Rev 10 to Procedure CP-EP-4.6, Field Design Change Control
ML20107C375
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/16/1984
From: Randy Baker, Mcbay M
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20106F959 List:
References
CP-EP-4.6, NUDOCS 8502210291
Download: ML20107C375 (15)


Text

.

0

    • ~'

m 3CO ESGINEERING DIVISICS P!OCFOURE REVISICN ISSUE PAGE

... o DATE CP-EP-4.6 10 4-16-34 1 of 15 FIELD DESIGN /

QiANGE CDNIBOL PREPARED BY APPIOVED BY M <t v /

V

1.0 REFERENCES

1-A 'IUGCO CA Plan 1-B TNE Procedures Manual 1-C CP-EP-4.7 Centrol of Ehgineering/ Design Review of Field Design Changes 1-D CP-EP-4.0 Design Control General Requirements 1-E CP-EP-4.5 Lesign Verification 2.0 GLNEPAL 2.1 RJRPOSE '

DM To describe the general method of documenting changes or deviations to specified design / construction requirements by authorized field personnel 'ollowing relea.3e of engineering &cuments approved for fabrication or construction. Rese provisions are established to assure cu:pliance with the requirements of Reference 1-A. Note, supplemental engineering procedures / instructions may be used to describe and implement alternate methods of design cnange control.

2.2 SCOPE Design change / deviations shall be approved den complete and validated y designated authorities as des:ribed in this instruction.

2.3 RESPCESIBILITIES n e Assistant Project General Manager has overall responsibility for the design of the CPSES project. Authority for the implementation of this procedure has been delegated to the Manager of Engineering and subordinate engineering organizations. Further delegation of authority may be acconplished through formal engineering instructions supplementing this procedure.

ne Manager of Ehgineering shall assure that adequate tracking mechanisne exist to provide positive control of the issue, disposition, and status of cbcuments issued as a result of these measures.

2.4 DEFINITIONS ,

2.4.1- Engineerino Documents As used in this procedure, documents approved for fabrication or construction which specify design, engineering, and/or construction requirements (such as specifications and drawings).

8502210291 850213 PDR ADOCK 05000445 S PDR

'IU3CO E::GINEERING DIVISICN PRDCEDURE REVISION ISSUE PAGE DATE

. CP-EP-4.'6 10 4-16-84 2 of 15 2.4.2 Design Change A revision to engineering documents which affects the form, fit, or function of the affected structure, system or exponent.

2.4.3 Deviation A departure from a specified engineering requirement that &es not affect the form, fit, or function of affected structure, system, or conponent.

2.4.4 Engineering Change Requests A document used to forward engineering, design, or technical informa-tion between engineerire organizations for the purposes of initiating revisions to engineering documents. 'Ihe ECR is a connunication/

interface document which does not authorize fabrication or construction activities.

2.5 DOCCM arATION Design changes / deviations to specified engineering documents shall be documented by revision initiated by an Ergineering Change Regaest (ECR), a Design Change Authorization (DCA), or a Congonent Modification Card -(CMC). 'Ihe respective forms and the application of each are further described below.

3.0 PPOCEEURE 3.1 ENGINEERING GANGE REQUESTS 3.1.1 General EER's shall be used by CPPE to initiate design changes to be documented by document revision. In addition, design change proposals forwarded by other organizations such as Westinghouse Field Oiange Notices (PCN's), 'IUGCD Design Change Requests ('IDCR's) and Gibbs & Hill Design / Engineering Change / Deviations (DE/CD's) may be processed by ECR's.

Upon coupletion by the originator,the ECR shall be forwarded as specified herein for engineering h==nt incorporation, approval, and design verification as required.

3.1.2 Specif Scope of ECR's

'Ihe specific scope of changes (i.e., systems, subsystems, areas, engineerity documents, etc.) to be processed by ECR's shall be administratively defined by the CPP Digineering Manager.

WrE: . Changes critica"l to construction in terms of an Lwediate need for implementation may be exempted from the scope of ECR's on a case by case basis. Changes processed in this manner shall be &cumented by DCA/ CMC;' however, the change shall be authorized by specified engineering management personnel.

e 1

'IUGCO ENGINEERING DIVISION PIOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-64 3 o'f 15 3.1.3 Form Comoletion Detailed instructions for mmpletion of the EER form are specified per Attadment 1. I 3.1.4 Request Approval and Distribution t.CR's shall be approved by individuals designated by the CPP Engineering Manager. Upon approval, the ECR shall be forwarded as follows for disposition:

Scope of ECR Resconsibility a) Non-ASME, BRP Related CPP Mechanical En3ineering b) Non-ASME, Non-BRP Related INE c) ASME Related: Stamping Complete TNE d) ASME Related: Stamping Incomplete CPP Mechanical or I&C Engineering 3.1.5 -Disposition 3.1.5.1 Non-ASME, BRP Related

  • The ECR. shall be used by CPP Technical Services as a basis for BRP revision and re-analysis (as required). If the ECR also affects design cbcuments other than BRP's, CPP Technical Services will forward mpies of the ECR to the responsible organizations. 'Itese activities shall be acconplished in accordance with the engineering procedures / instructions established to control the design and-

- design dange program. _ Revised design &Jcuments shall be entered into the doctanent control program.

3.1.5.2 M:n-ASME, Non-BRP Related The ECR shall be used by ':NE to conmence design mntrol activities as defined per Reference 1-B. ($cn coupletion of an engineering review to identify design mnsiderations (such as interdiscipline review, calculations, damage study, etc., inpact),,the ECR shall be ira.myaated into affected documents for formal approval of the design change and design verification (if required). During the disposition process, the ECR may be modified with the involvement of the oriainator.

Affected documents shall be entered into the document control Program for distribution.

'IUGOO ENGINEERING DIVISION PROCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-34 4 of 15 3.1.5.3 ASME Related: Sta. ping Conplete

'INE shall complete design mntrol activities as specified in Reference 1-B. CPPC shall participate in the analysis and pipe support effort as defined in the TNE-defined interface &cuments.

All CPPE activities shall be controlled in accordance with established engineeririg procedures / instructions. During the disposition process, the ECIt may be nodified with the involvement of the originator. i 3.1.5.4 ASME Related: Sta: ping Inco::plete >

'Ihe ECR shall be used by CPP Mechanical or I&C Engineering as a basis for revising the engineerirg document used in the certification process. The revised document shall be reviewed to determine if stress re-analysis is required. If stress re-analysis is recuired, the reviewing organization shall coordinate the analysis and -/

initiate pipe support design activities as required. After '

re-analysis, er if ro re-analysis is required, the revised &cument shau be forwarded to TNE for the completion of design control activities and return. The above activities shall be accomplished in accordance with the engineerirg procedure / instructions established to entrol the design and design change program.

Revised engineering documents shall be entered into the document control program.

3.1.6 Closure ECR disposition shall be documented per Figure 1. Distribution of the Mapositioned ECR shall include the originator and DCIG.' Where requiref, the responsible disposition organization shall retain a copy of 'e ECR for design control documentation.

3.2 DESIGN QiANGE AUIHORIZATIONS & COMPONENT KDIFICATION CARDS 3.2.1 Form Ccmipletion -

Detailed instructions for cchpletion of the DCA/Ott forms are specifiedperAttachment2,&(3.

t i

?

..f

'IUGCO ENGINEERING DIVISICN PIOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-84 5 of 15 3.2.2 Review and Aporoval Field originated design changes / deviations shall te approved by the original designer's designated site representative unless otherwise stated in formal engineering instructions supplementing this procedure. 'Ibe Engineering Manager shall maintain written authorization of personnel designated as a "G&H Design Representative" or design representative of any other vendor. Clarifications or design changes properly approved and issued by the original design organization require only the signature of the originatirg engineer /

technician. Such clarifications ce design changes shall be referenced or attached. Design changes / deviations documented as described herein are approved for fabrication and construction only. In addition, these measures may be used to communicate or identify to construction changes / deviations originated / approved by the original design organization.

Subsequent review and approval by the original design organization shall be accouplished per the provisions of Reference 1-C or 'INE.

3.2.3 Distribution Distribution of field change / deviation cbcuments shall be accomplished as required to fulfill the requirements of this procedure and to satisfy basic cbcument control requirements of interfacing organiza-tions such as the design and constructico groups. 'Ihe provisions of Reference 1-D shall also be considered when establishing distribution.

3.2.4 Revisions Revisions to DCVCMC Forms shall be accomplished as described in Attachments 1 and 2 and shall be reviewed and approved as prescribed in Section 3.2.2.

'IUGCO ENGINEERING DIVISIOti PBOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-34 6 of 15 3.2.5 Desien Verification '

1 Design changes / deviations shall be verified either prior to, or after inplementation by authorized personnel, to confirm or substantiate that the change is acceptable from an engineering standpoint and consistent with the design basis (or input), ESAR comnitments and applicable codes and standards. 'Ihis verification shall normally be acccmplished by the original design organization in accordance with established procedures although the provisions of References 1-B or 1-E may be utilized at the discretion of the Assistant Project General Manager.

l In the event the design verification a~ctivities indicate the change / deviation is unacceptable, the reviewing agency shall notify the originating organization who may, on the area in question, place a " Hold" or rescind and reissue the change /

deviation. Any physical corrective action required in problem areas shall be evaluated and formulated on a case by case basis.

3.2.6 MterfaceControl Significant changes / deviations to engineered items involving A/E and vendor interfaces for equipnent foundaticn details shall be reviewed with both the A/E and the vendor for cxxnpliance with design reqdirements, prior to approval for fabrication or construction.

Formal cbcumentation where vendor or A/E approval is required shall be accomplished in accordance with Reference 1-C.

+

se 4 m EXXD ENGINEERING DIVI $ ION PPOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-E4 7 of 15 ATIACHMENI I ECR ECBM COMPLETICN

'Ihe Engineering Change Request Form (Figure 1) shall be cornpleted as follows:

a. ECR No. - assigned by the responsible site organization.
b. Safety Belated Document - Check appropriate block.
c. Discipline - Designate appropriate Engineerirg organization.
d. Applicable Spec / Dwg / Document - Cross out &cuments that do not apply. Specify all known affected or interfacing engineering documents,
e. Details - Provide information on the cIlange under consideration usirg adequate descriptions or references to other dccaments which clearly illustrate the problem and resolution. Attach the design docunents marked to adequately show the change.
f. Supporting Documentation - References supporting docurents such as telephone conversations, telexes, telecopies, sketches, FCNs, DCAs, 'IDCRs, 'IDRs other ECRs, etc.

Handwritten forrs will be accepted in isolated cases; however, typing is preferred.

The originator and date shall be providad. Approval shall be ;rovided, disposition responsibility assigned, and the EX"R forwarded for disposition as indicated in Section 3.1.4.

Modifications required to the ECR in the disposition process shall be indicated by noting the change on the ECR. 'Ihe change shall be initialed or otherwise validated and dated. All involved parties should be identified in the validation.

.-- s ,w

TUGCO ENGINEERING DIVISION PIOCEDUPE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-24 8 of 15 ATTACHMENr 2 DCA EDIE COMPLE.T ICN The Design Change Authorization form (Figure 2) shall be completed as follows:

a.

Authorization No. - Assigned by the responsible site organization.

b. (WILL) (WILL PDF) Be Incorporated in Design Docunents - Cross out the one that does not apply.

As a general rule, design changes to a specification thich are generic in a nature and will affect future work on a continuing basis shall te designated drawings that can be delineated cn the drawing. Clarifications and/or interpretations. involving design docunents will normally not be incorporated into the design docenents. It is to be recognized that specific guidelines covering every situation cannot te delineared in this procedure; as such, it will be,the responsibility of the Originating Engineer / Technician to exercise judgement and designate whether or not a change should b3 incorporated. Note designatien of incorporaticn is for preliminary use only.

c. Safety Related Docunent - Check the appropriate block.
d. Originator - Check the appropriate block. (~he " Originator" of a DCA resulting from a DE/CD should be noted as the " Original Designer").

e.

Appilcable Spec /Dwg/ Document - Cross out the docunents that do not apply.

Specify all known affected or interfacing engineering documents.

f.

Details - Provide information on the change under consideraticn using adequate descriptions or references to other document (s) which clearly illustrate the problem and its resolution and provide sufficient information to reflect the "as-built" configuration.

g. Supporting Docunentation - Reference supporting documents such as telephone conversations, telexes, telecopies, DE/CD's, sketches, ECNs,

'IDCRs, TDRs, etc.

If the DE/CD is modified by site engineering, the word " Modified" shall be placed adjacent to the DE/CD number.

IT.1GCO ENGINEERING DIVISION PBOCEDURE REVISION

  • ISSUE PME DATE CP-EP-4.6 10 4-16-24 9 of 15 Handwritten perferred. forms will be accepted in isolated cases, however, typing is We DCA is then reviewed for technical acceptance by the designated personnel.

Approval is obtained by signature and dating the appropriate blanks as indicated in Section 332.2.

In the event formal approval and design verification is required prior to issue, the DCA shall be forwarded to the responsible organization.

Completion of those activities by the responsible organization shall be indicated by signature and date in the "DESIG3 REVIN PRIOR TO ISSUE" blank.

If formal approval and design verification is not required prior to issue, mark "NA" in the "DESIG3 REVIN PRIOR TO ISSUE" blank. Note "NA" does not indicate approval and design verification is not subsequently required.

Revisions to a DCA will use Figure 2 and are filled out as described with the following exceptions:

a.

The same authorization number shall be used.

b. The appropriate revision number shall ta placed after the authorization number.
c. Subsection 3.B, Details, shall contain the following:

"21s revision voids and supersedes Design Change Authorization No. , Revision .

d. If it is necessary to void or rescind a Design Change Authorization, it should be done by a revision to the existing DCA. Subsection 3-B (Details) of Figure 2 should contain the following statement "This revision voids Design Change Authorization No. and all revisions thereto".

4

'ItX3CO DXIINEERING DIVISION PIOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-E4 10 of 15 ATTACHMD7r 3 CMC FORM COMPLETICN Se Conponent Modif'ication Form (Figure 3) is a:mpleted as follows unless otherwise stated in engineering instructions supplementing this procedure.

I We card should be filled out using a black ink pen or " dark" pencil.

a. Serial No. - Prenu6ered, or as established through detailed application instructions supplementing this procedure.
b. Section 1, Application - State generic category of work (e.g. mechanical equi;nent, electrical equipment, pipe, pipe supports, etc).

Weld 2d., Q, Non-Q - Check appropriate block.

Design Change Deviation - Cross out the one that ches not apply.

Enter N/A or leave blank if not a change or deviation to design.

c. Section 2, Dwg. No. - Enter the complete number and revision of the affectal design basis and/or construction drawings as follows:
1. Electrical - Enter desiga b-ais drawing numbers.
2. Pipirg and Instrumentation - Enter the design and construction

' drawing numb - "or all design dange/ deviations; and enstruction drawing nu:r.bers for construction changes.

3. Pipe Supports - Enter the construction drawing nu2ers.

. d. Section 3, Line No./Conponent No. - Enter the specific identification number of the conponent to be nodified; spool number, equipment t

number, etc. It is not required to enter the pipe support number in block 3. If a number of~ items are affected, enter "see sketch", and show all changes in block 5.

e. Section 4, Reason for Change - State briefly but concisely the reason for the change. If to inplement a change properly approved by the i

Original Design, clearly state this fact (e.g., 'Ib inplement DE/CD 8600).

f.

Section 5, Instructions - Describe mnpletely and accurately the dange to be made.

1. Where there are no welds or material removed or added, enter m "N/A" in the appropriate blocks.
2. For renoval and/or addition of welds and/or material, check the appropriate block and enter all weld ntubers and/or Bill of Material item numbers renoved and/or added. It is not mandatory i

to disposition the future use and/or storage requirements for

! deleted material.

~. ___ . _ . _ _ _ _ _ _ _ _ _ _ __ -

0 TUGCO DGINEERING DIVISION PEOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-84 11 of 15

3. FOR PIPING ONLY AND INTEGRAL HANGER ATTACHMDTTS - If, after the original issue of BRP drawing, a weld has to be removed and rewelded, the weld number will be changed to indicate same by adding an "A" for the first removal, "B" for the second removal, etc. to the weld nu:rbers, e.g.,

for the weld 6, the first removal / reweld is 6A, and if 6A requires rework, the second removal / reweld is 68.

4. FOR PIPING 0;I.ll - When stainless steel materials are re-used and tne heat affected zone not removed, the new weld number will include the next sequential letter of the item with the highest numerical weld nu cer.

For exanple, if the pipe between welds 7A and 6C is deleted, and the remaining parts welded together, the new weld number will be 8D, not 7B. In the situation where weld 6A is cut and a pup installed between the tw pieces, the new welds will t:e numbered 6B and 6A-1.

5. PIPING ONLY - If, after the original issue of the BRP drawing, an added weld is required which is not a reweld of an existing weld; the new weld will be keyed to the lower of the two nu:-bered welds a:d suffixed by "-1" for the first weld, "-2" for the second weld, etc., if a wid is added between weld "3" and "4", the new weld will be "3-1".
g. Section 6- Provide a sketch indicating the new arrangement when necessary for clarification. When more than one CK' affects a drawing, care shall be taken to avoid conflicts between the CMC's. This block should include specifications of items added that are not listed on the affected drawing.

It should also show new wid locations, and all required wrking goint dimensions (cut lengths for piping and hangers are not reqaired).

h. Section 7 - Originator - Enter the na:ae of the individual preparing the modification (for piping changes, foreman requestig the change should be entered).

l

i. Section 8 - Approvad By - Approval shall be obtained in accordance with Section 3.2.2. ,

I

j. Section 9 - Distribution - If not predesignated, the Engineer / Technician i.

preparing the CMC shall enter the name of each agency requiring an

!. " Engineering nd Office Use Only" copy and shall indicate the nunter

  • j of required copies for each.

i I

I I

I L .

m... . .

'ITJGCO ENGINEERING DIVISION PIOCEDURE REVISION ISSUE PAGE DATE CP-EP-4.6 10 4-16-34 12 of 15

k. General - Extra sheets may be used wh'ere necessary to adequately cover the subject. All sheets nust he marked with the C4C serial nurrber and nimbered page of .
1. Revi'sions to s CT may be accor:plished by changing the original form or by utilizing a new form (nonserialized) and fillirg it out as outlined atove. me following additions shall be noted cn the revised CMC, as applicable.

, 1. Se sa:ne serial n=ler shall be used.

2. Se appropriate revision number shall be placed adjacent to the serial number.
3. If the reason for the revision is different from the original, enter the additional circumstances in Block 4.
4. Se CMC shall contain the following state:ent:

"21s revision voids and supersedes document Serial Nu:ter , Fevision .

m. When an occasion arises where a CMC has been issued and for some reason that card is not needed, it must be voided.
1. 'Ib void a CMC, the original card must be revised and clearly marked

" Voided - Not Superseded".

2. A void CMC shall not be reactivated.

k

'IUGCO ENGINEERING DIVISION PIOCEDURE REVISION ISSUE PME DATE CP-EP-4.6 10 4-16-34 13 of 15 FIGURE 1 (TYPICAL)

REV. .- PAGE 1 OF CDMANQiE PEAK STEAM ELECTRIC STATION ENGINEERING CHANGE REQUEST

, ECR NO.

1. SAFETY REIATED GA:CE: YF.S 10
2. DISCIPLINE: CPPE 'INE
3. DESCRIPTION:

A. APPLICABLE SPEC /WG/DOCUMaff

,s B. DETAILS C. REASON FOR ORT,E

4. SUPPCRTI!G DOCL7.E7TATICN:

2

5. APPIOVAL SIGNAWRES:

A. ORIGINA'IOR DATE~

B. APPIOVED BY DATE l C. DISPOSITION BY 'INE CPPME CPPI&C
6. DISPOSITION:

I =

A. APPIOVED APP 10VED AS PCTED REJECTED B. DRAWING & REVISICN AFFECTED BY ECR INCORPORATICN OR JUSTIFICATION EOR REJECTION:

i l'

BY: DATE 4

ECR FORM r

10-83 k

b

I TUGCO ENGINEERING DIVISICN PROCEDURE REVISION ISSUE PAGE DATE

' CP-EP-4.6 10 4-16-54 14 of 15 l

PA2 1 0P l CDMANCHE PEAK STEAM ELECTRIC STATICN DESIGN CHANGE AUIHORIZATION (WIIL) (WIIL NOr) BE IKORPORATED IN DESICH DOCUMENT DCA NO.

1. SAFETY REIATED DOCLNENT: YES NO
2. ORIGINATOR: CPPE ORIGINAL DESIGNER
3. DESCRIPTION:

-A.- APPLICABLE SPEC /DWG/DOCL7.Cir FIV.

B. DETAILS

4. ' SUPPORTING DOCUMENIATION:
5. APPROVAL SIGNATURES:

A. CRIGINMOR: OkTE B. DESIGi REPRESENTATIVE: DATE C. DESIGN REVIEW PRIOR TO ISSUE: ~DATE

6. STANDARD DISTRIBUTION: ,

ARMS (ORIGINAL) (1)

QUALITY ENGINEERIN3 (1)

DCIG FOR ORIG. DESIGN *

(1) ,

DCA stRM 3-84

~ .

EX;CO DX3INEERING DIVISION PIOCEDURE REVISICH ISSUE PAGE DATE CP-EP-4.6 10 4-16-34 15 of 15 CMC EDIM (TYPICAL) e a

i I 3 3 3 g 3 ud- l l l a a HI

! - a 2 a a a I I 1.

E o -

3 l

s s-ca g

=

i m

s 6 _-

t 4

a g e ULe e s .

u G ..-.

2 5

,v,t 5 _ .

e E

h 5,'

. r;\..?% ,, em - .e 2 e 6

? .y .. .

~ NN,w, --

g .

1..,. c

, p. .

- - =

c k .

g 9 a .

a y e .

=

= g g

{ ; _-

=

= o, e e

U ,, ,

Q

' s* . _

1 3 _ _ .

I g e -

2 1

3:

= 0.

55 ev (

o o

s l-'

wG E ,2 W

,  % g -

WX g 1 -

!! e554= i 1

.