Forwards Procedures Generation Package, Prepared in Accordance w/NUREG-0899, Guidelines for Preparation of Emergency Operating Procedures, Dtd Aug 1982,for Review
ML20102C412
Person / Time
Site: Fort Calhoun 
Issue date: 03/01/1985
From: Andrews R
OMAHA PUBLIC POWER DISTRICT
To: John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20102C413 List:
References
RTR-NUREG-0899, RTR-NUREG-899 LIC-85-086, LIC-85-86, NUDOCS 8503060326
Download: ML20102C412 (1)


Text

Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 402,536-4000 March 1, 1985 LIC-85-086 Mr. James R. Miller, Chief Office of fiuclear Reactor Regulation Division of Licensing U. S. fluclear Regulatory Commission Washington, DC 20555

Reference:

(1)

Docket fio. 50-285 (2)

Letter from f1RC (J. R. Miller) to OPPD (W. C. Jones) dated February 22, 1984

Dear Mr. Miller:

Procedures Generation Package (PGP)

In response to Reference (2), the District has prepared a PGP in accordance l

with guidance provided by If1P0 and flUREG-0899, Guidelines for Preparation of Emergency Operating Procedures, dated August,1982.

The purpose of this let-ter is to submit the Fort Calhoun Station PGP for f1RC staff review.

The Fort Calhoun PGP will be utilized to upgrade the existing Emergency Opera-ting Procedures (EOP) and will be maintained as a working document for future revisions to the E0Ps. The Administrative Procedures of the Fort Calhoun Station Operating Manual will be revised to stipulate the use of the PGP for upgrading and revising the E0Ps.

The E0Ps are currently being upgraded in accordance with the Fort Calhoun PGP.

Final implementation of the revised E0Ps is expected by the end of the 1985 refueling outage.

Si ncer,ely,

/ /'

[ ////.( /

B503060326 850301 R.L.dndrews PDR ADOCK 0500 g3 D hid on M m er F

fluclear Production RLA/CWil/dao Attachment i g0) cc:

LeBoeuf, Lamb, Leiby & MacRae 1333 flew Hampshire Avenue, fl.W.

\\}g Washington, DC 20036 n

1 Mr. E. G. Tourigny, f1RC Project Manager Mr. L. A. Yandell, flRC Senior Resident inspector imown n rg., oppormnay