Forwards Readings from Safety Injection & Refueling Water Tank Support Surveillance to Date,Along W/Preliminary Evaluation of Measurements.Nrc Will Be Notified of Schedule for Next Measurements
ML20117M930
Person / Time
Site: 05000000, Palisades
Issue date: 02/06/1984
From: Paul Klein
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Keating D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20114G054 List:
References
FOIA-84-616 PJK-05-84, PJK-5-84, NUDOCS 8505170301
Download: ML20117M930 (2)


Text

.

e s

)

,),

a[24A. 5, ; 6 3 n.

'" N i.,

h I

+

f

(

): l@."bi-

-(f Compmi s

General Officos: 1945 West Pernell Road. Jackson MI 49201 + (517) 788 0550

! February 6,'1984

.PJK 05-84' Mr Dale Keating NRC, Region Ill-

.799 Roosevelt Road GlennLEllys, IL 60137

-Attsched'are readings from.the Palisades SIRW Tank Support Surveillance to

'date, along with a preliminary evaluation of the measurements (CP Co internal memo).

In order to further investigate this condition, the number of surveillances is being increased. ~You vill be notified of the schedule for the next measure-

ments; however, due to the current increased nurber of surveillances, lead time for notification will be reduced'due to uncertainty of the plant' schedule at this-time.

-If you have further questions, plcase contact ne as obown below, li A.lff '

$2bi

bz abhWOA3 2 Ci @ b.- H h,'9 bdGJ M f

,i

(3J p '}c1.s. -

hw de L.lh

,f N Ol h

-Paul J K ein

. e'

'.' n.'~a'u.u. w..s.-.w ".-

~

~ Senior Engineer

., v.wm,/

i

.~ N Consumers Power Company j

1945 W Parnall Rd, Em P-24-ll4 -

  1. . W h T J 4 A ~ ~ T d v.~i~ A ' w 'r M u l Jackson, MI 49203 f j ';jjQ7g g,.g.,dy

,j f,u h (t Lt-C1 2.0 A d. +,> [fg, 4 w L D.s k (517) 788-5808 s

(

HO

    • ^M DJ\\ nde a e P2 1

- ERCooper, P-24-306 w'Ad _.D N1 v.pL h d(

'KKChao, P-24-304 g(g.,.g '0- -- g,, y --

l, cDC:

950/00211/01400 f.

.4.

U-( ba ejp.F. UAe wM y

84,

- l f&,,,3 @A4 h m L f }sLw2W~

ARFI

-616 PDR gg-

'j% v,tsLw t.f.v x m(>

w I 9 A

(

T2 64 FEB B 1334 0C0284-0041A-NS06

= -. -

ft L -.

t

,Ta-DJV ndewalla, P-24-614B' RWMontr:cc, Psliccd2a JGLewis, P-26-411A S3b From PJKlein, P-24-114 CONSUMERS POWER Date February 2, 1984 COMPANY

. Subject PALISADES SIRW TANK SUPPORT STRUCTURE Internal Correspondence CC ERTiffany, Palisades WLRoberts, P-26-405 PJK 04-84 ERCooper, P-24-306 KKChao, P-24-304 CHGilmor, Palisades DCC 950/00211/01400 The third of a series of quarterly inspections of the Palisades SIRW tank support was performed on 1/31/84. The inspection includes measurement of width of selected concrete beam cracks and elevation measurements of the support structure.

The inspection was conducted with the. tank filled to 94% of capacity which may be cocpared with the inspection on 8/8/83 with the tank 98% full.

The compar-ison indicates that the support structure has settled.002 ft (1/40") at the location of peak shear stresses which occur at the beam openings and that the support structure has generally settled up to an approximate maximum of 1/8" at its center. This amount of settlement is within established tolerances presented to Consumers Nuclear Safety Board.

The'displacecents neasured during*the three*insp~ectionsito'date,.tvice with' Ithe; tank l full landencewith;the, tank 7dspiy~,Tindicate'thatthetank. support.

~

r structure may be in an inelastic condition." The' basis for this-statement is

.the small amount of. upward displacementJuith"the SIRW tank unloaded and the L

-apparent rincrease in downward deflection af ter the^ tank was r'eloade'd. ;

Therefore, it is reco = ended that another inspection be made with the tank unloaded followed by an inspection made with the tank loaded to establish a trend of structural behavior.

The reloading of the tank may be in steps,

' depending on the outcome of the readings with the tank unloaded.

I am planning on proceeding with this work effort during this outage and will take readings approximately one week after the SIRW tank is unloaded for refueling.

9 8

IC0284-0039A-NS06 L-y

-.