05000354/LER-1996-030, Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-00

From kanterella
(Redirected from ML20134D754)
Jump to navigation Jump to search
Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-00
ML20134D754
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/29/1997
From: Bezilla M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134D756 List:
References
LR-N970063, NUDOCS 9702050356
Download: ML20134D754 (3)


LER-1996-030, Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-00
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(v), Loss of Safety Function
3541996030R00 - NRC Website

text

i O PSEG Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit

'JAN 2 91997 LR-N970063 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Dear Sir.

HOPE CREEK GENERATING STATION DOCKET NO. 50-354 UNIT NO.1 LICENSEE EVENT REPORT NO. 96-030-00 This Licensee Event Report entitled " Unplanned High Pressure Coolant injection System inoperability Due to a Stuck Open Extended Containment Boundary Valve" is being submitted pursuant to the requirements of 10CFR50.73(a)(2)(v).

Sincerely, ApM M rk Bezilla General Manager -

Hope Creek Operations Attachments (2) 050083

,1 PRD g-gg /,

SORC Mtg.97-005 C

Distribution LER File 9702050356 970129

+

PDR ADOCK 05000354 S

PDR The prxer i.in mttrlunds.

m o nov.

f I $N.2,

a i

Document Control Desk 2

LR-N970063 C

Mr. Hubert J. Miller, Administrator - Region l U. S. Nuclear Regulatory Commission l

475 Allendale Road King of Prussia, PA 19406 s

Mr. D. Jaffe, Licensing Project Manager - Hope Creek i

U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike I

Mail Stop 14E21 I

Rockville, MD 20852 l

Mr. R. Summers (X24) j USNRC Senior Resident inspector Mr. K. Tosch, Manager, IV Bureau of Nuclear Engineering 33 Arctic Parkway CN 415 Trenton, NJ 08625 i

l i

I

JAN 291997 1

i LR-N970063 1

i Attachment A i

The following items represent the commitments that Public Service Electric & Gas l

l (PSE&G) made to the Nuclear Regulatory Commission (NRC) relative to this LER

[

(354/96-030-00). The commitments are as follows:

i 1.

Discrepancies in the Hope Creek UFSAR related to the HPCI system extended containment boundary will be corrected. This action will be completed by July l

31,1997.

i l

2.

An IST program change has been initiated to correctly identify the HPCI system extended containment boundary valves. The change will be incorporated into the next revision of the Inservice Test Program Manual, currently scheduled for March 31,1997.

3.

The lessons learned from this event will be incorporated into Station Qualified Reviewer and 10 CFR 50.59 refresher training for appropriate personnel. This action will be completed by February 28,1997.

,2 4.

The HPCI system valve IST procedure will be revised to correctly identify the l

HPCI system extended containment boundary valves before the next planned performance, currently scheduled for March 2,1997.

i i

i t

i 1

a i