BEAVER VALLEY POWER STATION UNIT 2 SIMULATOR FOUR YEAR CERTIFICATION REPORT 1992 - 1995 k

d This four year certification report satisfies the reporting requirements identified in 10 CFR 55.45(b)(5)(ii) and (b)(5)(vi).

~ ;Bl22 ggg g;g; g

.r _._

eon j

Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 TABLE OF CONTENTS TOPIC PAGE References and Requirements 1

Summary of Results, 1992 - 1995 2

SQT Corrected Test Deficiencies, 1992 - 1995 3

SQT Uncorrected Test Deficiencies, 1992 - 1995 7

Tests and Schedule for 1996 - 1999 8

Test Schedule for 1996 - 1999 9

Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 1

References and Requirements

References:

1.

Title 10, Code of Federal Regulations, Part 55, " Operators' Licenses," Subpart E, Section 45.

2.

U.S. NRC Regulatory Guide 1.149,1987," Nuclear Power Plant Simulation Facilities for use in Operator License Examinations."

3.

ANSI 3.5,1985, " Nuclear Power Plant Simulators for use in Operator Training."

l Reporting Requirements:

The requirements of this report as outlined in 10 CFR 55 are:

1.

Identification of any uncorrected performance test failuies and a schedule for corrections of such performance failures if any. Subpart E, Section 55.45(b)(5)(ii). (Refer to page 7.)

' 2.

A description of performance testing completed for the simulation facility. Subpart E, Section 55.45(b)(5)(vi). (Refer to pages 2 through 7.)

3.

A description of the performance tests, if different, to be conducted on the simulation facility during the subsequent four year period. Subpart E, Section 55.45(b)(5)(vi). (Refer to page 8.)

4.

A schedule for the conduct of approximately 25 percent of the performance tests per year for the subsequent four years. Subpart E, Section 55.45(b)(5)(vi). (Refer to pages 9 through 16.)

l i

i 1

l

. _ ~

Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 Summary of Results 1992 - 1995

{

All commitments from the original certification report have been completed. The testing for the first four years following initial certification, as submitted in the original Simulator Certification Report, is complete. A l

total of 276 tests were performed and evaluated. The following tables summarize the test results:

i Tests Completed 1992 1993 1994 1995 i

Simulator Real Time 1

1 1

1 j

Steady State, Drift, Normal Ops.

9 9

10 10 i

Transient Test (Appendix B) 10 10 10 10 l

Transient Test (Plant Data) 0 2

2 1

l Malfunction Tests 47 48 47 47 1

Tctal 67 70 70 69 l

' Action List 1992 1993 1994 1995 i

Trouble Reports Written (TR) 19 20 19 17 Trouble Reports Cleared (TR) 19 20 17 10 l

Uncorrected Test Deficiencies:

0 0

2 7

The corrected test deficiences for 1992 - 1995 are listed on pages 3 through 6.

l The uncorrected test deficiences for 1992 - 1995 are listed on page 7 L

1 I

I e

i i

2 4

4 Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 i

Simulator Qualification Test (SQT)

Corrected Test Deficiencies SQT TEST TEST DESCRIPTION TROUBLE DATE NUMBER REPORT COMPLETE 1992 SQT-14.1.2.2 DUTY CYCLE TEST TR-5266 10/30/93 TR-5268 10/30/93 TR-5269 10/01/93 SQT-14.1.5.2.2.01 STEADY STATE DRIFT TEST - FULL POWER TR-5272 11/21/92 SQT-14.1.5.2.2.02 STEADY STATE DRIFT TEST - 75% POWER TR5272 11/21/92 SQT-14.1.5.4.02.01 AUXILIARY STEAM HEADER LEAK TEST TR-2985 12/18/93 TR-4058 11/01/93 SQT-14.1.5.4.17.03 PLANT COMPUTER SYSTEM FAILURE TEST TR-4697 10/02/93 TR-5019 11/12/92 TR-5115 10/24/92 TR-5284 11/28/92 TR-5289 10/26/93 SQT-14.1.5.4.22.05 RCP LOCKED ROTOR TEST TR-2498 09/18/93 SQT-14.1.5.4.23.11 VARIABLE PRESSURIZER NONCONDENS ABLE TR-5112 11/17/93 PARTIAL PRESSURE SQT-14.1.5.4.29.02 TRANSFORMER FAILURE TEST TR-5117 10/09/93 SQT-14.1.5.4.33.02 FILTER ADVANCE FAILURE TEST TR-5091 10/11/93 TR-5092 10/11/93 SQT-14.1.5.8.3.09 TURBINE TRIP WITIIOUT DIRECT REACTOR TR-4745 04/03/93 TRIP TEST SQT-14.1.5.8.3.11 DESIGN BASIS ACCIDENT LOSS OF COOLANT TR-5304 09/18/93 ACCIDENT TRANSIENT TEST SQT-14.1.5.8.3.12 DESIGN BASIS ACCIDENT STEAM LINE TR-5147 04/01/93 RUPTURE TEST t

3

Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 Simulator Qualification Test (SQT)

Corrected Test Deficiencies SQT TEST TEST DESCRIPTION TROUBLE DATE NUMBER REPORT COMPLETE 1993 SQT-14.1.5.2.1.05 PLANT SHUTDOWN FROM 40 PERCENT POWER TR-5404 09/23/93 TO HOT STANDBY SQT-14.1.5.3.07 100 PERCENT, PLANT TRIP / RECOVERY TEST TR-5472 12/12/93 TR-5473 01/05/95 SQT-14.1.5.4.03.01 AIR HEADER LEAK TEST TR-5402 09/18/93 SQT-14.1.5.4.08.05 DRPI FAILURE TEST TR-5403 09/18/93 SQT-14.1.5.4.12.04 ERRATIC THROTTLE VALVE CONTROL TEST TR-5378 08/14/93 SQT-14.1.5.4.17.04 CONTAIMENT AIR INLEAKAGE TEST TR-5380 08/14/93 SQT-14.1.5.4.23.04 STEAM GENERATOR TUBE LEAK TEST TR-5412 07/05/95 SQT-14.1.5.4.32.01 GASEOUS WASTE SURGE TANK EFFLUENT TR-5415 09/23/94 LEAK TEST SQT-14.1.5.4.33.03 LOSS OF FLOW CONTROL TEST TR-5414 12/18/93 SQT-14.1.5.5.1.03 OCB-94 TRIPS TR-5413 10/15/93 SQT-14.1.5.5.3.03 2 SIS *MOV867B SPURIOUSLY CLOSES TR-5422 12/11/93 SQT-14.1.5.5.4.02 2SAS*AOV105 SPURIOUSLY OPENS TR-5422 12/11/93 SQT-14.1.5.5.5.02

.2GNS*SOV853F SPURIOUSLY OPENS TR-5422 12/11/93 SQT-14.1.5.6.06 LOCA OUTSIDE CONTAINMENT TR-5474 09/23/94 SQT-14.1.5.8.3.05 TRIP OF ALL FEEDWATER PUMPS TEST TR-5304 09/18/93 TR-5348 07/10/93 SQT-14.1.5.8.3.07 COMPLETE LOSS OF REACTOR COOLANT TR-5421 10/21/93 FLOW TEST SQT-14.1.5.8.3.08 PARTIAL LOSS OF REACTOR COOLANT FLOW TR-5421 10/21/93 TEST i

SQT-14.1.5.8.3.11 DESIGN BASIS ACCIDENT LOSS OF COOLANT TR-5306 09/26/94 ACCIDENT TRANSIENT TEST TR-5457 09/26/94 SQT-14.1.5.8.3.13 STUCK OPEN PRESSURIZER SAFETY WITHOUT TR-5432 11/27/93 HIGH HEAD SAFETY INJECTION TEST TR-5477 07/07/95 4

J 4

~

Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 4

i Simulator Qualification Test (SQT) l Corrected Test Deficiencies SQT TEST TEST DESCRIPTION TROUBLE DATE NUMBER REPORT COMPLETE 1994 SQT-14.1.5.2.1.03 PLANT STARTUP FROM ZERO POWER TO FULL TR-5572 02/09/95 POWER SQT-14.1.5.2.6.10 OST 2.6.2 REACTOR COOLANT SYSTEM WATER TR-5555 11/30/94 INVENTORY BALANCE SQT-14.1.5.2.6.13 OST 2.6.7 ACCIDENT MONITORING TR-5549 01/05/95 INSTRUMENTATION CHANNEL CHECKS j

SQT-14.1.5.2.6.30 OST 2.36.4 EMERGENY DIESEL GENERATOR TR-5566 08/23/95 2EGS*EG2-2 AUTOMATIC TEST SQT-14.1.5.4. l l.03 DIESEL GENERATOR ERRATIC VOLTAGE TR-5547 07/07/95 REGULATION TEST TR-5548 01/03/95 SQT-14.1.5.4.16.01 LOSS OF 4160-VOLT BUS TEST TR-5563 07/07/95 SQT-14.1.5.4.19.08 POWER RANGE BLOWN FUSE TEST TR-5545 07/07/95 SQT-14.1.5.4.28.05 SIS VALVE SEAT LEAKAGE TEST TR-5561 07/07/95 j

SQT-14.1.5.4.9.2.1 CHARGING SYSTEM LEAK TEST TR-5562 07/07/95 SQT-14.1.5.5.2.04 PRESSURIZER HEATER SHORT TEST TR-5552 07/07/95 3

i SQT-14.1.5.5.4.03 2CHS*AOV200A SPURIOUSLY CLOSES TEST TR-5546 01/03/95 SQT-14.1.5.5.6.03 2FWS*HYV157C SPURIOUSLY CLOSES TR-5553 01/03/95 SQT-14.1.5.8.3.05 TRIP OF ALL FEEDWATER PUMPS TEST TR-5579 07/10/95 SQT-14.1.5.8.3.06 MAIN STEAM ISOLATION VALVES CLOSURE TR-5579 07/10/95 TEST I

SQT-14.1.5.8.3.11 DESIGN BASIS ACCIDENT LOSS OF COOLANT TR-5567 11/08/94 ACCIDENT TRANSIENT TEST SQT-14.1.5.8.3.12 DESIGN BASIS ACCIDENT STEAM LINE TR-5577 06/07/95 RUPTURE TEST 1

SQT-14.1.5.8.3.12 DESIGN BASIS ACCIDENT STEAM LINE TR-5578 08/15/95 RUPTURE TEST SQT-14.1.5.8.3.13 STUCK OPEN PRESSURIZER SAFETY WITHOUT TR-5579 07/10/95 HIGH HEAD SAFETY INJECTION TEST i

5

~

Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 Simulator Qualification Test (SQT)

Corrected Test Deficiencies SQT TEST TEST DESCRIPTION TROUBLE DATE NUMBER REPORT COMPLETE 1995 SQT-14.1.5.2.6.04 OST 2.2.2 NUCLEAR INTERMEDIATE RANGE TR-5592 08/15/95 CHANNEL FUNCTIONAL TEST SQT-14.1.5.2.6,05 OST 2.2.3 NUCLEAR SOURCE RANGE CHANNEL TR-5593 08/15/95 FUNCTIONAL TEST SQT-14.1.5.2.6.29 OST 2.36.1 EMERGENCY DIESEL GENERATOR TR-5595 08/23/95 2EGS*EG2-1 MONTHLY TEST SQT-14.1.5.4.08.03 DROPPED ROD (S) TEST TR-5597 08/15/95 TR-5620 08/22/95 SQT-14.1.5.4.12.02 ERRATIC GOVERNOR VALVE CONTROL TEST TR-5599 08/22/95 SQT-14.1.5.4.16.02 LOSS OF 480-VOLT BUS TEST TR-5586 08/15/95 SQT-14.1.5.4.24.04 RHS SYSTEM LEAK TEST TR-5610 08/16/95 SQT-14.1.5.4.30.03 CLOGGED SEAL WATER STRAINER TEST TR-5596 08/15/95 SQT-14.1.5.5.7.03 2FWE*HCV100A LOSS OF ACTUATOR POWER TR-5608 08/15/95 6

Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 Simulator Qualification Test (SQT)

Uncorrected Test Deficiencies SQT TEST TEST DEFICIENCY TROUBLE SCHEDULED NUMBER REPORT DATE 1994 SQT-14.1.5.2.1.03 MAIN GENERATOR HOT GAS DETA T IN TR-5573 12/31/96 ALARM AT LOW POWER j

SQT-14.1.5.8.3.10 2ND POINT FEEDWATER HTR ISOLATION TR-5576 12/31/96 OCCURED ON POWER INCREASE 1995 I

MUG SEAL OIL DELT._ P TOO HIGH DURING TR-5617 12/31/96 l

SQT-14.1.5.2.1.01 PLANT H/U TEST SQT-14.1.5.2.1.01 RVLIS STATIC HEAD TOO HIGH IN MODE 5 TR-5619 12/31/96 LEVEL IN PZR l

SQT-14.1.5.2.6.16 OST 2.7.12 BLENDER OPERATIONS TR-5594 12/31/95 SQT-14.1.5.4.05.03 CCP MAKEUP TO NEUTRON SHIELD TANK IS TR-5612 12/31/97 TOO St.OW SQT-14.1.5.4.23.03 RAD MONITORS 2RMR*RQ206,207 DID NOT TR-5602 12/31/96 ALARM ON DB A LOCA SQT-14.1.5.4.33.01 DRMS CRT MESS AGE DID NOT OCCUR FOR TR-5607 12/31/97 MALF RMS3 OPTION 1 SQT-14.1.5.8.3.10 2ND POINT FEEDWATER HTR ISOLATION TR-5576 12/31/96 OCCURED ON POWER INCREASE 7

9 Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 Tests and Schedule for 1996 - 1999 The following Normal Operations Tests have been removed from the testing schedule:

. SQT-14.1.5.2.6.16 OST 2.7.12 BLENDER OPERATIONS

. SQT-14.1.5.2.6.21 OST 2.11.11 ACCUh1ULATOR ISOLATION VALVES AUTO-OPEN TEST (P-11)

. SQT-14.1.5.2.6.23 OST 2.24.1 AUXILIARY FEEDWATER SYSTEh! VALVE EXERCISE

. SQT 14.1.5.2.6.24 OST 2.24.6 AUX FEEDWATER SYSTEhi CHECK VALVE EXERCISE AND FLOW VERIFICATION

. SQT-14.1.5.2.6.30 OST 2.36.4 EMERGENY DIESEL GENERATOR 2EGS*EG2-2 AUTOMATIC TEST

. SQT-14.1.5.2.6.31 OST 2.36.7 OFF-SITE TO ON-SITE POWER DIST SYS BREAKER ALIGNMENT VERIFICATION

. SQT-14.1.5.2.6.32 OST 2.36.8 AC POWER SOURCE WEEKLY BREAKER ALIGNhfENT VERIFICATION

. SQT-14.1.5.2.6.43 OST 2.49.I SHUTDOWN MARGIN CALCULATION (PLANT CRITICAL)

Each test was evaluated, and only the Normal Operations Tests that provide enhancements to the simulator were retained. The tests that were removed from the testing schedule were either redundant to other testing methods, or the critical parameters for the test were read outside the control room and relayed back to the control board operator.

The following Transient Tests have been removed from the testing schedule:.

. SQT-14.1.5.3.03 RIIS PUMP VORTEXING TEST

. SQT-14.1.5.3.04 RATED LOAD / UNLOAD TRANSIENT TEST

. SQT-14.1.5.3.05 STEP LOAD TRANSIENT TEST

. SQT-14.1.5.3.06 LARGE LOAD REJECTION TRANSIENT The tests that were removed from the testing schedule were either redundant to other testing methods, or could not be evaluated with existing data due to plant design changes since initial test performance. One Transient Test was changed to a Normal Operations Test to better support the test evaluation and is listed below:

Old Transient Test Title

. SQT-14.1.5.3.07 100 PERCENT, PLANT TRIP / RECOVERY TEST New Normal Operations Test Title

. SQT-14.1.5.2.1.07 100 PERCENT, PLANT TRIP / RECOVERY TEST The test procedure demonstrating LOCA outside containment capability has been incorporated into another test procedure as indicated below:

Old Test Title

. SQT-14.1.5.6,06 LOCA OUTSIDE CONTAINMENT New Combined Test Title

. SQT-14.1.5.4.23.03 LARGE BREAK LOCA TEST 8

Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 SQT TEST TEST DESCRIPTION YEAR TO BE TESTED NUMBER 1996 1997 1998 1999 Simulator Real Time Test SQT-14.1.2.2 DUTY CYCLE TEST X

X X

X Steady State, Drift and Normal Operations Test SQT-14.1.5.2.2.01 STEADY STATE DRIFT TEST - FULL POWER X

X X

X SQT-14.1.5.2.2.02 STEADY STATE DRIFT TEST - INTERIhi POWER X

X X

X SQT-14.1.5.2.2.03 STEADY STATE DRIFT TEST - LOW POWER X

X X

X SQT-14.1.5.2.1.01 REACTOR PLANT HEATUP FROh! COLD SHUTDOWN TO HOT STANDBY X

SQT-14.1.5.2.1.02 REACTOR STARTUP X

SQT-14.1.5.2.1.03 PLANT STARTUP FROh! ZERO POWER TO FULL POWER X

SQT-14.1.5.2.1.04 LOAD FOLLOWING FROhi FULL POWER TO 40 PERCENT X

SQT-14.1.5.2.1.05 PLANT SHUTDOWN FROh! 40 PERCENT POWER TO HOT STANDBY X

SQT-14.1.5.2.1.06 PLANT COOLDOWN FROh! HOT STANDBY TO COLD SHUTDOWN X

SQT-14.1.5.2.1.07 100 PERCENT, PLANT TRIP / RECOVERY TEST X

SQT-14.1.5.2.6.01 OST 2.1.1 CONTROL ROD ASSEh1BLY PARTIAL h10VEh1ENT TEST X

l SQT-14.1.5.2.6.03 OST 2.2.1 NUCLEAR POWER RANGE CHANNEL FUNCTIONAL TEST X

SQT-14.1.5.2.6,04 OST 2.2.2 NUCLEAR INTERh1EDIATE RANGE CHANNEL FUNCTIONAL TEST X

SQT-14.1.5.2.6.05 OST 2.2.3 NUCLEAR SOURCE RANGE CHANNEL FUNCTIONAL TEST X

SQT-14.1.5.2.6.10 OST 2.6.2 REACTOR COOLANT SYSTEh! WATER INVENTORY BALANCE X

SQT-14.1.5.2.6. l l OST 2.6.4 hiEASUREh1ENT OF CONTROLLED LEAKAGE X

SQT-14.1.5.2.6.12 OST 2.6.6 PORV ISOLATION VALVE TEST AND l

POSITION CHECK X

SQT-14.1.5.2.6.13 OST 2.6.7 ACCIDENT h10NITORING INSTRUhiENTATION CHANNEL CHECKS X

SQT-14.1.5.2.6.29 OST 2.36.1 Eh1ERGENCY DIESEL GENERATOR 2EGS*EG2-1 hf 0NTHLY TEST X

SQT-14.1.5.2.6.3 5 OST 2.43.9 GASEOUS EFFLUENT h10NITORS CHANNEL FUNCTIONAL TEST X

SQT-14.1.5.2.6.37 OST 2.44A.2 CONTROL ROOh! VENTILATION SYSTENITEST-TRAIN A X

SQT-14.1.5.2.6.45 OST 2.24.2 h10 TOR-DRIVEN AUILIARY FEED PUh1P 2FWE*P23 A TEST X

9

i Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 SQT TEST TEST DESCRIPTION YEAR TO BE TESTED NUMBER 1996 1997 1998 1999 Transient Tests SQT-14.1.5.8.3.04 REACTOR TRIP TEST X

X X

X SQT-14.1.5.8.3.05 TRIP OF ALL FEEDWATER PUMPS TEST X

X X

X SQT-14.1.5.8.3.06 MAIN STEAM ISOLATION VALVES CLOSURE

)

TEST X

X X

X

{

SQT-14.1.5.8.3.07 COMPLETE LOSS OF REACTOR COOLANT FLOW

{

TEST X

X X

X SQT-14.1.5.8.3.08 PARTIAL LOSS OF REACTOR COOLANT FLOW TEST X

X X

X SQT-14.1.5.8.3.09 TURBINE TRIP WITHOUT DIRECT REACTOR TRIP TEST X

X X

X SQT-14.1.5.8.3.10 MAIMUM RATE POWER RAMP TEST X

X X

X SQT-14.1.5.8.3. l l DESIGN BASIS ACCIDENT LOSS OF COOLANT f

ACCIDENT TRANSIENT TEST X

X X

X SQT-14.1.5.8.3.12 DESIGN BASIS ACCIDENT STEAM LINE RUPTURE t

TEST X

X X

X SQT-14.1.5.8.3.13 STUCK OPEN PRESSURIZER SAFETY WITHOUT HIGH HEAD SAFETY INJECTION TEST X

X X

X Malfunction Tests SQT-14.1.5.4.01.01 AFW PUMP RECIRCULATION VALVE FAILURE TEST X

l SQT-14.1.5.4.01.02 AUII.IARY FEEDWATER SYSTEM LEAK TEST X

i SQT-14.1.5.4.01.03 TERRY TURBINE GOVERNOR FAILURE TEST X

SQT-14.1.5.4.01.04 STEAM LEAK ON TERRY TURBINE SUPPLY LINE TEST X

SQT-14.1.5.4,02.01 AUILIARY STEAM HEADER LEAK TEST X

SQT-14.1.5.4.03.01 AIR HEADER LEAK TEST X

SQT-14.1.5.4.03.03 CLOGGED INSTRUMENT AIR FILTER TEST X

f SQT-14.1.5.4.04.01 CCS SYSTEM LEAK TEST X

SQT-14.1.5.4.05.01 CCP SYSTEM LEAK TEST X

SQT-14.1.5.4.05.02 CCP HEAT ECHANGER TUBE LEAK TEST X

SQT-14.1.5.4.05.03 NEUTRON SHIELD TANK LEAK TEST X

SQT-14.1.5.4.05.04 CCP VALVE SEAT LEAKAGE TEST X

SQT-14.1.5.4.06.01 CONDENSATE PUMP SUCTION STRAINER CLOGGED TEST X

SQT-14.1.5.4.06.02 CONDENSATE /FEEDWATER SYSTEM LEAK TEST X

SQT-14.1.5.4.06.03 CONDENSER TUBE LEAK TEST X

SQT-14.1.5.4.06.04 AIR EJECTOR FAILURE TEST X

SQT-14.1.5.4.06.05 ERRATIC MAIN AND BYPASS FWRV OPERATION TEST X

SQT-14.1.5.4.06.06 CFW VALVE SEAT LEAKAGE TEST X

10 l

i l

Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 SQT TEST TEST DESCRIPTION YEAR TO BE TESTED NUMBER 1996 1997 1998 1999 Malfunction Tests SQT-14.1.5.4.07.01 RECIRCULATION SPRAY SYSTEM LEAK TEST X

SQT-14.1.5.4.07.02 RECIRCULATION SPRAY HEAT ECHANGER TUBE LEAK TEST X

SQT-14.1.5.4.07.03 CSS VALVE SEAT LEAKAGE TEST X

SQT-14.1.5.4.08.01 FAILURE OF RODS TO MOVE TEST X

SQT-14.1.5.4.08.02 UNCOUPLED ROD TEST X

SQY '.4.1.5.4.08.03 DROPPED ROD (S) TEST X

SQT-14.1.5.4.08.04 UNCONTROLLED ROD MOTION TEST X

SQT-14.1.5.4.08.05 DRPI FAILURE TEST X

SQT-14. L5.4.08.06 ROD EJECTION TEST X

SQT-14.1.5.4.08.07 ROD POSITION STEP COUNTER FAILURE TEST X

SQT-14.1.5.4.08.08 STUCK ROD (S) TEST X

SQT-14.1.5.4.08.09 ' POWER CABINET FAILURE TEST X

SQT-14.1.5.4.08.10 LOGIC CABINET FAILURE TEST X

SQT-14.1.5 4.09.01 LETDOWN RELIEF VALVE FAILURE TEST X

SQT-14.1.5 4.09.03 PLUGGED CVCS FILTERS TEST X

SQT-14.1.5.4.09.04 VOLUME CONTROL TANK LEAK TEST X

SQT-14.1.5.4.09.05 LOSS OF PRIMARY GRADE WATER TEST X

SQT-14.1.5.4.09.06 CVCS HEAT ECHANGER TUBE LEAKS TEST X

SQT-14.1.5.4.09.07 CHARGING PUMP LUBE OIL COOLER CLOGGING TEST X

SQ'l-14.1.5.4.09.08 CHS VALVE SEAT LEAKAGE TEST X

SQT-14.1.5.4.10.01 CIRCULATING WATER SYSTEM LEAK TEST X

SQT-14.1.5.4. l l.01 DIESEL GENERATOR TRIP TEST X

SQT-14.1.5.4.11.02 DIESEL GENERATOR SEQUENCER FAILURE TEST X

SQT-14.1.5.4.11.03 DIESEL GENERATOR ERRATIC VOLTAGE REGULATION TEST X

l SQT-14.1.5.4.11.04 DIESEL GENERATOR ERRATIC SPEED CONTROL TEST X

SQT-14.1.5.4.12.01 GOVERNOR VALVE FAILURE TEST X

SQT-14.1.5.4.12.02 ERRATIC GOVERNOR VALVE CONTROL TEST X

SQT-14.1.5.4.12.03 THROTTLE VALVE FAILURE TEST X

t SQT-14.1.5.4.12.04 ERRATIC THROTTLE VALVE CONTROL TEST X

i SQT-14.1.5.4.12.05 REHEAT / INTERCEPT STOP VALVE FAILURE TEST X

l SQT-14.1.5.4.12.06 ' VALVE POSITION LIMITER FAILURE TEST X

SQT-14.1.5.4.12.07 INADVERTENT TURBINE TRIP TEST X

SQT-14.1.5.4.12.08 TURBINE TRIP FAILURE TEST X

SQT-14.1.5.4.12.09 TURBINE RUNbnCK FAILURE TEST X

SQT-It 1.5.4.12.10 EHC PUMP UNLOADER VALVE FAILURE TEST X

SQT-14.1.5.4.13.01 FPW VALVES OUT OF POSITION TEST X

i 11

)

Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995

~

SQT TEST TEST DESCRIPTION YEAR TO BE TESTED NUMBER 1996 1997 1998 1999 Malfunction Tests SQT-14.1.5.4.14.01 FIRST POINT FEEDWATER HEATER TUBE LEAK TEST X

SQT-14.1.5.4.14.02 SECOND POINT FEEDWATER HEATER TUBE LEAK TEST X

SQT-14.1.5.4.15.01 MA IN GENERATOR TRIP TEST X

SQT-14.1.5.4.15.02 AU10MATIC VOLTAGE REGULATOR FAILURE TEST X

SQT-14.1.5.4.15.03 GENERATOR HYDROGEN COOLER TUBE LEAK TEST X

SQT-14.1.5.4.16.01 LOSS OF 4160-VOLT BUS TEST X

SQT-14.1.5.4.16.02 LOSS OF 4% VOLT BUS TEST X

SQT-14.1.5.4.16.03 LOSS OF INVERTER / VITAL BUS /ESSENTIA.L BUS TEST X

SQT-14.1.5.4.16.04 LOSS OF DC BUS OR SWITCHBOARD TEST X

SQT-14.1.5.4.17.01 CONTAINMENT PENETRATION ELECTRICAL PROTECTION BREAKER TRIP X

SQT-14.1.5.4.17.02 LOSS OF ANNUNCIATOR CONTROL POWER TEST X

l

' SQT-14.1.5.4.17.03 PLANT COMPUTER SYSTEM FAILURE TEST X

SQT-14.1.5.4.17.04 CONTAIMENT AIR INLEAKAGE TEST X

SQT-14.1.5.4.17.05 REACTOR DRAINS AND VENTS SYSTEM LEAK TEST X

SQT-14.1.5.4.18.01 STEAM LEAK UPSTREAM OF MSIV INSIDE CONTAINMENT TEST X

SQT-14.1.5.4.18.02 STEAM LEAK UPSTREAM OF MSTV 6 JTSIDE CONTAINMENT TEST X

SQT-14.1.5.4.18.03 MAIN STEAM HEADER LEAK TEST X

SQT-14.1.5.4.18.04 STEAM LEAK ON RIIR VALVE LINE TEST X

SQT-14.1.5.4.18.05 STEAM GENERATOR SAFETY VALVE FAILURE TEST X

i SQT-14.1.5.4.18.06 MSS VALVE SEAT LEAKAGE TEST X

i SQT-14.1.5.4.19.01 SOURCE RANGE CHANNEL FAILURE TEST X

i SQT-14.1.5.4.19.02 INTERMEDIATE RANGE CHANNEL FAILURE TEST X

1 SQT-14.1.5.4.19.03 POWER RANGE CHANNEL FAILURE TEST X

SQT-14.1.5.4.19.04 INTERMEDIATE RANGE COMPENSATING VOLTAGE FAILURE TEST X

SQT-14.1.5.4.19.05 SOURCE RANGE HIGH VOLTAGE CUTOFF FAILURE TEST X

SQT-14.1.5.4.19.06 SOURCE RANGE BLOWN FUSE TEST X

SQT-14.1.5.4.19.07 INTERMEDI ATE RANGE BLOWN FUSE TEST X

SQT-14.1.5.4.19.08 POWER RANGE BLOWN FUSE TEST X

12

Beaver Valley Power Station Unit 2 o

Four Year Simulator Certification Report 1

1992 - 1995 i

SQT TEST TEST DESCRIPTION YEAR TO BE TESTED NUMBER 1996 1997 1998 1999 I

Malfunction Tests SQT-14.1.5.4.20.01 AUTOMATIC ROD SPEED CONTROLLER FAILURE TEST X

SQT-14.1.5.4.20.02 ROD CONTROL TREF FAILURE TEST X

SQT-14.1.5.4.20.03 ROD STOP FAILURE TEST X

SQT-14.1.5.4.21.01 REACTOR TRIP FAILURE TEST X

SQT-14.1.5.4.21.02 INADVERTENT REACTOR TRIP TEST X

SQT-14.1.5.4.21.03 INADVERTENT SAFETY INJECTION SIGNAL TEST X

SQT-14.1.5.4.21.04 INADVERTENT CONTAINMENT ISOLATION PHASE A SIGNAL TEST X

l SQT-14.1.5.4.21.05 SAFETY INJECTION ACTUATION FAILURE TEST X

SQT-14.1.5.4.21.06 SSPS INPUT RELAY FAILURE TEST X

SQT-14.1.5.4.21.07 ESF LOAD AUTO-START FAILURE TEST X

SQT-14.1.5.4.22.01 REACTOR COOLANT PUMP NO. I SEAL FAILURE TEST X

SQT-14.1.5.4.22.02 REACTOR COOLANT PUMP NO. 2 SEA.L FAILURE TEST X

SQT-14.1.5.4.22.03 REACTOR COOLANT PUMP NO. 3 SEAL FAILURE TEST X

SQT-14.1.5.4.22.04 RCP TRIP TEST X

SQT-14.1.5.4.22.05 RCP LOCKED ROTOR TEST X

SQT-14.1.5.4.22.06 RCP HIGH VIBRATION TEST X

SQT-14.1.5.4.22.07 RCP SHEARED SHAFT TEST X

SQT-14.1.5.4.22.08 RCP LUBE OIL LEAK TEST X

SQT-14.1.5.4.22.09 RCP THERMAL BARRIER HEAT ECHANGER TUBE LEAK TEST X

SQT-14.1.5.4.23.01 SURGE LINE LEAK TEST X

SQT-14.1.5.4.23.02 SMALL BREAK LOCA TEST X

SQT-14.1.5.4.23.03 LARGE BREAK LOCA TEST X

SQT-14.1.5.4.23.04 STEAM GENERATOR TUBE LEAK TEST X

SQT-14.1.5.4.23.05 REACTOR VESSEL HEAD O-RING LEAK TEST X

SQT-14.1.5.4.23.06 INTERMEDIATE LEG BREAK TEST X

SQT-14.1.5.4.23.07 PRESSURIZER SAFETY VALVE FAILURE TEST X

SQT-14.1.5.4.23.08 PRESSURIZER STEAM SPACE LEAK TES X

SQT-14.1.5.4.23.09 RCS LOOP ISOLATION VALVE STEM FAILURE TEST X

SQT-14.1.5.4.23.10 RCS VALVE SEAT LEAKAGE TEST X

SQT-14.1.5.4.23.11 VARIABLE PRESSURIZER NONCONDENSABLE PARTIAL PRESSURE X

SQT-14.1.5.4.24.01 RHS SUCTION RELIEF LEAKAGE TEST X

SQT-14.1.5.4.24.02 RHS PUMP VORTEING TEST X

SQT-14.1.5.4.24.03 RHS HEAT ECHANGER TUBE LEAK TES X

13 a

Beaver Valley Power Station Unit 2 Four Year Simulator Certification Report 1992 - 1995 SQT TEST TEST DESCRIPTION YEAR TO BE TESTED NUMBER 1996 1997 1998 1999 Malfunction Tests SQT-14.1.5.4.24.04 RHS SYSTEM LEAK TEST X

SQT-14.1.5.4.24.05 RHS VALVE SEAT LEAKAGE TEST X

SQT-14.1.5.4.25.01 REACTOR COOLANT SYSTEM ACTIVITY HIGH TEST X

SQT-14.1.5.4.25.02 REACTIVITY ANOMALY TEST X

SQT-14.1.5.4.26.01 SPENT FUEL POOL PURIFICATION SYSTEM LEAK TEST X

SQT-14.1.5.4.26.02 SPENT FUEL POOL COOLING SYSTEM LEAK TEST X

SQT-14.1.5.4.27.01 STEAM GENERATOR BLOWDOWN SYSTEM LEAK TEST X

SQT-14,1.5.4.28.01 REFUELING WATER STORAGE TANK LEAK TEST X

SQT-14.1.5.4.28.02 ACCUMULATOR GAS SPACE LEAK TEST X

SQT-14.1.5.4.28.03 ACCUMULATOR WATER SPACE LEAK TEST X

SQT-14.1.5.4.28.04 SAFETY INJECTION LINE LEAK TEST X

SQT-14.1.5.4.28.05 SIS VALVE SEAT LEAKAGE TEST X

SQT-14.1.5.4.29.01 STATION BLACKOUT TEST X

SQT-14.1.5.4.29.02 TRANSFORMER FAILURE TEST X

SQT-14.1.5.4.30.01 SERVICE WATER LINE LEAK TEST X

SQT-14.1.5.4.30.02 LOSS OF UNIT 1 SEAL WATER TO SWS PUMP TEST X

SQT-14.1.5.4.30.03 CLOGGED SEAL WATER STRAINER TEST X

SQT-14.1.5.4.31.01 TURBINE BEARING HIGH VIBRATION TEST X

SQT-14.1.5.4.31.02 AIR-SIDE HYDROGEN SEAL OIL HEADER LEAK X

TEST SQT-14.1.5.4.31.03 PLUGGED HYDROGEN SEAL OIL FILTER TEST X

SQT-14.1.5.4.31.04 SEAL OIL LEAK TO GENERATOR TEST X

SQT-14.1.5.4.31.05 MAIN LUBE OIL PUMP DISCHARGE HEADER LEAK TEST X

SQT-14.1.5.4.32.01 GASEOUS WASTE SURGE TANK EFFLUENT LEAK TEST X

SQT-14.1.5.4.32.02 GASEOUS WASTE DECAY TANK EFFLUENT HEADER LEAK TEST X

SQT-14.1.5.4.33.01 CHECK SOURCE TEST FAILURE TEST X

SQT-14.1.5.4.33.02 FILTER ADVANCE FAILURE TEST X

SQT-14.1.5.4.33.03 LOSS OF FLOW CONTROL TEST X

SQT-14.1.5.4.9.2.1 CHARGING SYSTEM LEAK TEST X

SQT-14.1.5.4.9.2.2 LETDOWN SYSTEM LEAK TEST X

SQT-14.1.5.4.9.2.3 BORIC ACID TANK SYSTEM LEAK TEST X

SQT-14.1.5.4.9.2.4 SEAL INJECTION SYSTEM LEAK TEST X

SQT-14.1.5.4.9.2.5 BORON RECOVERY SYSTEM LEAK TEST X

SQT-14.1.5.5.1.01 ACB-342 FAILS AS-IS X

14

1 4

Beaver Valley Power Station Unit 2 o

Four Year Simulator Certification Report 1992 - 1995 4

SQT TEST TEST DESCRIPTION YEAR TO BE TESTED NUMBER 1996 1997 1998 1999 i

Malfunction Tests l

SQT-14.1.5.5.1.02

.ACB-142 FAILS TO AUTO TRANSFER X

i SQT-14.1.5.5.1.03 OCB-94 TRIPS X

l SQT-14.1.5.5.2.01 2CCP*P21B SEVERED POWER LEADS X

l SQT-14.1.5.5.2.02 2FWS-P21 A SHEARED SHAFT X

SQT-14.1.5.5.2.03 2CNM-P21B SEIZED SHAFT X

SQT-14.1.5.5.2.04 PRESSURIZER HEATER SHORT TEST X

SQT-14.1.5.5.3.01 2QSS*MOV101B STICKS AT 30 PERCENT WHILE OPENING X

j SQT-14.1.5.5.3.02 2RHS*MOV750B SPURIOUSLY OPENS TEST X

i SQT-14.1.5.5.3.03 2 SIS *MOV867B SPURIOUSLY CLOSES X

l SQT-14.1.5.5.3.04 2CHS*MOV350 LOSES POWER X

l SQT-14.1.5.5.3.05 2 SIS *MOV8888A HANDWHEEL OPERATIONS X

SQT-14.1.5.5.4.01 2BDG*AOV101C2 FAILS TO 20 PERCENT X

SQT-14.1.5.5.4.02 2SAS*AOV105 SPURIOUSLY OPENS X

SQT-14.1.5.5.4.03 2CHS*AOV200A SPURIOUSLY CLOSES TEST X

i SQT-14.1.5.5.4.04 2CHS*LCV460B LOSES CONTROL POWER X

SQT-14.1.5.5.5.01 2CHS*SOV206 FAILS TO 35 PERCENT X

l SQT-14.1.5.5.5.02 2GNS*SOV853F SPURIOUSLY OPENS X

SQT-14.1.5.5.5.03 2 MSS *SOV105A SPUR 10USLY CLOSES X

i SQT-14.1.5.5.5.04 2RCS*PCV456 LOSES POWER X

i SQT-14.1.5.5.6.01 2FWS*HYV157A FAILS TO 90 PERCENT X

1 SQT-14.1.5.5.6.02 2FWS*HYV157B SPURIOUSLY OPENS X

I SQT-14.1.5.5.6.03 2FWS*HYV157C SPURIOUSLY CLOSES X

j SQT-14.1.5.5.6.04 2FWS*HYV157A LOSS OF PUMP POWER X

SQT-14.1.5.5.6.05 2FWS*HYV157B ACTUATOR OIL LEAK X

l SQT-14.1.5.5.7,01 2CCP*TCV144 FAILS AS-IS X

SQT-14.1.5.5.7.02 2FWE*HCV100C LOSS OF CONTROL SIGNAL TEST X

SQT-14.1.5.5.7,03 2FWE*HCV100A LOSS OF ACTUATOR POWER X

SQT-14.1.5.5.8.01 2CCP-192 STICKS OPEN X

SQT-14.1.5.5.8.02 2FWE*101 STICKS CLOSED AFTER CLOSING X

SQT-14.1.5.5.8.03 2RHS*4 SEAT LEAKAGE TEST X

SQT-14.1.5.5.9.01 2CCP*E21 A TUBE FOULING X

SQT-14.1.5.5.10.01 2RCS*PK444A OUTPUT FAILS TO 35 PERCENT X

SQT-14.1.5.5.10.02 2SVS*PCV101 A OUTPUT FAILS AT 80 PERCENT IN AUTOMATIC X

SQT-14.1.5.5.10.03 2FWS*FCV478 OUTPUT OSCILLATIONS IN AUTOMATIC X

SQT-14.1.5.5.10.04 2CNM-LC101 OUTPUT FAILS TO 100 PERCENT X

SQT-14.1.5.5.11.01 2RCS*TE420 OUTPUT FAILS TO 565 DEG F X

SQT-14.1.5.5.11.02 2FWS*FT476 OPERATING BIAS OF -5 PERCENT X

SQT-14.1.5.5.12.01 2RCS-TSH471 ACTUATES X

15

1 Beaver Valley Power Station Unit 2 o

Four Year Simulator Certification Report 1992 - 1995 SQT TEST TEST DESCRIPTION YEAR TO BE TESTED NUMBER 1996 1997 1998 1999 Malfunction Tests SQT-14.1.5.5.12.02 2RCS-TSH412D-2 IhHIBITED X

SQT-14.1.5.5.12.03 2CHS-TSH143 FAILS AS-IS X

TESTS PER YEAR 65 66 66 66 TOTAL TESTS 263 i