MONTHYEARML20062D6901982-07-29029 July 1982 Application for Amend to License NPF-5,temporarily Changing Tech Specs 3/4 8-1 & 3/4 8-2 to Extend 72-h Limiting Condition for Operation for One Inoperable Diesel Generator Project stage: Request ML20062D7101982-07-29029 July 1982 Proposed Temporary Changes to Tech Specs 3/4 8-1 & 3/4 8-2 to Extend 72-h Limiting Condition for Operation for One Inoperable Diesel Generator Project stage: Other ML20079E2151984-01-0909 January 1984 Submits Info on Diesel Generator Quick Starts & Opinion of Effect on Reliability.Record of Diesel Cold Starts for 1983 Summarized,In Response to NRC 831216 Request Project stage: Request ML20095D2031984-08-16016 August 1984 Requests Extension Until 841107,to Respond to Request for Info Re Reliability & Upgrading of Diesel Generators,Per Generic Ltr 84-15.Extension Due to Workload at Site for Unit 2 Recirculation Pipe Replacement Outage Project stage: Request ML20099E1841984-11-0707 November 1984 Proposed Tech Spec Changes Re Limiting Conditions for Operation,Surveillance Requirements & Bases for Diesel Generator Operability,In Response to Generic Ltr 84-15 Project stage: Other ML20099E1641984-11-0707 November 1984 Application to Amend Licenses DPR-57 & NPF-5,in Response to Generic Ltr 84-15, Proposed Staff Actions to Improve & Maintain Diesel Generator Reliability. Amend Revises Tech Specs Re Limiting Conditions for Operation.Fee Paid Project stage: Request ML20099L4301984-11-20020 November 1984 Corrected Page 3/4 8-3 to Tech Specs Re Surveillance Requirements Project stage: Other ML20099L1991984-11-20020 November 1984 Forwards Corrected Page 3/4 8-3 of Diesel Generator Tech Specs Covering Surveillance Requirements for Electrical Power Sys,In Response to Generic Ltr 84-15 Project stage: Other 05000366/LER-1985-005-01, :on 850329,determined That Battery Surveillance Procedure Contained Acceptance Criteria That Did Not Satisfy Tech Specs.Caused by Procedural Inadequacy.Procedure Being Revised1985-04-26026 April 1985
- on 850329,determined That Battery Surveillance Procedure Contained Acceptance Criteria That Did Not Satisfy Tech Specs.Caused by Procedural Inadequacy.Procedure Being Revised
Project stage: Other ML20129E4711985-05-30030 May 1985 Notification of 850613 Meeting W/Util in Bethesda,Md to Discuss Proposed Changes to Diesel Generator Tech Specs Project stage: Meeting ML20202F7371986-03-31031 March 1986 Proposed Tech Specs Re Reduction of Number of Fast Cold Starts,Frequency of Testing Determined to Be Abusive & Elimination of Excessive Testing to Diesel Generators Project stage: Other ML20202F7021986-03-31031 March 1986 Application for Amends to Licenses DPR-57 & NPF-5,revising Tech Specs to Reduce Number of Fast Cold Starts,Eliminate Excessive Testing & Reduce Frequency of Testing Determined to Be Abusive to Diesel Generators Project stage: Request ML20237K2301987-08-25025 August 1987 Amends 147 & 83 to Licenses DPR-57 & NPF-5,respectively, Modifying Tech Specs Re Testing of Onsite Emergency Diesel Generators Project stage: Other ML20237K2471987-08-25025 August 1987 Notice of Denial of Amends to Licenses DPR-57 & NPF-5 & Opportunity for Hearing on 860331 Request Re Extension from 2 to 24 H,Time Allowed to Restore Operability of 1 of 2 Inoperable Diesel Generators Project stage: Other ML20237K2351987-08-25025 August 1987 Safety Evaluation Supporting Amends 147 & 83 to Licenses DPR-57 & NPF-5,respectively Project stage: Approval 1984-08-16
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
,
_;e-
,s j
- a '
EIJ!CTRICAL POER SYSTTMS SURVEILIANCE PsmIRBGNIS f
'4.8.1.1.1
_ Each of the above required independent circuits E between _the offsite tranmission network and the onsite Class lE. distribution system -
.shall be:
a.
. Determined ' OPERABIE at least once per 7 days by verifying correct l
breaker alignsents and indicated power availability, and '
b.
Deonstrated OPERABIE at least once per 18 monthsiduring ' shutdown by transferring, manually and automatically, unit power supply from the normal circuit to the alternate circuit.
4.8.1.1.2 Each diesel generator shall be demonstrated OPERABIE:
a.
In accordance with the frequency specified in Taole 4.8.1.1.2-1 on a STAGGERED TEST BASIS by:
m.
1.
Verifying the fuel level in the day fuel tanks..
2.
Verifying the fuel level in r.he plant fuel storage tank.
3.
Verifying the fuel transfer pap can be started and ' transfers fuel fra the storage systs to the day tank.
4.
Verifying the diesel starts fra ambient condition and accelerates to synchronous speed in (12' seconds, is loaded
) 2764 kw for diesel generator 2A, ) 2360 kw for diesel generator 1B, and ) 2742 kw for diesel generator 2L ing 5 minutes, and operators for ) 60 minutc thereafter.
t 5.
Verifying the diesel generator is aligned to nrovide standby power to the associated mergency busses.
6.
Verifying the pressure in both diesel air stact recuers to be > 225 peig.
b.
At least once per 92 days by verifying that a saple of diesel tuel from the fuel storage
- tank, obtained in accordance with AS1M-D270-65, 'is within the acceptable limi) wified in Table 1 of AS1M D975-74 when checked for viscosity, we c and sediment.
I I
1 e
HAto!
IMIT-2 3/4 8-3 l
.