ML20127B910

From kanterella
Jump to navigation Jump to search
Forwards FEMA 840711 Response to NRC Request for Evaluation of Rev 4 to Offsite Radiological Emergency Response Plan. FEMA Will Provide Review Findings by 841115
ML20127B910
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/23/1984
From: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20127B321 List:
References
FOIA-85-190 NUDOCS 8407300103
Download: ML20127B910 (1)


Text

. _ - _ _ _ _ - _ _ -

=

u

]. 5

/ /,s.n Kec , o, UNITED STATES l' 3 y f  % NUCLEAR REGULATORY COMMISSION 3  !

$c .E WASHINGTON, D. C. 20555 j

\ ..v(/ ...

I JUL 2 31984 MEMORANDUM FOR: Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation FROM: Edward L. Jordan, Director Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement

SUBJECT:

FEMA REVIEW OF REVISION 4 0F THE LILCO l TRANSITION PLAN FOR SHOREHAM In response to a formal request from the NRC that the Federal Emergency Manage-l ment Agency (FEMA) conduct a review of Revision 4 to the Shoreham Nuclear Power

! Station Local Offsite Radiological Emergency Response Plan (i.e., the Transi-tion Plan), FEMA provided the enclosed response dated July 11, 1984 This response is being forwarded for your information.

As noted in the enclosure, FEMA intends to provide findings on Revision 4 of the LILCO Transition Plan on November 15, 1984 We have informed the Atomic Safety and Licensing Board Panel of this date in the course of preparing the quarterly Simpson report on the status of offsite emergency preparedness. The i Panel has advised us that a decision on offsite emergency planning issues for Shoreham is not expected before January 1985 and that the possibility of a licensing impact resulting from emergency planning issues will be reassessed as the schedule for hearing on issues other than ecergency planning becomes more definite.

m war n, Director Divisi of Emergency Preparedness and gineering Response Office of Inspection and Enforcement cc: S. A. Schwartz, IE J. N. Grace, IE T. E. Murley, RI B. P. Cotter, ASLBP T. Rehm, ED0 E. S. Christenbury, ELD E. J. Reis, ELD D. B. Matthews, IE C. R. Van Niel, IE F. Kantor, IE J. R. Sears, IE A. Schwencer, NRR R. R. Bellamy, RI R. Caruso, NRR

Enclosure:

As stated 1 64Q734dM63 LP M M

. _ _ _ _ _ _ _ _ _ _ .