ML20128Q890
| ML20128Q890 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 07/09/1984 |
| From: | Jordan E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Krim R Federal Emergency Management Agency |
| Shared Package | |
| ML20127B321 | List: |
| References | |
| FOIA-85-190 NUDOCS 8507270070 | |
| Download: ML20128Q890 (2) | |
Text
_
- f#"
/j UNITED STATES
( A,kM. ;,
NUCLEAR REGULATORY COMMISSION li i
j WASHINGTON, D. C. 20555 gp v["ff i
g 91984 MEMORANDUM FOR:
Richard W. Krimm, Assistant Associate Director Office of Natural and Technological Hazards Federal Emergency Management Agency FROM:
Edward L. Jordan, Director Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement
SUBJECT:
FEMA REVIEW 0F THE LILCO TRANSITION PLAN FOR SHOREHAM IN SUPPORT OF NRC LICENSING In accordance with the NRC/ FEMA Memorandum of Understanding dated November 1980, we request that FEMA review Revision 4 to the Shoreham Nuclear Power Station Local Offsite Radiological Emergency Response Plan (i.e., the Transition Plan) which was submitted to the NRC by LILCO on June 29, 1984. As noted in the sub-mittal cover letter, Revision 4 responds to comments in the FEMA report dated March 15, 1984, which were developed by the Regional Assistance Coninittee (RAC) as a result of a review of Revision 3 of the LILC0 Transition Plan.
In the June 29, 1984 letter, LILC0 states that copies of Revision 4 have been forwarded under separate cover directly to members of the RAC.
Additional clarifying infor-mation regarding Revision 4 is contained in a letter to the Atomic Safety and
, Licensing Board from the LILC0 counsel dated July 2,1984, copies of which were also sent to the RAC.
For your information, copies of the above-referenced letters are enclosed.
We request that Revisdon 4 of the LILC0 Transition Plan be given the same priority attention by FEMA and the RAC as in previous reviews of the plan. We have expressed our sense of urgency in discussions with members of your staff on July 3 and 5,1984, regarding the need for the plan review to be completed prior to the conclusion of the current hearing on emergency preparedness. Accordingly, we request that FEMA infonn us by July 15, 1984, of the date by which FEMA findings on Revision 4 of the LILCO plan can be provided.
a
. Jordan, Director Divis' n of Emergency Preparedness an E gineering Response Offic of Inspection and Enforcement
Enclosures:
1.
Ltr. fm. LIlqC to Denton dtd. 6/29/44 2.
Ltr. fm. LILC0 counsel to ASLB dtd. 7/2/84 8[507270070850506 cc: See Attached At$[-190
}
CONTACT:
F. Kantor, IE 492-9749
Richard W. Krimm JUL 9 1c84 cc:
S. A. Schwartz, IE C. R. Van Niel, IE J. N. Grace, IE F. Kantor, IE D. B. Matthews, IE J. R. Sears, IE E. S. Christenbury, El.D E. Reis, ELD R. R. Bellamy, RI J. A. Van Vliet, NRR O
e D
-