Rev 4 to Procedure HNP-2-2092, Seismic Switch Tripped
ML20108E045
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/10/1983
From:
GEORGIA POWER CO.
To:
Shared Package
ML20100P367 List:
References
HNP-2-2092, NUDOCS 8412140165
Download: ML20108E045 (2)


Text

GEORGIA POWER COMPANY s

HATCH NUCLEAR PLANT g\\

PROCEDURE O

Seismic Switch Trigged PROCEDURE TITLE HNP-2-2092 PROCEDURE NUMOER Operations RESPONSIBLE SECTION SAFETY RELATED (

)

NON-SAFE'Y RELATED ( X)

APPROVED APPROVED REV.

DESCRIPTION DEPT.

PLANT DATE HEAD ER 4

Page 1 j

g_ p_.

0412140165 841129 PDR ADOCK 05000321

____________t_

y p

PDR s

________________4 HP-9 R

w w

i w----

-vegm

  1. e,,

-g-w-

+ + = -

ms-3 ypr----w+

pyy-yy-as-

qw-r-*yw se-wev-e7--Pi7'N----eys


eyw-7a v W w

APPROVAL PROCEDURE PeO E.1. HATCH NUCLEAR PLANT HNP-2-2092 See Title Page a6 *

  • b oAre 4

GeorgiaPower

~~

rd 1 of 1 See Title Page SEISMIC SWITCH TRIPPED A.

CONDITION The Unit 2 seismic alarm located on panel 2H11-P657 is received.

B.

ACTION 1.

Unit two alarm (annunciated by 2L51-NO22 or 2L51-NO24) indicates the Unit 2 building has experienced an acceleration equal to or. greater than the operating basis earthquake (OSE).

2L51-NO22 actuates at i.054g vertical, i

.08g longitudinal and i.089 transverse.

2L51-NO24 actuates at i.063g vertical, i.18 longitudinal and i.178g transverse.

Check seismic acceleration play-back recorder on Panel H11-P701 to determine magnitude of tremor.

a.

Begin plant shutdown per HNP-2-1025 (acceleration).

b.

Monitor plant operating parameters for abnormalities.

c.

Conduct visual surveillance of plant structures for abnormalities.

d.

Refer to HNP-4858 and HNP-1-2092.

e.

Notify Plant Management.

f.

Refer to HNP-4420 for notification of an unusual event.

I t

(

. -