST. DOC
i Northe:st Utilities CK-MP3-03-04 Millstene Unit 3 System Modification No.
Sheet of Electrical System Design Review Attribute Yes N/A Commen
- 15. Assignment of equipr,ent and identification tagging was adequately addressed.
16.
Materials and equipment are adequately ident fled, specified, and suitable for the service emironment and process conditions.
For example, electrical device and componeat performance characteristics are identified and have been verified to be i
adequate for the application (such as minimum and maximum voltage, etc.). Resources such as IE Notices have been reviewed for applicable field service experience.
17.
Special material or equipment specification requirements or tests have. been appropriately specified. (Examples: 10CFR50.49, j
IEEE-323, UUFM Approved) 18.
Maintainability factors were accounted for in the design [such as location, accessibility, arrangement, emironment, and isolation / separation features (breakers, fuses)].
t
- 19. Affected calculations have been revised and/or new calculations have been prepared.
a.
Ampacity b.
Voltage drop c.
Relay or Trip device sizing and coordination d.
Interrupting rating, both momentary and full load
[
e.
Voltage Regulation f.
Bus loading under appropriate conditions
[
g.
Second Level Undervoltage i
h.
Ovedoad settings
~
i.
Equipment operating pressure j
j.
MOV Calculations, e.g. overload, torque, stroke time, etc.
k.
Configuration control, e.g. fuse sizing, bus loading, cable tray loading
- 20. Affected electrical drawings and databases have been updated?
i a.
Schematics b.
General Arrangements I
c.
Equipment Location d.
Single Line Drawings
[
e.
Wiring Diagrams f.
Front Elevations (if appropriate) g.
Logic Diagram h.
Bus Loadmg i.
Cable Tray Loading (CK-MP3-03-04, Rev. O, Page 4)
ELECSYST. DOC
~.
1 i;
i
' N:rtheast Utilities.
CK-MP3-03-04 p
Millstone Unit 3 System l
Modification No.
i Sheet of 5
Electrical System Design Review i
Attribute 1 21 F.2 NJA Commen l
j.
Design Installation and Test Specifications
]
j k.
Design Basis Documents 1.
Procurement Specifications 7
m.
Vendor Drawing / Data Sheets t
n.
Vendor Manual o.
Valve List
~
I p.
Electrical Equipment List
[
]
i -
q.
Component datasheets/ databases i
21.
If a containment electrical penetration was utilized, then all y
applicable factors were con.sidered, e.g., splicing, sizhig,
}
segregation, short circuit and overload protection, etc.
22.
Any changes in alarm settmgs, or the addition of new alarms, were properly evaluated agamst licensing requirements and operating procedures.
23.
If new equipment was aMM or existing equipment was modified such that changes in heat loadmg occurred, the Moact i
was evaluated on existing HVAC systems.-
24.
Groundmg and lightning protection was considered for any new equipment additions.
25.
Post Modification Test requirements have been specified and include acceptance criteria sufficient to allow verification that design requirements have been satisfactorily accomplished.
26.
Proper consideration was given to the mounting of small components or pieces of equipment relative to interaction with large dynamic pieces of equipment.
27.
Proper consideration was given to mimmize or elimmate the possibility of water entry into electrical equipment.
28.
Proper consideration was given to the impact on electrical
~ equipment ifit was mounted within close proximity to any components which generate heat, e.g. pipes, transformers, etc.
29.
Human factor engineering considerations were incorporated into the design.
- 30. 'Ihe design has no impact on security lighting.
31 "Ihe impact on the training curriculum and the simulator was correctly identified. Simulator compatible materials were specified.
. (CK-MP3 03-04, Rev. O, Page 5)
' CK03-04. DOC '
Ntrthe:st Utilities CK-MP3-03-04 Millst:ne Unit 3 System Modification No.
Sheet of Electrical System Design Review Attribute Yes Flo N/A Commen
- 32. The impact on the Safety Parameter Display System (SPDS) and the Emergency Operating Procedures (EOPs) were properly addressed.
33.
Other electrical system requirements as described in the System Requirements Checklist (CK-MP3-02-02) have been addressed.
(Identify below the requirement number from the System Requirements List.)
1
-us *_
s I
l l
l J
l (CK-MP3-03 04, Rev. O, Page 6)
ELECSYST. DOC
^
1 Nerthe:st Utilities CK-MP3-03-04 Millst:ne Unit 3 System Modification No.
Sheet of Electrical System Design Review Comment Form Comment No.
Comment
^
i l
I i
i Prepared by Signature Date (CK-MP3-03 04, Rev. O, Page 7)
ELECSYST. DOC