Submits Info from 840313 Meeting W/T Devine & J Clewett from Gap & Four Allegers.T Devine Stated Hardware Problems Written Up on Memos Rather than on Nonconformance Repts & Informal Repairs Made at Plant
ML20129B098
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/16/1984
From: Shackleton O
NRC OFFICE OF INVESTIGATIONS (OI)
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20129A429 List:
References
FOIA-84-745 NUDOCS 8506050114
Download: ML20129B098 (1)


Text

m (162ill

]

D'.e1 t !.1 s.1! t, 4,

[,

fJUCIi AR iti GUL AlLRY CO!/.'/!L',89?.

j Of f iCl D

1..'I !.,11'. A l tW;*, 8 it i D O I K t. F: f.i's'. V

',/

1r/, t/.t.sdL 1 Atil; f.Ui11 ML WAt f4U1 LPi t r. C&t sf us:'.tt M:.4

~

March IC. 1984 MEM';RANDUM FOR:

T. W. Bishop, Director, Division of Feactor Safety and Projects T POV.:

0. C. Shackleton Jr., Director 01:RV

SUBJECT:

DI ABLO CAi;YO!. F0'rlER PLANT, I!.FCR!'AT10ti C0i'CERNING From the meeting held by 01 personnel on March 13, 1984 wii.hattorneysTom DEVINE and John CLEWETT from GAP and four allegers, the following infornation s

was received by 01, which I am making available to you for what action you deem necessary.

1.

DEVINE feels that Steve LOCKERT could take RV people through Diablo and point out hardware that needs attention because of hardware problems.

2.

DEVINE stated that some hardware problems are being written up on memos rather than on NCRs.

3.

DEVINE claims informal repairs are being made in the plant.

4.

CLEWETT stated that Pullman Power Products deliberately falsified their response to the 1977 NSC audit.

He said RV eccepted Pullman's response to this audit by just looking at documents and did not interview some of.

the obvious people who could have told them the truth.

c:

chrono Diablo Canyon Misc. Info.

8506050114 841211 PDR FOIA DEVIPE84-745 PDR g- %

u

g GOVERNMENT ACCOUNTABILITY PROJECT Institute for Policy Studies 1901 Que Street.- NW., Washington. D.C. 20009 (202)234 9382 4

March 2, 1984 Mr.1 Thomas Bishop Division Director U.S. N.R.C.

Region'Five 1450 Maria Lane, Ste 210 Walnut Creek California 94596~

Re:

PACIFIC GAS AND ELECTRIC (Diablo Canyon Nuclear Power Plant, Unit 1), Dkt. No. 50-275

Dear Mr. Bishop:

Enclosed with this letter is a copy of a petition filed with'the Commission pursuant to 10 C.F.R. 2.206 on March 1, 1984, together with Attachments 1 through 17 thereto.

Also enclosed for your use, bound separately in this package, are three documents that were not included in the petition filed.on Febru-ary 2, 1984: Exhibit 4 to Attachment 2, and two Discrepancy Reports inadvertently omitted from Attachment 7.

Best wishes in your continuing investigation.

Sincere your,s,

---k'(L

. mg Jo n Clewett

Enclosures:

A/S

.n h ~ ?. :.'..* :

,.d
:g,=

--o wy

GOVERNMENT ACCOUNTABILITY PROJECT Instit'ute for Pohey Studies 1901 Ove Street. N.W.. Washington. D.C. 20009 (202)234 9382 March 2, 1984 Mr. Thomas Bishop Division Director

- U.S. N.R.C.

Region Five

~

1450 Maria Lane, Ste 210 Walnut.. Creek California 94596' Re:

PACIFIC GAS AND ELECTRIC (Diablo Canyon Nuclear Power Plant, Unit 1), Dkt. No. 50-275

Dear Mr. Bishop:

Enclosed with this letter is'a copy of a petition filed with the Commission pursuant to 10 C.F.R. 2.206 on March 1, 1984, together with Attachments 1 through.17 thereto.

-Also. enclosed for your use, bound separately in this package, are -

three documents that were not included in the petition filed on Febru-ary 2,_1984: Exhibit-4 to. Attachment 2, and two Discrepancy Reports inadvertently omitte'd from Attachment 7.

Best wishes in your continuing investigation.

Sincere

yours,

,f

,b mu Jo n Clewett

Enclosures:

A/S m.

b-D i.',5

^