GEORGIA POWER COMPANY HATCH NUCLEAR PLANT n

I i

PROCEDURE

\\%

Seismic Instrumentation Trig 2ered PROCEDURE TITLE HNP-1-2092 PROCEDURE NUMBER O erations R

RESPONSIBLE SECTION SAFETY RELATED (

)

NON-SAFETY RELATED ( X) r________________..

APPROVED APPROVED REV.

DESCRIPTION DEPT.

PLANT DATE HEAD ER

. _ _ J.

5 Page 1&2 4

l HNP-9 8412140163 841129 PDR ADOCK 05000321 V

PDR

AMmovAL PRCC&QURE peQ E. l. HATCH NUCLEAR PLANT HNP-1-2OT See Title Page aev e omre 5

O)-

Georgia Pbwer l (

See Title Page

'o 1 of 2 l

f SEISMIC INSTRUMENTATION TRIGGERED

(

A.

CONDITION One or both the following alarms is received on panel H11-P657.

NOTE Seismic Instrumentation Triggered Alarm is shared with Unit 2.

D.

ACTION 1.

SEISMIC INSTRUMENTATION TRIGGERED (Setpoint:

0.O')S e )

indicates an earth tremor has occured and the recording accelerometers have been triggered.

a.

Check Seismic Acceleration Play-back recorder L51-V6R-R601 on panel H11-D701 to determine Magnitutie of tremor.

b.

Shut down reactor per HNP-1-1025 if tremor exceeds OBE

[

O. 08cr horizontal and/or 0.054& vertical.

c.

Monitor plant operating parameters for abnormalities.

d.

Conduct visual surveillance of plant structures for abnormalities, and report findings to Shift Supervisor.

I e.

Notify plant management.

f.

Ref er to FNP-4858.

g.

Depending on the magnitude of the earthquake, refer to HNP-4420 for notification of an unusual event.

l 2.

SEISMIC PEAK SHOCK RECORDER HIGH G LEVEL (Setpoints in tables below) indicates earthquake accelerations approaching or exceeding DBE of 0.15& and peak shock recorder L51-Vbe--N105 is triggered.

Amber light on Annunciator L51-VbC-R620, panel H11-PG01, indicates earthquake accelerations on Unit 1; red lights indicate earthquake accelerations on Unit 2.

O I

x

~

~ ~,.

E. l. HATCH NUCLEAR PLANT HNP-1-2092 see Title Page

,,u,s. ~

DATE 5

GeorgiaPbwer

~~

O

,,, y see Ti+1 e e-ANNUNCIATOR PANEL L51-VbC-RCE SETPOINTS E/W AND N/S VERTIC_AL HERTZ G FORCE lERTZ G FORCE 2.5 O.2G G.4 O.15 4

0.48 10.1 0.15 6.4 0.28 12.7 0.12 12.7 0.15 16 0.10 a.

Check magnitude of earthquake at annunciator L51-V6C-R620 on panel H11-P701.

b.

Notify plant management.

c.

Refer to HNP-4858.

d.

Depending on the magnitude of the earthquake, refer to g

HNP-4420 for notification of an unusual event.

O C

e I

b 0

l i