GEORGIA POWER COMPANY HATCH NUCLEAR PLANT n
I i
PROCEDURE
\\%
Seismic Instrumentation Trig 2ered PROCEDURE TITLE HNP-1-2092 PROCEDURE NUMBER O erations R
RESPONSIBLE SECTION SAFETY RELATED (
)
NON-SAFETY RELATED ( X) r________________..
APPROVED APPROVED REV.
DESCRIPTION DEPT.
PLANT DATE HEAD ER
. _ _ J.
5 Page 1&2 4
l HNP-9 8412140163 841129 PDR ADOCK 05000321 V
AMmovAL PRCC&QURE peQ E. l. HATCH NUCLEAR PLANT HNP-1-2OT See Title Page aev e omre 5
O)-
Georgia Pbwer l (
See Title Page
'o 1 of 2 l
f SEISMIC INSTRUMENTATION TRIGGERED
(
A.
CONDITION One or both the following alarms is received on panel H11-P657.
NOTE Seismic Instrumentation Triggered Alarm is shared with Unit 2.
D.
ACTION 1.
SEISMIC INSTRUMENTATION TRIGGERED (Setpoint:
0.O')S e )
indicates an earth tremor has occured and the recording accelerometers have been triggered.
a.
Check Seismic Acceleration Play-back recorder L51-V6R-R601 on panel H11-D701 to determine Magnitutie of tremor.
b.
Shut down reactor per HNP-1-1025 if tremor exceeds OBE
[
O. 08cr horizontal and/or 0.054& vertical.
c.
Monitor plant operating parameters for abnormalities.
d.
Conduct visual surveillance of plant structures for abnormalities, and report findings to Shift Supervisor.
I e.
Notify plant management.
f.
Ref er to FNP-4858.
g.
Depending on the magnitude of the earthquake, refer to HNP-4420 for notification of an unusual event.
l 2.
SEISMIC PEAK SHOCK RECORDER HIGH G LEVEL (Setpoints in tables below) indicates earthquake accelerations approaching or exceeding DBE of 0.15& and peak shock recorder L51-Vbe--N105 is triggered.
Amber light on Annunciator L51-VbC-R620, panel H11-PG01, indicates earthquake accelerations on Unit 1; red lights indicate earthquake accelerations on Unit 2.
O I
x
~
~ ~,.
E. l. HATCH NUCLEAR PLANT HNP-1-2092 see Title Page
,,u,s. ~
DATE 5
GeorgiaPbwer
~~
O
,,, y see Ti+1 e e-ANNUNCIATOR PANEL L51-VbC-RCE SETPOINTS E/W AND N/S VERTIC_AL HERTZ G FORCE lERTZ G FORCE 2.5 O.2G G.4 O.15 4
0.48 10.1 0.15 6.4 0.28 12.7 0.12 12.7 0.15 16 0.10 a.
Check magnitude of earthquake at annunciator L51-V6C-R620 on panel H11-P701.
b.
Notify plant management.
c.
Refer to HNP-4858.
d.
Depending on the magnitude of the earthquake, refer to g
HNP-4420 for notification of an unusual event.
O C
e I