05000254/LER-1996-023, Provides Commitments Re LER 96-023.Predefined Model Work Request Which Initiates Perodic Maint Procedure Initiated

From kanterella
(Redirected from ML20133A566)
Jump to navigation Jump to search
Provides Commitments Re LER 96-023.Predefined Model Work Request Which Initiates Perodic Maint Procedure Initiated
ML20133A566
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 12/23/1996
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20133A570 List:
References
LWP-96-091, LWP-96-91, NUDOCS 9612310164
Download: ML20133A566 (2)


LER-1996-023, Provides Commitments Re LER 96-023.Predefined Model Work Request Which Initiates Perodic Maint Procedure Initiated
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
2541996023R00 - NRC Website

text

Gimmonw calth lAlmn Onnpany (Juad Otics Generating Mation 22Tto 2tkith Asenne North Cordosa. II.612f 2W-ed Tel M N M a22I!

LWP-96-091 December 23,1996 United States Nuclear Regulatory Qranission Washington, DC 20555 Attention:

Document Ccntrol Desk

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254, DPR-29, Unit One Docket Number 50-265, DPR-30, Unit Two Enclosed is Licensee Event Report (LER) 254/96-023, Revision 00, for Quad Cities Nuclear Power Station.

This report is submitted in accordance with the requirements of the Code of Federal Regulations, Title 10, Part 50.73(a)(2)(i)(B). The licensee shall report any operation or condition prohibited by the Plant's Technical Specifications.

The following commitments are being made by this letter:

1.

Initiate a predefine model work request which initiates a periodic maintenance procedure to perform a loop calibration for the loop of airflow gauge FI 1/2 5795-307 which includes calibrating the reading of the permanent gauge to actual airflow as determined by a pitot tube traverse. Actions to be completed by February 28,1997.

2.

Perform a review of all predefine calibrations that support technical specification requirements and utilize calibration procedures OIP 100-11, OIP 100-17, OIP 100-18, and OIP 100-19. This review will ensure that the calibrations are being properly performed. Actions to be completed by June 2,1997.

h 9612310164 961223

/

PDR ADOCK 05000254 s

S PDR

/

0:\\57NGR\\091%.LWP A i nitum compans

LWP-96-091 Page 2 December 23,1996 3.

Revise the existing process for post-surveillance data review to ensure that technical specification requirements are being satisfied. Actions to be completed by March 3,1997.

If there are any questions or comments concerning this letter, please refer them to Charles Peterson, Regulatory Affairs Manager at 309-654-2241, ext. 3602.

Respectfully, COMMONWEALTH EDISON COMPANY

- OU CIg NUCLEAR POWER STATION-p O'w cacc.

Ij. W. Pearce Station Manager LWP/CP/ea Enclosure A. B. Beach, Regional Administrator, Region III cc:

R. M. Pulsifer, Project Manager, NRR C. G. Miller, Senior Resident Inspector, Quad Cities R. J. Singer, MidAmerican Energy Company D. C. Tubbs, MidAmerican Energy Company P. L Piet, Licensing, Comed F. A. Spangenberg, Regulatory Affairs Manager, Dresden-l INPO Records Center

- i O.\\SMGR\\091%.LWP
- s--

_m..,

r r

- 7 1-P'