U. S. NUCLEAR REGULATORY COMMISSION
REGION V
Report No. 50-508/85-11 Docket No.' 50-508
' Construction Permit No. CPPR-154
~
Licensee: Washington Public Power Supply System 3000 George Washington Way Richland, Washington 99352 Facility'Name: ' Washington Nuclear Project' 3 >-
Meeting at':
Region V, Walnut Creek,1 California
'
Date: ' December 18 1985
'
Prepared by: ]
M
/2/b I
W.' P.; Ang, Project Ynspector Dat6 5figned Reactor Proj ct Section 1,
Approved 5y:
Id i
R. T. Dodds, Chief Date Sfgned
~
Reactor Project Section'1 Summary:
l Meeting on December 18, 1985, to discuss the Supply System proposed Phase 1
. Construction Assurance program for WNP-3.
,
8601160619 851230 PDR ADOCK 05000500 PM G
_
r
-
n-3,'
..
-
-
.
..
+
N
!
DETAILS h
. 1.
' Personnel Attending Meeting-D. F.~ Kirsch, ActinF Director, DRSP u
<
!
A. E. Chaffee,' Reactor Projects Branch R.. T. Dodds, Chief, Reactor Project Section 1
'
,
.
l W. P. Ang, Project Inspector, WNP-3
.
>
NRR-NRC T.; S. Michaels, Project' Manager'
.
IE-NRC -
.
G. T. Ankrum, Chief, Quality Assurance Branch
~R. F. Heishman,. Chief,. Construction Program Branch L
W. M. Hill, Sr. Engineer, Quality Assurance Branch WPPSS b
R. B.: Glasscock, Director, Licensing and' Assurance L. J.;Garvin, Program Manager, Readiness. Review
-
R. L. Knawa, Manager, Construction Assurance Program k-2.
. General l-(>'
The. Supply System has previously met with NRC representatives to discuss
'
the proposed readiness review programs for WNP-1 and WNP-3.
In the Supply System's letter of May 22, 1985, la specific request was made that-the NRC agree to review the program description of Readiness Reviews ~at
~
'
WNP-1-and WNP-3 for approval, agree to participate in the Readiness
.
-
Review'at WNP-1-and WNP-3 and review the Preservation Program Description
'
'for approval.
In letter G03-85-283 dated May'24, l'985, the Supply System sent a' copy of
~
the preservation program entitled " Preservation of Assets Preventative Maintenance Program" for:NRC review and approval. The description of the
..
- programmatic controls for the Preservation Program were subsequently.
p'
. furnished with G03-85-358 dated-June 28, 1985; which was also submitted for NRC review and approval. :The Preservation Program description was
- .
approved 'by JBM: Report"No.;50-508/85-05, dated September 18, 1985.
>
' ' '
,
.
.
i.
!~
In-letter G01-85-0127/G03-85-0299 dated. June 3, 1985, the Supply System
'
.
.~
P
. requested' review <and approval of the-Design Review Program entitled
^
~
-
" Engine'ering'AssurancejProgram (EAP)".' ~The Design Review Program description.was. approved'by,NRC. Report No. 50-508/85-06, dated
._
<OctoberJ5,,1985.
,
-
,
..
m.
,,
,
i-e
,
L
'In. letter G03-85-563 dated September 25, 1985, the Supply System frequested review and pproval of the Construction Assurance Program.
'
o r;
s
~
<w b
h C y j i.
'
-
,
l
_
,
,
+
"
[.
'y
...*
.
.
-
g f.i
-.
".
TheSupplySydtemmet;withNRCrepresentativesonOctober 29, 1985, to h
review the status of'the WNP-3 project and the proposed Construction
.
,
l~
-Assurance.Progra'm.
-
+;'
i.
+
,
,
[.
-On.' November"20,el'985 the NRC' forwarded, by letter to the Supply System,
~
j NRC comments regardin~g'.the proposed Construction Assurance Program. A i
~
-meeting between Supply l System-. representatives and NRC representatives was
+
L held to~ discuss the proposed Construction Assurance Program and the NRC
'
l comment's.rega'rding the program. -Significant topics discussed included
'
L Lthe follo ing:
i
.
L
.
Id CFR 5'O Appendix "B" applicability to Readiness Review i
~*
l Foimat 'and content of Readiness Review module = reports
'
l
Oversight committee functions l
'
,.
.
- Senior Management review' and approval of Readiness Review modille
'*
.
'
..
results
- -