Informs That Diesel Generator Reliability Info Submitted in in Response to Generic Ltr 84-15 Precludes Separate Response to Generic Ltr 83-41 Re Fast Cold Starts of Diesel Generators
ML20101R857
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/31/1985
From: Andrews R
OMAHA PUBLIC POWER DISTRICT
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
GL-83-41, GL-84-15, LIC-85-024, LIC-85-24, TAC-55860, NUDOCS 8502050070
Download: ML20101R857 (2)


Text

-

i Omalla Public Power District 1623 Harney Omaha. Nebraska 68102 402/536-4000 January 31, 1985 LIC-85-024 Mr. Darrell G. Eisenhut, Director Office of Nuclear Reactor Regulation Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

Reference:

(1) Docket No. 50-285 (2) Generic Letter 83-41, dated December 16, 1983 (3) Letter OPPD (W. C. Jones) to NRC (D. G. Eisenhut) dated January 6,1984 (LIC-84-002)

(4) Generic Letter 84-15, dated July 2, 1984 (5) Letter OPPD (R. L. Andrews) to NRC (D. G. Eisenhut) dated December 28, 1984 (LIC-84-413)

Dear Mr. Eisenhut:

Fast Cold Starts of Diesel Generators Generic Letter 83-41 Reference 2 contained a voluntary request for infomation concerning the fast cold starts of diesel generators (i.e., starts with rapid acceleration and loading without prelubrication and wamup).

In Reference 3, the District provided a response to Reference 2 which stated that Fort Calhoun's emergency diesel generators are provided with prelubrication and wamup capabilities.

The Fort Calhoun diesel generators are kept warm by a water jacket inmersion heater and a lube oil pump which circulates oil when the generator is not op-erating.

For these reasons, the District concluded that the concerns of NRC Generic Letter 83-41 were not applicable to Fort Calhoun Station.

Subsequently, the Omaha Public Power District received Reference 4.

This letter requested that certain information regarding diesel generator relia-bility be submitted.

In order to respond to this request, considerable research was conducted and numerous conversations were held with the manu-facturer of the Fort Calhoun diesel generators. Through these conversations it was ascertained that although the diesel generators are kept warm and are equipped with a lube oil heater, these items are not sufficient to eliminate the stresses associated with fast cold starts.

8502050070 850131 0

DRADOCK05000g

_=_

- O-

' As Reference (5) subsequently provided more detailed information on diesel gener-ator reliability at the Fort Calhoun Station, no separate response to Reference (2) is now required.

Sincerely, Y

R. L. Andrews Division Manager Nuclear Production RLA/DJM/dao cc: LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, DC 20036

-Mr. E. G. Tourigny, NRC Project Manager Mr. L. A. Yandell, NRC Senior Resident Inspector u_.