Lists Outstanding Items from Drl Rept on facility,691124, Including Review of Plant Procedures Not Complete,Ts Not Finished,Final Stack Emission Limit Not Developed & Emergency Plan Needs to Be Developed for Incident
ML20128F370
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/08/1969
From: Hard J
US ATOMIC ENERGY COMMISSION (AEC)
To: Stratton W
Advisory Committee on Reactor Safeguards
Shared Package
ML20125A422 List:
References
FOIA-92-198 NUDOCS 9212080320
Download: ML20128F370 (2)


Text

-..

t 01f o

A i

Deseder 4,1M9 W. R. Stratten, Chairmen Milletsee 1 subsammittse OUT1TAMBias ITEMB Ftott BEL REFGRT ON MIL 141cm #L, luoyamma 24, 1969 Face 1 Review of plant pr-i w is met eemplete. The Technisal speettisatione are met finished.

Page it - The final steek emission ilmit is not developed.

Page 13 - An emergemey pies needs to be developed for em lasident ta-volving contaminatten of amarby reservetro.

Page 14 - The design fleed level genettaa neede reeelettom.

Page 19 - The Neumark Report bee met yet been provided to the ACR$.

Fase 14 - An appropriate tampestiam program for eartain areas se the remeter vessel needed to be developed.

t Fase 25 - Certata sotamie analyses were still betag made by the staff eeteste design aeneuttant.

Page 29 - Lesation of the strong motion estamegraph was not specified.

Fage 30 - Setante design ef Class I piping eyetone is at111 betag dLa-cassed.

L Fase 34 - The reaeter building leakage test program to set establiebed.

Fase 39 - 3peraties of eartata amargemey equipaset at temperaturne higher them desism temperature had not been reeelved.

Fase 44 - The NFS5 geesties is discussed here.

Page 33 - A single failure problem in the seatatammet spray leep is maroselved.

Page 56 - A stacle failure problem La the safety / relief valve ammeseister has met been serrested.

FIIR t M111stona 1 project file oma,...sc as...........

--fy JE!!a r* **

su 12/8/69 om,.

snn Arc.sa ts.om

..-u

--m g-u s.on.u,,

.n.. m a.-+,. m 9212000320 920611 PDR FOIA LAWRENC92-198 PDR u y j!

i 4

o W. R. Stratten DesenM r 8, 1969 l

Fass 37 - Cartata lastrumentaties testing procedures have met besa reviewed.

i I

Fass 54 - lastromsstatten la the standby 6as treatment system most be redesigned.

Pass 59 - Mens informaties is to be admitted es the definities of single sempement failures.

Page 68 - The Lasta11 sties of the turbine oestrel valve fast sleevre 1

sensero is seasidered enasseptable.

s Page 63 - The design dess not completely satisfy the requiremsate of Gac 39.

Page 67 - The FSAR one feend to be Lasemplete la esepe stase it did not tastede certata vital class 1 erstems.

Fase 73 - The feel storage fasility design may regelre addittensi safety messeres.

Faen 84 - Pre-operettamat and startup test prosederes = ore met prepared mer reviewed. stallarly, the plant aerunt operating preceduree have met boom prepared.

I semetode, hosed se the resette of the sita. visit and the insampleteness of the Regulatory staf f review, that it may be preestwee for the committee to revise this projest.

Original Signed by J. E. liard J. E. Bard.

Senter 8tsif Asalatant omer >