Text
~~
ACCESSION NBR FAC IL:50-259 50-260 50-296 AUTH. NAl'lE QR IDLEYs R.
RECXr. NAME MULLER'. R.
REGULATORY I Rl'lATION DISTRIBUTION SYS (R IDS) 8612090401 DOC. DATE: Sb/12/04 NOTARIZED:
NO DOCKET 0 Brogans Fevry Nucleav'ower Stations Unit ii Tennessee 05000259 Brogans Ferv y Nucleav Pouer Station>
Unit 25 Tennessee 05000260 Brogans Fev v y Nucleav Pouer Stati one Unit 3.
Tennessee 05000296 AUTHOR AFFILIATION Tennessee Ual ley Authcrrity RECIPIENT AFFILIATION BNR Pv object Div'ectov ate 2
SUB JECT:
Fortoards response to Generic Ltr 83-28'tem
- 3. 2. 1> v evieu of
'test i~c maint pv oceduv es 5 Tech Specs Zc Item 3. 2. 2, c heck o+
vendov 8c engineev ing v'ecommendations for testing e< maint.
DISTRIBUTION CODE:
AO55D COPIEB RECEIVED: LTR l ENCL ]
SIZE:
TITLE: OR/Licensi ng Submi tta1:
Sa 1 em ATWS Events GL-83-28 NOTES: NMSS/FCAF icy.
NMSS/FCAF/PM icy.
OIA 1cy.
GROTENUIS, M 1cy.
05000259 NMSS/FCAF icy.
Ni"lSS/FCAF/PM icy.
OIA 1cy.
QROTENHUXSi M icy.
05000260 NMSS/FCAF 1cy.
NMSS/FCAF/PM icy.
OIA icy.
GROTENHUXS M icy.
05000296 RECIPIENT ID CODE/NAME.
BNR ADTS BNR EXCSB BNR PD2 LA GEARS' BNR RSB COPIES LTTR ENCL 2
2 1
0 1
1 1
RECI P I ENT ID CODE/NAME BWR EB BWR FOB BWR PD2 PD 01 BWR PSB COPIES LTTR ENCL 1
1 1
3 3
1 1
EXTERNAL: LPDR NSIC NOTES:
03 05 INTERNAL ACRS ELD/HDS4 XE/DGAVT NRR PNR-A ADTS N
RSIB REG L
04 6
6 1
0 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 TOTAL NUl'1BER OF COPIES REQUIRED:
LTTR 36 ENCL 33
i,y
'r FF)
IPN N
Ni Nl I
ry-Nig'f y
~
~ 'gNF I
I I'N,P >'FI r
r F y
TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 157B Lookout Place DEC 04 $86 Director of Nuclear Reactor Regulation Attention:
Mr. D. R. Muller, Project, Director BWR Project Directorate No.
2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Muller:
In the Matter of the Tennessee Valley Authority Docket Nos.
50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83-28 By my letter to you dated August 28, 1986 we provided responses to Generic Letter 83-28 items 3.1.1, 3.1.2, 3.1.3 and 3.2.3 and stated that responses to items 3.2.1 and 3.2.2 would be provided when programs were finalized'to resolve them.
The enclosed information is our response to these items.
Should additional information on this subject be required, please get in touch with J.
D. Wolcott at Browns Ferry (205) 729-2689.
'Very truly yours, TENNESSEE VALLEY AUTHORITY
~
~
R. Gridley, D'rector Nuclear Safety and Licensing Enclosure cc:
See page 2
86120'F0401 861204
'DR ADOCK 05000259 8
PDR pn6~
I/g An Equal Opportunity Employer
JV
~
~
N
Director of Nuclear Reactor Regulation cc (Enclosure):
Mr. G.
E. Gears U. S. Nuclear Regulatory Commission Browns Ferry Project Manager 7920 Norfolk Avenue
- Bethseda, Maryland 20814 U. S. Nuclear Regulatory Commission Region II ATTN:
Dr. J. Nelson Grace, Regional Administrator 101 Marietta Street, NM, Suite 2900 Atlanta, Georgia 30323 Mr. G.
G.
Zech
- Director, TVA Projects U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NM, Suite 2900 Atlanta, Georgia 30323
Cl t
S'e
'h
ENCLOSURE BROWNS FERRY NUCLEAR PLANT REQUEST FOR ADDITIONAL INFORMATION ITEM 3.2.1, Review of Test and Maintenance Procedures and Technical Specifications (All Other Safety Related Components).
Submit an unambiguous statement.
confirming that post maintenance test procedures were reviewed to ensure that the testing adequately verifies component capability to perform all safety functions.
ITEM 3.2.2 Check of Vendor and Engineering Recommendations for Testing and Maintenance (All Other Safety Related Components).
RESPONSE
ACTIONS RE UIRED TO COMPLETE 1TEMS 3.2.1 AND 3.2.2 Post maintenance testing is accomplished for safety-related equipment by one or more of the following:
1 ~
2.
3.
Testing specified by a standing maintenance procedure.
Performance of appropriate surveillance testing on the affected system.
Additional testing specified in Maintenance Request (MR).
Surveillance and maintenance procedures are currently being reviewed and upgraded under the procedure upgrade program as described in Sections II.2.4 and II.4.5 of the Browns Ferry Nuclear Performance Plan.
The total procedure upgrade program is divided into a two phase near-term (pre-startup) and long-term (post-startup) effort.
Part of the scope of this effort includes the following actions:
1.
To ensure that test guidance from vendor and engineering recommendations is reflected in plant procedures where appropriate using, the latest obtainable controlled vendor manuals.
2.
To ensure that General Electric Service Information Letters (SILs),
INPO/NSAC Significant Operating Event Reports (SOERs),
INFO Significant Event Reports (SERs),
Licensee Event Reports (LERs) technical information letters, vendor service bulletins and other similar documents are reflected in plant procedures where appropriate.
3.
To ensure that post-maintenance testing adequately demonstrates that the equipment is capable of performing its intended safety function.
INTERIM ACTIONS BEFORE STARTUP The procedures to be reviewed before plant restart which are important to safety are being prioritized and selected based upon the following criteria:
RESPONSE
(Continued) 1.
Maintenance required by Technical Specifications.
2.
Maintenance required by Final Safety Analysis Report commitments 3.
Recommended vendor maintenance associated with environmental qualification.
4.
Maintenance instructions associated with components selected on a reliability basis.
5.
Post-maintenance test instruction reviews required by previous NRC commitments, Unique testing requirements for MRs are written for specific maintenance tasks and are, therefore, outside the scope of this review.
0439c