Text
..
031 8ttMEEEEEE December 29, 1969 Members of Milletone 1 Subcommittee STATUS REPORT FOR JANUARY 7,1970 MEETING The attached report is for your use in preparing for the subcommittee meeting.
W OriF c'l Y#
i J.E.1"*
J. I. Hard Senior staff Assistant Attachment Milletone 1 Status Raport, dated 12/29/69 Addressees:
W. R. Stratten H. M. Hill H. C. Mangelederf W. J. Kaufama FILE: Millstone 1 project file omes >...hCES A
SURNAME >
...... m.h. _,w.
jf
- f. [
12/29/69 om >
qs
,_,m.........
9212000346 920611
JEH cab g
~
12/29/69' Pro tect: Millstone 1 Status.
POL Review Qhronoloavi May 19, 1964, CP Iseued Mersk-20, 1968 FSAR Received November 20, 1949, Subcommittee site Visit June 17, 1970, schabled Fuel Leading Date Discussion: At the time of the site visit, there were many unresolved arene between Staff and Applicant (See J. E. Hard memo dated 12/8/69).
since the site visit, the staff and Applicant have met several times, the Applicant has submitted Aaseenents 20, 21. and 22, and the staff has provided a supplemental tapert dated Decador 24, 1969. As of this date, the following areas of significance. La the DEL reporte seem to be incomplete er not resolved:
DEL Rasert of November 24. 1969 Page 12 - N final stac!: emission rate limit is not established.
Fase 13 - Aa emergency plan needs to be developed for the insident involving eestaminattee of anarby reservoirs.
Pages 39 6 40 and pass 5 et supplemental Report - This refers to-the
- - emergency heat removal and MPSE requiremsats. The Staff-will require both loops to be in operatime. N Applicant has not agreed to this.
Fase 54 and page 6 of Supplemental Report - Instrumentation in the standby gas treatment system must be redesigned.
Page 60 - N installation of the turbine centrol valve fast closure sensors is considered unacceptable.
I Fage 67 - h FRA1 was found to be incomplete in scope sinse it did not include so.rtain vital Class I systems (Standby Gas Treat-meat, Containment Isolation, tuergoney Electria Feuer).
DSI. J manlamental BaanILaiBeammhar_L.1149 Page S = h ICC8 Low Pressure Auto Relief Interlock is single-failure prose.
Amanda for January 7 Mastian Iseest19e seasten 8:30 AM Regulatory Staff 9:00 AM
=
Meet with Appliaant 9: 30 AM omer >
(9.timmed,),,,,,,
SOENAME>
..~
L
C 7.,
i
-l M111stees 1 Status Report December 29, 1969 j
The following areas have been identified for discussion:
- 1) Post-accident hydrogen Senoration (Brief presentation requested).
- 2) Emergency heat removal system NPSR questies (Brief presen-taties requested).
- 3) Frimary system instrument lines.
- 4) MSL isolation valve performanee -- Applicent abou14 be pre-pared to discusa possible thanese which might be made if valve leakase becomes a problem.
- 5) feehaical Soocifications -- Current status.
- 6) Fleed level questien (For Staff only).
- 7) Cemetrustian status -- Persentage templeted in various areas.
- 8) Rasrgency plane.
- 9) In-servise inopoetion plane.
s
- 10) Stack activity limite.
- 11) Instrumentation -- Separaties, diversity, etc.
e e e omet >
l l
sumar >
=
e4n >
..... k,.
h..........................
FDrin AW'.31 A (Rev. S41) u s em*=t=T ewmmg orFKI %-O 214 52.
i
p 03Y wm hv n1 v
o u u n r.1 ms g _
Jell:emb 1/6/70 Froject:
H111 stone 1 Status PGL Review Chronology:
May 19, 1966, CF Issued March 20, 1968, FSAR Received N w omber 20, 1969, Subcomunittee Site Visit January 7, li/0, subcommittee Meeting June 17, 1970, scheduled Fuel Loading Date Discus sion:
At the time of the site visit, there were many unresolved areas between Staff and Applicant. Since the site visit, the Staf f and Applicant have met several times, the Applicant has submitted Amendments 20, 21, and 22, and the Staf f hos provided 4 Supplemental Esport dated December 24, 1969.
The following areas were identified for discussion during the January 7 Subcomunittee meeting:
- 1) Post-aecident hydrossa generation (Brief presentation requested).
- 2) Emergency heat removal system NP$R questies (Brief presen-tation raquestad).
- 3) Frimary system instrument 11ase.
- 6) HEL Laolation valve performance -- Applicant eheutd be pre-pared to discuss possible changes which might be mede if 7
valve 1erkape becomes a problem.
- 5) Technical Specifications -- Current status.
i
- 6) Flood level question (For Staff only).
- 7) Construation status -- Forcentage completed in various areas.
- 8) Eme rgency plans.
9)
In-service inspection plans.
10)
Stack activity limits.
11)
Instrumentation -- separation, diversity, etc.
1 FILE:
Millstone 1 project file I
c,,,a,
m.
f aEiiara:emb so _,.
m
. h.v m e
..... q g.
1/7/6 70 awr 4
g=
hI hr O
g gg % pk,gi g fg
]g-i j$
i
_ - - - - - - - - - - - -