Requests Review of Acceptaibility of Proposed Delay in Implementation of Fire Protection Mod 3.1.14
ML20099A582
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/14/1979
From: Zwetzig G
Office of Nuclear Reactor Regulation
To: Lainas G
Office of Nuclear Reactor Regulation
Shared Package
ML20099A192 List:
References
FOIA-96-207 NUDOCS 7903230069
Download: ML20099A582 (2)


Text

...

e a

DISTRIBUTION February 14, 1979 Docket File /:

8 OR8if4 Rdn RReid GZwetzig Docket No.: 50-230 Mrfnes TJCarter t

f!emo File MO VR\\NDUM FOR:

G. Lainas, Chief Plant Systects Branch, DOR THP;, :

R. Reid, Chief, Operating Reactors Branch #4, DOR l

FNOM:

G. Zwetzig, Pmfect Manager, ORBf4, DOR-I

SUBJECT:

INA8ILITY TD MEET SCHEDULED COMPLETION DATE FOR FIRE PROTECTION MODIFICATION NO. 3.1.14 AT THREE g

MILE ISLAND NUCLEAR STATION, UNIT NO.1 (TMI-1)

By the enclosed letter dated February 2,1979. Metropolitan Edison Cowany informed us that they would not be able to complete fire P

protection modification No. 3.1.14 (described in the TMI-1 Fire j

Protection SER) by the scheduled date of "end of refueling 1979" (approximately March 14,1979). They further requested that the cogletion date be

. for the installatio. extended to the "end of refueling 1980" except 9

n of the fire door whfch would be installed by l

October 1,1980.

1 Since the cogletion dates for all fire protection modtfications is specified in the facility Itcense, a formal amendment of the license is required to change any of those dates.

l Accordingly, you are requested to review the acceptability of the i

proposed delay in iglementation of this podification. You are L

also requested to prepara a written safety evaluation setting forth your conclusions on this matter and the bases for your conclusions.

If additional information is needed please advise the TMI-1 ORPM.

t I

Because this matter must be resolved before THI-1 can operate in Cycle 5 (scheduled to start about March 14,1979) and because time 8

.is needed for preparation of an amendment. if acceptable, and legal review, it is requested that the written Safety Evaluation be i

provided to the TNI-1 ORPM by February 26, 1979.

Effort on this task should be charged to TACS No.11238.

' ?.r,:<=s n 7 9 0 3 2 3 0069 Gerald B. Zwetzig, Project Manager

,.,r<

' '!b /

Operadno Reactors Branch #4

,,,,,,, ~,,,,

ggiston of Operat' ng Reactors emes >

esemaam >

Q7t

...s u....m m 1M...........

.........2,...6./.

15.........

. 2m:o.......

M 88Mt H8 GMt Pecat ende

  • W o.a.

.e, V

0 3.*t 3 o 2aa

e:

4-

.- s i

g.

Lv 4 f;

Mero to G. Lainas from j

/

. tr. y G. Zwetzig -

4 i

a[,

cc w/o enclosure:

T. Lee M. Virgilio 1

R. Ferguson j

T. Wambach i

5, k

a 3

4 I.

e 1

1 e

i.

l l

l l

f r

l 4

3 l

l a;,

I i

4 s

.e.-w

.-