Text
..
U+
k.
UNITED STATES
_[
' NUCLEAR REGULATORY COMMISSION n
- )
-wassiscion. o. c. 20sss r,
',,,,,I w;.w MEMORANDUM FOR:
Thomas Novak, Assistant Director for Licensing FROM:
Darrell G. Eisenhut, Director Division of Licensing
SUBJECT:
BOARD NOTIFICATION CONCERNING REPORT ON THE REVIEW 0F THE DIESEL GENERATOR BUILDING AT MIDLAND I have determined that the attached report on the review of the diesel generator building at Midland (Kuo to Knight dtd 10/21/83) and the Consumers Power' analysis requested during the review (Erhardt to Denton dtd 10/14/83) should be transmitted to the Board and parties for Midland according to the procedures of Office Letter 19.
Issue this as Board Notification 83-165.
p Gl q[$[Da'rrellG
)
is ut
' rector Division of Licensing b
Enclosure:
As stated
.,9 4 -
5 a
g s
's 3
8408210450 840718 4
y'-
. j ;_.;
_ '.h
+
ny. v s
,y,n o
4
- . g3 4
?*
EDocument~Nane:-
.,y m,
.BN.-: MIDLAND:-;RE DGB-s
. Requestor's ID:
'1p
.. HELEN :
R 1Authorfs Name:
, DHood --
- Document Comments:
s
. Transmittal,of. Report on Re-review of the Midland DGB-4 t 1 t.
4 l
k',
y ;.:
4, 3
J e
i t
.j-I l.'
i i
lI i
t
?
i 1
1 R
e 4
J s
4 W
- s
,a i
1,%,
'j j-s
~. *,
y a
- '? *
,},
,, p.
i ' '
, '; 3 _1
.~
's r;
u _
'o -
ft
r, Docket Nos: 50-329 OM, OL:
and 50-330 OM,'OL MEMORANDUM FOR: The. Atomic Safety and Licensing Board for the Midland Plant, Units 1 & 2 FROM:
Thomas M. Novak, Assistant Director
-for Licensing Division.of Licensing
SUBJECT:
TRANSMITTAL OF REPORT ON RE-REVIEW 0F THE MIDLAND DIESEL GENERATOR BUILDING (BN 83-
)
By earlier Board Notifications83-109, 83-142 and 83-153, the NRC has described
_its plan to address the concerns of Dr. Ross Landsman of Region III regarding the structural adequacy of the Midland Diesel Generator Building (DGB). The plan included the preparation of a report.on the adequacy of the DGB by a team of NRC structural engineers and consultants. That report, and an accompanying
- coverletter by the team head, Dr. P. T. Kuo, is enclosed (Enclosure 1) for your information. provides the applicant's results of a modified finite-element analysis of the DGB which was requested by the review team on September 12, 1983, but which was not provided to a schedule consistent with issuance of.
The modified analysis is discussed in Section 2.4.2 to Appendix III of Enclosure 1.--
The NRC is currently reviewing Enclosures l' and 2 to determine its impact, if any, on existing staff positions. The staff plans to prepare a response to Congress relative to the concerns expressed by. Dr. Landsman before the Subcom-mittee on Interior and Insular Affairs on June 16, 1983. The effort is pro-ceeding on a high priority basis. Results will be reported as they become available.
Thomas M. Novak, Assistant Director for Licensing Division of Licensing
Enclosures:
As Stated cc: See next page DL:LB #4
. LA:DL:LB #4' DL:LB #4 - AD:L:DL i
DHood/hmc.*MDuncan EAdessam TNovak
- t 10/ '/83 10/- /83 10/ /83 10/ /83
+
- j.....
[I o
G
'j y'o UNITED STATES
+
H.
n NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555
\\....+/
and 50-330 OM, OL MEMORANDUM FOR: The Atomic Safety and Licensing Board for.
the Midland Plant,. Units 1 & 2 FROM:
Thomas M. Novak, Assistant Director for Licensing Division of Licensing
SUBJECT:
TRANSMITTAL OF REPORT ON RE-REVIEW 0F THE MIDLAND DIESEL GENERATOR BUILDING (BN 83-
)
By ' earlier Board Notifications83-109, 83-142 and 83-153, the NRC has described its plan to address the concerns of Dr. Ross Landsman of Region III re the structural adequacy of the Midland Diesel Generator Building (DGB)garding The plan included the preparation of a report on the adequacy of the DGB by a team of NRC structural engineers and consultants. That report, and an accompanying coverletter by the' team head, Dr. P. T. Kuo, is enclosed (Enclosure 1) for your information. provides the applicant's results of a modified finite-element analysis of the DGB which was requested by the review team on September 12, 1983, but which was not provided to a schedule consistent with issuance of.
The modified. analysis is discussed in Section 2.4.2 to Appendix III of Enclosure 1.
L The NRC is currently reviewing Enclosures 1 and 2 to determine its impact, if any, on existing staff positions. The staff plans to prepare a response to Congress relative to the concerns expressed by Dr. Landsman before the Subcon-mittee on Interior and Insular Affairs on June 16, 1983. 'Jhe effort is pre-ceeding on a high priority basis. Results will be reported as they becone available.
Thomas M. Novak, Assistant Director for Licensing Division of Licensing
Enclosures:
As Stated cc: See next page s
s ha 4'
- ;4
)
9 P
P Y_.
')
D
.._._.M.22S e nhv
}
?
p I
October 24, 1983
.Dpcket Nos: 50-329 OM, OL and 50-330 OM, OL i
MEMORANDUM FOR: The Atomic Safety and Licensing Board for the Midland Plant, Units 1 and 2 4
I FROM:
Thomas M. Novak, Assistant Director for Licensing Division of Licensing
SUBJECT:
BOARD NOTIFICATION - MIDLAND STOP WORK ORDER ON.
"Q"S0ILDRILLING(BN83-155)
This Notification is provided in accordance with NRC procedures regarding Board Notifications and is deemed to provide information material and relevant to safety issues in the Midland'OM/0L proceeding, As stated in the Enclosure, on September 28, 1983, the Consumers Power Company (CPCo) -
issued a stop work order on all "Q" soil drillino and pile driving after drilling into structural concrete. The stop work order shall remain in effect until CPCo implements action to correct this incident and to ensure no reoccurrence.
The NRC plans to follow CPCo's corrective actions and will provide follow up information to the Board when it becomes available.
/S/
Thomas it. Novak, Assistant Director for Licensing Division of Licensing
Enclosure:
Memorandum from R. F. Warnick to D. G. Eisenhut dated October 5, 1983 cc: See next page MN
)
N005 DL:LB #4
,g DL:LB #4 LA:DL:NB#4 0'
- 4 A
MMiller/hmd DHood me M0unfan Ed sam i a S
10// /83 10/}/83 10$83 i
10/,9/83 10/,s/83
i
' L i ; dd. ' AImOdhiAtYl$dri '
'7~
h
~
V. *
. J..
1 e
!i DISTRIBUTION LIST FOR BO.ARD NOTIFICATION
. \\MidlandUnits1&2,
[:
Docket Nos. 50-329/330 ACRS Members Charles Bechhoefer, Esq.
Dr. Robert C. Axtmann Ms.,Lynne Bernabei Mr. Myer Bender I
Lee L. Bishop, Esq.
Dr. Max W. Carbon f
James E. Brunner. Esq.
Mr..4 9 e C. Ebersole j;
Dr.. John H. Buck Mr. Harold Etherington Myron M.. Cherry, P.C.
Dr. William Kerr
.Dr. Frederick P. Cowan Dr. Harold W. Lewis T. J. Creswell.
Dr. J. Carson Mark Steve J. Galder, P.E.
Mr. William M. Mathis Dr. Jerry Harbour Dr. Dade W. Moeller Mr. Wayne Hearn Dr. Milton S. Plesset Mr. James R. Kates Mr. Jeremiah J. Ray Frank J. Kelley, Esq.
Dr. David Okrent Christine N. Kohl, Esq.
Dr. Paul C. Shewmon Mr. Howard A. Levin Dr. Chester P. Siess Mr. Wendell H. Marshall Mr. David A. Ward Michael I. Miller, Esq.
Thomas S. Moore, Esq.
Mr. Paul Rau Ms. Mary Sinclair Ms. Barbara Stamiris Frederick C. Williams, Esq.
Atomic Ssfety and Licensing Board Panel Atomic Safety and Licensing Appeal Panel Docketing and Service Section Document Management Branch e
&: : d.L a_v.:.u:L L.a L xi G Oi & %c R M G &L' s
s
['.
j.p
- MIDLAND.(For.BNs) a i
Mr. J. W. Cook
)
1 Vi~ce President l
Consumers Power Company 1945 West Parnall Road
+
Jackson, Michigan 49201 p
s cc: Stewart H. Freman James G. Keppler, Regional Administrator Assistant Attorney General U.S. Nuclear Regulatory Comission, 1
State of Michigan Enviornmental Region III L
Protection Division 799 Roosevelt Road
), '
720 Law Building Gle': Elly% 11 Maois 60137 Lansing, Michigan 48913 Mr. Ron Callen l
Mr. Paul Rau Michigan Public Service Commission 1'
Midland Daily' News 6545 Mercantile Way 124 Mcdonald Street P.O. Box 30221 Midland, Michigan 48640 Lansing, Michigan 4890s Mr. R. B. Borsum Geotechnical Engineers, Inc.
Nuclear Power Generation Division ATTN: Dr. Steven J. Poulos Babcock & Wilcox 1017 Main Street 7910 Woodmont Avenue, Suite 220 Winchester, Massachusetts 01890 Bethesda, Maryland 20814 Billie Pirner Garde Mr. Don van Farrowe, Chief Director, Citizens Clinic i
Division of Radiological Health for Accountable Government Department of Public Health Government Accountability Project P.O. Box 33035 Institute for Policy Studies Lansing, Michigan 48909 1901 Que Street, N.W.
Washington, D. C.
20009 U.S. Nuclear Regulatory Commission Resident Inspectors Office Comander, Naval Surface Weapons Centar Route 7 ATTN: P. C. Huang Midland, Michigan 48640 White Oak Silver Spring, Maryland 20910 Mr. Paul A. Perry, Secretary Constner s Power Company Mr. L. J. Auge, Manager 212 W. Michigan Avenue Facility Design Engineering Jackson, Michigan 49201 Energy Technology Engineering Center P.O. Box 1449 Mr. Walt Apley Canoga Park, California 91304 c/o Mr. Max Clausen Battelle Pacific North West Labs (PMWL)
Mr. Neil Gehring Battelle Blvd.
U.S. Corps of Engineers SIGMA IV Building NCEED - T Richland, Washington 99352 7th Floor 477 Michigan Avenue Mr. I. Charak, Manager Detroit, Michigan 48226 NRC Assistance Project Argonne National Laboratory 9700 South Cass Avenue Argonne, Illinois 60439 w
.go,.
~
C-
.J a 1.;..; ~
$ O j '
'dhiE.h;,Y L21:2 drh Nihi.11./ d YIO%
[;.~ * '
%~
u as Usiggygg giargg e
i NUCLEAR REGULATORY COMMIS310N
[
.-.a..-
neoloN lli 5
no acosavsLT mono eten su.vn,ILumois sein
- .2*
OCT 5 s83 d
t MEMORANDTDi FOR:
D. G. Eisenhut, Director, Division of Licensing, NRR li'2421:
- 1. F. Wan.i.e.2, riesator, Office of Special Cases i
l
SUBJECT:
RECOMMENDATION FOR NOTIFICATION OF LICEK5HiG BOARD i
4 In accordance with present NRC procedures regarding Board Notifications!
the fe,11owing information is being provided as constituting new information relevant and material to the Midland OM/0L proceedings. This information i
deals with the licensee's September 28, 1983, decision to stop all "Q" soil drilling and pile driving imposed as a result of unknowingly drilling into structural concrete. The pertinent facts that relate to the stop work are as follows:
I 1.
On September 20, 1983, the licensee began drilling piezometer BB-1 which is located in the control tower area near the main auxiliary building.
2.
On September 22, 1983, concrete was encountered at El. 594.3. Drilling was temporarily stopped until approval was obtained to resume based on existing borings which indicated a six inch concrete working slab at that elevation.
3.
On September 23, 1983, concrete was encountered at El. 583.5. Drilling was temporartly stopped until approval was obtained to resume based on existing borings which ind4cated ten feet of lean backfill concrete at /
that elevation.
4.
On September 26, 1983 steel was encountered at El. 581.3. Drilling was temporarily stopped until approval was obtained to resuse based on the
+
assumption that the steel in question was scrap.
ii'I 5.
On September 27, 1983 the steel was cored through, retrieved and found to be one #6 reinforcing bar and one #11 reinforcing bar. Cognizant
[.
individuals thought that there was a good possibility that this rebar l:
had been used to reinforce the concrete backfill because of a crans wat H
used during earlier construction at that approvinate location.
6.
On September 27, 1983, more steel was encountered at El. 580.1. Drilling was stopped and this time a more thorough review of drawings was made.
~
It became obvious that they had not drilled into fill concrete with added rebar, but into a' structural strongback attached to the south side of the auxiliary building B-Line wall.
I:
il 1
YOU u
A O
ha
.,-_,.-.-,m_..
.,,......._.._..._.a......-__,~._.--..-.-.--
' h. u d u.c &-
- ' ~~
u' wc==~.aua.a.
~
'. ~ -
'4.
- n. c. Eisenhut
.2 OCT 5 1983' 7.
On September 28, 1983, the licensee issued Stop U.prk Order No. FSW-32 which stopped all "Q" soil drilling and pile driving.
e-8.
On September 29, 1983 the NRC was informed of 1;his stop work. At this time all work remains stopped pending adequate corrective action to
' preclude drilling into structural concrete. This action includes revising the procedure to include a review of structural drawings and not just buried utility drawings. Also retraining to the new procedure will be i
accomplished. All completed excavation permits will be reviewed to determine whether structural concrete has been hit in the past and dis-counted as lean concrete.
If you have any questions or desire further information regarding this-matter, please call me.
- t EO R. F. Warnick, Director Office of Special Cases 4
- . i ec:
A. B. Davis J. J. Harrison R. N. Gardner
- 1. B. Lan.ssman s
R. J. Cook i
e f
4 i
z.;
4 7
i_
- i 1
l l-g
,--_.,n_
,,-.-n~.---..
~,,,
.n.,-_,-.,..-.
p',,,.,%
/7 45 UNITED STATES fs j,i L,Cf ) 1 NUCLEAR REGULATORY COMMISSION e
}
WASWNGTON. D. C. 20555
'e M$
\\... *. /
October 4, 1983 Docket Ncs.
50-329/330 OM, OL Mr.-- J. W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201
Dear Mr. Cook:
SUBJECT:
Followup Meeting on Construction Completion Dates My letter of August 9,1983, noted that since the April 19-21, 1983, NRC staff visit to assess construction completion schedules for Midland, Consumers Power Company had requested a followup meeting to review the material previously provided, to provide additional information, and to discuss reconsideration of scheduling priorities between Units 1 and 2 in light of recent actions by Dow Chemica's Company. The letter also noted that at Consumers' request, the
. staff would be scheduling this meeting in September 1983.
On September 2,1983, Messrs. B. Hershe, N. Leech and others from your Company advised us that the week of October 24, 1983, would be the earliest time that Consumers would be prepared to discuss scheduling priorities between Units 1 and 2, and that some months beyond this may be needed to establish a scheduling projection basis.
The staff views this as a significant delay in our efforts to consider your views regarding the schedule for plant completion at Midland. Unless your dates for establishing a firm schedule for plant completion are substantially improved, the staff will consider the estimate it developed based upon the April 19-21,1983 visit to be appropriate for its planning purposes. Please
' advise me of your intent in this regard within two weeks of receipt of this letter.
Sincerely, Thomas M. Novak, Assistant Director for Licensing Division of Licensing sc: See next page
^l5$5Ui
\\
j
\\
=
o-r y
- ,c..,.,.... D c
Mr. J.
W.~ Cook Vice' President Cors.r ers Power Company
- 1945 *a'est Farnall Road Jackson, Michigan. 49201.
v.:.. c. 1 i.. v.i l '. a. r, e.s c..
."y.1 s :~, n o. c.a a.. o e. :
- ~. ~. r. v.=. r.. c.-.. =.,. ". '. c '.
m.
.. =
r.
' c... e :i n, : s q.
c -
......ci
. ::.n
...c..z i e c.
...c.
s Al an S. - Farnell', Esq.
Departr.ent of Pu'aiic ealth Isham, Lincoln & Beale P.O. E:x 33035 Three First paticnal Plaza, l.ansing, Michigan 15909 Elst fioor Chicago, - 111inois 50602 Mr. Steve Cadier 2120 Carter Avenue Cares E..Brunner, Esq.
St.
a ul, ".i r.neso a 55108
-.,... c. e.- s.:
- a. r.
o..r.= n.v v
212 West "ichic.an Avenue U. S. '.'u:l e a r 0.5 c.u'. a tor.v C:c.ission Jack sen, Michigan : 49201 F.esident Ins e: tors Of fice
. c.e o.
s Ms. vary Sinclair "idianc, Michigan 4S540 e
'5711 Sum.erset Drive "Mv. 5 n d, v.i u-h '. :.= n
'em ".,0
- v... : = -.=.. a c '. c-.. '..- i. s
,s.
ever
.e... r. u... r. :.. : n'
...... : :. :.,.,.a...:...
. e.o,
.e-c o
e.,...
c
- cc
.... e... q.
- s. e. =.v
. z.. =. a i c... e o,. v.. u. '.. i.=. n :.s '. r -.. =.... a '
.M. : a '. - n'.
- .. v, h. -
e" 2. r.v
.....:on.3. v :. s :. on
......"..e m.
... e n.s.
..> n...., :..
- 3..a :,,.
3-
.y.
4...
c v :. :., r., ::
.a.,:..,
. ~. -
".. Wandell ".arshall
". Walt Apl ey
- .cnt.e 10 c/o Mr. Max ' Ci a
- sen
Miciand, Michigan
'S540 Batteile 7acific *.a tn West. ans ( 'r,'L)
- ..=.....,.e. civd.
V.. R. :.. :.3r.c m.
('..."..
... -,. 3. u n
- .s. V..t i. v n
- . b r' '. :. a..
4 4
' s..::r r.-C.
- ,,'.4....--
- ~*S O..g '..... )......
., mitg%.g
- ..:c e
a rc
,...f.....:.....:,
.'. s. :
- i. '
. ~.:
te...*..a a.
- :. :.....:.0, a j. : +.
...: =14
- .a e......
4 a..j
- ..:. j :. '. j.
.e.
,n
=..
.:...cz
...g..:
.....,D..
..~
=...,...
.*.....'**.a
.....: ~....
,.:e.
. ~..
~... -.. -.. -
..e
.C.
.j.,
-tt
":,o
.s a=
t.
~.. - ' ',
<.:.. g
. ~ - -
4 nao
Y e
MrlJ.Ol Cook.
l2' -
n.
t; f
"cc
/Mr.'RonCallen.
F Michican Public.. Service Concission-M 5545 Mercantile Way.
(n
'P.O.: Sox 30221
{,
. Lansing. Michigan 48909_
~ M..: Taul Rau Pidland Daily News-124 Mcdonald Street Midiand,.Michican 48540-g.
Sillie-Nirner Garde.
p Director, Citizens Clinic y
.)
for Accountable Govern ent:
' Geve. n ent ~ Accountability Project
. Institute.for Policy Studies 1901 Que Street, N.W..
l'.
.%ashirgton, D. C.
20009!
1 i
Mr.. Howard. Levin,- Proj ect Manager.
I TEF.AiCorporation I
.7101' Wisconsin Avenue Ect.6esda, MS yland 20S14l-Ms.5'.ynne Ee. nabei 1
Scie n ent Accourtability ? refect.
T 190'.-C 5 reet,-N.W.
- a s tinct:n, D. C.
20009 u
~
4
.m J'
h-
_m..___.-___.__.m
p-_n-w
--- r a.
6, i*?,:
e n!)
s'
~
3-e
-Mr.t-J. - W. - Cook '
(cct-Cc sander,- Naval Surf ace Jeapons Center ATTN:
P. C. F.uang
-Waite Oak
~ " ;
nSi'ver Spring,_"ary;and. 2C910 Mr. L..J. Auge,' Manager lTacility' Design Engineerir.g
. Energy Technology Engineering Cir.ter P.C. - Box 1?49 Canaga-Park, California 91304 i
Mr. : Seil Gahring-l
-U.S; Corps _of Engir.eers I
. ::. -D.-
T 7th Floor 477 Michigan Avenue Detroit, Michigan 48226 e
Charles Bechhoe'er, Esq.
Ator.ic Safety & Licensing Board U.S. Nuclear: P.egul atory Co 7.i ssion Washin gon, D.
C.-
23E55 Dr. Frederick P. Caan
...o..=. - 2 c.
9 er:e s rall.
01i:
a.
0
. Fn. 7 D'on, Fiorida 33'33 Jerry Haroour, Esq.
_ - Ato?.ic Safety and Licensing Board U.S. Nuclear Ee;ul ato: y Co..ission Washington, D.-C.
2C555 hi! *.i bri al 5".gi rSeIs,'
"c.
AI'*i : 3F. Stev e J. EC'.;I C',
o r.. ~...,: '.s
.s.
,4 *
...Lm'
'f..... m. a 3 6 g
- .*g*6
.a p-ggQy*
yne 3 s
e
.e..
i h '.
k
-el' N----
.n.-
- - - - - - - - - -. _ - - - - - - - - -