bk.-D/(
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION n-7, rp WASHINGTON, D. C. 20555
\\*****/
i DEC 11 1984 Mr. Thomas Devine, Legal Director Ms. Crystal Dixon, Legal Intern Government Accountability Project 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, DC 20036 TO F01A-84-745
Dear Mr. Devine and Ms. Dixon:
This is in partial response to your letter dated September 13, 1984, in which i
you requested, pursuant to the Freedom of Information Act (F0IA), copies of records relevant to and/or generated in connection with the Office of Inspector i
and Auditor Report on allegations of staff misconduct at Diablo Canyon.
l The Report of Investigation you referenced is available for public inspection and copying at the NRC Public Document Room (PDR) located at 1717 H Street, NW, i
Washington, DC, under accession number 8408310032.
The documents listed on Appendix A are being placed in the PDR, except for document 93 with enclosures which are already in your possession.
Document 1 of Appendix B is a predecisional document that represents staff
~
opinion, the disclosure of which could interfere with future expression of candid opinions by the staff. This document is being withheld from public disclosure pursuant to Exemption (5) of the F0IA (5 U.S.C. 552(b)(5)) and 10 CFR 9.5(a)(5).
Pursuant to 10 CFR 9.15 of the NRC's regulations, it has been determined that i
the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The person responsible for this denial is Ms. Sharon R. Connelly, Director, Office of Inspector and Auditor.
This denial may be appealed to the NRC within 30 days from the receipt of this letter. Any such appeal must be in writing, addressed to the Secretary of the Comission, U.S. Nuclear Regulatory Comission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."
A few additional documents are being reviewed and we will comunicate with you again regarding their disposition.
/p Si ere C506040591 841211 PDR FDIA DEVINE84-745 PDR J. M. Felton, Director Division of Rules and Records.
Office of Administration
Enclosures:
As stated 1
. ~ - -
Re:
F01A-84-745 APPENDIX A 1m
,,o.
NO.
DATE DESCRIPTION PAGES 1.
1/16/84 Memo from Shackleton to Bishop. Sub: Diablo Canyon Power Plant, 1
Information Concerning j
2.
3/2/84 Ltr from GAP to Bishop re: Diablo Canyon 1
j 3.
7/5/84 Ltr from Shellenberger to T. Devine 1
l 4.
4/12/84 Page 5 & 6 0F GAP Letter 2
5..
3/15/84 Western Union Message 1
i 6.
Undated Transcript 4
l 7.
3/19/84 Transcript 1
A11esat Lon No. 344 i
8.
Undated Enclosure to'PG&E let: DCL-84-170 1
9.
5/2/84 PGR ltr to J. Martin 1
1 j
10.
2/11/84
" Problem Description" - Original copy not-legible - A11eger No. 2 1
11, 2/11/84
" Problem Description" - A11eger No. 2 1
1 12.
Undated Problem Statement - Allegation No. 344 1
13.
PG&E Response - Platform As-builts, Unit L 1
f A11eastion No. 345 14.
2/11/84 Problem Description (Original copy not legible) i f
15.
2/11/84 Problem Description 1
f
}
16.
9/16/84 Problem Statement 1
l 4
i
]
17.
Undated Enclosure to PG&E ltr DCtr84-170 2
l 18, 5/2/84 PG&E ltr to J. Martin 1
)
j 19.
Undated PG&E Response 1
i f
20.
4/25/84 GAP ltr to Palladino, etal 2
l 21.
Undeted PG&E' Response 1
I 22.
4/27/84 Bechtel Memorandus No. 049370 1
l 23.
4/27/84 1
j i
L
.M
.. ~..
- ~. - ~. -. -
1 Re: FOIA-84-745 APPENDIX A (CONTINUED) a
~,ITr.ri NO.
Jeo.
DATE DESCRIPTION.
_ PAGES 4
24.
8-12-83 Certificate of Qualification (R. J. Keith) 2 25.,
4-12-84 PG&E Moserandum from R. Keith 1
i 26.
Undated Notification of Hydrotest 1
I 27.
3-15-75 Pield Process Sheet 2
28.
4-10-75 Liquid Penetrant Examinat6on Record 1
29.
6-5-74 Radiographic Inspection Report 1
klegationI!**3$6
""I "
31.
Undated PG&E Response 1
32.
Undated Item Documets (Received 4/12/84) 2 i
33.
5/2/84 PG&E ltr to J. Martin i
I 34.
6/5/84 Problem Statement 1
i 35.
2/11/84 Problem Descriptin 1
1 36.
2/11/84 Problem Description 1
i Allegatiim No. 347 l
37.
Undated PG&E Response i
y i
38.
Undated items with response 1
39.
5/2/84 PG&E ltr to J. Martin l
1 i
40.
2/12/84 Problem Description 1
i 41.
2/12/84 Problem Description y
42.
4/16/84 Problem Statement i
2 I
Allegati m No. 348 43.
Undated Items with Response 44.
5/2/84 PGE ltr to J. Martin y
45, 4/16/84 Problem Statement 1
46.
Undated Problem Description y
47.
4/12/84 Problem Descritpion 1
1 48.
Undated PG&E Response (Rec'd 4/12/84)
)
Re:
F0!A-84-745 APPENDIX A NO.
ITEM NO.
DATE-DESCRIPTIOM PAGES i
A11enatii m No. 349 49.
Undated Items with responses 2
50.
5/2/84 PG&E ltr to J. Martin 1
51.-
4/16/84 Problem Statement I
f 1
l 52.
4/12/84 Problem Description l
53.
4/12/84 Probism Description 1
2 54.
Undated PC&E Response A11enati< m No. 350 55.
Undated Items with responses 3
1 56.
5/2/84 Ltr from PC&E to J. Martin 57.
4/16/84 Problem Statement 1
58.
Undated Problem Descripcion
)
1 l
59, 4/12/84 Problem D.escription
)
60.
Undated PG&E Reaponse (Rec'd 4/12/84) 2 l
1 01 6/22/84 Mailgram to Region V 62.
6/12/84 NRC Inspection of Diablo Canyon Units 1 & 2 10 4
63.
4/13/84 Transcript of April 1984 j
64.
5/3/84 l GAP Petition of May 3, 1984 1
65.
Undated Exhibit 5 of Richard D. Parks 8
66.
3/19/84 Transcript from March 19, 1984 11 67.
GAP 2.206 Petition Supplement of March 23, 1984 1
68.
Undated Transcript of March 19, 1984 g
I 69.
4/11/84 PGE letter to J. Martin
'l 70.
Undeted
. Response to Notice of Violation in NRC Insp Report 50-275/83-37 7
R]: 'F0!A-84-745 APPENDIX-A (CONTINUED)
ITEM NO.
}
NO.
DATE DESCRIPTION PAGES t
71.
4/11/84 PGE letter to J. Martin (84-141) 1 72.
Undated Enclosure to PG&E letter DCL-84-141 7
j 73.
6/18/84 PG&E letter to J. Martin (DCL 84-231) 1 74.
Undated Enclosure to PG&E letter DCL-84-231 7
l 75.
Undated Transcript of March 27, 1984 2
~
76.
Undated Transcript of March 19, 1984 1
77.
Undated Transcript of March 26, 1984 6
78.
Undated Attachment #2 (Affidavit) from GAP 2.206 Petition of 2/2/84 32 79.
3/9/84 Table of Allegations Status (Diablo Canyon) 4 i
{
80.
Undated Transcript of March 27. 1984 2
I 81.
Undated Transcript of March 27, 1984 2
82.
3/15/84 Western Union Message to shellenberger Region V 1
83.
Undated Attachment No. 2 (Af fidavit) from GAP 2.206 Petition of 2/2/84 33 f
84.
Undated GAP Letter (Pages 5 e 6) 2 85.
4/12/84 GAP Letter to NRC 2
i 86.
Undated Transcript of March 19, 1984 2
}
87.
Undated Transcript of March 26, 1984 6
I i
l i
r 1
I i
Re: F01A-84-745 APPENDIX A (Continued)
- 88. 2/6/84 SECY-84-61 Staff Paper to Commission
Subject:
Status Report on Resolution of Allegations and Concerns About Design, Construction and Operation of Diablo Canyon Nuclear Power Plant (12pages) Acc. #8402210404'*
89.
4/16/84 Memo to Messenger and Hayes from Trubatch (1 page) w/ attachments:
a) 4/13/84 CLI-84-5, Memorandum and Order re: Diablo Canyon Nuclear Plant, Unit 1 (35 pages) b) _4/12/84 Letter to NRC Comissioners from Devine (11 pages) c) 4/10/84 Affidavit by Steven Lockert (11 pages) d) 12/18/74 Letter to Runyan from Carosella,
Subject:
Quality Assurance at Diablo Canyon Nuclear Plant Construction Site (1 page) e) 3/23/77 Collection of data sheets, etc. - the M.W. Kellogg Company (25 pages) f) 4/5/77 Memo to Runyan from Engler,
Subject:
Intepretation of Radiographs Previously Interpreted by K. Beck (Pullman Kellogg)
(1page) g) 3/24/77 Collection of data sheets, etc. (18 pages) h) 4/15/77 Letter to Engelken from Crane re: Docket No. 50-275, Unit 1, Diablo Canyon Site (2 pages) i) 8/26/77 Report by PG and E, Failure Analysis of Cracked Field Weld No. 212 Diablo Canyon Unit -1, Steam Generator 1-2 Nozzle-to-PipeWeld(129pages) 90.
5/15/84 Memo to Messenger from Lieberman
Subject:
10 CFR 2.206 Petition Field By Government Accountability Project Concerning Diablo Canyon (142 pages)
- 91. '6/13/84 Letter to Udall from Palladino (23 pages) 92.
7/11/84 Letter to Messenger from Devine (1 page) w/ enclosure a) Affidavit by Thomas Devine (4 pages) 93.
7/ 19/84 Letter to Messenger from Devine.(2 pages) w/ enclosures a) 7/5/84 Letter to Devine from Messenger w/ attachments (10 pages) b) 2/13/84 Memo to Clewett from Kirsch
Subject:
Transmittal of Transcript, Interview Conducted on January 5,1984 (69 pages) c) 1/5/84 Transcript: Interview with NRC Investigators (70 pages) d) Undated Memo to Vollmer from Vin,
Subject:
Comments on SSER License Condition 2.c.(11) Prepared by the Diablo Canyon Piping Peer Review Panel (11 pages) e) 4/4/84 Memo to Commissioners from Messenger
Subject:
0IA Review of A Government Accountability Project Complaint Concerning NRC's Treatment of E. Earl Kent (35 pages)
- Document located in the NRC Public Document Room
Re: FOIA-N-745 i
i APPENDIX A
- 94. 6/4/84 Routing Slip to Smith from Messenger (1 page)
- 95. 6/12/84 Briefing Paper by R.M. Smith - 10 CFR 2.206 Petition vt: Diablo Canyon (2 pages)
- 96. 6/14/84 OIA Case Summary Sheet File No. 84-26 (1 page)
- 97. 7/5/84 Letter to Devine from Messenger w/o enclosures (1 page)
- 98. 7/13/84 Memo to Messenger fmm Smith (referenced Attachment is Appendix A document 92)(1 Page)
{
- 99. 7/16/84 LettertoDevinefromMessenger(1page) l 100. 7/17/84 Conversation Record ('1 page) 101. 7/19/84 Memo to Messenger frem Bowers (1 page) 102. 7/19/84 Note to Smith from Knight w/ attachment: Affidavit of Dr. Mark Hartzman regarding the Joint Intervenors Motion to Augment or in the Altemative, to Reopen The Record l
(except SSER 22) (23 pages) 103. 7/27/84 Memo to Flie from Smith Sihject: Telephonic Contacts With i
Thomas Devine, GAP (3 pages) 104. 7/27/84 Briefing Statement by R.M. Smith re: Diable Canyon 2.2n6 Petition w/ supplement (5 pages) 105. 8/1/84 Memo to IRC Commissioners from Messenger w/ attachment (18pages) 106. 8/1/84 Memo to NRC Commissioners from Messenger subject: Diablo Canyon 2.206 Petition w/o Report of Investigation (2 pages) 107. 8/2/84 Text of Testimony given to NRC Commissioners 8/2/84 (1 page) 108. 8/8/84 Note to Con 6s from Herr (1 page) 109. 8/13/84 Memo to Plaine from Messenger subject: Report of Investigation Entitled "Diablo Canyon 2.206 Petition" (1page) 110. 8/16/84 Memo to Plaine from Messenger subject: Report of Investigation Entitled "Diablo Canyon 2.206 Petition" (1page) 111. 8/31/84 Memo to Martin from Messenger subject: Diablo Canyon j
2.206 Petition (1 page)
F
f' t
l Attachment B 1.
Undated Mulley review of 2.206 Petition.
s e
he: FOIA-N-745 APPENDIX A
- 94. 6/4/84 Routing Slip to Smith frem hssenger (1 page)
- 95. 6/ 12/84 Briefing Paper by R.M. Smith - 10 CFR 2.206 Petition re: Diablo Canyon (2 pays)
- 96. 6/14/84 OIA Case Sunnary Sheet. File No. 84-26 (1 page)
- 97. 7/5/84 Letter to Devine from kssenger w/o enclosures (1 page)
- 98. 7/13/84 Memo to Messenger from Smith (referenced Attachment is Appendix A document 6) (1 page)
- 99. 7/16/84
. Letter to Devine from Messenger (1 page) j 100. 7/17/84 ConversationRecord('1page) 101. 7/19/84 Memo to Messenger from Bowers (1 page) i 102. 7/19/84 Note to Smith from Knight w/ attachment: Affidavit of Dr. Mark Hartzman regarding the Joint Interven6rs Motion to Augment ~ or in the Alternative, to Reopen The Record (except SSER 22) (23 pages) 103. 7/27/8A Memo to File from Smith Sihject: Telephonic Contacts With Thomas Devine, GAP (3 pages) 104. 7/27/84 Briefing Statement by R.M. Smith re: Biablo Canyon 2.206 Petition w/spplement (5 pages) l 105. 8/1/84 Memo to 15tC Commissioners from Messenger w/ attachment (18 pages) 106,8/1/84 Meno to NRC Consissioners from Messenger subject: Diablo Canyon 2.206 Petition w/o Report of Investigation.(2 pages) 107. 8/2/84 Text of Testimony given to NRC Commissioners 8/2/84 (1 page) 108. 8/8/84 Note to Con 6s from Herr (1 page) 109. 8/13/84 Memo to Plaine from Messenger subject: Report of Investigation Entitled "Diablo Canyon 2.206 Petition" (1page) 110. 8/16/84 Memo to Plaine from Messenger subject: Report of-Investigation Entitled "Diablo Canyon 2.206 Petition" (1page) 111. 8/31/84 Memo to Martin from Messenger subject: Diablo Canyon 2.206 Petition (1 page) j
_/
~
~
ROUTING SLIP Harry Maggie
- r
.,/-
u$
Eoklis Ren Eileen
/
.Annh k
Al
() information
(
necessary actlon
() approval / concurrence ( ) correction
() initials / signature
() note'& return
() as requested
( )~see me
() per conversation
() filing
() ACTION ITEM: DATE DUE:
,$,] { -~~ g _Z~ f -] ~~ Q -~
~~
o2 k& &
n&
2.w G Ww
' h De.4 dA.
U
/
M m.
86.
rf>
%~
4 ' M d W. WAmJA $
/,AaA w 4 L w Trom: Georg ger Date;
&# Y i
/u. 4. H-mL s,c.
e
.o 5
/l~,'t
--