Letter Sequence Other |
|---|
|
|
MONTHYEARML20062D6901982-07-29029 July 1982 Application for Amend to License NPF-5,temporarily Changing Tech Specs 3/4 8-1 & 3/4 8-2 to Extend 72-h Limiting Condition for Operation for One Inoperable Diesel Generator Project stage: Request ML20062D7101982-07-29029 July 1982 Proposed Temporary Changes to Tech Specs 3/4 8-1 & 3/4 8-2 to Extend 72-h Limiting Condition for Operation for One Inoperable Diesel Generator Project stage: Other ML20079E2151984-01-0909 January 1984 Submits Info on Diesel Generator Quick Starts & Opinion of Effect on Reliability.Record of Diesel Cold Starts for 1983 Summarized,In Response to NRC 831216 Request Project stage: Request ML20095D2031984-08-16016 August 1984 Requests Extension Until 841107,to Respond to Request for Info Re Reliability & Upgrading of Diesel Generators,Per Generic Ltr 84-15.Extension Due to Workload at Site for Unit 2 Recirculation Pipe Replacement Outage Project stage: Request ML20099E1841984-11-0707 November 1984 Proposed Tech Spec Changes Re Limiting Conditions for Operation,Surveillance Requirements & Bases for Diesel Generator Operability,In Response to Generic Ltr 84-15 Project stage: Other ML20099E1641984-11-0707 November 1984 Application to Amend Licenses DPR-57 & NPF-5,in Response to Generic Ltr 84-15, Proposed Staff Actions to Improve & Maintain Diesel Generator Reliability. Amend Revises Tech Specs Re Limiting Conditions for Operation.Fee Paid Project stage: Request ML20099L4301984-11-20020 November 1984 Corrected Page 3/4 8-3 to Tech Specs Re Surveillance Requirements Project stage: Other ML20099L1991984-11-20020 November 1984 Forwards Corrected Page 3/4 8-3 of Diesel Generator Tech Specs Covering Surveillance Requirements for Electrical Power Sys,In Response to Generic Ltr 84-15 Project stage: Other 05000366/LER-1985-005-01, :on 850329,determined That Battery Surveillance Procedure Contained Acceptance Criteria That Did Not Satisfy Tech Specs.Caused by Procedural Inadequacy.Procedure Being Revised1985-04-26026 April 1985
- on 850329,determined That Battery Surveillance Procedure Contained Acceptance Criteria That Did Not Satisfy Tech Specs.Caused by Procedural Inadequacy.Procedure Being Revised
Project stage: Other ML20129E4711985-05-30030 May 1985 Notification of 850613 Meeting W/Util in Bethesda,Md to Discuss Proposed Changes to Diesel Generator Tech Specs Project stage: Meeting ML20202F7371986-03-31031 March 1986 Proposed Tech Specs Re Reduction of Number of Fast Cold Starts,Frequency of Testing Determined to Be Abusive & Elimination of Excessive Testing to Diesel Generators Project stage: Other ML20202F7021986-03-31031 March 1986 Application for Amends to Licenses DPR-57 & NPF-5,revising Tech Specs to Reduce Number of Fast Cold Starts,Eliminate Excessive Testing & Reduce Frequency of Testing Determined to Be Abusive to Diesel Generators Project stage: Request ML20237K2301987-08-25025 August 1987 Amends 147 & 83 to Licenses DPR-57 & NPF-5,respectively, Modifying Tech Specs Re Testing of Onsite Emergency Diesel Generators Project stage: Other ML20237K2471987-08-25025 August 1987 Notice of Denial of Amends to Licenses DPR-57 & NPF-5 & Opportunity for Hearing on 860331 Request Re Extension from 2 to 24 H,Time Allowed to Restore Operability of 1 of 2 Inoperable Diesel Generators Project stage: Other ML20237K2351987-08-25025 August 1987 Safety Evaluation Supporting Amends 147 & 83 to Licenses DPR-57 & NPF-5,respectively Project stage: Approval 1984-08-16
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
.k
^ *
...~.......
j 1 Geof gia Power Company 1 A f-
- 333 Piedmont Avenue -
. Atlanta, Georgia 30308
-W.
_ Telephone 404 526-6526 b--
. Mailing Address:.
Post Office Box 4545.
Atlanta, Georg;a 30302 ~
Georgia Power -
L T. Gucwa the southern electic system i
1 Manager NucIear Engineering -
i and Ch4e! Nuclear Engineer
[,
x.
NED-84-592 November 20,.1984 i
.' Director of Nuclear' Reactor Regulation.
Attention:.Mr. John F. Stolz, 011ef
! ~
Operating Reactors Branch No. 4
. Division of Licensing-U. S. Nuclear Regulatory Consission Washington, D. C.
20555 NRC D00GTS '50-321, 50-366 -
i OPERATING LIGNSES DPR-57, NPF-5 EDWIN I. HA'ICH NUCIEAR PIANT UNITS 1, ' 2 i
RESPONSE TO NRC GENERIC IETIER 84-15/ REQUEST 10 AMDB DIESEL GNERA'KR 'IE091ICAL SPECIFICATIONS
'i I'
Gentlenen:
Due to typographical errors in our letter NED-84-085 dated November 7, 1
1984, we hereby sutnit a correction to page 3/4 8-3 of Plant Hatch Unit 2 I
Technical Specification. The error (2764 kw instead of 2674 kw) is in~ the third line of paragraph 4.8.1.1.2.a.4.
Also, in the sane line the word
)
'" generators" should be corrected to say " generator".
If you have any questions or cannents, please contact this office.
very truly yours,
- ~
g g y _-,
t-L. T. Gucwa e
CTAnb D1 closure jl xc:
H. C. Nix, Jr.
I
~ Senior' Resident In6pector j
J. ~ P. O'Reilly, (NRC-Region II)
J. L. Ledbetter.
e i
-f l.
. '.h '~,
-.,._..--..,-,-.,-,.,_.._,,t,.
-