APPENDIX 8 U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report:
50-458/91-09 Operating License:
NPF-47 Occket:
50-458 Licensee:
Gulf States Utilities (GSU)
P.O. Box 22C St. Francisville, Louisiana 70775 Facility Name:
River Bend Station (RBS)
Insoection At:
RBS, St. Francisville, Louisiana Inspection Conoucted:
February 25-26, 1991
,
/
/
Insoectors:
$
bqhS e tdN
' -4/
--
R. A. Calaweil, Security inspec:O r,.', a c i e a r Jate
~
Materials anc Safeguarcs Insoection Sec:10n
,
i
m
~
N./--l Udahi,.4/f.
.n
- 'e
% A. 3. darnest, security Inspec:Or, Nuc!sar Cate
,,
Materials anc Safeguarcs Inscection Section
.
Accrovea:
, Mw U$iN
.
..
Charles L. Cain, Chief, Nuclear Mater ais anc Cate Safeguards Inspection Section Insoection Summary Insoection Conducted February 25-26. 1991 (Recor: 50-458/91-09)
Areas Insoected:
Routine, unannouncea inspection of :ne licensee's ::nysical security program. The areas inspected within tne pnysical security program included management effectiveness security program, reports and recorcs, assessment aids, and protected area detection aids.
Results: Within the areas inspected, one violation ana one noncitea violation were identified.
At the time of this inspection, RBS haa reaucec the size of :ne security organization.
The inspectors, witn licensee assistance, evaluated licensee
ENCLOSURE CONTAINS Ph Ik 7 910415 SAFEGUARDS INFORMATIGy G
05000459 i
UPON S:PARATION THIS s-PDR
PACC IS DCCONTnctIFn
-
.,
_
_ _ _ _ _
.. _. _ _. _ _ _... _ _ _ _ _... _. _. _ _... _. _
- _ - _. _.. - - _
_ _ _ _ _.. _. _. _ -
V
.
-
.
-2-ability to provide adequate countermeasures for certain contingencies with a smaller security force each shift.
,
The inspectors determined that licensee security management had recucea the size of the security organization without first changing the security program to provide for a smaller security force.
The licensee failed to recesign :ne protection system so that it was capable of meeting certain safeguard contitaency countermeasures with the reduced security cersonnel available eacn shift.
- Since the licensee had not reaefined the protective enveloce as recuirea witn i
fewer security officers, the capaoility to train security personnel in execution of the reaefinea protective envelope was not :ossiole.
For approximately 2 months, this inaction significantly recucea :ne effectiveness
,
of :ne security organization to meet certaid contingencies snould tne contingency reaction have teen recuired.
,
also, an isolatea Severity Level V violation was identifiea f:r failing to maintain control of a visitor. This violation is describec in caragraon 7 anc is not ceing citea because tne criteria of Section V.A of NRC's Enforcement j
Policy nave ceen met.