I BROWN & ROOT, INC. PROCEDURE 1

EFFECTIVE  !

CPSES NUMBER REVISION DATE PAGE l CP-CPM 9.2 0 ,6/25/84 I of 3 TITLE: ORIGINATOR I"M8 CONTROL OF CHEMICAL SUBSTANCES REVIEWED BY: ,

B4it '

6 [

Date O f0 tilzflH

. o W I TUGCO W f 'Date APPROVED BY: . &/A# # /#

CONSTRUCTION PROJECT MGR

[-2EYf Da te l-o.i. TABE OF CONTENTS

_Sec t io n Title 1.0 INIRODUCTION 2.0 INSTRUCTION 2.1 USE OF APPROVED CHEMICALS

-I hgk }f 2.2 USE OF NON-APPROVED CHEMICAIS 4J/ {

h 1.0 INrRODUCrION This instruction provides for the control of chemical substances within the Reactor, Sa feguard, and Auxiliary Buildings. This instruction is applicable to commercial chemical products as permitted by specifications as well as other chemical substances such as janitorial supplies including wax, glass cleaner, liquid scap, e tc .

2.0 INSTRUCTION 2.1 USE OF APPROVED CHEMICA M

(

Chemicals defined by specifications and procedures [nay be used in accordance with the prescribed requirements, but may not be used elsewhere without Engineering approval.

h S

M

e BROWN & R00I, INC. PROCEDURE EFFECIIVE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 CP-CPM 9.2 0 6/25/84 2 of 3 2.2 USE OF NON-APPROVED CHEMICAIS Chemicals other than those discussed in paragraph 2.1 shall not be brought into permanent plant structures without authori-tation of the applicable Building Manager. This authoridation shall be documented on the attached form which will specify the brand name of the product, and it's intended use and location.

The product shall not be used for any other purpose or in any other location than those specified. Use o f t he se < .nces

,1 in the other buildings should be controlled in ace ( ;- .a with normal sa fety practices.

i I

( .

rss:- M _ M 1 1A". .

BRINN & 200r, INC. INSTRUCTION EFFECTIVE (7

CPSES EMER REVISION DATE PACE JOB 35-1195 CP-CPM 9.2 0 6/25/84 3 of 3 GEMICAL SUBSTANCE AUTHORIZATION Use of t he follovirg chemical substances are authorized as described:

Product / brand name Intended use Authorized location Building Manager Da te N

e 9

m

TII-4249 '

August 10, 1984 QUESTIONS RELATIVE TO ALLEGATION NO. 42 a) Provide revisions of procedures to prevent repetition of these practices.

Response

No formal actions were taken other than disposition of the than NCR's.

e 9

O

TII-4249 August 10, 1984 QUESTIONS RELATIVE TO ALLEGATION NO. 43 a) Provide coating procedure which gives requirements for monitoring / verifying temperature and relative humidity during curing of inorganic zine coatings, 4

b) Was water curing of the zine coatings ever used and recorded?

c) What fraction of the backfit adhesion test failures (less than 200 psi) were zine cohesive failures.

d) What percentage of coatings NCR's involve zine cohesive failures?

Response

a) The require =ents for monitoring / verifying temperature and relative humidity during cure of inorganic zine coatings is described in CCP-30, CCP-30A, QI-QP-11.4-1, QI-QP-11.4-5 and QI-QP-11.4-26. (Copies attached).

b) Yes, on inspection reports, c) Specific data is not available.

d) Since July 1980, approximately 430 NCR's have been written in the coatings area. 18 of these NCR's involve adhesion / cohesion failure of some type on liner place, but do not specify type of failure.

O O