t 01f o
A i
Deseder 4,1M9 W. R. Stratten, Chairmen Milletsee 1 subsammittse OUT1TAMBias ITEMB Ftott BEL REFGRT ON MIL 141cm #L, luoyamma 24, 1969 Face 1 Review of plant pr-i w is met eemplete. The Technisal speettisatione are met finished.
Page it - The final steek emission ilmit is not developed.
Page 13 - An emergemey pies needs to be developed for em lasident ta-volving contaminatten of amarby reservetro.
Page 14 - The design fleed level genettaa neede reeelettom.
Page 19 - The Neumark Report bee met yet been provided to the ACR$.
Fase 14 - An appropriate tampestiam program for eartain areas se the remeter vessel needed to be developed.
t Fase 25 - Certata sotamie analyses were still betag made by the staff eeteste design aeneuttant.
Page 29 - Lesation of the strong motion estamegraph was not specified.
Fage 30 - Setante design ef Class I piping eyetone is at111 betag dLa-cassed.
L Fase 34 - The reaeter building leakage test program to set establiebed.
Fase 39 - 3peraties of eartata amargemey equipaset at temperaturne higher them desism temperature had not been reeelved.
Fase 44 - The NFS5 geesties is discussed here.
Page 33 - A single failure problem in the seatatammet spray leep is maroselved.
Page 56 - A stacle failure problem La the safety / relief valve ammeseister has met been serrested.
FIIR t M111stona 1 project file oma,...sc as...........
--fy JE!!a r* **
su 12/8/69 om,.
snn Arc.sa ts.om
..-u
--m g-u s.on.u,,
.n.. m a.-+,. m 9212000320 920611 PDR FOIA LAWRENC92-198 PDR u y j!
i 4
o W. R. Stratten DesenM r 8, 1969 l
Fass 37 - Cartata lastrumentaties testing procedures have met besa reviewed.
i I
Fass 54 - lastromsstatten la the standby 6as treatment system most be redesigned.
Pass 59 - Mens informaties is to be admitted es the definities of single sempement failures.
Page 68 - The Lasta11 sties of the turbine oestrel valve fast sleevre 1
sensero is seasidered enasseptable.
s Page 63 - The design dess not completely satisfy the requiremsate of Gac 39.
Page 67 - The FSAR one feend to be Lasemplete la esepe stase it did not tastede certata vital class 1 erstems.
Fase 73 - The feel storage fasility design may regelre addittensi safety messeres.
Faen 84 - Pre-operettamat and startup test prosederes = ore met prepared mer reviewed. stallarly, the plant aerunt operating preceduree have met boom prepared.
I semetode, hosed se the resette of the sita. visit and the insampleteness of the Regulatory staf f review, that it may be preestwee for the committee to revise this projest.
Original Signed by J. E. liard J. E. Bard.
Senter 8tsif Asalatant omer >
sumur>