ML20128Q623

From kanterella
Jump to navigation Jump to search
Further Response to FOIA Request for Documents Re Radiological Emergency Plans for Facility & Correspondence Between NRC & Util Since 840101.Forwards Documents in Apps B & C.Documents Also Available in PDR
ML20128Q623
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 05/06/1985
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Belair R
KIRKPATRICK & LOCKHART
Shared Package
ML20127B321 List:
References
FOIA-85-190, RTR-NUREG-0420, RTR-NUREG-420 NUDOCS 8507270019
Download: ML20128Q623 (6)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

f-es[og y, UNITED STATES p 0l6 Ill o NUCLEAR REGULATORY COMMISSION l WASHINGTON, D. C. 20555 s...../ e Docket No. 50-322 -

ON Robert R. Belair, Esquire i Kirkpatrick & Lockhart i 1900 M Street, NW IN RESPONSE REFER Washington, DC 20036 TO F01A-85-190 .

Dear Mr. Belair:

This is in further response to your letter dated March 19, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), copies of documents related to radiological emergency plans for the Shoreham Nuclear Power Plant since January 1984, and copies of correspondence between NRC and the Long Island Lighting Company since January, 1984.

The documents identified on enclosed Appendix B are being placed in the NRC Public Document Room (PDR) located at 1717 H Street, NW, Washington, DC 20555, in file folder F01A-85-190 in your name. The documents identified on enclosed Appendix C are already available in the PDR. I have indicated the file location beside each document description.

The search for and review of additional documents that are subject to your i request are continuing. We will notify you upon completion of the search and review.

1 1

/

yr f

. M. Felton, Director l- /,</ Division of Rules and Records Office of Administration f

Enclosures:

As stated )

I l

l g720g9850506 0

BELAIR85-190 pga u .

., l Re: F01A-85-190 APPENDIX B Documents Being Placed in the PDR

1. 03/29/85 Memo to Richard Krimm from Edward Jordan Re: LILC0 Shoreham Prompt Notification System Design Report w/ enclosure Ltr.

from J. Leonard to H. Denton dtd. 4/21/85 (4 pages)

2. 03/27/85 News Article Re: Reports Show U.S. Role in Dispute at Shoreham (1 page)
3. 03/15/85 Memo to Richard Krimm from Edward Jordan Re: Shoreham Exercise w/ enclosures Ltr. from J. Leonard to H. Denton dtd. 2/8/85, i

Ltr. from J. Leonard to H. Denton dtd. 2/22/85 and LILC0 l Shoreham/LER0 Plan (40 pages)

4. 02/28/85 Insert for the Record Subcommittee on Energy and the l l Environment (1 page) I l

! 5. 02/26/85 Letter to Alan Simpson from Nunzio Palladino Re: Authority to l Implement Emergency Plans for Nuclear Power Plants (4 pages)

6. 02/08/85 Memo to Richard Krimm from Edward Jordan Re: LILC0 Response to FEMA Findings on Shoreham Transition Plan w/ enclosures Ltr.

dtd.1/16/85 from J. Leonard to H. Denton and Sumary of Responses to Consolidated RAC Review of LILC0 Transition Plan Rev. 4 for Shoreham Items Graded Inadequate (24 pages)

7. 02/04/85 Letter to John Gallagher from William Dircks Re: Source Term Data w/ enclosure Ltr. dtd. 1/4/85 to William Dircks (3 pages)
8. 01/30/85 Memo to Albert Schwencer from David Matthers Re: LILC0 Request for Shoreham Exercise w/ enclosures Memo to R. Krimm from E. Jordan dtd. 12/19/84, Ltr. to Governor Cuomo from W. Dircks dtd. 1/11/85 and Ltr. to J. Gallaaher from W Dircks dtd.1/11/85 (16 pages)
9. 01/24/85 Memo to Chairman Palladino from William Dircks Re: Scheduling of Emergency Plan Exercise for Shoreham w/ enclosures Memo to R. Krimm from E. Jordan dtd. 12/19/84, Ltr. to Governor Cuomo from W. Dircks dtd.1/11/85 and Ltr. to J. Gallaher from W. Dircks dtd. 1/11/85 (12 pages)
10. 01/23/85 Memo to Richard Krimm from Edward Jordan Re: Shoreham Exercise w/ enclosures Ltr. to Governor Cuomo from W. Dircks dtd. 1/11/85 and Ltr. to J. Gallagher from W. Dircks dtd. 1/11/85 (5 pages)
11. 01/16/85 Memo to William Dircks from Nunzio Palladino Re: Scheduling  ;

of Emergency Plan Drill for Shoreham w/ attachment Newspaper )

Article Re: Another Snag and Correspondence Control to Dircks from Chairman Palladino (3 pages)

12. 01/11/85 Letter to John Gallagher from William Dircks Re: Emergency 1 Preparedness Exercise Planned by LILC0 (2 pages)
13. 01/11/85 Letter to Mario Cuomo from William Dircks Re: Emergency Preparedness Exercise Planned by LILC0 (2 pages)
14. 12/19/84 Memo to Richard Krimm from Edward Jordan Re: Shoreham Exercise I

w/ enclosures Ltr. from J. Leonard to H. Denton dtd. 11/14/84, Ltr. from Governor Cuomo to H. Denton, dtd 11/29/84 and Ltr.

from John Gallagher to H. Denton dtd. 11/28/84 (10 pages)

15. 12/07/84 Letter to Nunzio Palladino from Norman Lent Re: Procedures for the Licensing of Shoreham Nuclear Power Station (2 pages)
16. 12/03/84 Letter to Nunzio Palladino from William Carney Re: Shoreham Nuclear Power Plant Licensing Process w/ enclosures Ltd. to William Carney from Donald Hodel dtd. 10/2/84 and Ltr. to Bill from Ronald Reagan dtd. 10/11/84 (4 pages)
17. 12/03/84 Letter to Nunzio Palladino from Robert Mrazek Re: Shorehan Nuclear Power Station (1 page) l
18. 12/01/84 Letter to Nunzio Palladino from Thomas Downey Re: LILC0 License (1 page)
19. 11/30/84 Routing Slip to Dave Re: Participation in Shoreham Exercise (1page)
20. 11/28/84 Letter to Harold Denton from John Gallagher Re: FEMA Materials w/ enclosure Ltr. to Bill from Ronald Reagan dtd. 10/11/84 (2 pages)
21. 11/20/84 Letter to Samuel Speck from Stewart Glass Re: Exercise Objectives for Emergency Plan Exercise Shoreham Nuclear Power Station w/ enclosures Ltr. dtd. 11/14/84 to Harold Denton and LILC0 Shoreham/LER0 Plan (13 pages)
22. 11/19/84 Mero to Darrell Eisenhut from Edward Jordan Re: FEftA Review of Revision 4 of the LILC0 Transition Plan for Shoreham (1 page)
23. 10/31/84 Letter to Nunzio Palladino from Alan Simpson Re: Emergency Preparedness (2 pages) i

Re: F01A-85-190

24. 10/30/84 Memo to Richard Krim from Edward Jordan Re: Correspondence Related to Offsite Emergency Planning at Shoreham w/ enclosures Ltr. to R. DeYoung from J. Carpenter dtd 10/4/84, Ltr. to N. Palladino from J. Carpenter dtd 8/22/84, Ltr. to N. Palladino from J. Carpenter dtd 4/12/84 and Ltr. to J. Carpenter from R. DeYoung dtd. 10/30/84 (19 pages)
25. 10/09/84 Letter to Mark Hatfield from William Dircks Re: Licensing of Shoreham Nuclear Power Plant (1 page)
26. 09/24/84 Letter to Joseph Carpenter from Richard DeYoung Re: Emergency l i

Preparedness for Shoreham (1 page)

27. 07/23/84 Memo to Darrell Eisenhut from Edward Jordan Re: FEIM Review of Revision 4 of the LILC0 Transition Plan for Shoreham (1 page)
28. 07/09/84 Memo to Richard Krim from Edward Jordan Re: FEMA Review of

, the LILC0 Transition Plan for Shoreham in Support of NRC Licensing w/ enclosures Ltr. from LILC0 to Denton dtd 6/29/84 and Ltr. from LILC0 Counsel to ASLB dtd. 7/2/84 (9 pages)

29. 05/14/84 Routing Slip to Van Neil Re: LILC0 (1 page)
30. 05/04/84 Memo to Richard Udell from American Law Division Re: Whether the DOE or FEMA Has Authority Under Existing Law to Conduct

]

Command and Control Activities in the Event of a Civilian i Nuclear Powerplant Emergency (6 pages) l 31. 05/01/84 Transmittal Request to Dave Matthews from L. Husman w/ enclosure Question and Answer Re: Emergency Preparedness (2 pages)

32. 04/18/84 Memo Slip to ELJ from Wilkerson Re
LILC0 w/ enclosure Draft for Meeting Notice (2 pages)
33. 04/17/84 Memo to Albert Schwencer from David Matthews Re: Supplement to SER for Shoreham w/ enclosure EP Input for Shoreham SER (10 pages)
34. 03/29/84 Memo to Albert Schwencer from Frank Pagano Re: FEMA Findings on LILC0 Transition Plan for Shoreham w/ enclosures FEf% letter dtd. 3/15/84 and Draft Transmittal Letter (6 pages)
35. 03/28/84 Route Slip to Pagano and Matthews Re: Shoreham (1 page)
36. 03/23/84 Handwritten Notes Re: Sumary Report on FEMA Evaluation of LILCO Plan (3 pages)
37. 03/24/84 News Article Re: U.S. Standing Back of Shoreham w/ enclosures Memo to Morris Udall from Edward Markey Re: Emergency Preparedness and Last Resort Federal Response (11 pages)

I-e . .

Re: FOIA-85-190

38. 02/24/84 Memo to E. Christenbury from Sheldon Schwartz Re: FEMA Review of Offsite Emergency Plan for Shoreham w/ enclosure Ltr. dtd. 2/1/84 to Christenbury from S. Schwartz (2 pages)
39. 01/03/84 Note to James Taylor from Edward Jordan Re: Request for Briefing Paper w/ attachment Response to Topic 7 (3 pages)
40. Undated Memo to Darrell Eisenhut from Edward Jordan Re: Low-Power License for Shoreham (1 page)

?

l l

Re: F01A-85-190 APPENDIX C Documents Already in the PDR

1. 11/28/84 Letter from A. Schwencer to John D. Leonard,

Subject:

FEMA Findings on LILC0 Transition Plan for Shoreham.

Acc. No. 8412060533

2. 07/13/84 Letter from Palladino to Markey Re: Response to letters on Shoreham proceeding. Acc. No. 8407170564 3.- 06/01/84 Letter from W. Dircks to Samuel Speck re: Response to 4/26/84 letter on offsite emergency preparedness at Shoreham.

Acc. No. 8406080287

4. 05/10/84 Letter from Cong. Markey to Palladino re: Responses to letters on the Shoreham licensing proceedings. Acc. No. 8407310213
5. 05/04/84 Letter from Cong. Markey to Palladino re: Contacts with DOE and FEMA. Acc. No. 8407310205
6. 04/30/84 Letter from Cong. Mrazek from Palladino re: Response to 4/27/84 letter on the Shoreham licensing proceedings.

Acc. No. 8405040032

7. 04/26/84 Letter from Palladino to Cong. Markey re: Request for meeting transcript of 4/23 meeting on Shoreham. Acc. No. 8405140594
8. 04/24/84 Letter from Cong. Markey to Palladino re: Shoreham licensing proceeding. Acc. No. 8407310196
9. 04/23/84 Letter from Palladino to Cong Markey re: Response to 4/12/84 letter. Acc. No. 8404240240
10. 04/12/84 Letter from Cong. Markey to Palladino re: Shoreham licensing proceeding. Acc. No. 8404240247
11. 03/28/84 Letter from Cong. Markey to Palladino re: Shoreham licensing proceeding. Acc. No. 8412070460 L

.-. q

. e

. KIRKPATRICK & LOCKHART 1900 M STREET. N.W.

WASHINGTON, D.C. 200M ONE aostow Ptact sosrow.uAouas 7:unos aen maa em msa0 1428 BRicIn1 ANTNUE TEuoOPER QCD 4524052 bCAM: FL 33131 0 05: 374 4112 March 19, 1985 n ga m PITT58URCH, PA 15222 WRITER 1 DIRECT DIAL NUMBEA (412) M54500 (202) 452-7023 FREED 0v 0F NCPN. . .O n

60. flr.QUf,SL fora-05#0 HAND DELIVER Q' 7I bb Director, Office of Administration U.S. Nuclear Regulatory Commission 1717 H Street, N.W.

Washington, D.C. 20555 Re: Freedom of Information Act Request

Dear Sir:

On behalf of our client, Suffolk County, we request, pursu-ant to the Freedom of Information Act, as amended, 5 U.S.C. S 552, ("FOIA") and the rules of the Nuclear Regulatory Commission

(" Commission") issued thereunder, 10 C.F.R. Part 9, copies of all written materials which are dated January 2, 1984 or later, or, if undated, which were created after January 1, 1984 in the pos-session or control of the Commission relating to radiological emergency planning and preparedness concerning the Shoreham Nuclear Power Plant in Suffolk County, New York, except for those materials which have been served on all the parties in the Shoreham proceeding (Docket No. 50-322-OL).

Without limiting the scope of this request, but merely to assist the Commission in its search, the written materials that we are requesting may include the following:

1. All materials since January 1984 concerning the imple-mentation by the Long Island Lighting Company of radiological erergency plans for the Shoreham Nuclear Power Plant.
2. All materials since January 1984 re: implementation by the Federal Government, or any Federal departments, agencies, instrumentalities, or contractors, of radiological plans for the Shoreham Nuclear Power Plant.

D Ct>9 b (d k a

9

~

~

KIRKPATRICK & LOCKHART Director, Office of Administration March-19, 1985 Page.2 l

3. All materials since January 1984 concerning an exercise of radiological emergency plans for the Shoreham Nuclear Power Plant, including materials related to participation by or obser-vation of such an exercise by any Federal department, agency, instrumentality, or contractor.

In addition, we request copies of all correspondence, memo-randa and any other written materials between the Commission and the Long Island Lighting Company and/or its employees, agents or I representatives, occurring after January 1, 1984.

In the event that access is denied to any part of the requested materials, please supply the following information:

a. Identify the withheld or deleted material and specify your reasons for believing that an exemption applies, as required by 10 C.F.R. @

9.10(b).

b. Segregate the nonexempt from the allegedly exempt portions of all materials and release the former, as required by 10 C.F.R. 6 9.10(a).
c. Supply a detailed statement of the content of the withheld or deleted material, along with the date on which the material was written; its section heading or title; its author; the author's title, and an identification of any persons or entities who have received copies of such material, as required by applicable case law. Vaughn v. Rosen, 484 F.2d 820, 826-827 (D.C. Cir. 1973).
d. Separately state your reason (s) for not invok-ing your discretionary power to release the allegedly exempt materials.

The undersigned is willing to inspect the requested material prior to its reproduction in order to identify specific material for reproduction.

The undersigned will pay charges for search time and copying fees, as provided by Commission regulations, 10 C.F.R. S 9.14.

If search and copying fees to be incurred by the undersigned will exceed $100.00, please notify the undersigned before this sum is exceeded.

. A KIRKPATRICK & LOCKHART Director, Office of Administration March 19, 1985 Page 3 We expect to receive your response to this FOIA request within ten (10) working days of your receipt of this request, as required under the FOIA and as set out at 10 C.F.R. 9.8(c).

Sincerely, i O -

Robert R. Belair