Other: ML19256A477, ML19270F299, ML20028G169, ML20038C773, ML20039B509, ML20039C402, ML20076H345, ML20076H356, ML20079L206, ML20083H217, ML20084R401, ML20086R733, ML20087F011, ML20091H366, ML20094L286, ML20101S507, ML20105A761, ML20112F937, ML20112H464, ML20116G108, ML20117L149, ML20133E155, ML20137Q206, ML20137Y413, ML20147B179, ML20147B185, ML20155A572, ML20155E666, ML20155J854, ML20211K690, ML20214H088, ML20214P673
|
MONTHYEARML20147B1791978-06-20020 June 1978 Describes Post Irradiation Surveillance Prog for Proposed Test & Standard Fuel Elements of Subj Facil Reactor Project stage: Other ML20155A5721978-06-20020 June 1978 Forwards App a to SAR for Fort St Vrain Reload 1 Test Fuel Elements FTE-1 Through FTE-8, Consisting of post-irradiation Exam Program,In Response to 780510 Request. Approval of 780109 Submittal Requested Project stage: Other ML20147B1851978-06-23023 June 1978 Statement That Gamma Scan to Determine Distribution of Fission Product & Core Powerwas Included by Mistake in on- Site Examination Description for Pie Prog.The Gamma Scan Will Be Conducted on a Selective Basis Project stage: Other ML19256A4771979-01-0303 January 1979 Withdraws Request for Surveillance of 8 Test Fuel Elements, & Insists That Utility Perform Detailed Surveillance on Reference Fuel,Defined by NRC as a first-core Loading.In Future,All Mods Should Be Submitted to NRC for Review Project stage: Other ML19270F2991979-01-24024 January 1979 Requests NRC Issue Release to Install Test Fuel Elements Immediately Due to March,1979 Refueling Schedule.Submits Info Re Modified Fuel post-irradiation Examination (Pie) Program.Util Is Aware of Requirements for Pie Project stage: Other ML20038C7731981-11-16016 November 1981 Forwards Ga Co Nondestructive Exam at 51 Fuel & Reflector Elements from Fort St Vrain Core Segment, & Post-Irradiation Exam & Evaluation of Fort St Vrain Fuel Element 1-0743 Project stage: Other ML20039B5091981-12-11011 December 1981 Requests Mod to Fuel Surveillance Program Workscope to Eliminate Destructive post-radiation Exam of Segment 2 Surveillance Element.Doe Funding Reduced for FY82.NRC Concurrence Requested by 820301 Project stage: Other ML20039C4021981-12-11011 December 1981 Proposes Modified DOE Funded Fuel Surveillance Program Workscope for FY82,per 790124 Commitment.Decision Requested by 810301.WA Graul Encl Project stage: Other ML20076H3561982-05-17017 May 1982 NDE of Fort St Vrain Fuel Element 1-2415 Project stage: Other ML20028G1691983-01-24024 January 1983 Informs That Licensee 811211 Request to Eliminate Segment 2 Fuel Assembly from post-irradiated Fuel Element Surveillance Program Acceptable.Supplemental Destructive Exams Should Be Substituted.Commitment to Exams Requested Project stage: Other ML20079L2061983-02-10010 February 1983 Commits to Funding Fuel Surveillance Program.One Fuel Rod from Cracked Segment 2 Fuel Element Sectioned & Examined Using Metallographic Techniques to Confirm Predicted Fuel Performance Project stage: Other ML20076H3451983-06-0202 June 1983 Forwards Ga Co Repts 906505,906577 & GA-A16829 Describing Results of Exams on Fuel Elements W/Cracked Webs.Repts Convey Belief That Cracks in Fuel Block Graphite Webbing Do Not Intersect Fuel Holes Project stage: Other ML20083H2171984-01-0303 January 1984 Forwards Ga Co Fuel Surveillance Rept, Metallographic Exam of Fuel Rod from Segment 2 - Fort St Vrain Fuel Element 1-2415 Project stage: Other ML20086R7331984-02-15015 February 1984 Submits Schedule & Program Description for Segment 3 Fuel Element Insps,Per 840210 Telcon.Program Will Be Performed Upon Request.Fuel Element Cracks Have No Effect on Fuel Particle Integrity Project stage: Other ML20087F0111984-03-0606 March 1984 Documents 840305 Telcon Which Advised NRC That Photographs Committed to in Fuel Element Insp Program Underexposed. Preparations to Remove All Region 18 Fuel Elements from Fuel Storage Well to Permit Photographs of Elements Begun Project stage: Other ML20083L8541984-04-0606 April 1984 Summarizes 840404 Meeting W/Nrr in Bethesda,Md Re Two Cracked Fuel Elements Discovered in 1982 & Present Insp Program for Segment 3 Fuel.Viewgraphs Encl Project stage: Meeting ML20084R4011984-05-15015 May 1984 Forwards List of Fuel & Reflector Elements to Be Examined During Segment 3 post-irradiation Exam,Including All Fuel Elements from Region 18 & Listed Elements from Regions 3,13 & 22 Project stage: Other ML20091H3661984-05-21021 May 1984 Requests That 10-day Response Deadline Re Fuel Element Program Schedule,Per NRC ,Be Extended to 90 Days to Allow Time for Arrangements W/Outside Firm Project stage: Other ML20094L2861984-07-31031 July 1984 Submits Description of Spent Fuel Insp Program to Be Incorporated Into Tech Specs.Changes Concern Obtaining Photographic Record of Vertical Faces of Fuel Elements Removed from Core During Each Refueling Project stage: Other ML20112F9371984-12-17017 December 1984 Forwards Ga Technologies Fuel Surveillance Rept, Post-Irradiation Exam & Evaluation of Fort St Vrain Fuel Element 1-2415 Project stage: Other ML20105A7611985-01-17017 January 1985 Submits Update Re Progress on Section 3 of Fuel Element Insp Program,Photography of Fuel Elements.Only Regions 22 & 29 Remain to Be Photographed During Spent Fuel Shipping Project stage: Other ML20101S5071985-01-18018 January 1985 Commits to Resolve Listed Concerns Re Fuel Surveillance Activities in Response to .Proposed Tech Spec Changes & Fuel Surveillance Program Document Will Be Submitted for Approval by 850501 Project stage: Other ML20112H4641985-03-21021 March 1985 Forwards Ga Technologies,Inc 850124 Document 907785, NDE of 62 Fuel & Reflector Elements from Fort St Vrain Core Segment 3. All Fuel Elements,Including FTE-2,in Good Condition & irradiation-induced Dimensional Change Small Project stage: Other ML20116G1081985-04-12012 April 1985 Forwards Photographs of Hot Svc Facility Metrology Robot Used for NDE of Fuel & Reflector Elements.Photos Inadvertently Omitted from 850124 Submittal Project stage: Other ML20117L1491985-05-0303 May 1985 Forwards Modified Fuel Surveillance Program,Summary of Refueling 3 Fuel Surveillance Commitments & Current Status, Per .Programs Incorporate Past Commitments W/Mods Necessitated by Reductions in DOE Funding Project stage: Other ML20127J7321985-06-10010 June 1985 Application to Amend License DPR-34,updating Section 7 of Tech Specs for Recent Organizational Changes & Adding Section 7.7 Re Formalized Fuel Surveillance Program.Fee Paid Project stage: Request ML20137Y4131985-09-18018 September 1985 Clarifies Commitment in Statement of Page 7 of Ga Co Document 907785, NDE of 62 Fuel & Reflector Elements from Fort St Vrain Core Segment 3, Per 850321 Submittal. Statement Made in Ref to DOE Reporting Commitment Project stage: Other ML20133E1551985-10-0202 October 1985 Forwards Comments on Proposed Fuel Surveillance Program Submitted by .Response to Comments & Revised Program Should Be Submitted within 60 Days of Ltr Receipt. Problems Must Be Corrected Prior to Program Approval Project stage: Other ML20137Q2061985-11-27027 November 1985 Forwards Revised Fuel Surveillance Program,Incorporating NRC Comments Per ,For Approval.Approved Program Will Appear as App to USAR & Will Be Implemented Via Core Mgt Guides Project stage: Other ML20141G1831986-04-10010 April 1986 Forwards Request for Addl Info Re 851127 Proposed Fuel Surveillance Program.Items 1,2 & 7 Acceptable.Addl Info Requested Re Item 8 on Primary Coolant Activity Increases Project stage: RAI ML20155E6661986-04-10010 April 1986 Accepts Items 1,2 & 7 of 851127 Proposed Fuel Surveillance Program.Addl Info Re Items 8 & 9 Requested within 45 Days of Ltr Date Project stage: Other ML20155J8541986-05-22022 May 1986 Forwards Response to NRC Comments on Fuel Surveillance Program.Revised Fuel Surveillance Program Also Encl Project stage: Other ML20214H0881986-05-31031 May 1986 Assessment of Proposed Fuel Surveillance Program for Fort St Vrain Project stage: Other ML20211K6901986-06-19019 June 1986 Submits Correction to Attachment 1 to Response 6 to Util 860522 Responses to NRC Comments on Proposed Fuel Surveillance Program.Listed Sentence Partially Omitted in Original Version Project stage: Other ML20214P6491986-11-25025 November 1986 Forwards Amend 48 to License DPR-34 & Safety Evaluation. Amend Adds Section 7.7 Concerning Formalized Fuel Surveillance Program to Tech Specs Project stage: Approval ML20214P6731986-11-25025 November 1986 Amend 48 to License DPR-34,adding Section 7.7 Concerning Formalized Fuel Surveillance Program to Tech Specs Project stage: Other ML20214P6951986-11-25025 November 1986 Safety Evaluation Supporting Amend 48 to License DPR-34 Project stage: Approval 1984-05-15
[Table View] |
Text
-
g PUBLIC SERVICE COMPANY OF COLORADO P. O. BOX 840 + DENVER.
COLORADO 80201 February 10, 1983 Fort St. Vrain OscAn n. us Unit No. 1 viec - e.ioc'"
P-83058
- > 7 k v Mr. John T. Collins
~
N Regional Administrator U.S. Nuclear Regulatory Commission I
g[4{9g Region IV I
y 611 Ryan Plaza Drive, Suite 1000 x
a Arlington, TX 76011 Qg,
SUBJECT:
Commitment to FSV Fuel Surveillance
REFERENCES:
1)G-83042,2)P-81322
Dear Mr. Collins:
PSC has reviewed the letter from Glen L. Madsen to 0.R. Lee dated January 24, 1983 (G-83042) conceraing the modification of the Fort St.
Vrain post-irradiated fuel element surveillance program. The above mentioned letter stated that the elimination of the destructive examination of a Segment 2 fuel assembly as proposed by PSC in P-81322 is acceptable, but ti,at supplemental destructive examinations should be performed.
These examinations were deemed necessary to confirm that kernel migration remains less than the maximum migration limit set forth in the FSAR of 20 microns.
In examination of fuel rods from Segment 1, no kernel migration was observed, and none was expected (metallographic lower detectable limit is 3 to 4 microns).
PSC hereby commits to funding:
- 1) one fuel rod from a cracked Segment 2 fuel element to be sectioned and examined using metallographic techniques to confirm predicted fuel performance (with respect to fuel kernel migration) and, 2) one reference fuel rod from fuel element FTE-2 to be examined in a similar fashion after removal from the reactor following cycle 3.
bd 8302230174 830210
~'
PDR ADOCK 05000267 p
PDR
a P-83058 Paga 2 i
- oi./
This commitment is expressly. contingent on the availability of EDE funding for the basic destructive examination (shipping, hot cell disassembly for examination, and fuel element disposal) of both the Segment 2 cracked block and fuel element FTE-2.
~
2 If PSC-can be of further assistance,~ or if you have any questions regarding this matter, please let us know.
Very truly yours,
- 0. R. Lee, Vice President Electric Production ORL/SH:pa l
I l
I
--r,--------
- -