ML20095A167

From kanterella
Jump to navigation Jump to search
Forwards B Garde FOIA 83-454 Request for Documents Re re-review of Structural Adequacy of Diesel Generator Bldg
ML20095A167
Person / Time
Site: Midland
Issue date: 08/10/1983
From: Veronica Wilson
Office of Nuclear Reactor Regulation
To: Bosnak R, Lear G
Office of Nuclear Reactor Regulation
Shared Package
ML19258A087 List: ... further results
References
CON-BX18-026, CON-BX18-26, FOIA-84-96 NUDOCS 8408210397
Download: ML20095A167 (2)


Text

12-

~

_ _._ m h]

v eauq'o,

. [#

UNITED STATES g

NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. C. 20555 h

Gh P /-

August 10, 1983

/f

/'

/

George Lear, Chief, SGEB MEMORANCUM FOR:

Robert Bosnak, Chief, MEB FROM:

Valeria H. Wilson Management Analysis Branch Planning and Program Analysis Staff, NRR

SUBJECT:

. F01A-83-454 -- REQUEST FROM BILLIE GARDE FOR DOCUMENTS-RELATING TO THE RE-REVIEW 0F THE STRUCTURAL ADEQUACY OF THE DIESEL GENERATOR BUILDING AT MIDLAND The subject FOIA request is enclosed for your actionh Please provide documents which you might have that are subject to this request, along with a list of such documents so there is a record of what you actually provided as part of your response.

Incoming documents which are handled through the official distribution system dre in the PDR and need not be provided. However, if you can easily identify specific letters, reports, dates, applicable docket numbers, etc., please do so.

Internally generated documents do not routinely go in the PDR unless PDR is specified on the official file copy. Therefore, all such memos which have been generated without the PDR designation should be provided, even if it means retrieving them from Central Files. Do not indicate PDR on the file copy of your response to me. Please make a careful review to identify (1) any material which should be withheld as classified, safeguards, or pro-prietary information, and (2) all memos received from, or transmitted to one or more Comissioners, or which contain substantive excerpts from records received from, or transmitted to, the Commissioners. Also highlight or identify any documents obtained from foreign sources. Documents to be withheld should be separated from documents to be released.

Keep track of the actual search time involved, i.e., time actually spent reviewing files to determine if there are relevant documents. All other time should be accounted for under the "other activity" column of the enclosed FOIA Time Record Form. Please return the Time Record Form with your documents.

If you believe the search time will exceed two hourt, please contact me immediately, and let me know approximately how long the search will take, as well as whether you anticipate that documents will be withheld from public disclosure. Also let me know if you think other NRR branches or NRC offices might have documents which are subject to this request.

/

h.=

Mu Valeria H. Wilson ftanagement Analysis Branch Planning and Program Analysis Staff, NRp

Enclosure:

FOIA Request

$ 8 g 97 e407tg RICEBA-96 pyg

r,

.. (p;,

7_-

~

~ ^ _

e

~a:

. c:u _
n,.

Y.:

{

- RECORD OF FOIA PROCESSING tit'E

r 1

INSTRUCTIONS: Complete this form to cr tablish the time associated with the processing of this F0IA request.

Record the time in man-hours, rounded to the nearest 15 minutes, for all actions taken.

Include the number of pages i

repcoduced.

['

.Your clerical ' overhead factor will be added by the FOI A/PA Branch.

-Negative results t'ime will be reported to this office by telephone.

RETURN FORit T0:

Director, Division of Rules and Records, Room liNBB-4210.

1 F6rm Date-f Name of Requester BILLIEGAsDE

/

}

FOIA Request Nuinber FOIA-83-454 k

1 DIRECT TIME FOR SEARCH

(

i

'}

ORGANIZATION Clerical i Professional ALL OTHER ACTIVITY _/

2 2

[

L Wt

/A A

A S t/

6/t/

H 5

]

.e.

-r x

1 4

j COPY REPRODUCTION

]

ORGANIZATION NUMBER OF PAGES j

l REPRODUCED

?

MV' M

i U1 C011PUTER SEARCH 4

Report actual trachine time and applicable cost rate for machine used.

j 2

[L:

If Includes only the time actually ipent in searching for or locating documents.

L+

2/ Includes the time spent reviewing documents for exempt information, conferring

{

with the staff, reproduction, etc.

w.,,

n

..JG6NERNMENT ACCOUNTABILITY PROJECT

-Institute for Policy Studies 1901 Que Street. N.\\V.. \\Voshington, D.C. 20009 (202)234 9382 l

{~

i August 8, 1983 t

Director

~

1-Office of Administration FREEDOM OF INFORM 5 TON i

U.S. fluclear Regulatory Commis sion ACT REQUEST

[

Washington, D.C. 20555 ggg g, pg

.f 04 Q-l0-S $

/

3 To Whom It May Concern:

Pursuant to the Freedom of Information Act (FOIA), 5 U.S.C.

1552, the Government Accountability Project.(GAP) of the Institute for Policy Studies requests copies of any and all agenc,y records and information, including but not limited to notes, letters, memoranda, dra f ts, mi nutes, di aries', l ogs, cal endars, tapes, transcripts, summaries, interview reports, procedures, instructions, i

engineering analyses, drawings, files, gra phs, charts, maps, photo-i graphs, agreements, handwritten notes, studies, data sheets, note-j books, books, telephone messages, computations, voice recordings, 1

and other data compilations, interim and/or final reports, status j

(,rttgottn _and.any_and"alltoocuments_re. latin _g to thejre-review of' j

the structural adequacy of'the Viesel Generator Building at the s

Midland Plant.

s p e c iYi~cil l y, we re qu es t all inforhion subsequent tohe

~

j May testimony of Dr. Ross Landsman in_.tjg_ASLB proceedings about f

the adequacy of the Diesel Generator Building.

9 If any. records have been destroyed and/or removed, pl e a s e l

provide all surrounding records, including but not limited to a 1-1 i s t of-a l l records which have been or are destroyed and/or remeecd, a description of the action (s) taken, relevant date(s), individual,

~,

of fice and/or agency-wide policies and/or justification (s) for the 1

action (s), identification of all personnel involved with the 1

action (s), and any and all records relevant to, generated in

]

connection with, and/or issued in order to implement the action (s).

GAP requests that fees b'e waived, because " finding the informa-

  • a tion can be considered as primarily benefitting the general public."

5 U.S.C. %552(a)(4)(A).

The Government Accountability Project is a

'j n o n-pro fi t, non-partisan public interest organization concerned with honest and open government.

Through legal representation, j;

advice, national conferences, films, publications and public s

outreach, the Project promotes whistleblowers as agents of govern-ment accountability.

GAP requests the above information as part 1

of an ongoing monitoring project on the adequacy of the flRC's efforts to protect public safety and health at nuclear power plants.

4 l

e.n

/ I" s*

,,.y e, o

.o.

Di, rector of Administration-i

[

U.S. Nuclear Regulatory Commission

-August 8, 1983 Page Two I{fi Lt.

For any documents or portions that you deny due to a specific q

FOIA exemption, please provide an index itemizing and describing the~ documents or portions of documents withheld.

The index should aj provide a detailed justification of your grounds for claiming f.

each exemption, explaining why each exemption is relevant to the a

document or portion of the document withheld.

This index is,

1 required under Vaughn v. Rosen (I), 484 F.2d 820 (D. C.

Cir. 1973),

i cert, denied, 4T5 U.S. 977 (1974).

Q We look forward to your response-to.this request within ten

~

j

. days.

3 Il Yours truly, Li j.

q' j

Q; a a~

[ce

.C s

d Billie Pirner Garde n;

Director, Citizens Clinic for a

Accountable Government

  • ,j' '.

pdc-

.e

.+

.a p

1

+

d.

2 y

J

  • 2 t

d li Li

}i df t1