ML20099A582
| ML20099A582 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/14/1979 |
| From: | Zwetzig G Office of Nuclear Reactor Regulation |
| To: | Lainas G Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20099A192 | List: |
| References | |
| FOIA-96-207 NUDOCS 7903230069 | |
| Download: ML20099A582 (2) | |
Text
...
e a
DISTRIBUTION February 14, 1979 Docket File /:
8 OR8if4 Rdn RReid GZwetzig Docket No.: 50-230 Mrfnes TJCarter t
f!emo File MO VR\\NDUM FOR:
G. Lainas, Chief Plant Systects Branch, DOR THP;, :
R. Reid, Chief, Operating Reactors Branch #4, DOR l
FNOM:
G. Zwetzig, Pmfect Manager, ORBf4, DOR-I
SUBJECT:
INA8ILITY TD MEET SCHEDULED COMPLETION DATE FOR FIRE PROTECTION MODIFICATION NO. 3.1.14 AT THREE g
MILE ISLAND NUCLEAR STATION, UNIT NO.1 (TMI-1)
By the enclosed letter dated February 2,1979. Metropolitan Edison Cowany informed us that they would not be able to complete fire P
protection modification No. 3.1.14 (described in the TMI-1 Fire j
Protection SER) by the scheduled date of "end of refueling 1979" (approximately March 14,1979). They further requested that the cogletion date be
. for the installatio. extended to the "end of refueling 1980" except 9
n of the fire door whfch would be installed by l
October 1,1980.
1 Since the cogletion dates for all fire protection modtfications is specified in the facility Itcense, a formal amendment of the license is required to change any of those dates.
l Accordingly, you are requested to review the acceptability of the i
proposed delay in iglementation of this podification. You are L
also requested to prepara a written safety evaluation setting forth your conclusions on this matter and the bases for your conclusions.
If additional information is needed please advise the TMI-1 ORPM.
t I
Because this matter must be resolved before THI-1 can operate in Cycle 5 (scheduled to start about March 14,1979) and because time 8
.is needed for preparation of an amendment. if acceptable, and legal review, it is requested that the written Safety Evaluation be i
provided to the TNI-1 ORPM by February 26, 1979.
Effort on this task should be charged to TACS No.11238.
' ?.r,:<=s n 7 9 0 3 2 3 0069 Gerald B. Zwetzig, Project Manager
,.,r<
' '!b /
Operadno Reactors Branch #4
,,,,,,, ~,,,,
ggiston of Operat' ng Reactors emes >
esemaam >
Q7t
...s u....m m 1M...........
.........2,...6./.
15.........
. 2m:o.......
M 88Mt H8 GMt Pecat ende
- W o.a.
.e, V
0 3.*t 3 o 2aa
e:
4-
.- s i
- g.
Lv 4 f;
Mero to G. Lainas from j
/
. tr. y G. Zwetzig -
4 i
a[,
cc w/o enclosure:
T. Lee M. Virgilio 1
R. Ferguson j
T. Wambach i
5, k
a 3
4 I.
e 1
1 e
i.
l l
l l
f r
l 4
3 l
l a;,
I i
4 s
.e.-w
.-