_

.

.

...

'

,

U. S. NUCLEAR REGULATORY COMMISSION

REGION V

Report No. 50-508/85-11 Docket No.' 50-508

' Construction Permit No. CPPR-154

~

Licensee: Washington Public Power Supply System 3000 George Washington Way Richland, Washington 99352 Facility'Name: ' Washington Nuclear Project' 3 >-

Meeting at':

Region V, Walnut Creek,1 California

'

Date: ' December 18 1985

'

Prepared by: ]

M

/2/b I

W.' P.; Ang, Project Ynspector Dat6 5figned Reactor Proj ct Section 1,

Approved 5y:

Id i

R. T. Dodds, Chief Date Sfgned

~

Reactor Project Section'1 Summary:

l Meeting on December 18, 1985, to discuss the Supply System proposed Phase 1

. Construction Assurance program for WNP-3.

,

8601160619 851230 PDR ADOCK 05000500 PM G

_

r

-

n-3,'

..

-

-

.

..

+

N

!

DETAILS h

. 1.

' Personnel Attending Meeting-D. F.~ Kirsch, ActinF Director, DRSP u

<

!

A. E. Chaffee,' Reactor Projects Branch R.. T. Dodds, Chief, Reactor Project Section 1

'

,

.

l W. P. Ang, Project Inspector, WNP-3

.

>

NRR-NRC T.; S. Michaels, Project' Manager'

.

IE-NRC -

.

G. T. Ankrum, Chief, Quality Assurance Branch

~R. F. Heishman,. Chief,. Construction Program Branch L

W. M. Hill, Sr. Engineer, Quality Assurance Branch WPPSS b

R. B.: Glasscock, Director, Licensing and' Assurance L. J.;Garvin, Program Manager, Readiness. Review

-

R. L. Knawa, Manager, Construction Assurance Program k-2.

. General l-(>'

The. Supply System has previously met with NRC representatives to discuss

'

the proposed readiness review programs for WNP-1 and WNP-3.

In the Supply System's letter of May 22, 1985, la specific request was made that-the NRC agree to review the program description of Readiness Reviews ~at

~

'

WNP-1-and WNP-3 for approval, agree to participate in the Readiness

.

-

Review'at WNP-1-and WNP-3 and review the Preservation Program Description

'

'for approval.

In letter G03-85-283 dated May'24, l'985, the Supply System sent a' copy of

~

the preservation program entitled " Preservation of Assets Preventative Maintenance Program" for:NRC review and approval. The description of the

..

programmatic controls for the Preservation Program were subsequently.

p'

. furnished with G03-85-358 dated-June 28, 1985; which was also submitted for NRC review and approval. :The Preservation Program description was

.

approved 'by JBM: Report"No.;50-508/85-05, dated September 18, 1985.

>

' ' '

,

.

.

i.

!~

In-letter G01-85-0127/G03-85-0299 dated. June 3, 1985, the Supply System

'

.

.~

P

. requested' review <and approval of the-Design Review Program entitled

^

~

-

" Engine'ering'AssurancejProgram (EAP)".' ~The Design Review Program description.was. approved'by,NRC. Report No. 50-508/85-06, dated

._

<OctoberJ5,,1985.

,

-

,

..

m.

,,

,

i-e

,

L

'In. letter G03-85-563 dated September 25, 1985, the Supply System frequested review and pproval of the Construction Assurance Program.

'

o r;

s

~

<w b

h C y j i.

'

-

,

l

_

,

,

+

"

[.

'y

...*

.

.

-

g f.i

-.

".

TheSupplySydtemmet;withNRCrepresentativesonOctober 29, 1985, to h

review the status of'the WNP-3 project and the proposed Construction

.

,

l~

-Assurance.Progra'm.

-

+;'

i.

+

,

,

[.

-On.' November"20,el'985 the NRC' forwarded, by letter to the Supply System,

~

j NRC comments regardin~g'.the proposed Construction Assurance Program. A i

~

-meeting between Supply l System-. representatives and NRC representatives was

+

L held to~ discuss the proposed Construction Assurance Program and the NRC

'

l comment's.rega'rding the program. -Significant topics discussed included

'

L Lthe follo ing:

i

.

L

.

Id CFR 5'O Appendix "B" applicability to Readiness Review i

~*

l Foimat 'and content of Readiness Review module = reports

'