Requests Extension Until 841107,to Respond to Request for Info Re Reliability & Upgrading of Diesel Generators,Per Generic Ltr 84-15.Extension Due to Workload at Site for Unit 2 Recirculation Pipe Replacement Outage
ML20095D203
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/16/1984
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
GL-84-15, NED-84-432, TAC-55865, TAC-55866, NUDOCS 8408230251
Download: ML20095D203 (2)


Text

-.

'. Georgia Power Company

.. ~.

- 333 Pedmont Avenue Atlanta. Georgia 30308

9-Telephone 404 5266526 Maihng Address
'
Post Offce Box 4545 At!anta. Georgia 30302.

Georgia Power L T. Gucws..

the southem eleCfnc Systerr Manager Nuclear Engineering -

NED-84-432

. and Chief Nuclear Engineer August 16, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, 011ef

' Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Ccmunission Washington, D. C.

20555 NRC DOG ETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HMOI NUCLEAR PUNT UNITS 1, 2

. DIESEL GENERA'IOR RELIABILITY (GENERIC IEITER 84-15)

Gentlenen:

YourLletter dated July 2,1984 requested Georgia Power Capany (GPC) to furnish infomation related to reliability and upgrading of diesel generators.. We hereby request.an extension for our response until November 7, 1984, based upon the following:

i 1.

'Ite' initial copy of your letter (GL 84-15) was danaged by the

' postal service, and was received in an illegible condition.

We requested a replacanent copy in ' a conversation with Mr. George Rivenbark (replacanent copy received July 30, 1984);

2.

A large workload at the plant site and corporate office for the Unit 2 -recirculation pipe replacanent outage, along' with the l

preparation for the upconing Unit 1 outage scheduled for fall, 1984, have prevented application of sufficient. resources to address j

Generic Istter 84-15 by the proposed schedule; and

-3.

Our yet to be proposed Technical Specifications to support. a

' desired diesel generator reliability goal are conplete, but will be delayed due to. the requested actions stated in Generic' Imtter 84-15.

It will require a longer time for establishing a consistent asproach between our response to your letter and our proposed

[

Technical Specifications.

GPC has previously -subnitted to you (see letter dated January 9,1984) information on fast cold starts of diesel generators, as a response to your letter dated Decenber.16, 1983 (Generic Letter 83-41).

This information

. will be updated and subnitted along with the response to Generic Ietter 84-15.

~

8408230251 840816 PDR ADOCK 05000321 P

PDR g

e-

.. L ';

GeorgiaPower A Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 August 16, 1984 Page 'IWo If you should require additional infoonation regarding this request please contact this office.

Very truly yours,

/ X Ps,

L. T. Gucwa CTAnb xc:

H. C. Nix, Jr.

J. P. O'Reilly (NRC-Region II)

Senior Resident Inspector uns