IR 05000285/1985020

From kanterella
(Redirected from ML20136F530)
Jump to navigation Jump to search
Insp Rept 50-285/85-20 on 850909-13.Violation Noted:Failure to Follow Search Procedures.One Unresolved Item Identified Re Search Area Glazing Specs.Details Withheld (Ref 10CFR73.21)
ML20136F530
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/07/1985
From: Earnest A, Joseph Kelly, Yandell L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20136F510 List:
References
50-285-85-20, NUDOCS 8511220141
Download: ML20136F530 (1)


Text

,:=.

<.

e i

APPENDIX B U. S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report: 50-285/85-20 License: DPR-40 Docket: 50-285 Licensee: Omaha Public Power District (OPPD)

1623 Harney Street Omaha, Nebraska 68102 Facility Name: Fort Calhoun Station (FCS), Unit 1 Inspection At: Blair, Nebraska Inspection Conducted: September 9-13, 1985 Inspector: u Qudd) ,

'

m Ll/7/f4~

James A. F. Kelly, S i Physica{cotection Date Specialist .

! _ ua#11 k OAEaua4

~

w />/ u'

Date A.BruceEarnest,Pgsica1ProtectionSpecialist

!

Approved: b M_d_b u /v/Af'

L. A. Yandell, Chief Emergency Preparedness Date'

and Safeguards Programs Section

,

i Inspection Summary Inspection Conducted September 9-13, 1985 (Report 50-285/85-20)

Areas Inspected: Routine, unannounced inspection consisting of a followup on licensee action on previous inspection findings. The inspection involved

96 direct inspector-hours by two NRC inspector Results: Within the areas inspected, one violation was identified (failure to ,,

follow search procedures, paragraph 11). One unresolved item was identified (search area glazing specifications, paragraph 6).

8511220141 851115  % 00Ni'ifyg PDR ADOCK 05000205 %S Ir?c:A;;op G M SEPARATION TdiS PACE in wn- ~... . .