ML20108E066

From kanterella
Jump to navigation Jump to search
Rev 5 to Procedure HNP-4622, Site Area Emergency - Control Room Operators
ML20108E066
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/10/1983
From:
GEORGIA POWER CO.
To:
Shared Package
ML20100P367 List:
References
HNP-4622, NUDOCS 8412140179
Download: ML20108E066 (3)


Text

GEORGIA POWER'COPPANY HATCH NUCLEAR PLANT n

I 1

PROCEDURE V

SITE AREA EPERGENCY - CONTROL ROOM OPERATORS PROCEDURE TITLE F9F-4E22 PROCEDURE NUMBER LAB RESPONSIBLE SECTION SAFETY RELATED ( X)

NON-SAFETY RELATED (

)

-APPROVED APPROVED REV.

DESCRIPTION DEPT.

PLANT DATE~

HEAD MANAGER 1

Page 2

% Auf

._h p.

2 Page 2

,m,_

7 _ _ _J_,

__._r-___.

r________ge 2 ________. "g

__..{d Zf f_t.

_ _ _3 Pa s

_ _ _4_ _, _ _ _P_a.F_e_s _1_ _a_n_d _2_ _ _ _ _ _ _.

F

)

5 Page 1

.1 LL_i e

) _ _ +. g _

y f_ _.5_ _

_ _ _1 s____________________.

F________...

p____________________.

r______..

[

p________________.

p___

p_____________.

F_____________.

r____

8412140179 841129 PDR ADOCK 05000321 V

PDR p___________________.

r_______________..

p______________F_____.______..____._____.__.

ItF-9 e

e

,--,--c y,,my-


r-

-r v-.g mgwyf--,,-.,e-my m.y y ps Y,-p.-ge-

,iry,.-y,-g,,--.,i,9

y., - -

.,,gw---,,e

,,-wy,,

-,w e-.e--gar---e-----.me s%

-r-'

APPROVAL PROCEDUREhs0

" -'6 E. l. HATCH NUCLEAR PLANT See Title Page

,,o GeorgiaPbwerd 1

,a e Title Page SITE _ AREA EMERGENCY - CONTROL ROOM OPERATORS NOTE This procedure supercedes HNP-4G01 Revision 5 dated 8-1-80, A.

CONDITION Events are in process or have occurred which involve actual or likely major failures of plant functions'needed for protection of the nublic, Any releases are not expected to exceed PAG exposure levels, evcept near the site boundary, G.

REFERENCES HNP -4GEO C,

ACTIOlj 1.

Take appropriate action to place the plant in a safe condition in accordance with emergency operating procedures, Tech, Specs., and annunciator response procedures, 2,

Check wind direction and speed on panel H11-PG89 or l.

H11-PG90.

Determine evacuation route, based on wind direction as follows:

WI_NO O_I,RECTION ROUTE 315*

- 90 North on U.S.

1 91* *

- 225 South on U.S.

1 22G

- 314' Either direction on U.S.

1 3.

Make the following announcement over the PA:

ATTENTION, ATTENTION:

A GITE AREA EMERGENCY EXISTG, INITIATE SITE AREA EMERGENCY PROCEOUREG, REPORT TO GATE 16 TO EYIT THE PLANT AND RECEIVE FURTHER INSTRUCTIONG, EVACUATION ROUTE WILL GE (NORTH /SOUTI-4/EITHER OIRECTION) ON U.S.

1 HIGHWAY, Sound the Gai-Tronics tone for Site Area Emergency and repeat announcement,

'i 4

Check Control Room instrumentation t.o determine status of 1 -

plant as to whether or not a General Emergency should be N

declared, Notify Ghift Gupervisor of findings from i

pe rf o rmance of HNP -4853, t

'I

,--~..,,,.,w

,---w

APPROVAL NOURE too HNP-4622 E. l. HATCH NUCLEAR PLANT see Titie page REytSQ q ceorgrapowerA DATE O

see ritie e.g.

2 of a 5,

If Shift Supervisor has not reported in to the Control Room, initiate his ar.tions as per HNP-4623, 6.

Announe.ement of the " Site Area Emergenr.y" status should be repeated periodir. ally (approximately every 30 minutes) throughout the duration of the event, 9

O i

l l

rO l:

o

(

.M