MONTHYEARML20062D6901982-07-29029 July 1982 Application for Amend to License NPF-5,temporarily Changing Tech Specs 3/4 8-1 & 3/4 8-2 to Extend 72-h Limiting Condition for Operation for One Inoperable Diesel Generator Project stage: Request ML20062D7101982-07-29029 July 1982 Proposed Temporary Changes to Tech Specs 3/4 8-1 & 3/4 8-2 to Extend 72-h Limiting Condition for Operation for One Inoperable Diesel Generator Project stage: Other ML20079E2151984-01-0909 January 1984 Submits Info on Diesel Generator Quick Starts & Opinion of Effect on Reliability.Record of Diesel Cold Starts for 1983 Summarized,In Response to NRC 831216 Request Project stage: Request ML20095D2031984-08-16016 August 1984 Requests Extension Until 841107,to Respond to Request for Info Re Reliability & Upgrading of Diesel Generators,Per Generic Ltr 84-15.Extension Due to Workload at Site for Unit 2 Recirculation Pipe Replacement Outage Project stage: Request ML20099E1841984-11-0707 November 1984 Proposed Tech Spec Changes Re Limiting Conditions for Operation,Surveillance Requirements & Bases for Diesel Generator Operability,In Response to Generic Ltr 84-15 Project stage: Other ML20099E1641984-11-0707 November 1984 Application to Amend Licenses DPR-57 & NPF-5,in Response to Generic Ltr 84-15, Proposed Staff Actions to Improve & Maintain Diesel Generator Reliability. Amend Revises Tech Specs Re Limiting Conditions for Operation.Fee Paid Project stage: Request ML20099L4301984-11-20020 November 1984 Corrected Page 3/4 8-3 to Tech Specs Re Surveillance Requirements Project stage: Other ML20099L1991984-11-20020 November 1984 Forwards Corrected Page 3/4 8-3 of Diesel Generator Tech Specs Covering Surveillance Requirements for Electrical Power Sys,In Response to Generic Ltr 84-15 Project stage: Other 05000366/LER-1985-005-01, :on 850329,determined That Battery Surveillance Procedure Contained Acceptance Criteria That Did Not Satisfy Tech Specs.Caused by Procedural Inadequacy.Procedure Being Revised1985-04-26026 April 1985
- on 850329,determined That Battery Surveillance Procedure Contained Acceptance Criteria That Did Not Satisfy Tech Specs.Caused by Procedural Inadequacy.Procedure Being Revised
Project stage: Other ML20129E4711985-05-30030 May 1985 Notification of 850613 Meeting W/Util in Bethesda,Md to Discuss Proposed Changes to Diesel Generator Tech Specs Project stage: Meeting ML20202F7371986-03-31031 March 1986 Proposed Tech Specs Re Reduction of Number of Fast Cold Starts,Frequency of Testing Determined to Be Abusive & Elimination of Excessive Testing to Diesel Generators Project stage: Other ML20202F7021986-03-31031 March 1986 Application for Amends to Licenses DPR-57 & NPF-5,revising Tech Specs to Reduce Number of Fast Cold Starts,Eliminate Excessive Testing & Reduce Frequency of Testing Determined to Be Abusive to Diesel Generators Project stage: Request ML20237K2301987-08-25025 August 1987 Amends 147 & 83 to Licenses DPR-57 & NPF-5,respectively, Modifying Tech Specs Re Testing of Onsite Emergency Diesel Generators Project stage: Other ML20237K2471987-08-25025 August 1987 Notice of Denial of Amends to Licenses DPR-57 & NPF-5 & Opportunity for Hearing on 860331 Request Re Extension from 2 to 24 H,Time Allowed to Restore Operability of 1 of 2 Inoperable Diesel Generators Project stage: Other ML20237K2351987-08-25025 August 1987 Safety Evaluation Supporting Amends 147 & 83 to Licenses DPR-57 & NPF-5,respectively Project stage: Approval 1984-08-16
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
&
4 N Y 30 ggg Docket No. 321 and 366 MEMORANDUM FOR: John F. Stolz, Chief, Operating Reactors Branch #4, DL FROM:
G. W. Rivenbark, Project Manager, Operating Reactors Branch #4, DL
SUBJECT:
FORTHCOMING MEETING WITH GEORGIA POWER COMPANY (GPC)
Time &'Date:
Thursday, June 13, 1985 9:00am-12:00pm Location:
Room P110, Phillips Building Bethesda, Maryland
Purpose:
Discuss GPC's proposed Diesel generator Technical Specification changes.
Requested.
Participants:
NRC-P. Kang, J. Knight, G. Rivenbark, et al.
Licensee-P. Springer, R. Baker, et al.
Ort @st *"*d "
G. W. Rivenbark, Project Manager Operating Reactors Branch #4, DL cc: See-next page ORBf4:D GRiven a ;cr 5/fo/85 8506060504 850530 PDR ADOCK 05000321 P
ppg
' M
~
MEETING NOTICE DISTRIBUTION OPERATING REACTORS BRANCH #4, DIVISION OF LICENSING Docket File-NRC PDR-
'L PDR ORB #4 Rdg l
Project Manager-G. Rivenbark JStolz-Glainas BGrimes OELD GHolahan, ORAB HDenton ELJordan', IE.
- ACRS-10 MSchaaf NSIC-PMorriette Receptionist Regional Administrator Region-Dr. J. Nelson Grace Resident Inspector-NRC Meeting
Participants:
PKang JKnight GRivenbark M
i O
?s
[
11 UNITED STATES
[
g NUCLEAR REGULATORY COMMISSION 5
j WASHINGTON, D. C. 20555
,/
May 30,1985 Docket No. 321 and 366 l
MEMORANDUM FORi John F. Stolz, Chief, Operating Reactors Branch #4, DL FROM:
G. W. Rivenbark, Project Manager, Operating Reactors Branch #4, DL
SUBJECT:
FORTHCOMING MEETING WITH GEORGIA POWER COMPANY (GPC)
Time & Date:
Thursday. June 13, 1985 9:00am-12:00pm Location:
Room P110, Phillips Building Bethesda, Maryland
Purpose:
Discuss GPC's proposed Diesel generator Technical Specification changes.
Requested
Participants:
NRC-P. Kang, J. Knight, G. Rivenbark, et al.
~
Licensee-P. Springer,, R. Baker, et al.
h (N$M
. W. Ri enbark, Project Manager Operating Reactors Branch #4, DL cc: See next page T