ML20095J630

From kanterella
Jump to navigation Jump to search
Forwards BVPS Unit 2 Simulator Four Yr Certification Rept 1992 - 1995, in Accordance w/10CFR55.45
ML20095J630
Person / Time
Site: Beaver Valley
Issue date: 12/19/1995
From: George Thomas
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095J632 List:
References
NUDOCS 9512270215
Download: ML20095J630 (1)


Text

.

Beavef Valley Power Station snlgo ngn ex iso 77-ooo4 (412) 6418069 FAX ElloN.'eT0*.It December 19, 1995

l::3::.Len U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, No. 2 BV-2 Docket No. 50-412, License No. NPF-73 Four Year Simulator Certification Report (10 CFR 55.45)

The purpose of this letter is to submit the Four Year Simulator Certification Report for the Beaver Valley Unit 2 Simulator in accordance with 10 CFR 55.45. Duquesne Light Company, by submitting this report, as required by 10 CFR 55.45 (b)(5)(ii) and (b)(5)(vi), certifies that the Beaver Valley Unit 2 plant referenced simulator has been maintained to meet the Commission's regulations.

Questions concerning this report can be directed to Mr. Thomas W. Bums, Director, Operations Training at (412) 393-5751.

Sincerely, Ah George S. Thomas on >

Attachment c: Director, Office of Nuclear Reactor Regulation Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. G. W. Meyer, Chief, Operator Licensing - Human Performance Branch ,

Division of Reactor Safety, Region I Mr. D. S. Brinkman, Sr. Project Manager e n ,, ,.

'VvLL3 9512270215 951219 PDR ADOCK 05000412 h- I

._R_____ _PDR_. _

i \ f