1...

t

~

V Bill Hafner 5h Robinwood Street Mastic, NY 11950 23 May 1082 Jerry N. Wilson, F.E.

US Nuclear Regulatory Commission Division of Licensing 4ashington, DC 20555 technical inquiry SUBJ: Shoreham unit no.1, Docket number 50-322 RE:

?

Dear Mr. dilson,

The following questions are directed to you or your associates largely based on material cresented in NUREG-Ok20, the SER, and its supplenents.

RHR and, in suecific RSCS (1) SUBJ:

RE: NUREG-Ok20, section 7 k,.2, page 7-11

~

The NRC notes that a single failure in any cne of the two valves in series will preclude dSCS from nerforming its intended func-tion.

Jhy didn't the NRC order a design modification to eliminate the situation rather than accept an SRV backup, especially)in light of and tne the poor c.perational history of the valves tgenericallyas c ciu ted * *dh 3J2 generic a.c system problac.sto be of concern aince RSCS is the norma Automatic switchover of RCICS suction (2) SUBJ:NUREG-Ok20, suppl 1, page 22 86 RE:

The applicant agrees to implement the recommended modification, ho ever, there is no mention as to when.

upon?

Multiplexing circuitry NUddG-Ok20, section 7.6, pages 7-13 to 7-15 (3) SUBJ:

RE:

Numerous SNPS safety-related systems employ multiplexing circuitry than individual hard-wired ones. What other BWR's are a rathb in this ategory ?

042 e40518 PDR.

O

-250 p

BELA

?!

Nfonfbfner SNPS (h) SUBJ: 5tainless Steel Pipe cracking RE: NUREG-Oh20, suppl 1, section 5.2.6.2, pages 5-3 and 5-k The NRC states that the applicant was not able to nake all the modifications recommended in NUREG-0313 Rev 1 but did take significant action.

ty was the applicant not able to make all the recommended changes ?

(5) SUBJ: Mark II Ioad Criteria RE: NUR5G-0420, Section 6.2.1.8 Peel Dynamics The NRC has issued NUREG-Oh87 and supulements in order to neet the needs of the lead Park II facilities.

2he applicant has agreed to adept NRC generic criteria er. cent for a few cases where alternative criteria were proposed. i.hy has the applicant deceided to follow the long-term program rather than meet the criteria established for the lead plants in those areas ?

If it would be mere convenient for you or members of your ctsfe nicase feel free to call during normal to employ a telephone reol3,6ch6 business hours--- (516) 281-ihank you for your time and awaiting your reply, Sincerely,

_m Bill Hafner i

e-L.

k_

m