Meeting Rept 50-508/85-11 on 851218.Major Areas Discussed: Proposed Const Assurance Program
ML20137D330
Person / Time
Site: Satsop
Issue date: 12/30/1985
From: Ang W, Dodds R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20137D314 List:
References
50-508-85-11-MM, NUDOCS 8601160619
Download: ML20137D330 (3)


Text

.. _

.

.

.. .

'

,

U. S. NUCLEAR REGULATORY COMMISSION

REGION V

Report No. 50-508/85-11 Docket No.' 50-508

' Construction Permit No. CPPR-154

~

Licensee: Washington Public Power Supply System 3000 George Washington Way Richland, Washington 99352 Facility'Name: ' Washington Nuclear Project' 3 >-

Meeting at': Region V, Walnut Creek,1 California

'

Date: ' December 18 1985 '

Prepared by: ] P.; Ang, Project Ynspector W.'

M /2/b I Dat6 5figned Reactor Proj ct Section 1 ,

Approved 5y: Id i Date Sfgned

~

R. T. Dodds, Chief Reactor Project Section'1 Summary:

l Meeting on December 18, 1985, to discuss the Supply System proposed Phase 1

. Construction Assurance program for WNP- ,

8601160619 851230 PDR ADOCK 05000500 G PM

_

r -

n-3 ,'

..

-

- .

..

+

N

! DETAILS h

. ' Personnel Attending Meeting-u < F.~ Kirsch, ActinF Director, DRSP

!

'

A. E. Chaffee,' Reactor Projects Branch

, R.. T. Dodds, Chief, Reactor Project Section 1

.

l W. P. Ang, Project Inspector, WNP-3

. >

NRR-NRC

.

T.; S. Michaels, Project' Manager'

IE-NRC -

. G. T. Ankrum, Chief, Quality Assurance Branch

~ F. Heishman,. Chief,. Construction Program Branch L

W. M. Hill, Sr. Engineer, Quality Assurance Branch WPPSS b R. B.: Glasscock, Director, Licensing and' Assurance L. J.;Garvin, Program Manager, Readiness. Review

-

R. L. Knawa, Manager, Construction Assurance Program k- . General l-(>'

'

The. Supply System has previously met with NRC representatives to discuss the proposed readiness review programs for WNP-1 and WNP-3. In the Supply System's letter of May 22, 1985, la specific request was made that-the NRC agree to review the program description of Readiness Reviews ~at

~

' .

-

WNP-1- and WNP-3 for approval, agree to participate in the Readiness

'

Review'at WNP-1-and WNP-3 and review the Preservation Program Description

'for approva In letter G03-85-283 dated May'24, l'985, the Supply System sent a' copy of

~

the preservation program entitled " Preservation of Assets Preventative Maintenance Program" for:NRC review and approval. The description of the

..  ; programmatic controls for the Preservation Program were subsequently .

p' . furnished with G03-85-358 dated-June 28, 1985; which was also submitted for NRC review and approval. :The Preservation Program description was *

. approved 'by JBM
Report"No.;50-508/85-05, dated September 18, 198 >

' '

!~ , .

. .

.~

In-letter G01-85-0127/G03-85-0299 dated. June 3, 1985, the Supply System

^

P . requested' review <and approval of the-Design Review Program entitled

~

-

" Engine'ering'AssurancejProgram (EAP)".' ~The Design Review Program

._ description.was. approved'by,NRC. Report No. 50-508/85-06, dated

,

<OctoberJ5,,1985.-

,

.. ,,

, i- e ,

L 'In. letter G03-85-563 dated September 25, 1985, the Supply System

'

frequested review and pproval of the Construction Assurance Progra *

o r;

~

s

<w b

h C y

-

'

,

j , _

,

l +

"

. . .* [. 'y

-

. .

g .

".

h ,

TheSupplySydtemmet;withNRCrepresentativesonOctober 29, 1985, to

.

review the status of'the WNP-3 project and the proposed Construction l~ -Assurance.Progra' +;' ,

+

, ;

-On.' November"20,el'985 the NRC' forwarded, by letter to the Supply System,

~

[.

j NRC comments regardin~g'.the proposed Construction Assurance Program. A

~

i

+

-meeting between Supply l System-. representatives and NRC representatives was L ' :

'

held to~ discuss the proposed Construction Assurance Program and the NRC l

comment's.rega'rding the program. -Significant topics discussed included L Lthe follo ing:

.

i L

~*

.

Id CFR 5'Oi Appendix "B" applicability to Readiness Review

'

l Foimat 'and content of Readiness Review module = reports  ;

  • '

Oversight committee functions l l ,.

'*

. ; Senior Management review' and approval of Readiness Review modille

.

  • '

..

results  ;-