05000254/LER-1996-017, Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items

From kanterella
(Redirected from ML20129E744)
Jump to navigation Jump to search
Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items
ML20129E744
Person / Time
Site: Quad Cities 
Issue date: 09/13/1996
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20129E747 List:
References
LWP-96-068, LWP-96-68, NUDOCS 9610010155
Download: ML20129E744 (2)


LER-1996-017, Forwards LER 96-017-00,for Quad Cities Nuclear Power Station.Review Plan Will Be Prepared to Identify Open Items
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(iv), System Actuation
2541996017R00 - NRC Website

text

-

o.mnion.caith tar.on o,mpan3 Quad Otics Generating stanon 2l'io 2tu,th Asenue %>rth o,raosa.n.<,u a n su 1,ci 3ow>s. 22 o LWP-96-068 September 13, 1996 U.S. Nuclear Regulatory Commission i

Washington, DC 20555 Attention: Document Control Desk

]

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254, DPR-29, Unit One Enclosed is Licensee Event Report (LER)96-017, Revision 00, for Quad Cities Nuclear Power Station.

This report is submitted in accordance with the requirements of the Code of Federal Regulations, Title 10, Part 50.73(a)(2)(iv). The licensee shall report any event or condition that resulted in manual or automatic actuation of any Engineered Safety Feature.

The following commitments are being made by this letter:

1.

Licensed Operator lesson plans will be revised to ensure the details of the 8/25/96 event and pressure transducer calibration data affecting the EHC system are presented in initial training i

by 12/31/96.

2.

The 0/25/96 event will be presented to Operators and Engineers in retraining by 12/31/96.

3.

QCGF 1-1, Normal Unit Startup, will be revised to ensure the condenser backpressure bypass permissive is satisfied prior to lowering the EHC setpoint into a control range. This revision will be completed by 11/01/96.

4.

The 8/25/96 event will be tailgated with the Training Department by 12/31/96 emphasizing the instructor's responsibility to communicate such discovered information in training materials to ensure thorough and consistent training.

[pO STMGRW68% LWP 9610010155 960913 PDR ADOCK 05000254 S

PDR s i owom ( ompan3

t t

l LWP-96-068 t

September 13, 1996 j

.page 2 j.

i If there are any questions or comments concerning this letter, please i

i refer them'to Charles Peterson, Regulatory Affairs Manager at l

309-654-2241, ext. 3602.

4 i

}

Respectfully, q

i COMMONWEALTH EDISON 3

QU ITIES LEAR POWER STATION l

K Lf W. Pearce Station Manager i

LWP/NC/as t

Enclosure A. B. Beach,-Regional Administrator, Region ~III l

cc:

R. M. Pulsifer, Project Manager, NRR C. Miller, Senior Resident Inspector, Quad Cities R. J. Singer, Mid American Energy Company s

i D. C. Tubbs, Mid American Energy Company l

P. Piet, Licensing,-Comed F. Spangenberg, Regulatory Affairs Manager, Dresden l

4 INPO Records Center i

i i

l I

i I

l i

h STMGRWM96.LWP t

~

i

~

.I