MONTHYEARML20062D6901982-07-29029 July 1982 Application for Amend to License NPF-5,temporarily Changing Tech Specs 3/4 8-1 & 3/4 8-2 to Extend 72-h Limiting Condition for Operation for One Inoperable Diesel Generator Project stage: Request ML20062D7101982-07-29029 July 1982 Proposed Temporary Changes to Tech Specs 3/4 8-1 & 3/4 8-2 to Extend 72-h Limiting Condition for Operation for One Inoperable Diesel Generator Project stage: Other ML20079E2151984-01-0909 January 1984 Submits Info on Diesel Generator Quick Starts & Opinion of Effect on Reliability.Record of Diesel Cold Starts for 1983 Summarized,In Response to NRC 831216 Request Project stage: Request ML20095D2031984-08-16016 August 1984 Requests Extension Until 841107,to Respond to Request for Info Re Reliability & Upgrading of Diesel Generators,Per Generic Ltr 84-15.Extension Due to Workload at Site for Unit 2 Recirculation Pipe Replacement Outage Project stage: Request ML20099E1841984-11-0707 November 1984 Proposed Tech Spec Changes Re Limiting Conditions for Operation,Surveillance Requirements & Bases for Diesel Generator Operability,In Response to Generic Ltr 84-15 Project stage: Other ML20099E1641984-11-0707 November 1984 Application to Amend Licenses DPR-57 & NPF-5,in Response to Generic Ltr 84-15, Proposed Staff Actions to Improve & Maintain Diesel Generator Reliability. Amend Revises Tech Specs Re Limiting Conditions for Operation.Fee Paid Project stage: Request ML20099L4301984-11-20020 November 1984 Corrected Page 3/4 8-3 to Tech Specs Re Surveillance Requirements Project stage: Other ML20099L1991984-11-20020 November 1984 Forwards Corrected Page 3/4 8-3 of Diesel Generator Tech Specs Covering Surveillance Requirements for Electrical Power Sys,In Response to Generic Ltr 84-15 Project stage: Other 05000366/LER-1985-005-01, :on 850329,determined That Battery Surveillance Procedure Contained Acceptance Criteria That Did Not Satisfy Tech Specs.Caused by Procedural Inadequacy.Procedure Being Revised1985-04-26026 April 1985
- on 850329,determined That Battery Surveillance Procedure Contained Acceptance Criteria That Did Not Satisfy Tech Specs.Caused by Procedural Inadequacy.Procedure Being Revised
Project stage: Other ML20129E4711985-05-30030 May 1985 Notification of 850613 Meeting W/Util in Bethesda,Md to Discuss Proposed Changes to Diesel Generator Tech Specs Project stage: Meeting ML20202F7371986-03-31031 March 1986 Proposed Tech Specs Re Reduction of Number of Fast Cold Starts,Frequency of Testing Determined to Be Abusive & Elimination of Excessive Testing to Diesel Generators Project stage: Other ML20202F7021986-03-31031 March 1986 Application for Amends to Licenses DPR-57 & NPF-5,revising Tech Specs to Reduce Number of Fast Cold Starts,Eliminate Excessive Testing & Reduce Frequency of Testing Determined to Be Abusive to Diesel Generators Project stage: Request ML20237K2301987-08-25025 August 1987 Amends 147 & 83 to Licenses DPR-57 & NPF-5,respectively, Modifying Tech Specs Re Testing of Onsite Emergency Diesel Generators Project stage: Other ML20237K2471987-08-25025 August 1987 Notice of Denial of Amends to Licenses DPR-57 & NPF-5 & Opportunity for Hearing on 860331 Request Re Extension from 2 to 24 H,Time Allowed to Restore Operability of 1 of 2 Inoperable Diesel Generators Project stage: Other ML20237K2351987-08-25025 August 1987 Safety Evaluation Supporting Amends 147 & 83 to Licenses DPR-57 & NPF-5,respectively Project stage: Approval 1984-08-16
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
-.
'. Georgia Power Company
.. ~.
- 333 Pedmont Avenue Atlanta. Georgia 30308
- 9-Telephone 404 5266526 Maihng Address
- '
- Post Offce Box 4545 At!anta. Georgia 30302.
Georgia Power L T. Gucws..
the southem eleCfnc Systerr Manager Nuclear Engineering -
NED-84-432
. and Chief Nuclear Engineer August 16, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, 011ef
' Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Ccmunission Washington, D. C.
20555 NRC DOG ETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HMOI NUCLEAR PUNT UNITS 1, 2
. DIESEL GENERA'IOR RELIABILITY (GENERIC IEITER 84-15)
Gentlenen:
YourLletter dated July 2,1984 requested Georgia Power Capany (GPC) to furnish infomation related to reliability and upgrading of diesel generators.. We hereby request.an extension for our response until November 7, 1984, based upon the following:
i 1.
'Ite' initial copy of your letter (GL 84-15) was danaged by the
' postal service, and was received in an illegible condition.
We requested a replacanent copy in ' a conversation with Mr. George Rivenbark (replacanent copy received July 30, 1984);
2.
A large workload at the plant site and corporate office for the Unit 2 -recirculation pipe replacanent outage, along' with the l
preparation for the upconing Unit 1 outage scheduled for fall, 1984, have prevented application of sufficient. resources to address j
Generic Istter 84-15 by the proposed schedule; and
-3.
Our yet to be proposed Technical Specifications to support. a
' desired diesel generator reliability goal are conplete, but will be delayed due to. the requested actions stated in Generic' Imtter 84-15.
It will require a longer time for establishing a consistent asproach between our response to your letter and our proposed
[
Technical Specifications.
GPC has previously -subnitted to you (see letter dated January 9,1984) information on fast cold starts of diesel generators, as a response to your letter dated Decenber.16, 1983 (Generic Letter 83-41).
This information
. will be updated and subnitted along with the response to Generic Ietter 84-15.
~
8408230251 840816 PDR ADOCK 05000321 P
PDR g
e-
.. L ';
GeorgiaPower A Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 August 16, 1984 Page 'IWo If you should require additional infoonation regarding this request please contact this office.
Very truly yours,
/ X Ps,
L. T. Gucwa CTAnb xc:
H. C. Nix, Jr.
J. P. O'Reilly (NRC-Region II)
Senior Resident Inspector uns