MONTHYEARML20211D1321999-08-20020 August 1999 Application for Amend to License DPR-50 to Revise TS Bases Re Degraded Undervoltage Relay Setpoint Calibration Frequency & Degraded Voltage Relay Tolerance Rev ML20210J0941999-07-29029 July 1999 Suppl TS Change Request 274 to License DPR-50,revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance Tss,As Result of NRC Generic Concerns Re CR Habitability Issues ML20196K5901999-06-29029 June 1999 LAR 285 for License DPR-50,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls Can Continue to Be Moved ML20209C0551999-06-29029 June 1999 LAR 77 for License DPR-73,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matl May Continue to Be Moved ML20195E3341999-06-0404 June 1999 TS Change Request 265 to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20209B5891999-05-26026 May 1999 LAR 281 to License DPR-50,revising TMI-1 UFSAR Chapters 5 & 14 to Permit Use of Conservative Deterministic Failure Margin Methodology for Seismic Analysis of Portions of Auxiliary Steam Line.Rept 240046-R-001 Encl.Rept Withheld ML20206R1111999-05-13013 May 1999 Application for Amend to License DPR-50,requesting That License Sections 2.a.(3) & 2.c.(7) & TS Section 3.1.1 Be Revised to Incorporate Administrative Updating & Changes to Bases Statement ML20205H0691999-04-0101 April 1999 TS Change Request 262 to License DPR-50,revising TS by Adding LCO Action Statements & Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20203B0421999-02-0202 February 1999 TS Change Request 274 to License DPR-50,expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems ML20196G4401998-12-0303 December 1998 LAR 278 to License DPR-50,requesting Consent to Transfer & Authorize Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License.Supporting Documentation,Encl ML20196H9751998-12-0303 December 1998 LAR 279 to License DPR-50,reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196G7671998-11-25025 November 1998 TS Change Request 277 to License DPR-50,changing Surveillance Specs for OTSG ISIs for TMI-1 Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only ML20154Q6201998-10-19019 October 1998 TS Change Request 248 to License DPR-50,adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18, Remote Shutdown Sys ML20154P8441998-10-19019 October 1998 Application for Amend to License DPR-50,providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage.Proprietary & non- Proprietary Calculation,Encl.Proprietary Info Withheld ML20154M3691998-10-15015 October 1998 Application for Amend to License Amend Request 276 to License DPR-50 Revising UFSAR Chapter 14 Accident Analysis Atmospheric Dispersion Factors.Ufsar Revised Pages Encl ML20249B2391998-06-11011 June 1998 TS Change Request 273 to License DPR-50,incorporating Alternate High Radiation Area Control Consistent W/Reg Guide 8.38 ML20217E5131998-03-23023 March 1998 Application for Amend to License DPR-50,revising TS Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 Efpy.Request Also Submitted in Response to NRC ML20217G0161997-10-0303 October 1997 Suppl to License Amend Request 268 to License DPR-50, Replacing Pages 4-80 & 4-81 Previously Submitted w/TMI-1 License Amend Request 268 on 970812 ML20211C3211997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re License Amend Request 269 Submitted on 970814.Suppl Includes Addl Change to TS Section 3.1.4 & Proposed Page Rev Clarifying That UFSAR Analysis Is More Conservative ML20211C2221997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re TS Change Request 266.Supplement Provides for Phased Review & Issuance of License Amends & Involves Administrative Correction to TS Decay Heat Removal Sys Leakage Rate ML20210J9951997-08-14014 August 1997 Revised License Amend Request 269 for License DPR-50, Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J3981997-08-12012 August 1997 Tech Spec Change Request 268 for License DPR-50,revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operations ML20198E7871997-07-30030 July 1997 TS Change Request 266 to License DPR-50,incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 ML20141E1311997-05-0808 May 1997 Application for Amend to License DPR-50,consisting of Change Request 264,incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2351997-04-21021 April 1997 Application for Amend to License DPR-50,requesting Rev to TS 3.3 Re Emergency Core Cooling,Reactor Bldg Emergency Cooling & Reactor Bldg Spray Systems ML20134M1111997-02-0707 February 1997 Application for Amend to License DPR-50,incorporating Certain Improvements from Revised STS for B&W Plants, NUREG-1430 & Addl Changes as Described in Encl TS ML20133D2651996-12-24024 December 1996 Application for Amend to License DPR-50,requesting Reinstatement of Auxiliary & Fuel Handling Bldg Ventilation Sys TS ML20132F3221996-12-16016 December 1996 Application for Amend to License DPR-50,consisting of Change Request 260,reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135C5201996-12-0202 December 1996 TS Change Request (Tscr) 75 to License DPR-73,relocating Audit Frequency Requirements to Pdms QA Plan ML20117H0181996-08-29029 August 1996 Application for Amend to License DPR-50,consisting of TS Change Request 257,incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1901996-06-28028 June 1996 Application for Amend to License DPR-50,consisting of Change Request 259,allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8751996-05-24024 May 1996 Errata to Application for Amend to License DPR-50,consisting of TS Change Request 243,replacing Pages for App a ML20101R1361996-04-10010 April 1996 Application for Amend to License DPR-50,consisting of Change Request 243,revising Addl Group of Surveillances in Which Justification Has Been Completed Following Receipt of 930623 Application ML20100J6831996-02-22022 February 1996 Application for Amend to License DPR-50,consisting of Change Request 254,revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Station Battery Cell Parameters Not Met ML20095J2261995-12-21021 December 1995 Revised TS Change Request 254,raising Low Voltage Action Level to 105 Volts DC ML20091L2831995-08-23023 August 1995 Rev to TS Change Request 223 to License DPR-50,incorporating Ref to 10CFR20.1302 ML20087F4881995-08-11011 August 1995 Rev to TS Change Request 252 to License DPR-50,removing TS Section 3.2 Re Makeup,Purification & Chemical Addition Sys Requirements.Certificate of Svc Encl ML20086R3001995-07-24024 July 1995 Rev to LAR 250 to License DPR-50,clarifying Section III, SE Justifying Change for source-range Nuclear Instrumentation SRs ML20085N1551995-06-22022 June 1995 TS Change Request 227 to License DPR-50,replacing Pages for App A.Certificate of Svc Encl ML20084N3461995-06-0101 June 1995 TS Change Request 223 to License DPR-50,deleting Remaining Portions of RETS & Relocating TSs Per Guidance in GL 89-01 & NUREG-1430 ML20084L4201995-06-0101 June 1995 TS Change Request 251 to DPR-50,revising TS 5.3.1.1 to Describe Use of Advanced Clad Assemblies ML20084B3261995-05-24024 May 1995 Application for Amend to License DPR-50.Amend Would Change Surveillance Test Requirements for source-range Nuclear Instrumentation ML20083N7771995-05-17017 May 1995 Application for Amend to License DPR-50,consisting of Change Request 252,removing Chemical Addition Sys Requirements from TS to COLR ML20079A7771994-12-23023 December 1994 Rev to TS Change Request 221 to License DPR-50,revising TS Page 3-32a ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20069A6731994-05-20020 May 1994 TS Change Request 244 to License DPR-50,requesting Revised CR Trip Insertion Time Testing Acceptance Criterion for Remainder of Cycle 10 for 12 Specific CRs Which Initially Experienced Slow Rod Drop Times During Testing on 940317 ML20065M6681994-04-19019 April 1994 TS Change Request 237 to License DPR-50,deleting Audit Program Frequency Requirements from TS & Relocating Subj Requirements to Operational QA Plan ML20065K0381994-04-11011 April 1994 TS Change Request 238 to License DPR-50,relocating Detailed Insp Criteria,Methods & Frequencies of Containment Tendon Surveillance Program to FSAR ML20073C7701994-03-22022 March 1994 Application for Amend to License DPR-50 Re TS Change Request 242 Concerning Control Rod Trip Insertion Time Testing ML20064J3771994-03-11011 March 1994 Application for Amend to License DPR-50,revising TS Re Allowable Outage Time for Emergency Feedwater Pumps During Surveillance Activities 1999-08-20
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211D1321999-08-20020 August 1999 Application for Amend to License DPR-50 to Revise TS Bases Re Degraded Undervoltage Relay Setpoint Calibration Frequency & Degraded Voltage Relay Tolerance Rev ML20210J0941999-07-29029 July 1999 Suppl TS Change Request 274 to License DPR-50,revising ESF Sys Leakage Limits in post-accident Recirculation Surveillance Tss,As Result of NRC Generic Concerns Re CR Habitability Issues ML20209D6651999-07-0808 July 1999 Corrected TS Pages 3-21,4-5a,4-9,4-38 & 6-3 to Amends 211 & 212 to License DPR-50.Pages Failed to Reflect Previously Approved Changes Granted in Amends 203 & 204 in Case of Amend 211 & 207 in Case of Amend 212 ML20196K5901999-06-29029 June 1999 LAR 285 for License DPR-50,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matls Can Continue to Be Moved ML20209C0551999-06-29029 June 1999 LAR 77 for License DPR-73,clarifying Authority in Encl License Pages to Possess Radioactive Matls Without Unit Distinction,So That After Transfer of TMI-1 License to Amergen,Radioactive Matl May Continue to Be Moved ML20195E3341999-06-0404 June 1999 TS Change Request 265 to License DPR-50,modifying Conditions Which Allow Reduction in Number of Means for Maintaining Decay Heat Removal Capability During Shutdown Conditions ML20209B5891999-05-26026 May 1999 LAR 281 to License DPR-50,revising TMI-1 UFSAR Chapters 5 & 14 to Permit Use of Conservative Deterministic Failure Margin Methodology for Seismic Analysis of Portions of Auxiliary Steam Line.Rept 240046-R-001 Encl.Rept Withheld ML20206R1111999-05-13013 May 1999 Application for Amend to License DPR-50,requesting That License Sections 2.a.(3) & 2.c.(7) & TS Section 3.1.1 Be Revised to Incorporate Administrative Updating & Changes to Bases Statement ML20205H0691999-04-0101 April 1999 TS Change Request 262 to License DPR-50,revising TS by Adding LCO Action Statements & Making SRs More Consistent with NUREG-1430,correcting Conflicts or Inconsistencies Caused by Earlier TS Revs & Revising SFP Sampling ML20203B0421999-02-0202 February 1999 TS Change Request 274 to License DPR-50,expanding Scope of Systems & Test Requirements for post-accident RB Sump Recirculation ESF Systems & Increasing Max Allowable Leakage of TS 4.5.4 for Applicable Portions of ESF Systems ML20196H9751998-12-0303 December 1998 LAR 279 to License DPR-50,reflecting Decrease in RCS Flow Resulting from Revised Analysis to Allow Operation of Plant with 20% Average Level of SG Tubes Plugged Per SG ML20196G4401998-12-0303 December 1998 LAR 278 to License DPR-50,requesting Consent to Transfer & Authorize Amergen to Possess,Use & Operate TMI-1 Under Essentially Same Conditions & Authorizations Included in Existing License.Supporting Documentation,Encl ML20196G7671998-11-25025 November 1998 TS Change Request 277 to License DPR-50,changing Surveillance Specs for OTSG ISIs for TMI-1 Cycle 13 RFO Exams Which Would Be Applicable for One Cycle of Operation Only ML20195C6811998-11-12012 November 1998 Amend 52 to License DPR-73,relocating Audit Frequency Requirements from TMI-2 to TMI-2 Post Defueling Monitored Storage QA Plan & Extends Max Allowed Interval Between Certain Audits from 12 Months to 24 Months ML20154P8441998-10-19019 October 1998 Application for Amend to License DPR-50,providing Allowable RCS Specific Activity Limit Based on OTSG Insp Results Performed Each Refueling Outage.Proprietary & non- Proprietary Calculation,Encl.Proprietary Info Withheld ML20154Q6201998-10-19019 October 1998 TS Change Request 248 to License DPR-50,adding Operability & SRs for Remote Shutdown Sys Similar to Requirements in NUREG-1430, Std Tech Specs - B&W Plants, Section 3.3.18, Remote Shutdown Sys ML20154M3691998-10-15015 October 1998 Application for Amend to License Amend Request 276 to License DPR-50 Revising UFSAR Chapter 14 Accident Analysis Atmospheric Dispersion Factors.Ufsar Revised Pages Encl ML20249B2391998-06-11011 June 1998 TS Change Request 273 to License DPR-50,incorporating Alternate High Radiation Area Control Consistent W/Reg Guide 8.38 ML20217E5131998-03-23023 March 1998 Application for Amend to License DPR-50,revising TS Section 3.1.2 to Incorporate New Pressure Limits for Reactor Vessel IAW 10CFR50,App G for Period of Applicability Through 17.7 Efpy.Request Also Submitted in Response to NRC ML20217G0161997-10-0303 October 1997 Suppl to License Amend Request 268 to License DPR-50, Replacing Pages 4-80 & 4-81 Previously Submitted w/TMI-1 License Amend Request 268 on 970812 ML20211C2221997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re TS Change Request 266.Supplement Provides for Phased Review & Issuance of License Amends & Involves Administrative Correction to TS Decay Heat Removal Sys Leakage Rate ML20211C3211997-09-19019 September 1997 Supplemental Application for Amend to License DPR-50 Re License Amend Request 269 Submitted on 970814.Suppl Includes Addl Change to TS Section 3.1.4 & Proposed Page Rev Clarifying That UFSAR Analysis Is More Conservative ML20210J9951997-08-14014 August 1997 Revised License Amend Request 269 for License DPR-50, Revising TMI-1 UFSAR Section 14.1.2.9 Environ Dose Consequences for TMI-1 Steam Line Break Analysis ML20141J3981997-08-12012 August 1997 Tech Spec Change Request 268 for License DPR-50,revising Surveillance Specification for Once Through Steam Generator Inservice Insp for TMI-1 Cycle 12 Refueling (12R) Exams Applicable to TMI-1 Cycle 12 Operations ML20198E7871997-07-30030 July 1997 TS Change Request 266 to License DPR-50,incorporating Addl Sys Leakage Limits & Leak Test Requirements for Systems Outside Containment Which Were Not Previously Contained in TS 4.5.4 ML20141E1311997-05-0808 May 1997 Application for Amend to License DPR-50,consisting of Change Request 264,incorporating Addl NRC-approved Analytical Methods Used to Determine TMI-1 Core Operating Limits ML20140E2351997-04-21021 April 1997 Application for Amend to License DPR-50,requesting Rev to TS 3.3 Re Emergency Core Cooling,Reactor Bldg Emergency Cooling & Reactor Bldg Spray Systems ML20134M1111997-02-0707 February 1997 Application for Amend to License DPR-50,incorporating Certain Improvements from Revised STS for B&W Plants, NUREG-1430 & Addl Changes as Described in Encl TS ML20133D2651996-12-24024 December 1996 Application for Amend to License DPR-50,requesting Reinstatement of Auxiliary & Fuel Handling Bldg Ventilation Sys TS ML20132F3221996-12-16016 December 1996 Application for Amend to License DPR-50,consisting of Change Request 260,reflecting Change in Legal Name of Operator of Plant from Gpu Corp to Gpu Inc & Reflecting Plant License & TS Registered Trade Name of Gpu Energy ML20135C5201996-12-0202 December 1996 TS Change Request (Tscr) 75 to License DPR-73,relocating Audit Frequency Requirements to Pdms QA Plan ML20134D7761996-10-24024 October 1996 Amend 51 to License DPR-73,revising TS to Extend Surveillance Interval for Demonstrating Operability of Containment Airlock ML20128K1831996-10-0808 October 1996 Amend 50 to License DPR-73,revising TS to Incorporate Improvement from Administrative Controls Section of Revised STS for B&W Plants ML20117H0181996-08-29029 August 1996 Application for Amend to License DPR-50,consisting of TS Change Request 257,incorporating Certain Improvements from STS for B&W Plants (NUREG-1430) ML20113D1901996-06-28028 June 1996 Application for Amend to License DPR-50,consisting of Change Request 259,allowing Implementation of Recently Approved Option B to 10CFR50,App J ML20112C8751996-05-24024 May 1996 Errata to Application for Amend to License DPR-50,consisting of TS Change Request 243,replacing Pages for App a ML20101R1361996-04-10010 April 1996 Application for Amend to License DPR-50,consisting of Change Request 243,revising Addl Group of Surveillances in Which Justification Has Been Completed Following Receipt of 930623 Application ML20100J6831996-02-22022 February 1996 Application for Amend to License DPR-50,consisting of Change Request 254,revising Proposed TS Page 4-46 on Paragraph 4.6.2 That Provides Addl Testing Requirements in Case Station Battery Cell Parameters Not Met ML20095J2261995-12-21021 December 1995 Revised TS Change Request 254,raising Low Voltage Action Level to 105 Volts DC ML20091L2831995-08-23023 August 1995 Rev to TS Change Request 223 to License DPR-50,incorporating Ref to 10CFR20.1302 ML20087F4881995-08-11011 August 1995 Rev to TS Change Request 252 to License DPR-50,removing TS Section 3.2 Re Makeup,Purification & Chemical Addition Sys Requirements.Certificate of Svc Encl ML20086R3001995-07-24024 July 1995 Rev to LAR 250 to License DPR-50,clarifying Section III, SE Justifying Change for source-range Nuclear Instrumentation SRs ML20085N1551995-06-22022 June 1995 TS Change Request 227 to License DPR-50,replacing Pages for App A.Certificate of Svc Encl ML20084N3461995-06-0101 June 1995 TS Change Request 223 to License DPR-50,deleting Remaining Portions of RETS & Relocating TSs Per Guidance in GL 89-01 & NUREG-1430 ML20084L4201995-06-0101 June 1995 TS Change Request 251 to DPR-50,revising TS 5.3.1.1 to Describe Use of Advanced Clad Assemblies ML20084B3261995-05-24024 May 1995 Application for Amend to License DPR-50.Amend Would Change Surveillance Test Requirements for source-range Nuclear Instrumentation ML20083N7771995-05-17017 May 1995 Application for Amend to License DPR-50,consisting of Change Request 252,removing Chemical Addition Sys Requirements from TS to COLR ML20079A7771994-12-23023 December 1994 Rev to TS Change Request 221 to License DPR-50,revising TS Page 3-32a ML20073F9241994-09-26026 September 1994 LAR 246 to License DPR-50,revising License Condition 2.C.9 Re Long Range Planning Program ML20069A6731994-05-20020 May 1994 TS Change Request 244 to License DPR-50,requesting Revised CR Trip Insertion Time Testing Acceptance Criterion for Remainder of Cycle 10 for 12 Specific CRs Which Initially Experienced Slow Rod Drop Times During Testing on 940317 1999-08-20
[Table view] |
Text
.
, +
h GPU Nuclear Corporation Nuclear o
- ers:reo Middletown, Pennsylvania 17057 0191 717 944 7621
, TELEX 84 2386
. Writer's Direct Dial Number:
5211-85-2088 May 14, 1985 Office of Nuclear Reactor Regulation Attn: John F. Stolz, Chief
,0perating Reactors Branch No. 4 '
.U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Stolz:
Three Mile Island Nuclear Station, Unit I, (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Technical Specification Change Request No. 142 (Rev. 1)
Enclosed are three originals and forty conformed copies of Technical
-Specification Change Request No. 142 (Rev. 1).
Also enclosed is one signed copy of the Certificate of Service for this request to the chief executives of the township and county in which the facility is located, as well as the Bureau of Radiation Protection.
Pursuant to 10 CFR 50.91(a)(1), we enclose our analyses, using the standards in 10 CFR 50.92 of significant hazards considerations. As stated above, pursuant to 10 CFR 50.91(a) of the regulations, we have provided a copy of this letter, the proposed change in Technical Specifications, and our analyses of significant hazards considerations to Thomas Gerusky, the designated representative of the Commonwealth of Pennsylvania.
Pursuant to the provisions of 10 CFR 170.21, a check for $150.00 was provided with our letter of March 8,1985 as payment of the fee associated with Technical Specification Change Request No. 142.
Sincerely, 8505210281 DR 850514 [ V!V ADOCK 05000289
. D. Fukill Director, THI-1 HDH/MRd/spb
Enclosures:
- 1) Technical Specification Change Request No. 142 (Rev. 1)
- 2) Certificate of Service for Technical Specification Change Request No. 142 (Rev. 1) cc: J. Thoma p bJf 001 GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation l l t ~ m -
r .
METROPOLITAN EDISON COMPANY JERSEY CENTRAL POWER & LIGHT COMPANY AND PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION, UNIT 1 Operating License No. DPR-50 Docket No. 50-289 Technical Specification Change Request No.142 (Rev.1)
This Technical Specification Change Request is submitted in support of Licensee's request to change Appendix A to Operating License No. DPR-50 for Three Mile Island Nuclear Station, Unit 1. As a part of this request, proposed replacement pages for Appendix A are also included.
GPU NUCLEAR CORPORATION BY .
Direct 0r, TMI-1 Sworn and Subscribed to before me this th day of- , 1985.
b e -w a + ._m..e Notart-Public DAktA JEAM BERRY. NOTARY PWUC MIDDLETOWN BORD, DAUPHIN COUNTY MY COMMISSION FRP:RES JUNE 17,1%5 Vember. Pennsylumi Aw, oat : cf h mes
E UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
-IN THE MATTER OF DOCKET N0. 50-289 LICENSE N0. DPR-50 GPU NUCLEAR CORPORATION This is to certify that a copy of Technical Specification Change Request No.142 (Rev.1) to Appendix A of the Operating License for Three Mile Island Nuclear Station Unit 1, has, on the date given below, been filed with executives of Londonderry Township, Dauphin County, Pennsylvania; Dauphin County, Pennsylvania; and the Pennsylvania Department of Environmental P.esources, Bureau of Radiation Protection, by deposit in the United States mail, addressed as follows:
Mr. Jay H. Kopp, Chairman Mr. John E. Minnich,' Chairman Board of. Supervisors of Board of County Commissioners Londonderry Township of Dauphin County
-R. D. #1, Geyers Church Road Dauphin County Courthouse Middletown, PA 17057 Harrisburg, PA 17120 Mr. Thomas Gerusky, Director PA. Dept. of Environmental Resources Bureau of Radiation Protection
,.O.
P Box 2063' Harrisburg, PA 17120 GPU NUCLEAR CORPORATI i
\
BY
' Directtr, TMI-1 DATE: May 14. 1985 u .
.3
r I. TECHNICAL SPECIFICATION CHANGE REQUEST (TSCR) NO. 142 (Rev. 1)
The Licensee requests that the revised pages attached replace the following pages of the existing Technical Specifications:
11, iv. 3-25, 3-26, 3-26a, 3-26b, 3-26c, 4-52, 4-52a This Request No. 142 (Rev. 1) supersedes the previous Request No. 142 in its entirety.
II. REASON FOR CHANGE By letter dated July 18, 1984 NRC provided its evaluation of GPUN's
- submittal (LIL 341) of January 26, 1984 regarding Decay Heat Removal and requested that GPUN include certain aspects of Standard Technical u Specifications (STS) into the TMI-1 Technical Specifications or provide justification as to why the requirements are not necessary.
This TSCR provides additional technical specification requirements and clarification for maintaining decay heat removal capability below 250 F 4 reactor coolant temperature as described in GPUN's letter of October 10, 1984, in order to assure redundant or diverse decay heat removal capability without reliance upon administrative requirements or management directives alone and incorporates NRC staff comment on TSCR No. 142.
III. SAFETY EVALUATION JUSTIFYING CHANGE The changes made through this proposed revision incorporate additional requirements and clarification which meet the intent of STS (NUREG-0103, Rev. 4) in order to assure DHR capability for plant conditions with reactor coolant temperature less than 250*F. For this reason, these changes will have a beneficial effect on plant safety. Exceptions or modifications to certain' aspects of the STS which are described in NRC's letter of July 18, 1984 are justified as follows:
- 1) This change is structured to conform to the TMI-1 T.S. format, applicable to the plant conditions which correspond most closely to STS modes of operation and meets the intent of STS to assure DHR capability.
2)' Surveillance of RCP operation at power is performed continuously by the Reactor Protection System. Without a F.CP in operation in each loop, the RPS will trip the reactor as specified in TMI-1 T.S.
Table 2.3-1. This accomplishes the.STS goal of verifying RCP operation. If an RCP is not in operation in each loop, the operator will know because the reactor will trip. Also, equipment status is turned over as part of the normal shift change process. Any inoperable RCP would be part of this turnover process when at power.
f-Surveillance requirements for reactor protection system instrumentation are given in TMI-1 T.S. 4.1.1. Procedures for these requirements are specified by TMI-1 T.S. 6.8 to be implemented and maintained requiring review and approval prior to implementation and periodic review as set forth in administrative procedures.
Therefore, additional surveillance requirements for verification of RCP operation at power are not included as part of this change.
- 3) This change includes surveillance specifications that the means for decay heat removal below 250'F which are required to be operable be verified operable daily. Detailed surveillance procedures are required by Specification 6.8 in order to implement these
. surveillance requirements. However, during shutdown plant conditions, reactor coolant pump operability is not required inasmuch as natural circulation is an acceptable means for decay heat removal as discussed in Section III.6. Therefore, a surveillance requirement to document verification of the operability of reador coolant pumps every 7 days is unnecessary.
Major equipment which is in operation to maintain the conditions of the Reactor Coolant System, such as decay heat removal loops and reactor coolant loops, is under continual observation as a part of the normal control room operator duties. Equipment status is turned over as part of the normal shift change process. Therefore, a specific Technical Specification surveillance requirement to document the verification of operation of such equipment is unnecessary.
- 4) This change recognizes heat losses -to the Reactor Building atmosphere as an acceptable means of decay heat removal at decay l heat generation rates below'188 KW with the RCS full and below l_ .100 KW with the RCS drained down for maintenance (TMI-1 calculation,
- - C3320-85-001). When decay heat load is very low, as with the l~
present plant conditions at TMI-1, heat loss to ambient is sufficient to provide adequate decay heat removal capability. This-cooling method requires no active components but relies upon basic heat transfer principles.
- 5) This change requires equipment to be in operation only when needed to circulate reactor coolant in order to maintain the reactor coolant-system in a subcooled condition. While STS Sections 3.4.1.3, 3.4.1.4 and 3.9.8.1 require equipment to be in operation l allowing only a maximum of one hour down time with certain '
l stipulations applied, this change allows equipment to be secured for i longer periods where conditions permit.
Depending on the decay heat generation rate, shutdown of the forced circulation equipment may allow reactor coolant system temperature to increase very slowly some time after shutdown compared to the conditions'immediately following plant shutdown from power i
t I
l
operation. During these conditions of slow temperature increase, continuous operation of a decay heat removal loop would not be necessary and suspension of operation would be permitted under 3.4.2.2.
- 6) This change recognizes the acceptability of cooldown by natural circulation as an acceptable means of decay heat removal. The adequacy of natural circulation cooldown as a stable means of decay heat removal is presented in TMI-1 FSAR Table 14.1-12.
- 7) This change allows a limited period of up to 7 days for which the requirement for operability of a redundant or diverse means of DHR may be suspended with reactor coolant temperature 250*F or less.
This is to provide for preventive or corrective maintenance that may be necessary to ensure the continued reliability of the preferred means of DHR capability. This provides the assurance also that appropriate action will be taken to restore the preferred means of DHR capability to operable status in a timely manner, without prohibiting maintenance which is needed to decrease the likelihood of actual in-service failures. A period of up to 7 days is justified considering the low probability and minimal consequences of such a system failure.
- 8) This change recognizes that the DHR system is not the only system capable of providing a flow of borated cooling water through the reactor vessel below 250*F. In addition to the equipment allowed by STS in fulfilling the requirements for DHR capability, this change allows the use of a flow path from the BWST with BWST level greater than 44 ft. as an alternate flow path whenever such means are determined to be capable of maintaining RCS in a subcooled condition for at least 7 days. The length of time such an alternate flow path would be available for decay heat removal is predictable using
! calculations based on actual plant data or through plant testing at
- l. the time the system is to be declared operable.
l Surveillance requirements are included to verify the operability of the circulating path daily whenever the flow path is required to be operable.
These changes as discussed above are justified in that the requirements embodied in this TSCR provide for continucls decay heat removal capability, provide additional guidance, and specify a level of redundancy while allowing systems to be taken out of service for proper maintenance to be performed.
l
IV. NO SIGNIFICANT HAZARDS CONSIDERATIONS
-These proposed changes provide additional operational requirements to assure redundant or diverse decay heat removal capability. Additional limiting conditions for operation and additional surveillance requirements are included. Therefore, operation of TMI-1 in accordance with this TSCR:
1)- does not involve a significant increase in the probability or consequences of an accident previously evaluated,
- 2) does not create the possibility of a new or different kind of.
accident from any accident previously evaluated, and
- 3) does not involve a significant reduction in a margin of safety.
Therefore, significant safety hazards are not associated with this change.
V. IMPLEMENTATION It is requested that the amendment authorizing this change become effective 120 days after receipt, to allow for the necessary procedural revisions to be put in place.
VI. AMENDMENT FEE (10 CFR 170.21)
Pursuant to the provisions of 10 CFR 170.21, a check for $150.00 was provided with our letter of March 8,1985 as payment of the fee associated with TSCR No. 142.