ML20099B215
| ML20099B215 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/29/1976 |
| From: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20099A192 | List: |
| References | |
| FOIA-96-207 NUDOCS 8004290755 | |
| Download: ML20099B215 (1) | |
Text
^^
j s.
i UNITE 3 STATES
/
NUCLEAR REGULATORY COMMISSION AEGION lli 798RoostvtL7noAo GLEN ELLYN,ILLfNoll 6et 37 March 29, 1976
)
\\
i
. K. V. Seyfrit, Chief, Reactor Technical Assistance Branch Office of Inspection and Enforcement Headquarters G. Fiore111. Chief, Reactor Operations'and Nuclear Support Branch U:
INTERNAL VENT VALVE REQUIREMENTS It is requested that you review the attached letter from R. D. Martin to determine if the acceptance criteria being used by the licensee is
]
acceptable for initial core loading.
In addition, it is requested that you pursue with NRR the desirability of routine opening force tests of these vent valves during subsequent refueling outages.
h vf R. C. Knop, Chief Reactor Projects Section 1
Attachment:
As stated cc w/ attachment:
- 5. H. Grier, IE:HQ D. Thompson. IE:HQ C. W. Roy, IE:HQ R. F. Warnick, Regional Coordinator 4
a 4
O 8'e/04290 / $,>
q.
o I