Text
GEORGIA POWER COMPANY s
HATCH NUCLEAR PLANT g\\
PROCEDURE O
Seismic Switch Trigged PROCEDURE TITLE HNP-2-2092 PROCEDURE NUMOER Operations RESPONSIBLE SECTION SAFETY RELATED (
)
NON-SAFE'Y RELATED ( X)
APPROVED APPROVED REV.
DESCRIPTION DEPT.
PLANT DATE HEAD ER 4
Page 1 j
g_ p_.
0412140165 841129 PDR ADOCK 05000321
____________t_
y p
PDR s
________________4 HP-9 R
w w
i w----
-vegm
- e,,
-g-w-
+ + = -
ms-3 ypr----w+
pyy-yy-as-
qw-r-*yw se-wev-e7--Pi7'N----eys
eyw-7a v W w
APPROVAL PROCEDURE PeO E.1. HATCH NUCLEAR PLANT HNP-2-2092 See Title Page a6 *
- b oAre 4
GeorgiaPower
~~
rd 1 of 1 See Title Page SEISMIC SWITCH TRIPPED A.
CONDITION The Unit 2 seismic alarm located on panel 2H11-P657 is received.
B.
ACTION 1.
Unit two alarm (annunciated by 2L51-NO22 or 2L51-NO24) indicates the Unit 2 building has experienced an acceleration equal to or. greater than the operating basis earthquake (OSE).
2L51-NO22 actuates at i.054g vertical, i
.08g longitudinal and i.089 transverse.
2L51-NO24 actuates at i.063g vertical, i.18 longitudinal and i.178g transverse.
Check seismic acceleration play-back recorder on Panel H11-P701 to determine magnitude of tremor.
a.
Begin plant shutdown per HNP-2-1025 (acceleration).
b.
Monitor plant operating parameters for abnormalities.
c.
Conduct visual surveillance of plant structures for abnormalities.
d.
Refer to HNP-4858 and HNP-1-2092.
e.
Notify Plant Management.
f.
Refer to HNP-4420 for notification of an unusual event.