Text
.
ga oto e<-
?*,
UNITED STATE S l,
j-NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D.C. 20555-0001 4
,o 9 *****
METROPOLITAN EDISON COMPANY JERSEY CENTRAL POWER & LIGHT COMPANY PENNSYLVANIA ELECTRIC COMPANY GPU NUCLEAR. INC.
DOCKET NO. 50-289 THREE MILE ISLAND NUCLEAR STATION. UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 214 License No. DPR-50 l
I 1.
The Nuclear Regulatory Commission (the Commission or NRC) has found that:
A.
The application for amendment by GPU Nuclear, Inc., et al. (the licensee) dated December 3,1998, as supplemented March 26, April 16, May 7, May 21 June 4, June 15, and June 29,1999, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; i
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance: (i) that the activities authorized by this amendment caa be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9908240239 990819 PDR ADOCK 05000289 P
1
\\
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.c.(2) of Facility Operating License No. DPR-50 is hereby amended to read as follows:
)
(2)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 214, are hereby incorporated in the license. GPU Nuclear Corporation shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date, as documented by the licensee in plant records, that surveillance of the emergency feedwater system (EFWS) has demonstrated that: (a) The EFWS pumps can deliver a minimum flow rate of 550 gpm (assumed in the licensee's analyses supporting the amendment) and (b) the developed head at the minimum flow rate specified in item (a) is at least 2,662 feet plus instrument uncertainties. This amendment is to be implemented within 30 days of the date of the demonstration of the flow rate and head, as documented by the licensee, as stated above. The licensee plans to pedorm the demonstration described above during the 13R refueling outage, which is scheduled to begin on September 10,1999; should this demonstration, however, not be made on or before December 31,1999, this amendment shall be void.and of no effect.
FOR THE NUCLEAR REGULATORY COMMISSION S. Singh Bajwa, Chief, Section 1 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications' Date of issuance: August 19, 1999
R.'
l.
ATTACHMENT TO LICENSE AMENDMENT NO.214 FACILITY OPERATING LICENSE NO. DPR 50 DOCKET NO. 50-289 Replace the following pages of the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by Amendment number and contain marginal
' lines indicating the areas of change.
Remove Insert 2-4a (Figure 2.1-1) 2-4a (Figure 2.1-1) 2-4c (Figure 2.1-3) 2-4c (Figure 2.1-3) l i
I l
I l
I l
l l
l l
I L
L-
2500 l
2300 ACCEPTABLE
/
. OPERATION
/
u n.
b d
8 1900
. UNACCEPTABLE
[
OPERATION -
o
.1700 1500 600 610 620 630 640 650 REACTOR OUTLET TEMPERATURE (dogf)
CORE PROTECTION SAFETY LIMIT TMI-l Figure 2.1-1 2-4a-Amendment No. 50,142,167, 214
r-2500 i l
~
+ 4-PUMP CP
+3-PUMP OP
+ 2-PUMP OF
'E 2100 e
i
/
E t-
=
/
3 1900 0
/
8e 8
1700 l
1500 600 610 620 630 640 650 REACTOR OUTLET TEMPERATURE (deo-F)
RC Reactor Coolant Flow Power Pumps Operating (Type of Limit)
Pumps (Ibs/hr) 4 134.02 x 10' i12 %
Four Pumps (DNBR Limit) 3 See COLR See COLR Three Pumps (Quality Limit) 2 See COLR See COLR One Pump in Each Loop (Quality Limit)
CORE PROTECTION SAFETY BASES TMI-l FIGURE 2.1-3 2-ac Amendment No. 50,125,142. !67d84, 214