JUL 2 81983 MEMDRANDUM FOR: Jane A. Axelrad. Director of Enforcement, IE FROM:
W. H. Schultz, Enforcement Coordinator, Rill r
SUBJECT:
. CONSUMERS POWER COMPANY - MIDLAND PROPOSED CIVIL PENALTIES We have reviewed the licensee's responses dated March 10, June 24, and July-12, 1983, and have concluded that the violations did occur as stated.
The civil penalty proposed for Items A and B is based on the breakdown in the implementation of the licensee's quality assurance program as evidenced by numerous examples of noncompliance with nine of the eighteen different criteria as set forth in 10 CFR 50, Appendix B.
Therefore, we recommend that a $120,000 civil penalty b2 imposed ($60,000 for Item A and $60,000 for Items B.1, B.2, B.3, B.4, 3.5, B.6, B.7, and B.8).
However, in view of the $3500 overpayment made by Consumers Power Company in response to the January 7,1981 Notice of Violation and Notice of Proposed Imposition of Civil Penalties, the cumulative amount of civil penalties designated in the Notice of Violation is reduced from $120,000 to $116,500.
Attached is a draft letter to the licensee with enclosure.
4 i
i-W. H. Schultz j.
Enforcement Coordinator
- a
Attachment:
As stated i
cc w/ attachment:
J. Liaberman, ELD f
Enforcement Coordinators, RI, RII, RIV, and RV t
l' 8408170145 840718
~
RIII RRIg RIII II RIII II kt%
F RA'd wus RII(I Gardner/jp Harri.io Warnick L
Schultz ivis K spler 07/25/83 e-d45 %
?W 771 94%3 u.
. ar
==. -.
2
. -. -. ~ -
-. ~.
- u: -
- ~
=.
l5
. Docket No. 50-329
?.
h
~ Docket No. 50-330 e
e Consumers Power Company 1
ATTN: Mr. John D. Selby N
President 212 West Michigan Avenue Jackson, MI 49201 k
n 1-Centlemen:
!i This will acknowledge receipt of your letters dated March 10, June 24 and t
July 12, 1983, in response to the Notice of Violation and Proposed Imposition of Civil Penalties sent to you with our letters dated February 8,
[
and May 23, 1983. Our February 8, 1983 letter concerned violations found during the special inspection conducted at the Midland Nuclear Power Plant, Units 1 and 2 during the period October 12 - November 25, 1982, and on 4
January 19-21, 1983.
After careful consideration of your response, and for the reasons given in the enclosed Order and Appendix, we have concluded that the violations did occur as set forth in the Notice of Violation and Proposed Imposition of Civil Penalties. The proposed civil penalties for. Items A and B were based on the breakdown in the implementation of your quality assurance program as evidenced by numerous examples of noncompliance with nine of the eighteen different criteria as set forth in 10 CFR 50 Appendix B.
t
~
x= ~. : -. ~. ~.
I Con:umera Power Comp:ny 2
(:
Included in these violations were examples demonstrating the consequences of the failure to exercise adequate oversight and control of your principal contractor, to whom you had delegated the work of executing the quality assurance program. Item A addressed the consequences of QC supervisors instructing QC inspectors to suspend an inspection when an excessive number of deficiencies were observed. Item B illustrated numerous examples where cognizant personnel failed to follow procedures, drawings, and specifications; first line supervisors and field engineers failed to identify and correct unacceptable sork; construction management failed to call for quality control inspections in a timely manner; and quality assurance personnel failed to identify the problems and ensure that corrective actions were taken. These violations occurred as originally stated. No adequate reasons have been provided for not imposing the proposed civil penalties for the violations.
However, in view of the $3500 overpayment made by Consumers Power Company in response to the January 7, 1981 Notice of Violation and Notice of Proposed Imposition of Civil Penalties, the cumulative amount of civil penalties
~
designated in the Notice of Violation is reduced from $120,000 to $116,500.
Accordingly, we hereby serve the enclosed Order on Consumers Power Company imposing civil penalties in the amount of One Hundred Sixteen Thousand Five Hundred Dollars.
In regard to your June 24, 1983 supplemental response to Item B.6 of the
?
j Notice of Violation, we are forwarding your response to the appropriate technical NRC office for their review. We will inform you of the results of that review.
l l
4
..,w
- * - +
- rw*-s=-
.---u.a,....=..
3 t..
-l
- Consumers Power Comp ny 3
I In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, L
Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Room.
Sincerely, 1
i Richard C. DeYoung, Director.
u' Office of Inspection and Enforcement 4
Enclosures:
- 1. Order imposing Civil Monetary Penalties
,i
- 2. Appendix - Evaluation and Conclusions i
t 1
I l
4 f
't
-.. ~ - -
- a. -. i.
w : --
a.---.~.
w-~..=.a
[
p.
~
U. S. NUCLEAR REGULATORY COMMISSION r
In the Matter of
)
Docket No. 50-329
)
Docket No. 50-330 Consumers Power Company
)
)
Construction Permit No. CPPR-81 Midland Energy Center
)
Construction Permit No. CPPR-82 t
ORDER IMPOSING CIVIL MONETARY PENALTIES Consumers Power Company (the " licensee") is the holder of Construction Permits No. CPPR-81 and No. CPPR-82 (the " permit") issued by the Nuclear Regulatory Connaission (the "Cossaission"). These Construction Permits authorize the construction of the Midland Energy Center near Midland, MI.
These Construction Permits were issued on December 15, 1972.
II As a result of a special inspection of the licensee's facilities by the Nuclear Regulatory Commission's Office of Inspection and Enforcement during the period October 12 - November 25, 1982, and on January 19-21, 1983, the NRC Staff determined that a breakdown had occurred in the implementation of the Midland quality assurance program as evidenced by numerous examples of
. pe w s -
- ' Gam e - W
w.
--aa
- wa.u.,.
. w.u. ~
e n.
I e 4
s I
noncompliances with nine of the eighteen criteria as set forth in 10 CFR 50, Appendix B.
s The breakdown was caused by personnel who failed to follow procedures, drawings, and specifications; by first line supervisors and field engineers who failed to identify and correct unacceptable work; by construction-management who failed to call for quality control inspections in a timely manner, and by quality assurance personnel who failed to identify the problems and ensure that corrective actions were taken. The NRC served E
j the licer.see a written Notice of Violation and Proposed Imposition of Civil l
Penalties by letter dated February 8, 1983. The Notice stated the nature of the violations, the provisions of the Atomic Energy Act, the Nuclear Regulatory Commision's regulations that were violated, and the amount of civil penalty proposed for each violation. The licensee responded to the Notice of Violation and Proposed Imposition of Civil Penalties with letters dated March 10,' June 24, and July 12, 1983.
I e
t Upon consideration of Consumers Power Company's responses (March 10, June 24, 4
and July 12, 1983) and the statements of fact, explanation, and argument in denial or sitigation contained therein, as set forth in the Appendix to the Order, the Director of the Office of Inspection and Enforcement determined that the penalties proposed for the violations designated in the Notice of I
Violation and Proposed Imposition of Civil Penalties should be imposed.
2
(*
'P*-A e'
6 5-
='
m.
- w&w e, a 4 w,,-
mm,,,
e
,+.%.sw.-w--r-mw,
--go4 e,pe-q-
-i.9ey
.,<,mi.,epy-e,
.w.----y-.,w7.
9-
-%,a
-gw%yy
,q,,_4,eyge
-,,.yw,wg.appw.yy-y,_,p,c
-y-,
..a. m. s e. _ a 1
~ ' _
.1_
~
m...
Bowever, in view of the $3500 overpayment made by Consumers Power Company in response to the January 7, 1981, Notice of Violation and Notice of Proposed Imposition of Civil Penalties, the cumulative status of civil penalties designated in the Notice of Violation is reduced from $120,000 to $116,500.
IV In view of the foregoing and pursuant to Section 234 of the Atomic Energy
'Act of 1954, as amended, (42 U.S.C. 2282, PL 96-295), and 10 CFR 2.205, IT
}
IS HEREBY ORDERED THAT:
The licensee pay civil penalties in the total amount of One Hundred Sixteen Thousand Five Hundred Dollars within thirty days of the date of this Order, by check, draft, or money order payable to the Treasurer of the United States and mailed to the Director of the Office of Inspection l
and Enforcement, U.S.N.R.C., Washington, D. C.20555.
l The licensee may within thirty days of the date of this Order request a hearing. A request for a hearing shall be addressed to the Director, Office of Inspection and Enforcement. A copy of the hearing request shall also be sent to the Executive Legal Director, USNRC, Washington, D.C. 20555. If a hearing is requested, the Commission will issue an Order designating the time and place of hearing. Should the licensee fail to request a hearing within thirty days of the date of this Order, the provisions of this Order shall be 3
c--
e,,,. -,.w,-,--,
n
,,,,.,,-,-,-w+,,,,~,-e--w,-----,---.-wy-<g
-- w g.v,,-mnwy---
a.
~.
-x t u. ~ ;.
1
\\
l u
k i
effective without further processings and, if payment has not been made by that time, the matter may be referred to the Attorney General for collection.
i-
.In the event the licensee requests a hearing as provided above, the issues to be considered at such a hearing shall be:
(a) whether the ifcensee was in violation of the Commission's requirements as set forth in the Notice of Violation and Proposed Imposition of Civil Penalties referenced in Section II above, and s
6 (b) whether on the basis of such violations this Order should be sustained.
J FOR THE NUCLEAR REGULATORY COMMISSION
-i Richard C. DeYoung, Director Office of Inspection and Enforcement Dated at Bethesda, Maryland this day of 1983 I
J-o l'
I u
u' 4
lt h
- -~'~
~ '
L.~~T ~,
-_...._L_,.
- r :' _ ::::: ^.. -,. --..__.. -,.,,,.-._._ _,,- -. -.-~ -
.m.
u-s.-
- i.
a l
^*
Appendix h
ll c
Evaluations and Conclusions
}
Each item of noncompliance and associated civil penalty identified in the Notice of Violation (dated February 8,1983), which was denied, in part, by the licensee, is restated below. The Office of Inspection and Enforcement's evaluation of the licensee's response is presented, followed by conclusions I
regarding the occurrence of the noncompliance and the proposed civil renalty.
In addition, the Request for Reduction of Civil Penalty is also restated below. The Office of Inspection and Enforcement's evaluation of the licensee's request is presented followed by conclusions regarding the proposed civil penalty.
'I Item B Statement of Noncompliance 10 CFR 50. Appendix B, Criterion Il requires holders of construction per-t mits for nuclear power plants to document, by written policies, procedures, or instructions, a quality assurance program which complies with the re-quirements of Appendix B for all activities affecting the quality of I
safety-related structures, systems, and components and to implement that program in accordance with those documents.
e e:-
1
-g
,. +
-.-,--._.-,.yr
.yw
+-,,-----------m---
r9
--w--eg-..-,...
-m.-i.a.-,g
- i. q w
iy,_
-a g e.wg
-ryw,r,w,iwyww-p.,.,,.ww,,.w,,,e-
--we-
+,y-
- -- _ -- ------------.r---------------
Contrary to the above, Consumers Power Company and its contractor did not
. adequately implement a quality assurance program to comply with the require-ments of Appendix B as evidenced by the following examples:
1, 10 CFR 50, Appendix B, Criterion V requires, in part, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings."
1 Consumers Power Quality Assurance Program Policy No. 5 Revision 12 Paragraph 1.0 states, in part " Instructions for controlling and performing activities affecting quality of equipment or activities such as... construction, installation...are documented in instruc-tions, procedures...and other forms of documents."
s Contrary to the above, the following instances of failure to accomplish activities affecting quality in accordance with instruc-tions, procedures, specifications, or drawing requirements were identified:
a.
Installation of diesel generator engine control panels 1C111, 1C112, 2C111, and 2C112 was not in accordance with the require-ments delineated on foundation Drawing 7220-M18-250 in that the foundation bolt washers required by the subject drawing were not installed.
2 e%w -
-e.m+--
m.y-
.-e-
=
b.
Unscheduled pull box associated with conduits 2EN006, 2BN007, and 2SDA002 was not sized in accordance with the requirements delineated on Sheet 42 of Drawing E-42 in that the 12" x 12" x 6" as-built dimensions of the subject pull box did not conform to the 13 " x 12" x 6" dimension requirements delineated on Sheet 42 of Drawing E-42.
c.
The l'-10" wall to support dimension required by raceway support Drawing E-796(Q), Sheet 2 of 2, Revision 5. for hanger No. 86 was not correctly translated into the as-built installation of the subject hanger in that the as-built wall to support dimension was 2'-1 " in lieu of the required l'-10".
d.
The 6'-6" wall to support dimension required by raceway support Drawing E-796(Q) Sheet 1 of 2, Revision 11 for hanger No. 14 5
was not correctly translated into the as-built installation of the subject hanger in that the as-built vall to support dimen-sion was 5'-5" in lieu of the required 6'-6"i e.
The inspectors identified high strength steel piste placed in the laydown area which was not marked with the material type and grade as required by Field Instruction FIG-9.600, Revision 1.
f.
The inspectors identified various stock steel shapes in the "Q" area with yellow-colored paint on the ends (indicating 3
~~
~ ~7
~TL.
T
'T
- L..
- - ~. - _
u.
.. m _.
.-_2-_.
]
r s.
the material was non "Q") and'various steel stock shapes in the non "Q" area without painted ends (indicating "Q" material),
contrary to the requirements of Field Instruction FIG-9.600, Revision 1.
g.
The slots in the muffler support plates were not machined but were determined to be irregular and flame cut, leaving rough slot edges not in conformance with design Drawing M18-425(5)-1.
h.
Jacking plates were not installed beneath the center support plates of Bay 1 diesel generator muffler as required by Drawing M18-250-6.
i.
Procedure FID-2.100, " Outstanding FCR/TCN Retirement," Revision 2 was inadequate in that the design drawings were not changed i
when an FCR/FCN had been retired and no further reference to the FCR existed on the revised drawing. As a result, the retired FCR C-2103 relating to HVAC structural steel was lost and could not be traced to the design drawing to ensure a complete quality record.
j.
Field Sketch CY-1035 which illustrated the bottom gusset plates for HVAC fan supports was not identified as "Q", nor was there a reference to the affected drawing on the sketch as required by Procedure FFD-5.000, " Preparation of Field Sketches."
4
3.
r -
k.
Procedure FFD-5.000, " Preparation of Field Sketches," Revision I did not require design drawings to reference appropriate field sketches to ensure a complete quality record.
1.
The eight bracing top gusset plates identified on Drawing C-1004, Revision 10, as 5/16" thick were measured by the inspectors to be 1/4" thick in all four diesel generator bays. This change was neither reviewed nor properly authorized.
's.
The as-built gusset plate connections in Bay 1 were not built as identified on Detail 3 of Drawing C-1004. The angle braces were welded together as opposed to having separate welds for each brace. This change was neither reviewed nor properly authorized.
1 n.
None of the sixteen k" bracing angles identified on Drawing C-1004 were constructed utilizing 4" material. This change was neither reviewed nor properly authorized.
o.
Drawing C-1004, Detail 2, required the W10 beam-to-beam connection l
l to be welded. In Bay No. 3, a bolted connection was constructed I
in lieu of the required welded connection, without review nor proper authorization.
p.
The column cover plate identified on FCR-C4401 was not constructed i
in Bay No. 3 as required. The plate was slotted instead of solid 1
4 n -,
- e-we m e s -
m m-a- me
.ms
j
\\
as required. This change was neither reviewed nor properly authorized.
q.
A section (approximately 18 x 10 x 4 inches deep) of the primary containment wall in Containment Purge Room 702 was removed (by chipping) without obtaining approval as required by FIG-1-111, Revision 4. Concrete Drilling Permit.
2.
10 CFR 50, Appendix B, Criterion III requires, in part, " Measures shall be established to assure that applicable regulatory requirements and the design basis are correctly translated into specifications, drawings, procedures, and instructions. Measures shall also be estab-lished for the selection and review for suitability of application of asterials, parts, equipment, and processes that are essential to the safety-related functions of the structures, systems, and components.
4 Design changes, including field changes, shall be subject to design control measures commensurate with those applied to the original design and be approved by the organlaation that performed the original design unless the applicant designates another responsible organization."
Consumers Power Company Quality Assurance Program Policy No. 3 Revision 12, Paragraphs 3.3 and 3.5 state, in part, "Each group or organization performing detailed design translates the applicable regulatory requirements, design bases, codes, standards, and design criteria into design documents, such as... drawings....
Changes to the design require the same review and approval as the original design by the group or organization delegated lead design responsibility."
i 6
i
Contrary to the above:
a.
Measures were not established for the selection and review for I
suitability of application of "Q" asterials associated vith the diesel generator exhaust suffler in that design drawings and specifications did not indicate the material ide.7tity of the installed muffler saddle supports and plates.
b.
Design Drawing C-147 required bolted bracing connections for the diesel generator building HVAC bracing gusset plates. Field Sketch-CY-1035 was used to change the design to welded connections in lieu of the specified bolted connections. This design change was neither properly reviewed nor approved.
c.
Design Drawings C-1004 and C-147 did not specify the sizes of the diesel generator building HVAC fan gusset plates. A " combo" shop work order request was used to design the gusset plates without appropriate review and approval.
d.
The licensee failed to analyze the four diesel generator building monorails as seismic Category I as described in their commitment to Regulatory Guide 1.29. In Appendix 3A of the FSAR.
e.
The licensee designed and constructed thirty-two diesel generator building exhaust system hangers without ensuring that the applicable requirements for "Q" components were included in the design documents.
7
...w
=....
~..
i-
_ f.
The licensee purchased armor stone for a "Q" portion of the peri-I meter dike without translating the applicable reguistory require-ments into appropriate specifications and design documents.
- 3. -
10 CFR 50 Appendix 5. Criterion VII requires, in part " Measures shall be established to assure that purchased... equipment... conforms to the procurement documents. These measures shall include provisions, as appropriate, for... inspection at the contractor or subcontractor source, and examination of products upon delivery."
Consumers Power Quality Assurance Program Policy No. 7. Revision 12, Paragraphs 1.0 and 3.4, state, in part "The Midland Project Office and the Midland Project Quality Assurance Department verify that procurement requirements are met. This is accesplished through...
source evaluation and inspection...rece.ipt inspections are made to verify that the items... conform to procurement requirements not verified by source surveillance or inspection...."
Contrary to the above, source inspections at the panel supplier facility and receipt inspections at the Midisnd site failed to ensure conformance of the internal wiring within diesel generator engine control panels 1C111, IC112, 2C111, and 2C112 to Procurement Specification 7220-C-5, Revision 1.
Paragraph 6.0 of Specification 7220-G-5 states, "All electrical wiring...within the board enclosure shall conform to the highest industrial standards of design and workmanship." An NRC in-spection on October 15, 1982 identified the following examples of defective terminations of internal wiring within the subject panels, d
8
~..
,e
!i a.
The output lead on the Relay Tach device had numerous broken i
\\
l strands at the termination lug.
t b.
The K1 lead on the Relay Tach device had two broken stra'nds resulting in a potential short circuit between the K1 lead and an adjacent conductor.
c.
The 1-lead on the CB-1 device did not have all strands inserted i
into the compression lug.
i r
Li 4.
10 CFR 50, Appendix B, Criterion X requires, in part, "A program for inspection of activit!.es'affecting quelity shall be established and executed...to verify conformance with the documented... drawings for accomplishing the activity."
t Consumers Power Company Quality Assurance Program Policy No. 10 Revision,12.Syction1.0 states,inpart,"Inspectionandsurveillance are performed'to assure that activities affecting quality comply with docuaented... design documents... inspection and surveillance are performed according to written instructions."
Contrary to the abover f
a.
An inspection program was not established to ensure segregation of cables installed in horisontal trays which used metal dividers to segregate control and instrumentation cables in accordance with design requirements.
t e
9 am e m me e
-*-me+
-. ~.
l b.
Quality Control (QC) inspections failed to ensure that activi-i ties affecting quality conformed to design documents in that QC 1
4 inspections performed on July 1, 1981 and documented on QCIR C210-172 failed to detect and identify nonconformances 3*.1.(1) through (o) of this Notice of Violation. These nonconformances were associated with installation of the diesel generator building MVAC fan support steel.
5.
10 CFR 50 Appendix B. Criterion XIII requires, in part, " Measures shall i
be established to control the... cleaning and preservation of material and equipment in accordance with work and inspection instructions to prevent damage or deterioration. When necessary for particular products, special protective environments...shall be specified."
Consumers Power Company Quality Assurance Program Policy No.13. Revision l
- 12. Paragraph 3.3, states, in part " Suppliers provide plans... maintain and control items upon arrival at the site."
Contrary to the above, the licensee did not implement a maintenance program to prevent five of sixteen installed diesel generator slide bearing muffler plates from accumulating dirt and dust as required by the vendor's manual.
6.
10 CFR 50, Appendix 3 Criterion IX requires, in part " Measures shall be established to assurs that special processes, including welding, heat-treating, and nondestructive testing, are controlled...."
I i
~
10
_u
- _ c._
- _ya _ _ -
2:
2_.
..:. u
~
Consumers Power Company Quality Assurance Program Policy No. 9. Revision 12-Paragraph 1.0 states, in'part, "Where the required level of quality qj.
cannot be measured by inspection only of the item... accomplish these
. processes under controlled conditions in accordance with applicable codes, standards and specifications using qualified procedures, equipment i
-and personnel." Paragraph 3.3 states, in part, Personnel performing j
special processes maintain records to verify that the required activities n-h were accomplished in accordance with qualified procedures by qualified personnel."
15 Contrary to the above, during welding of the diesel generator building exhaust piping hanger support steel, the licensee did not verify preheat of existing safety-related structural steel to a temperature of 70*F as j,
required by site specifications and the AWS 1974 Code, l
7.
10 CFR 50, Appendix B, Criterion VI requires in part, that " Measures
.i shall be established to control the issuance of documents, such as instructions, procedures, and drawings including changes thereto, which prescribe all activities affecting quality...."
The Consumers Power Company Quality Assurance Program Policy No. 6 Revision 12. Paragraph 1.0 states, in part, 'Hessures are included to assure that documents, including changes,...are distributed according to a controlled distribution to the user functions."
k I
~
f 11 s
g i --
r
.,-,u
.S
.w
.M
_..,y, y-g.g
..E,,,
m.- u. -
a--.
.'.- ~ - - - - -
- u. - ~
i Contrary to the above, measures were not established to control the distribution of changes (red lines) to hanger isometric drawings in i
l that changes to Drawing 1-652-2-25(Q) were not controlled utilizing the-Site Document Control Center.
8.
10 CFR 50, Appendix B, Criterion IV requires in part, 'Hessures shall be established to control materials, parts, or components which do not conform to requirements in order te prevent their inadvertent use or inseallation."
Consumers Power Quality Assurance Program Policy No. 15, Revision 12 Paragraph 1.0, states, in part, "1tems, services or activities which are deficient in characteristic, documentation or procedure which renders the quality unacceptable or indeterminate and which is considered signi-ficant to safety are identified as nonconformances. Nonconforming t
b items...are identified by marking, tagging, segregating or by documenta-L tion. Nonconforming items are controlled to prevent their inadvertent installation or use. Nonconforming items and activities are recorded and are considered for corrective action to prevent recurrence...."
Contrary to the above:
a.
Measures were not established or implemented to determine if materials ultimately restricted (per Nonconformance Report No. 3266) from installation or use in ASME Class I systems were actually installed or used in Class 1 systems.
L
- )
12 2
+
, ~. - -.
..,o-.,
i
. j.
b.
As of November 10, 1982, two nonconforming conditions identified 4
by the NRC on October 12, 1982, and confirmed by the licensee on a
S October 19 and 25, respectively, had not been documented,on a nonconformancereport,aqualityassurancereport,orot5ter appropriate report. The two nonconforming conditions were:
(1) The diesel generator exhaust hangers were not classified, designed, or built as "Q" as committed to in the FSAR.
(See item 2.c.)
(2) The design of the diesel generator monorail was not analyzed to seismic Category I design requirements as committed to in the FSAR.
(See item 2.d.)
Evaluation of Licensee's Response The licensee admits that examples B.I.b., B.I.c., B.I.d., B.I.e., B.1.g.,
B. l.h., B. I. i., B. I.j., B. I.k., B. I. l., B.1.m., B. I.n., B. I.o., B. I.' p.,
B.I.q., B.2.a., B.2.b., B.2.c., B.2.d., B.2.e., B.2.f., B.3., B.4.a.,
B.4.b., B.5, B.6, B.7, B.8.a., and B.8.b., did occur as stated in the Notice of Violation. The licensee denies, in part, examples B.I.a. and B.I.f.
t 13
.o e emep mo m yap.,-+
.-w mmgoe'
- ~-w-.
.+s-
-s n,
-e e,~-sme m.
y
...-_.1_._
~
. _.. ~.
~ ~..
i
~
2 NRC Evaluation Concerning example B.I.a.,
the licensee contends that since the inspection
~
records for panels IC-111, IC-112, 2C-111, and 2C-112 were open with attributes such as washers and torquing not yet inspected, the portion of the noncompliance pertaining to flat washers was not a violation. The licensee's position that open inspection records negate the failure to install the required flat washers is unacceptable. The philosophy of inspecting quality into the job cannot be accepted as a substitute for the i
philo' sophy of building quality into the job. The licensee admits the remaining portion of the violation which deals with the omission of bevel washers.
Concerning example B.1.f., the licensee contends that, contrary to the 4
Notice of Violation, all steel in the "Q" area was identified in accordance i
with procedures. The licensee purports that some manufacturer's marking of this steel led to confusion. At the time of the NRC inspection, the in-spectors observed yellow-colored paint on steel in the "Q" area. This condition, as stated in the Notice of Violation, is contrary to the require-ments of Field Instruction FIG-9.600, Revision 1.
The licensee's contention that this paint was applied by some manufacturers does not mitigate the finding. Site quality control inspections should have detected the noncon-forming paint and initiated proper corrective actions. The licensee admits the remaining portion of this violation which deals with the marking of steel in "non-Q" areas.
i 1
[.
s L
0 g.
-- - - -.,.. - -. - _ _ -.--_,.;_<-,,--~-~-
.L.:-.z....
, s.:1d i s..w. -
.a
~.:.
Conclusion -
{_
These violations did occur as originally stated. The information in the licensee's response does not provide a basis for modification of the enforcement action.
Request for' Reduction of Civil Penalty 4
Pursuant to 10 CFR 2.205, Consumers Power Company respectively requests that the NRC reconsider the amount of civil penalty proposed to CPCo for the
}
violations cited in the NRC's letter, dated February 8, 1983, J. G. Keppler
.to J. D. Selby. The Company does not contest the validity of the violations and aggrees that a civil penalty is warranted, but believes that certain mitigating factors should be considered.
4 The NRC's criteria for enforcement actions (at 47 Federal Register page 9991, March 9, 1982) sets forth specific criteria for increasing or reducing base civil penalties, and provides in part as follows:
"2. Corrective Action to Prevent Recurrence. Recognizing that corrective action is always required to meet regula-tory requirements, the promptness and extent to which the licensee takes corrective action, including actions to prevent recurrence, may be considered in modifying the civil penalty to be assessed. Unusually prompt and exten-sive corrective action may result in reducing the proposed 1.';
l:
?
15
(:
Y.
y
- .w.~ t
. ~
~
~
t l
i L
L-civil penalty as much as 50% of the base value shown in i
Table 1.
On the other hand, the civil penalty may be increased as much as 25% of the base value if initiation of l
corrective action is not prompt or if the corrective action s
is only minimally acceptable. In weighing this factor consideration will be given to, among other things, the timeliness of the corrective action, degree of licensee initiative, and comprehensiveness of the corrective action L
- such as whether the action is focused narrowly to the specific violation or broadly to the general area of
~
concern."
l We believe that our actions to correct the situation at issue have been timely and have been conceived and organized mainly through our own initiative. Most I,
important, however, is that our program to correct these deficiencias is cucprehensive and far reaching.
Shortly after receiving feedback on the NRC's inspection findings, the Company launched major, extensive corrective action. The Company halted the rajority of the Category I work of its prime contractor, and laid the groundwork for a verification of past inspections and statusing of incomplete work. The work stoppage resulted in the layoff of more than 1,000 workers. The Company also initiated major, generic corrective action addressing the specific areas of
^
NEC inspection findings. The Company's entire plan is entitled the Construc-tion Completion Program, and included steps responding broadly to the NRC's and Company's areas of concern. This was addressed at length in the Company's I
4 16
~-
':Y
~
. -.- - ::' ^ ~ ^
~ T T. ~ Y;;L J.
- l. :T:.
'~~
z..-__..
=
s-1etter.of January 10, 1983, J. W. Cook to J. G. Keppler and further discussed
. at a Public Meeting with the NRC at Midland on February 8,1983.
j The corrective action undertaken by the Company was not narrowly fbcused on the specific violations identified by the NRC. The work reduction entended
?
to all major safety related structures on-site, not merely the diesel gener-ator building which was the focus of NRC's inspection. The verification pro-
+
a
{
gram begins in the auxiliary building, includes the reactor buildings and diesel generator building as well as the service water pump structure.
i 3
g i
The Construction Completion Program, which is the organizational basis for 1
the generic corrective action, will encompass and structure the remaining preturnover systems and area work to be done at the Midland site, (excepting soils, HVAC and NSSS work). The Company's willingness to accept the NRC's suggestion that we take direct control of the project QC staff formerly under A
Bechtel supsrvision extends broadly to the entire job, and involves a major r
commitment of additional manpower and resources in recertification, training, and inspection activities.
The Company does not contest the NRC's decision to increase the civil penalty on the basis of certain other factors specified in the enforcement guidelines.
We request, however, that consideration be given in determining the amount of
[
the penalty to the corrective action taken and planned by the Company.
.1 q
r.
b a
l 2, d
17 M-l t
, -. ~. - - - -.
,-+%
r.~.-
w-.w..
-.w.
a:.a.;
)
i L
1 t
Evaluation of Licensee's Response While the licensee's corrective actions are recognized as being both comprehensive and far reaching, these actions are viewed as having'been 4
dictated by the nature and severity of the noncompliance identified during the diesel generator building inspection. In addition, we perceive the issuance of nonconformance reports in March 1983 (items B.I.b., B.1.c.,
r B.1.d., B.I.e., B.I.f., and B.5) for nonconforming conditions identified
- t by the NRC during the period of October 12 - November 25, 1982, and
- 1 January 19-21, 1983, to be indicative of less than prompt corrective action.
.o Finally, the licensee's decision to halt the majority of the Category 1 work 1
of its prime contractor was based upon the knowledge that the NRC would initiate escalated enforcement actions to stop the work unless the licensee acted promptly.
3 conclusion The information in the licensee's request does not provide a basis for reduction of civil penalty.
I i
[j 7..
w.-aw%-
e.---e.,
=a.
,.e-*
O_
-M
- [,
--w--
O *S O M
- 9 -N #*"
- " + -
~s
'w3.. j f. i ~
"-~ ~R _._.
- ~~ -+"
.,f-------
~;
-~-'.
7,
' ' 3 -- '
~ '
g' { (./
'.'rT
- }., ;-'
-- - - -~
1 On
. i-.w :.
'q,4' P,%$M.f" M C' bbN
.N. T"'
WfnLJ ps &
p.
w I
m Il Mh m L A % artrL & Am Alu th n O Y b [b1 t; oaxd TIL A
A e d f1L #d k % A ( E D & & U~ L b u L i _ b '_'
- N A tau NDEA L iM. '.,1 d L
/tal.
%.2 uu L a i % & dtwe GA d d a ;LK
?
a kK ;du J albt %)2d Lv
- 4,,_ ;
U DVarw W as a s%a o a +1t e s m L'J A J t @W, A are ;&
L w
Nkhakd tkmm4 d.L W d c)
'nuALA.W wossd a lh doMA1 M L e th nt1 L'A d E e &o d h d
.L, I
a.)
d($,e CMu
$5& L h k t6 yit d udL W cl% k d $<A a-LudtwLatLW M LM
. a sb a_M Oss V
l f$
-.s. _
M. ~
~
a b re d % 4 i
QMi%_&.
(oA)_pmpm_ad
4-A-4-p a&
.m4.mt..
m-
+eWmm se-..w..e.
h e w-
.4M W-4 94,f 44
_.e-e a
g e
,e en
.g
.=.g ge,...
6 e
g '
O.,p.
,4'.
e.
f
- S 4
6 v-9 E 3
~.a.~
~
._a'
-LL.
h m+
.e.
,es.e-.
.e,
,e
.,,, e e.
~
]"4 0 y..
'g,;
I h
h 9
-c Mi A m
uJk M
ild nl M
& g?M
& _gA ut a&D sk cA n-A,aJEo AJLA.
A nt J&
al isna sco.
4 y
/
M Q
~
L 2_ % std &
A.)
&k 0uhod nehk&Oumb & d$ th M._
h}nLL &
c&
LL nr p u eL i;J J A M WE & suks non64 6-ndLJ una
~
~
! & A th %uLJ A un6 M _
VLL akk%% Liu aa9% ad 6h; h (11A ALM MA ul+A lRM v' M Q ak M sCNunc%cL L b L ( L J ' R ).
l n
v il
- 1 >,.
1.7J. -
, "l-L
,f 's :.
+4 & %.5 N
l~ :::%.
i
- c.
v a:n..
~
,' '.S. ~ g e[ ~
.n.',
15
(-
e v
'*]
. m :.n.-
-e-
.a n.
a.mn.ee. -
1 n,
-- y-. 7.
r ----
s m
m-p
- ------+--s.
o.
c.
..,-7~---1-~<.---".;-~'
v--
--- --- - - ~ - - - - -
~
.,v.i _ _,,
~
..__..c_.._
.._._...--__.i._.._,..
I
, +
g N y.: Q(m hQ
- n*1
,.g f.
, +.,
5" y
ma l
Aou
@ M N b
/J4.JL l aA a o m a
.ah h '
3
! % h 6 a %d A_c1,-> M c
~
,dMasawki-
&drWA$ n da auf La% 4 orauL ad.ud &
1 a av 1
a fL 'yLSof on 'omem.
o 0
/
0 l1 LJE 0AAA M "O
O r
Arb.uY11JJM L iM Ehw OA MtwE&
. NM. fAwe ha M & E,w f >$
li wAkidill O M
& n & 6
--& d:
o' i
~
r.:kt 3. :-
~
n y u
o a....
$(Dfd m h [h.
lb5 $p
[
$5.h;"
AA]ad.3LL W w b b 2$1 U, 2
~
ud AL k
L I
(L A N A A h a l L
L Q-L oAL.~
/
,,wpan.
-mee.--
- =
O P*-
w-
+wy p-s.-
y-p-
...~~:.:..
~
.. - -. ~
...+. m.3. s ym.. v g.g:..g p: g.,. y,v f.. -
,., 4.,
m-
....~,.m._,,
m.
.s
-e.,
.. ~., : {... ::s. -
s
- 3..
.y.
^;
- y. -4.n.,_-; =...s.; o -% r.n.:
V,
. 7-
-..--7.+
> ? Wig :4M-
- c. -
f' -..N.* Qui;1-j. :]/~'j :+t, !,'.". J p' +,,# *#A'. ".1WJ." -6,:U
- t'I'*;.-
s
. 20'Hyr
~
2
>.. - ~. -
,.(, ;.A
$! '..'y g,,-
'..^
' j'e
^ ~ ~ ^
.........._'l..._.'.
f lht. ':y
..fj.
, d ,'T.
~
m t, nr:
g#
.m
^ '.
.. y
....;y..
e
=..:
$$Q p
I N
V i
i U A.
ur L
nn 0 0
i i
0 1
%tiiubo Q w nuc a M P & A 1
0 0
0 i
' ~
I h
/bec M v
o I
l-fwa ZS
% S 1h & la d r4 N
y
/
P I!
keki$ %. 50-3 7 % 50-33 0 i
s I
ll l
Le. 50- 32 9 8.1-
- So -330 8.f -
y t
I eay.#2 d
.. v.c.,,'s m.c..
c.
n x.
w
. :.e vn ue
. a
- t. L I. d 8 ]
W llW.y-d
' ~
ggq l
,w '
- + ~.
, Q "~f '
a
- 'j '.' gG'*e t. t-c *. m.v. r * * ' - * ^
QF
~_%.
s r
t--
- ..,j;.- -' c q t..'j v
..t_.,-
4 1 v.
....x n
.: w.
.g,y;_m. (. 3.
f,.
. sb,- NLa ~.
- g. *,.;, ;_.-p.,..
- 'C.*.',*
..[.i f.
g
[.
,,e..
=es -
, ;7e p. ;r ' b-s' s
a w
m
f'....a,-.... --.. -. ~..-._..
y-5 i
C0!frENTS I
i P, age Letter to Licenses from SALP Board Chairman
...................J.
Licensee Comments...............................................
I.
Introduction...............................................
II. Criteria...................................................
III. Summary of Results.........................................
IV. Performance Analyses.......................................
[
V.
Supporting Data and Summaries..............................
e t
l t
i l
i l
l l.'
l-i
~
4 e
La g
2 l<
l}
l P
e e..*-%-e.
e-e m.
--r
,.g c.
r..c m,.,
c.
4,.----...
m,..=_ _ ~ 1. _. c-~ -
Q g
i.
Tr I.
INTRODUCTION The NRC has established a program for the Systematic Assessment of Licensee Performance (SALP).
The'SALP is an integrated NRC Staff effort to collect available observations and data on a periodic basis and evaluate licensee performance based upon those observa-tions.
SALP is supplemental to normal regulatory processes used to insure compliance to the rules and regulations. SALP is intended Primarily from a historical point to be sufficiently diagnostic to provide a rational basis for allocating future NRC resources and to provide meaningful guidance to the licensee's management to promote quality and safety of plant construction and operation.
l A NRC SALP Board, composed.of the staff members listed below, met on May 24, 1983, to review the collection of performance observations and data to assess the licensee performance in accordance with the guidanceinNRgManualChapter0516,SystematicAssessmentofLicensee Performances A summary of the guidance and evaluation criteria is 1
provided in Section II of this report.
~
This report is the SALP Board's assessment of the licensee safety performance at Nuclear S.tation, Units 1 and 2, from J;a-. y
(,
1 through Bee" r 3F,1982.
l lf8/
M j
M 'S l i The results of the SALP Board assessments in the selected functional areas were present d o the licensee at a meeting held on J :: 13, 1983.
5 ALP Board for Nuclear Station:
N C. E. Norelius, Director, Division of Project and Resident Programs R. L. Spessard, Director, Division of Engineering
. A. Hind, Chairman, Director, Division of Radiological and Materials Safety Programs.,
4krl! H ye., Chic, " jt;te Ecstieu 1" L. A. -R;yc, Chief, Tcet ".vgt.ms 5eetion By-M D-ai-1 en,-Chief, M:tcrial; eed ".ecesse:
c--+4 en WL_ va-aey, S-nior nacia.a+ I;3pecto., Byron R. C. Knop, Chief Projects Branch 1 T.N. Tambling, Chief, Program Support Section
-J. 3. "cras cuy-Pre;rse e";pa-+ Rectien M..'.. Rius, Ic.c Fius... Scu+ien l'
l 1
i
.w-e-
- - - ~
- ~
- - -.. - ~ -
(i
/
II. CRITERIA The licen ee performance is assessed in selected functional areas depending 3w ether the facility is in a construction, pre-operational or operating phase. Each functional area normally represents areas significant to nuclear safety and the environment, and are normal programmatic areas. Some functional areas may not be assessed because of little or no licensee activities or lack of meaningful observations.
Special areas may be added to highlight significant observation.
Dae or more of the following evaluation criteria were used to assess '
each functional area.
1.
Management involvement in assuring quality 2.
Approach to resolution of technical issues from safety standpoint f
3.
Responsiveness to NRC initiatives 4.
Enforcement history 5.
Reporting and analysis of reportable events 6.
Staffing (including management) 7.
Training effectiveness and qualification.
However, the SALP Board is not limited to these criteria and others may have been used where appropriate.
Based upon the SALP Board assessment each functional area evaluated is classified into one of three performance categories. The defini-tion of these performance categories is:
Category 1.
Reduced NRC attention may be appropriate. Licensee man-agement attention and involvement are aggressive and oriented toward nuclear safety; licensee resources are ample and effectively used such that a high level of performence with respect to' operational safety or construction is being achieved.
Category 2.
NRC attention should be maintained at normal levels.
Licensee management attention and involvement are evident and are concerned with nuclear safety; licensee resources are adequate and are reasonably effective such that satisf actory performance with respect to operational safety or construction is being achieved.
Category 3.
Both NRC and licensee attention should be increased.
Licensee management attention or involvement is acceptable and considers nuclear safety, but weaknesses are evident; licensee resources appear to be strained or not effectively used such that minimally satisf actory performance with respect to operational safety or construction is being achieved.
t i
4 w.,
--~
- a..
w - <
,.- w
- -- w.
,gm.,
, =. - ww w.
m_,-
p
- f l
t
.- L...
Q -...
9 u
=....
? EW)W%h
%I Cdr W3 ge L,
uU v
U~
U C
i/. 1 4l.a r d L w d.L'A' X
b.&A am h A etkw ill AA A L i a h Lt cou uceag a
- h. P,61 h h.,t bt ana caw i
%k%)sQ x
kCd x
&Mia L L.A (Ia M
""~
M c M aduwc4 L
h.k%aL A llc,A A 4 Lt ou e-aw
%,w M6 x
!9. d b a w.o U Pa h A m tL. W
!60, b eni d Juda, YLt (AA e d. Mo#
l!ill. Adihad Md LI d&wat m da b k %ALudd Pdu%
!!aA h t
-Q Rf M,x e s v
y eg
&'/E E %,aor a, n&& h 3
'ik tka, e %
A lMo 61 klu AJAc.lC Co lJo h W o O
\\Pm k &Swkatd'ww%%'
?ty
' & >&s~ tlaA pf r&, ad uhd a
o.
p*
e me.ee e
w---
...i.
.-et u,
8
.-(
-*'*rew4 91P't.
Mau-.-
.T"'*
-M
~'** tap 3"-'*******"""'*****"8**."'
.gya*.e ;.y>.
s
~
- c.
- ^
,.,( 7., f ;..i*"~~
" ' * * - ~ ~ - - * ' * - * * ~
y
~ ~
[ 7..
~_.7-..-.-_..-
p.
j
,,. x,"
f ANNA!l$. '-
o'
'o..
. )5l.*ie' ?
.(*k"; Q*n*.$
v -r !s e..
4-j, a L s'
Qh N.i G 6.
du k$
M l
' h in u
& ler w/
l u
4 A mhi o
?
a'J w'a a J.:L al<u L&
AL nia e a d ecue ztwh1A O
u
~
o o
i u2 h.,
l c
sa M '" T 0
[l\\ $
Star *] W
- N '
N tLhk O
1
& ts W ' cu d
/.nthz-o3.uo/n c I
<@ L L e t-ne5m k? a lxna&s,a a.u.nck o
o u
I MIL M h h.
/duti6 R ?dh,w,mL A.
[b 1.e :O axt. b* a.M &o- - - -
'o r
ArtkOln W
bh amubmi ytt._zdeh 0 I
O l
w-0 l
hk /~+b / p & & Q g. A g Q, &&
Yi, b5 ~ ' &w (3n/5.oh.33o/n-og), ' N j
les
<Am u.,a,1s m A m l
o u
~
[
& ntMhrdL ami M coM7 L'
l M L h 2; dd MA A t whd N
~ L & L i e &.'
' (c. Y ;
E k & l L u: b w o Lc
' wg g
o o
~
_.._ _ t
.x
- r..Q
-- r r a v,.+,. -- _
~: = w ---J n.s:7..
-- ; ; -- =-.
hZ..r '. -
-l
. _;.-' > 'i~ f fy' ?f',0. '
......a.
-a-Ef-
. -. _ '. * [i. 3 t,i
.i
- s. ** ^ '
- A 'T
, i.,.. q
.a ;
p. ;... -.-
_>l
~ ~ f -
- .s....
=... -. -..
y'... - -.
......=.u...
. u,$. ~ ~-.-
o O
^'
bk
/10 0,
^00s
% %1 a?kM,% Wisac.Lud ifaLu!L.L d % - e d ai M M AfEL U
2ALo M.% a cs. dar a& -:d I a +L $a n th w 2hL ri D lI 0
O
& M L 2-ta th f/ L 1 y t Nl M hae d O M octdru M R a. 3 k o fs w I k L th.' %,~ h, M da L L f L A YO M +M sALP hu.Lda-l
% tk und, a tJa. b~ rJA & O w.
Uktk1 & a6 W !s k k.
0 h i m k A u + k U iJ b 'P m E b or y
u 6-
~ 0 o m,M b11 3
~J Y'
mb lJ$
t'p_ % &,'
G V
O Yls) L$O a &. tar inJak utlkl, cLud Cr +)>
V ' Lau a $ 'PUbiwb IN & MUkm NfJu. m at W r4 w?
!fhi es, aA:nL b th. W A,Adulwm
. i uh & db.
I.
,X V.
l
- , M.
. :* ~
r.'
,}'..[
., = -
c.,,,,.;.,.
,4 s
y
/^
_g g
' (f.s) I//6/6 Y W 6.8 L-f W ! N j a.
7ji -
- .eco.3,.
^
- i... _:
..s:
=. s... -
~
' ^
~.
v :...
s 9
nw w.
.;+
wmgp-
- w w w e w w : g.s n + m.,. m..~ w. -- u
... a., s.v
- j.. -.
... :.. 3:.
g x :.a..c.e b
($ kLsh Ld-am a.b5Wavruba 4
~
W W
?m a;wb&
M&l& 6.
- r..,K.' '.y l
I i~
~
f
/
%1
- v. w
~ /0 d - h; L_,_4 f, a &
u ;o
~
l
%.L a h ShJ L (3M/u!os.330ka-osh.
99 l0 Ew w J.wd TE - LsAs hs ichdal & tok
\\
o o
A k k n n sdLdL & n u flL nannu
[3c29lL2-04 330bn ggw%- -%%gp.e m %
/5) AAah~ W 7-L11 wet, fg h.oA!A mw ld
la nubluut,At.att.,m< min-ii,non~
l (6) N d L - Al. Lure # ra_t aonn*SL lylg.i /
~'
I
&L Uk mn to cLEL+ +h k&Al ',
i wk 6knowfL(3mha-n-a 3 o in-Ilh'.
V V
i I
l
/n M Linr.-A h a ~ w A L dr
- n. v. ' ~,wE rk. v.S.,, a M& o&h(sahi ao
,%W@G.-
.JJt;
- 33 o/ 21-1 A).
g v<
a 3.s 4 - <-
4 M~ M.>.a..
sa. :n..++-
Y s -hvAuk~g a.Y tk L _ W a.w.w ):d.d.f g-0-
-v v
u s M n a.er.rdte.,o idttA h
~
w.n 0 i **, :- '
. m.....,. s,.,.:..:. n.>. m. ~.. -
o
.. f 'll \\.
- d:., k.i;si ~ p -
.k.- * .' E' ;
- e yM'1,^,'[,-.
., " f "
' ~
'-f i'
~
- p.
...,. ;..., m. y ;7;
- c..
m
v-
- 7 "N
-3
_r.
m. m... _
, 7. _.. _,_
...g. _ -. = _
-.. ~
.~
- . w ;-,.
s--
c.
>..s.
~ _ -.. - _ _.......
...._L..7_.L_...._,
$'N1
$9?r'. (9) LwesL dw.l W-uand, &n nia W W fi M M n:s o .w a m C w h n A tJtt-g o.. W=M-o,s M dbM- /_n_ g /R/1 -a /,. 33 0 /8 2.2 /,), ' O t !d d M A, OM R UanA'L cAicA M /paEfdw$ ~ 9O. 2.a % uun L o s en n w mv mm a x nb [h) b E ^ (dd ~ o llo) M h4 77T-b % M c ' E JLfl % O a & 4 i M* rtL in v adL a ha a ~ i 4A ;&s b 1 cd h lA Kd A51JEa-x,.33oleku). 1 nemkl ash. k (w/ss-on 33oh3-oi). r-l At k%Jt$' Y Undn Arm & ) o m lre d,l L n !m. c >&1. 06 sr ddki atAu /aAn L# W-22] EhLab. LI 1r% mA_. k & RenuaS.zfdl & WnsL t &M a -th. aud$cu Aalba wk!$a ( V . J W & rA-a.A0L Q Ab_, M UM(O b..' ro-33ilha-12iErs co $3olm-a (ErdYkfit &b d5h 4 MM Ala bN 1;JL [$ M_g 6-* A8 .6L u w w % u axn a z u. hr ah ~'b&uth Lx% %& ~ g % L 2 r A L h, w nu b M +)u a A so.1, r /
,.n_,..--.,,,..
_---,n
. : ;;., + ',j', ~~a.
- m p i
-~-=-"-3:. ,,y-._;. v- =. - ,..~... _._.._.. i i.t:.iyls, ~ 'W i. Ofi W & M dotA fLSLEh $h 1Alk em v.w p a 3 'N.N $Nad&. oJA & abt) & ],, h E. 4,r 5k- ' 1A!.a %. M LA & & a.rGr uolad OMc-i M Jitm Mih G ik h ~ / i ) A k A L. " U O" yn Y WAC an3M nk,_ L j' ) E 8 / A+A M W"ukkhkla A *t.)a. ASL& m-l.w .th.L }& W vh.N $ wAL & & 5&;dk vrL aA on
- ~
ihM #d~ &Ak bt/A-) a -A \\ MsM &Juk \\ LL m Am. \\! N T ? l A_ md Y - w Ad.3L S Uhl.S0t e n & Il/H2. U tan WNOS L CAL koo i / Y IM k O f L m & / 2, /M2. 0 V em.. - .,y, l/ , lR *9 -s ' g
- *'L.'
/.T,;;. '4' M 'g]. 4' -I I : r+ 4 1. h N "*; g... b G E' .56 ? 0
- ~ ny.g2.S ;
t 4, r _ ;s - '~ + .--%..e, w
ww. -- r-~~ - 3.. 3,,.m.. ., -- ~g.4.: --. y.-- - m. =~ =- ~= :- : v-e - (... - _., ;;:}......' ~
- . ;U J..'
J. ' I 1 d_ ^ ' *jO ~ C.h 'El
- _b ' ?: .', ~.
' ~ l'. ~ a,~'4 y{ $ < -w f j, r,g., - 5,*, ~
- e
._g 1 : ? ':. a s., n w.'s. - -,.. : - ', 74 'g .1 D
- r. ;c y
- m n. W.6 % L&ua r nka L 3 6 tka m. ~ 036 A tha 6 & uno:Udh.on+ nawSwi>4 anxiA t% l.ku mwdLperk m. s & C % A C #A&A a d m d.NRc & A n O l s & % cA hdLaEk s. k..) 4ch a A O t LEU Ja tlu. Mua OA ~ Lhw mudM 3 Apk a au. L'eua H c m L > & -t k & a d u. I mdLA A A. s >A e A c4 1 A L & %L % a tJu. ncha b. Mk Pd 6At doo /du.Abl h& ll Pwuk Ld% tht akluhd dh m A a I ak NYd uh' L 4Ja Mh' dal? ~~ p U () il l 1, 1 i u, . e,d
- i a'.
- .lf..
n..,. :. - w +
- S'.'*e l-l t
L l l l ,,...,,.....s. .~ a. ..'.i '. ' ' ,.~.c ~ g-.
. a P.s1. G a_wan.aw .a - .-m n. _... .- a. --. ~. - - - o e [. v c j _ ~. L
- 0., --
.) 0 3pa._lAshhrY!.aLS-n, W (.urtto d u A M g. d u. A A. A d. q w A a g ae .a am G L A 4 ui B & s c t p h l ns ~ i - - _h w A k L 4 -e u a. a h. ...i.:1 ;J W.o &, a 6 o c l! - .--M hn< h w A -dt t.Ju. Aen od (J>AlLc."w4}.s. r A._n*% ah),ku e b y e,m wlx 4 A a M L ._.-. - _ _ m Ki _ $ u.G b l J w u hr.n L 4 4, g/.1. b a,u&g L 2 w h 6 w d / % h zd k J e LG ch w. JJ,LU..h & % z',4 m L y, & wo - m& yA a AL-: a.s w. - 10.+64 pJ.Z -- 3 a.b. 6 /4-., t :. ....m _ ] b Y.6 %m.N0/2 -ol; EEo/n- 0 0. u. u..e.N. pau wrrk._jtup^ su, s sa.. ~ u.. _. 0I
- r. hlm.
.)'w<. i A5.Or4A Eq =sh .e*= -. m e a ww-ps. 'O
- 4."
T.g+w ah.e.*-se w a weheg .O eg e e 4,w .r..._. ,n
a s -/- m v, . u _1 ._asa y _wx. s .=_-. ,-5:_.,Aa. e a b,ne sib,s - 4. m,,w s_...,wn~-- ~#m .+._e s+ -'+,,~n...a. _ = - -. +.
- ,++. - - + - - *- * -, - -. *+.~--* * - -. -
- - ---++-+ - - * * - -. ~ -*. -
+-~==.~aa. e - s. ;. e s F 9 9 9 =*.eg.s.* e-
- e...w.m..
.,,u ,,,,,,.m m L \\.m e h
- y..
i 4 A'..- . 4 --.._.... -..,. _.. _ _... _.. _.. _,_ _,_. _,. S ...~_ -, _ ,,.) W. km e . +..h..thL. phu %S w m y.w$ jsrbd.. au.o) F> l I*
- == - - - -
.. - ~ -=.,- I' ---.e..---.. ..e,,,.._ W +***** +=-en -e +++e+ - we +a ,,,m,., o QP 6 e. ~. @>= m e.A h O-6=== t'm13. 4 *4 e==O=' espe h enemhpeeee em&- e -4 -,p.-ee v. g e 4 g g .) -e N r. = = = - 4-- +.* *
- s
+ t >~ 4 = o m,-- n, W 9 -g-i ge.she si mee am e,, g--ag a> -em, e eaus h.gsh,e,, ep ep.gi .e.g i e 4 e6 24 4-4 eng g u .=u.
- 'pe
-ge.m-g&We+4-54*'is.eqM pee.. gage em p 9, g g, a pg, g..,g, 1 (a+- D e==ew h - ene +6+, e e
- w* * - -
2.- ,e ...,,,.g, E s' =* 9 ee + S5 4 e 4m> . S eem.M e + a 4* O-=p W*6* W MMeMeW4-m-m em.- w$eenee ne4.e,w e, pmm. . go e, em p. b --we.4,0+-- = ww-- .e s -eh. , e-e e .w. oeng. ,e h6N - 4ep= 9-enum, e awe ey w.emm-h migh w.> wh..p , wm pe.. ,., em4 e $p=G.*8 Rest 46 aM-We NM%= ' * * - W-8 '4 -WW' P " ' MM _
- W
'~l = u....a j IP 9 e t 9 l .-.M.L. -~,.... _.... _. _,.. _ _,.. _.. o u kb I O _......__..__..7 'fW..f.. Y. -.).!f.Er 0U 0. 'JW D'^*Ww .- -.. _...&Ln,kL L. a 6kk,La., G vr? 4.) wdkr 2 ib.A nac1 A W glk ny' ^ ^ ' uLHac iii & [w N .. k k w.u ' fr.n.caaf.r.w:*n:.oN-7 map. Aeg.a..sp;w._.. eJLA& s'N: >~.-V. g g tk kan. .y PWag,AM .h mdo.,la 4 e u14 %p % aa. aq Le g .- y tWAcy-r%% AykJW.<, A. walbe wa':! .66..cred).Jd... faLg ou.h- ;du-. cAdhld-t 4 m : ' 1.. &,3 y &m, usa %L: ,m.t.. u . aw . y _pu are u htimpA p ' AAL pad y tk r.k,-t gg rLM .. n wm e % e.w n p a - u 1aa e as A a A %.e f -r i q, A A L LL.:.L.du W dLeh- _. & +.w 41G p sn A AAc A A d e M ladatuu. 4. g.a hangciakr g j9 .#O6""E"6*4"6 m e+ h-wg.m p .~...... + - -.. .... we
- e. e g.-e
.w. ...au...+. .....w...- = M -N ir.- i e-- m.-se GM we e -.-.w.4 - se e 6 .ge-.m.gi pie. e
2_ ZZC. _. - --C~.~J--'.-----C--- ' 2-e J_.._ bND_ -/ .I r. i .b. N-( ^I ^N s.V,%AA .D G U ... m u. g o.&..,. mah aw.., M._ . _~. ___.m... e e.- w l -- w a .Gi-* .W .eb d ..ie w. e n.e _.we ,m.m l. -- _ ..m. e. -em ._~ - 'e. .Ohsh.- e. '-em 8_.-e s-p. e e ,e e gg e.e =wm e. s_*e_a ww.-. q..+..e h .e.ee4 ...w. .em, _e,_ p. ee .We_a .'q m ee. e e-_- go..i--g. ee-g g __..p. l
..__._..___...9r.._ _ _. _ _.. ..w-.,.--;---.,- n;.... p asu.-.3 ..;,....+-.r r.- - n -- _n= -*~ zn.-. = e.. 3; :.;;:... . a r :r -= = --- -g_.. - - = - - - = - - ~ i. . h. bMa N e $,^ ~ $. f..:.
- 5. hd k % : YYti.k0d :llan / YhNd %. sv-329
--c. % $,i % u,91 I/'y1 4 g3 b f O
- p. g y
.v -.49*k.s % et-w e d m i 2 On dsd.asud I w nT TT Z h.y H n f
- l. h.Jdu aA 2rd (2.) (6L (l)
(2_) ? t2d uk ni% I LE R Lhi Stwho ,m # al.h.eu d a't b e d ra
- 3. P ; '
., <J Lg en # h d_ U t b 947 b V.1JA-f)Alc M ld / oo i v i(j l-5LJ n /
- 6. b w brJL a E bdis h nur A M atL_ M 7Abd 10 cM LL, u x && a tLa. &
N
- 2. w;u E>hMs O
- 9. n..k k
- w i,tX eJ % d a L e ;t b
u PwSO 3N mX A ~ A & L N& v v W //. h _ J M met u Abem.L L tL fe.4 i l .. a. g & W .- a NM d ngl;j WM m.f M a d., M ., : s. i n[ m".' r __ y ll<.%. ' ~ ' .W l 6* I 'T'67'A L. $
- +' ?
I/ ) Y. ikCw m & [dt $ li n' h. I u b. T*', \\- c. . :X 'Wp. -ar ~ 11
Q,,p ~~i~~] [-]f.;.g 1-- ~' 7T @ h G.[*.~~' -"','yh ) .i. m.:. - gf (- g-V - N @.. --
- r* ll e
ipsiin Y --* s N,.' 7 T 'T t 'j- ~, d + ?.3 4 .fA . %.J ...c 1
- . gd.*..*
- .*p..,.'..T
,v .i..'%..,.,,.,. 1 q74i .g,, ' *t. y ..'y ,..c 7 3,... ,k c'=,r.. ".CUSM . i, q a l Q, ' [. .-[ z. *. e ,wA .., -m *. p ; ; ::; ;.., T. l .:Q.y& s:- n y?. ' .4 ,.:.o,g,. n..,.. q. e... n,'. Q.9 . s..- y. ~'. hu' Y lh)_ 1. ^
- c. m.tq,C.'.';Yj& ~r?l*. ?_
fN% V.'Q%f.'.a : .;;;:li? '.i.'s .N. , e.,, v.a.g.yy,l.:., $,'h: t?. -~. - ~* ... _5 s w,..;,. g.~. -n.
- <. -s?E " 3y :.;y.. _
2 m m. e ... La.; ..,.v.,.,.. -.. w. ,A_ h g..>... _1 s
- ..y. x,...;.._ :..,
~
- e. w.y.~. L. s.s.y
= - 3 .32 ~ ..,..~. ,w.: m..:.m. .....e..x.., a,, y . p. _..;., .g.._g ........ _ _... z.. z,. - :: r;(z%... ... s.r. .~ t .A . RadrA h._._. awt db=A_AILM _' y._ .a_ ._f....1 Pg v.u.Lkr _md. ell &id.M du ( h, . q,. .9 L / q s s'.Jq .x. s z,. w s._..- ii A M,L nJ.dbuuksika E_ l ~ 7.. e.k. . ~- l 1 3,.
- n
$.....Lo 4 h _._..__.a1 dhad_ axis M, a o o.. Y*$ ..lC W ^^ ' n .. M_ _ t. % A. la . )O :., ? -n l ....,. _..\\. 9 a-L g il 3 8.. l O Mi&. h e ti M4 Eid.g L 7 ? d..# 8 ..e e S e..* ..ge. e. e-..e w a. l -. = - -. g --,,a, -.,,-,-a 4 --,--g-
.._.;.~ ~ ~ - - - ' ...? ..,2--- ~~T-. ~ ~ ' ~ ~ ' " ~ * * ~ - ~ - * - - ~ - ~ g D B. $eport.Szi2 r 'kt y j7 ort $ (CDRf ,1. S y t ct ...__...Yhuriftb b Y 0C, .. C 0R'S _ Wet <2 sannsL b 1ke__hwe oder +Ae-p fe iieAebs _}_10 cFB 50.55~(eb. A. Opralf jrm?ns must k ach k.d sa fan cn seny b n,y my / ~ /. f 2,. y erah. 3
- s. 6r artG i sica w s,a u t, y be /cy.
tat /tA Fs Ac gv)nc :j, e a k n.._ cf rAE i kc ccatc / c+~ le c s kr le r e 9ds wis/ce 4 k d. &s./m< wl y t [ bsp A s a LUN U reuIt o l % ur!s L --...._... f R@n.y.gj Yo uy_h lcn3 ccAYrc l_cOI e.s. _ _ ( l ['~ ~ ~
..~ -K, 4 .. =.. ~ i 4 j -w-L~ ws L eh mam siem a.idiGuks bu~ ~ r c;% u & chat sypdiv k ^ l cr,%ik cn ~ Af^ (nde i. wj gl9 s h5ih 4r y e n $ 8t'5 ih 4 'df[C\\Rhot ( gd IS bM V he.d ^ ' d o u T. ~ s e. ), c'es ".clw3s has cccanc</ cc e h&nu l _..p i.0 T1fl%1 VCrrn m.c/ CE' b!rI.
- 8. bG
' dud {f t'df y Ce E W 3 hev^fbV6 CcytYYcf._ fed rent Cfyss IE ch s trueu[ V0 lves a ce q
- l p er
<>shwl n ChzsIEprdmed cm.t
- )
b Sy 'eS as gehWec th-T E /*IA I'- oos?C. f... Th I eidh.r3 desyn oh rlt saiilrnr y ~~ (._ _.._ g tf ea wal.n.1 shn...ju v p fux} m e e/. 7 nve r _ b.- sh_aksiliLED&Lk sjsfeKL =
t i Wow /c bloc,/t sfe ss. e$ 3) yw [ g h N f ry W 'g w*..a-f p.- bA Y Y f k A M S Y in gr [t h BS 61 i . Sbr 3 e Ticf._jh _t_d3 $ftvo S aNa.r /e Ve / h Ee- _..r_nectds_.._._.,t h cet.b'ftMS Gym $5 . ctr ca.t'f 5, on 4 [ Afcyc[ +c 6L$4bbbk.S]Nn1 4r (Yor p CC S cen$c [_3Efpc,>, ):. ' ~ erafide t uu.sp tm s 1 F th rgel, 5 fv pJa,Jc h. % ea..._. _ _._ d_ boulp to fd 6. ty fei n q / pgvi/rg th d't B .t (E.W ftr 3 62 k r. 8L h N$/l'f5. Mer/ Py /cf n I .. ekhr N ML f Ycdbk all_ fml c b'cr 7 l MptuNCme. eDg (.hc?_b b_ rG V 'ety jf wa S ._ _. _._ l .O_R n a t ere[_hbeh__SomG__ j-Ye]z!c[e up ryoh u
- - --- ^- u_ggg
,.w &p,gj p/s , h +- 3 g _g _
.:- ^ .L-
- 0 e
9 'i._ ~ ~~Misl$k./ElnlAnippaqfs,/osi_ JfLyV sy si. nihecsmunylyalched . LI k ~~ eri sam.c a.a 6 jaJJu N% siance. 9 ~ L,9 pd of W re,k ~cuknFpressne ~ ()c wt 6 h
- n. Agw.r. ma fely ec %
cf ds ce Ja k ^ s o< y m, a s, ~ A s 9 a w a %t u h noodrey. ik wn & we e r sq n e hest +-0 A. bre2k ka a+ tk to 'a fu /fe r. J. %wy O ldd m,h fccato ns a f n o y c I m it J. h6kk con %! ceder s sp eJ h _ar-G.ad h y .- -.A I 5.. $?.$.. h [l' O L~. w1E16dhsed wdMEsiked'.~ ~ ~~ u . CMT__7Y_.fsei bille3_.weve 4vllid ic) ~~ -. w. .--_-.e-- .ee.- y-- .e we+ ->=m
5 "z; _. 7 7_ _ _;;7 ;; - -- f 4 _e }nActM[ApiddeisndAjn1W ~ spagu e x w,y a em e r,ny A blI h.._ .-. 2_ e[..g 8v6 * / e.fenSidyc Tec < )7 ema rcE; y l Soes.%%Kd sm kb<~f &gn t, sbca;Kcu %)m1~ dad w a f f eks W t Jat es n u cc,vu w. spdcg $uhrep % mchcjde /vo g.p$ cati / Ge toc.>2 % en r k Sern<c. w&e r Cn $abe s+rae alC are whae d h fbe byn t The Se(ml \\hD]?re.74 he.S be!vH. c' d b h .. o. YT e ESipt ofIbG. sutftcn ( 9t>3 ec 1bE %OvL%eclwatty sysk d:d u h p c L h 7 r ... ove rp ress *dd}rdeMw. Ei .. _ ~ - 4 4_..-.% .... ~ ~ s-. il n
= = - - - =. ...,, ~ T . 5 enep~Qk whmubp eca bfus: kk }es>T . cltdbidie/eckil c.3r l }iels ead ca b.'ne)s. sw jNe <lly VB!%s_.sfus yv, fizlMs and rcc4s
- r. %ly Cr1r /s C
a cak.1s Asv bra oM bluh5 4M ne-o fas+end+o tat hvrmafetfue6b y % name M k. T%ese ufs ecc/c/beant ) loo re, s. Class /2 eledr,tz/ bekl cabmc h 2gpc <a on 33 6 Gl SvPIrciea Y clGavstco ~lo 8dlG*>t$ ron m^ f er ga //3, e wm. a.se-.- ...-....e+ - -. -- =... aw@
- en eN. e h
-g.uem-e w mee ,,..mw ...e.e. +
- - -....- n =-... ......a e'0 A 1 A ~' er-e g
==.. .%-..w.- ... -I..N [be.YiEIk.Iee__1ANe n I._..) h t. t 2- ]J c.C = d 5 /
- b.._ _
_ _ _reych p - 3 gra q rg r c .~.._ _ .) +1 4 e l 4 =* .m e me w e-. ..w ..-.e-. N -,. -+ em.- heew-4=. -w e. e. h-64. e=-p .O em se.em .g. g -w .u***ee eeem.. 4 eea-We em .e.- G ...,..-.4- .--.m, .- w __e. L i, a.- _. _.. - _ __ -,...,. _. - ~., -. _ _. _... _ _. _.. _ _ _. - -. - - _ _ _ _ _.. - _... ~. _ ~. ~ _ ' _ - -.. _ ~ '. _ ~ _ _ n.
l .'~.L......-. ~\\ ~ ~~~ ~ t 6 t e em - em + l prrcd x <s yss3 wer k, sled << t a i epswcs + Ccn$ut$s, VabfL fvtlC, Cab le3 y )0 VA-cy o f h, i fem 6 t,d f SO( S We( svog }) g,c) eh(cft9)cy
- )Nsug t
prpe ]tayc, s0[;sn u b)st I,9reo c2fiM v { /es 60,y was <ca M e d an de cynen + cJy wahr syske the begy bcd reewal sp% v d h tk ne/ fmu i r syc he. 70-._b6 H f6 l6N,.fal,I 55 bbE 5 C cv si shiled to le Felr4,ndLL L 6 d. k c s k resjJE WWei.le/s E ~~~~ikileil$iLikl%jC !ei 1 2 & & 0p M ac.
- .q:.
__~~r _.. ~.. o a 1 a ~2'(R$v!$..t.-_ fbl. k h. V J : = Yf_..f {___ _ E l r w x e h l t e c) o n p a y k r v w
- 1. _ Q 1 S /) f Lsnyd +
y o n -.lCee o[~ 7 6 fe! W Ofs$em.l2 uf Tbt tY(E / M;A}~o[ Ac.l ~cik te msjekas}~~grl1 L _.- sa&&&;nky 8%ajak F & ~ u r3e;h l k m nm). ~ V 0 ~. .+ + a ww-e e- -- e .ew -e' -it.. .h
- 6
-. es wem m e-g
- w. o-e
><a. e-_- omeo. m. .mm. o..._. '.W 4 ""==* -
- e. #
- =
.a.4.s.-e.e, m.a e. w_ 4 e 6w
- Whwm.=
g..-e-e e.w -hw... .g, m--.. m m.,-wae-m. -~ ~ e..
l ~
A.
- .
- . ::. :i-
.... =i+ .= .u --m p. m O 1. j r-- -- CYIY ' fit 3 0 P-et (N l hk (h5 ec f... mnt e fc/ kV_J[e g/lC _.._ e ro i t / $ {I O (hj p /9 I b ~ - ~ vhk p,,J. -~ ^ - ~ ~ ~ - ^ A spaa) wp n @ A m a p-2y) h +ew 1 m s c a d n ase; we a/ 79 y a J & p H, n ~ u p p.+ k 6:i fu ek ,meps,y Tks oss esw& was <> rk n 6. M o on A e y o (t b0 ff$0* I6' f ML SGt D S -. cn3xcb n resallecl (a 7-/c /? +v ses s e s s - e s e c i;,.us u._ A _w ~ hten I6r _2., /ff 2 [ i vp m'Se. W&- 4 .a ..*.h.h-.u* -mede e*.nea-eheM me. h,emm#..-m .me. .m ,g. -~ =69e6$ - h -M*= 1 M
- h.N1 u rS2 Jew.Ne@h-N w. '%-9=8* + e d h @#. $ p heD"EW'*#9 am M9 m .) .....=_m. h fj .Y_..]. n v'&S?t)3J Pn 3 A A. fl%a,Y L YeVit I k4 1 n i.c h nc k _ . - _ __i. __u, ~ i y Os WP-prad <yahy ewe m. M k % / e k ctc. 6 A sic ~ ~ rbc o,y (ese I o r g a,a. 7/ v//ephc.s a,c /u t/4 six r ykiday;ls ~ %,p ed by tje $swa d h s kcn+dyaj nqed((,11). ne,6a.v w res,l s 4 s - s n#u/ wrb fd6e a//e<dro.3 w6d (V/rdc/ [u mSr/c s / s u P y rc,J. h D \\leS flyp) Gs1$3 (Cn V c Q _ f0 & Efn't1 j vt wrWsalemd hise s b /c E h K. I1r d l ~ M d_nid C hfille ~k sks ib@ a T [ tephs Mis 72GM:aAo d 14s ' ~~ ~ l? ~ __,l___--_-_-_..
~~}~ ~T' -. ~~2:.'..-
- ~~: ^~' ~
" ~ ~ ' ' l-b h,a _ ... ]be N.veskpbbn_JforF f&bmee 12 /3) ~ 1 f ukJ t, ?rEW cmdusa aw&d th+ -:x;awa Atsa au sna:c,A . z. Av one q, k was kg ~ d Jd 6,sy +k3 na pmJ
- AA -
mk @ rle /fcs,Se c v%lglcc/ y/c hjr,)S9 /9tz 4StE orhe w kA sephd d rodd w!5 ~ 3A dus on V""r,, /s Ar r.j g We/mug v!df2mva/. did n # h gro fr he h ef me,---e-- e e-- m, w. .,.mee-...+,_s. -w., =. me, m. WSp9 *** W wehee-e-8 mmem-m."wie h-am e.s pi.lme. - me e h.... _ _-.. -.. - -wm+. -eh = e.hMd+ha.h h am-N w. 'w '-'tre*-W" 4'
- ===4*
n. O.. s - 4.ma m es. e t .+: ete N.. -e m +. g 6 g
- e.
l 2. hS Gls ii$.-- ..-.....--..--..- j>1 Ten ekt,hclte
- Mhwe-
--..ee,-, .,s .e--g. - - ---.-yy 3 _.-. 'N l . k Ovd Pwb $/rui y m.. a u"d 2 S hY$!U4 $M fgk(!$. h l'O t .. [ O Y. b b[Ib] b I 't e s tw n/er*4 a2-22).. Tks //wde Au) d au Ac e m n9, u - M is m Yer. -.-Ve VI'e v by 1lc / RC y V .5i0 t 7. 2. b r ders / hD (
- SS%
t .- Gll.Te# 'd G b tCb Al% \\ cn ... p. _ p _ _ _. _ _ t __ __ b4 b. (_ h I.'C d. '? E /lhl $&{ h! AC ._..-._). __ [ f. h hf O f *_L ypn. Thyidhid a xecad slw iff =
.~. ..w., -u. - s -~ j -~ ~ e S 0 9
+ - * - =
==e e+ee. =m-mm.m.,pe-e- -.e-e .- - = -a,. -.is==+--- -onee.-.. -e-=e.w+.ee m e-- a- = - * --we==*ee em ?, t w p'= ei.= O 1 t e f ems e mm = 6-Me gM M-4*= w e e > M ae* -w -M 4 =e-e.e-gim m g==.
== - ++ --4--
==m-
e
-4se .e,,e e eh - ee -+-We- -we.m e - m enwhw- .-_me4-w.*, ph -e=es -h i 4 s o. 44. ,m-m w. .-wea- .e-e -e w ..= = = -
- 4-46 v
A+en w-De-Me-e e ^W M M- ^ M&
,'m.[. 't w.s. -- + * ~ ~ '~ 1 ,.A.... .,....-.*+4+..a. -.---+-------*d----+b-*-- /[ f. 31,Yr n ( lY3 _ k I'en.$_ _ ~ ._). CorwiNs. A-i5 ~lsHers ^ - _ a. A ! e m e r o fo n b r:c h el m 3vnsinuelb y k' /I!f"566. O t'. M A c.5..h 1 1 ? fr2 fw ye5 cn SE. /-C 5 n aj n e o,
- s 0 gim.d yv. %
+,.e n,.; p % 1-he to,(ncy b6(/my ncM e > c fry n m fa %,1. y ( bien.,,s az- ). na mHv <s she M en cn 9,h m 5. E t. 9lh,1 rya r +.
- b. h Cobsha.!re,3 ) _ bdren _ def+e r (cAC) 1wa3 ~~iisel o n A ys+ n,r7ei,,y r p.. S 0 ( h "
V I ci
- t. n
- fIIlfh t(
p t . ~ii . Tha m e He ~ als 4 ccv.sse f < *n r is .-.u hkJ 2- . n..... hth b o. s W. l. & g c ? y b a r y e r f, f s_to lu brcil c l' id Ai ecn Anil dsis /<7/ ut ler (UU.b..'in _. ~ e_ s p. +_
~. .e j i kA. G9L_xdsNisSFS!. n =A lAtlc ,'972 c t> re MSG...to., fev& G l.N.sn/s A C) t At Di $ csfic O _ s e bsera d b m iHfc (5 -- Feierk9,caf,',i[pekm<<.r2.- ). ~ b-,==e-+. m. -.=,._._.m, w... _,.. I~-~----- on Oet.tubsr 3 0 l / 1 8 *L t> r e zlha 6 10 i dePmstes o bssred b mx]did 6. Bulk s O 5mlim fefe <nic 22 -2 2). ?% >, a ':' r 11 o Ao du m s a l m % !v,a iA&c rbs naHer cs g/rc ks cid an %his k. c u.a. t.i. I,P r k rep e t. A cm/ / (S S t4G. k_ ___ Sc) b T gQ l2c; ceg d _..4t3a fl 6( W~d s ~ h &s JeBec.~ ~ ~ ~ I N* aume-e 9 W -en 4 4m 9 m .e.Weum e = w 4 .e a w ea g, O + ep =-w +. .+ w. ...m.. ao .w w.e.e me w.,, w ee>,,. m...%,.m_ ..m.. .M' e 8.= aw siemm i. =w -e e .a =-e==mm e. --eewe h.e weeh= e he w me *., M
- a w
w w4 h --.g. M WM eene
q ..-...i.2:::..... ~ j h
- 2. A w ~ # Gbas Y. x0n_A ul.24,19r<l...al Akeya mdn>eQ was
~ ~ y n n n s p u g 4_ p 4.. m n enpHws b chi hul w,a# /m __ _ _ y/f s 77 Ch1hN of& fI l2r g5 th ( e e% ,e -e m e - e ** a* 41m3 Wae eW@e W e -$
- w
,y h-44 9e 6
- 66 e@
1 M+ 4D uo- -m.ses 4-
- ==
- h e>=me 4 sh emy m
>Em>4-6 e e elB h e e ,..m w s4 -ne g. Sea - e+e ame-Me$ en-emar-m e. 4--D%e a.4m-e =new a h6 m-, e aue 6 -<me-ye GDu e4 -@ @6 '4Emme-M O.M mu N8*W wwMw-ah & eg.$. q g- ,%.y em=me6 --r 6 ' 1e h&e mese 'w 4twe4mWm.e m.6S eiwSe@ eh $h 6 m. > Me * - m hW -5 6 we,ey -me, e e*h a.e g ee 6 4 4-ume m.m eg e -+6 m emL., a sem-m4 wigggee.weg, e am. g g.4,4, .,,.gg,. mp A IM* -wg--- e, -,,,g- .,--m-_-n,-,. g -._, -___.._,n_., .--v,-
-l ~ 3 6 m 6 Q s held n rev,ev ~ nd a%ss t w d c.A a y s s rie & Inv) 0.) 09osofw rJ the. e e A _th reeld Ms ar( s/ gr m c 4. On Mr l so,nte a manapas ne<43 we
- \\e N fc. desws M C $d qs & t/s Es$AllehN ob cn(]erju>way nw,%y _ inshna,jelan.
MLA? Q, W I -**eM 'h---e4D meme meme m. 66 m_ -%4a...-e --..em e-- w. -. 4. ..emee e.g.qq ^ h.m.,.p. e ogw ,w_e. w -.
ar- % m# 6-4 ,y e& 4.+4Mwe=-s-w .qu.m a.etD e.a.W'6 eup4WN*.e.. m. d <e*e** + - p g f a.e ug em w
- M***"
e
- W' N
... ~ .-.,_.m--.- -m-. ""~-' - ' (mEF wcka kput *E 3M 2 1: ~ B&TLLb s. _ ~ ~ ~ ~ ~fjr OF Ah /g/nt12se&f wi AN dnj y wA,d, #EXis /g / spg/<xnaj ^ ksed g Tcib/t ~ ~dveksgt hms, ~ ~ ~~ 4 on. hns 4 as a mea %, nu Ae N A +. N t3 ea.s5._C /?Cch luf~_t to SA/-lD. . g On h vjJf ~~ 2 mee b vas hen +e T T Y k d i s k,. B r z 3 s.c Pce, ups s sus Q_0x hpst /GMa 2 r>w f medy wn
- L Ef C &l M s c h^ A dsI n w /
~ l l -. _.fht._}SLE 01]Cr---- }. riI 3a /98 2 / 8 DM
- M"W ep*
.h ws.4 eep m 4 e.- d 9 "h M M * "O O *M 9-2N %w. em., m ,,-em. e
= -1 J.~/~dn bysE2ifsz~ i m&yydkeekj wts hV t. Ascos GF pr:17G J f On TjWkri}/78z a mkyou+l nedy ms h/t! tJ 4 9 ais ~ t h vw/<y7 fmggvemet h b. Sejemb'r29,/982-t m 2n vyst ! Mb'3 k uc. On t he/d to It5'u55 ike th 9 abrot ob tards G C schvihd _ jh b & Pc M. ) n. On Cohk,9ifitz a vnee hy wt L/d fa hscass FA E. CPG - TSpA p r use / cc u e w y r } e. fpvP-m r.. On Oc tdec 24,19TL 2 mee by was Ac.E .N fu h s estG S _ Y h fe I f4(btn)Oce_ rablGr.! S, .n j do l'nshc r,Mewxsed,f % he/d /) kuS_hv'_y____p.ijra
- s l___.______
to Tr ~~~~'?' _.?___,.____-.-. ? ??. -,. ~ . - - - - - - - - - - - - - - - - - - - ~
=_. 4 .........., ~., D cd...-. -... %M. + _ ]w==n-e+ - -
==e-me. = ss s t p e,9, ac n 3 _. _. _. u% wwy /8, f 82-0 ae er ( c c n, hu n cdsums.?wai3e]{fo 43cas +R D 6. i h df/m. Tch J. ~
- a. p. ( n ~ y % y
, 19 u a..rnenipad rneeh 8 y Je/d IR% sis rk. ccP cad 1/1 was 5 acvP. fi adWA pac Vasie c/ t o. impcH!ns ck 0 _. Zo, cca fng he 4 b p.6. %- hj An dbs.: y e. On /n kk 7., iN u ~ vee +,vjwas he/c! a a l . + + + -+ r* h e e.4 ,e h p-we. mh -4+ . owe..ge e e., 4, .m ms9-m.- e g-me 4.-..e-emee.e ewe 6e e gg.un. g>,p,p. mm g-I l ~ ^ ' ~' ..,, _ ~ $~ . ~...
pT -. ... - a. . t.i - = w-s, ., -m _qn. L.9 DRAFT f ou ap & STAFF EVALUATION OF CONSUMERS POWER COMPANY y i. PROPOSAL TO USE STONE AND WEBSTER MICHIGAN, INC. I l TO CONDUCT THE THIRD PARTY CONSTRUCTION IMPLEMENTATION OVERVIEW OF THE l/ MIDLAND NUCLEAR PLANT \\ .\\,O e i +1 t i p / Purpose and Background i The purpose of this document is to provide an evaluation of the Consumers -} Power Company's (CPCo) proposal to use Stone and Webster 7 (S&W), Michigan, Inc. to conduct the third party overview of the Construction Completion Program at Midland. Consumers' proposal is documented in their letter of April 6,1983, ? in response to the NRC's March 28, 1983, request for additional information. The CPCo commitment to provide for an independent third party Construction Implementation Overview (CIO) has been reviewed and found acceptable. This e evaluation provides the basis of the NRC's acceptance of Consumers proposal. J d The purpose of the CIO is to provide an independent overview of the Construction Completion Program (CCP) to assure the program is adequate writt= and will be properly implemented. This is to ensure that the construction of the facility can be completed in conformance with the Commission's regulations and the construction permit. O p / p i _/< d ( 1
. m ca _ w_ _., Am. a. . _.:__.:;._ u . J_,c__ i. _ _~ E----~-~- so. - DRAFT l n X The S&W overview of the CCP will be independent from and supplemental to the c normal NRC inspection program. As part of their inspectics program, the NRC -inspectors will monitor and review the S&W CIO. .The use of S&W as the third party overviewer will provide additional assurance of proper implementation of the quality program. In addition, it will-function as a mechanism to allow members of the public and the NRC to regain confidence in the program, t The results of the overview program will be submitted to the Regional ~ Administrator in a weekly report of CCP activities overviewed and any problems identified. 4 The NRC has required communications between CPCo and S&W to follow certain protocol to assure S&W's independence is being maintained and to assure public and NRC knowledge of S&W activities and correspondence. It should be noted that the protocol provides for a monthly meeting, open to the public for observation, to review S&W activities for the month and to discuss problems identified by the overview. CPCo's Proposed Third Party Reviewer CPCo has proposed that Stone and Webster perform an independent overview of the Midland project CCP. The NRC staff has considered CPCo's submittal of April 6, 1983, and responses to Region III questions, public comments, and the clarification of submitted comments and additional comments received at l i s e 2
..w-a.... a..:. -.. a -.- ~-
- .:- a - -, a DRAFT p.\\
L t public meetings held in Midland, Michigan on February 8,1983, and August 11, %Dep 1983. In addition, the staff conducted numerous me64 ass and telephone conversa-tions with representatives of the Government Accountability Project (GAP) and the intervenors. In considering CPCo's proposal, the staff has used as guidance l the letter of February 1, 1982, from Chairman Palladino to Congressmen Ottinger and Dingell, (attached) which sets forth the " competence" and standards that l have been applied by the Commission in determining the acceptability'of proposed i third party reviewers. l S&W Competence l The staff has considered the qualifications of both the S&W organization and the individuals proposed as team menbars to conduct the independent' overview of the i Midland project. Input to the staff's review included the information supplied in CPCo's submittal, the responses to the staff's inquiries, the i I S&W submittals and the staff's existing knowledge of S&W performance at other l nuclear power plants. The staff has reviewed S&W's experience in assessing nuclear construction projects, particularly its performance in independent reviews of design, construction, and quality assurance undertaken for utilities as input to the NRC's operating license reviews.1 B ( The staff has also reviewed the qualifications of the key persons proposed for I l the project, as set forth in the April 6, 1983, April 11, 1983, and May 19, 1983, i submittals, and has concluded that the team has significant stated experience in 1Reference Secy 82-414, "Diablo Canyon Design Verification Program Phase II Recosusendations" ~ _... ,... - -. ~.
g-e 4 0 k V.f rne*:k S -a N: .i. S.rj rs n: . Arc 1: wAirc wc a ><;E ,4 cen e e.Os$ /. Bedrkd ~ . - F" c r p /hji St..r:yc,Gid *n s 3. i it.. Novycr: j Eu,;; l,'.- S
- ;g@ k4 J
.i; 1 A
- 5. Corredsh Ae%,. :
l 9.6... Sec<o' f Clrrajs / A k > d b f * , y y. Z' at.te %.....: s
- 8..- :.
r .A. e l 7 s{welu<d sal 8 Subc.edrsees' (0allor C y o 1.e',**: 5.L-d 4 9. M y aye W enh Dve/ Vird (f.-hun i iO* So ll.:- 1 I/duj:.mer-L0eIlIry f // D 7~ c,.,,4, .l ..I 2..I ( c 3... Me d." ial. l.._. 'l .2 IscfricsI i.... 5 hahp 9'. Tirf : .I. Y n . E atg e ::............... 7 Cl.a.%... 8 C n k. t l 9. %, /. ur-1. 10.La.v):*rs:a, //. M < / 714:e ?'.~.e e re.$ iy ' ! r 2 eo .i Ik). e? en crn ro /b?C i ...... l...fsv. 6 -lb cC.~ b.e. ,J h.. T: L t. le t a le.). a.$'. MIOla>d e e A.
- v. -
x - _. ' ' i.. y i Q C I n. p e c ' ?,. Ak apu:c,',/ & : S / / n.,. ........ ire / use CPc fo reins <e l a ll G. c we,A an2 A.z ve J/ &C i,r.y. us,-
- rep u-
+> c P co. & /$ N7A?}Crs::s; Y j. SN thm. pt%Y Senns $3fffll0 fe.0*m. ft.sh lurl+ c/uje *$ G A s1 o M h/ d'/ 4 Sel~. l e o Da vir-carsviired Ha/ buiYdy ualIb. //Wa ~!2n h /]- Ws..'//lL f/s. $ / 4, M. a. J..r $, .l hfc/c. .cee iL-a b w.c... 6 u wLh.k..aadd, Ae air . '. 3de//<w.. 74.perdae A ... @ p ei%r - .........l...-.-...
- 3. E x i. A.. a dK.. Dm' A?iYb,,.:.w,II.a: cA
~ ~ $,6,rm2rexnr!r p'.e24xer. W -.. / l. l . _.... @........./. S / /c e -. Vedic- . 1ooL.. k. m + a peJ..o/..... _... _. nAA,-,eAi4) s s4m. An de.rjn 7% % nt,s.n s. 2<y +4...f snde,f fA>ld,c.er ~ b inde ~.o D D 'dc>r C.. - -...a... - -... J M W. edr +s.. u.
a ~. m s.
- .g.,
- .. 2
.g 3 t. l . ReedA ras i Y .... -l._Ee, rpm:e:.-- Ai :<<e h as%.-sl..nsf ...c zure.. f. Ark. /xf f' dee/.-ne....rcAk a: . -... % /. o v e e e a /S y C n : n e < r.
- a. EeM t,
- lia.MakoW.c6< v.- e a.....: f' urin 's.. R.. /W
- "7 /
.5"! } t... K Z wip u /r a... h e e,s.wirr's. > d / A M i d; . 4 Deof-in.-..wbe.r >;ef, pry <<f1.-A AU y,y.g.,,, ..7. 6M.JaecAr. failel /s.rup 4# Dh &ws,r. = -.. -. -....... r .. - -.:....-.-.. =. r.
- 8. Cmdeued7:r. MM eryi ece Ai/d. /0 f k.
n. . schk.. wdan.. o.J.sf..gcee.,cedi4h ... WAS.. l$1"a % b*b'ed.. .u.. :=ENI Ncl0 cS...........l' ' O - if'h 'hb - 14 ^/MC- =. - -. E0h T "..... _.. _ _ -. ' 9..,. n ig.;.,..,. c a..,... .s J0. Ucesi ec tw.s<r. AAh.4<r. Ar... da%rr/p 1 1.pr.ollemu. - .podfdr.By..-- .-....M. Likwise.-.:ee)s.NE'C. ap&<... _aes.. o>rL p e z. p2<t'^A. Hec sy a d q.; w.::,y... fl$/ Yrp-. / r. 3 f(t/ **-*4*ib// C. s w.m :,+ /J. S ).gg,x)es. E g bih5 bslse / W.cfrsJ2iln I Q .4 $ hrtfl// /.h.b'... t/1ll&rf f/ssatd.. j f. f C!at/W.a.t e o. S /CC fE44u.'b$ k. ?>1/N/btib> l$.Yks?NT*~~~ 5 .m.:. G#Mf. /.,,cie,.,ca.. e,cM. & J avJh,t. - S 1 ',g~. & ,k ' ,, ;.,L.. .Qc.
- . sy e. :..
. s a, 9.. e _ ./.n: a J ...w (%4 '<l*/ Q*;*@h @ *:h * * '.' T l"! ' '? E. .-*:-d t 6' - - -. -. ' ~. t I 4 f ..a e w 4 __._./I__-._--____ M t m._
.. ~
- Q*,
1 f Iq . { hy__ gg,,k,./. _ I. }{ y p.gQ Qy'9 ~~ * . _i .. l ?... $ hl... h. ??? (~ M /. (,/ , !*J~ ~ /
- 9. Soi:..- nc s:yr A/9 n, nu-t
- 0...
e t,) b. v 2 c. g.... k.. f M / ~.~~. r'*C S M;;I//{Y... ~ ..c (). 2 (.. k. C."Y,.. C cv1.,~ Y u e ;,t m.
- . %#.. e.,,
4, J //2 / <g. /Mj a . ftM... ',l0... m r. G.C,, t i .....)}. / g o
- r. i 2,.
-H, n. W I e***.A
- 1 J;
o, ~,. r i v .v v,. .. a..,... r...... = u ........ ~
- 4. 4.a %.. 1:..
i'. :., 4.. ...w ...A.1 c, v.. % .s i ., I.. b,.-' . s, ~t/.[f,.., 9}bh.0,.. ', ' u.- .s .t -.a ~~. ~}. ~4
- ,,. ; y. a*.... ' * ' '-*...~..-~v
. ~. - - t !..si '. ( .. ~..
- .., ' ' e, s ~
... ~.. n.. .g
- /,.' b.
- eyC.
, V,. 6 Y#* g, p .e. F.y. ;i4, ',? a ajgy,, j_* d i 'g k. *. y . g K..,Q,,. 6 e -l.-.... ...,, 1 ..r.e.. s- -......-..........y.. .......y. .y. s..
- A,f i **4,, 3 g,.' ".T 2,
5 8 .'.L,a.Q. ;'. ' M ' 3. *.e d,'
- 9 '; f.. ' *. 4.,..,
- 4.= p.
g i g,.,. .l,* k,.... '. g.. t ,s,o g.;,. 3 is +,." a. r ,-8. ..,,.y.. ye d.- 6 7 *., i
- ca ; t, y
...,.,f f,,.y g y ,r p - s. ..ws .. -../ .e s ..f. a 1 %., 2-r g. W,. ee. g.. l . ), ?.!.s* ' 0;i L ,A ,..'..oi.*'.*.**.'*g b _s.".......s_.....'e...
- .,4,.
~ x. i o.~,.. [, Deci.c : Nc. 50-329 Dochct n. 50-330 Censumers Power Company ATTN: Mr. James W. Cook Vice President Midland Project 1945 West Parnall Road-Jackson, MI 49201 Gentlemen: During our inspection of December 20-22, 1982, our inspector was requested to review and authorize 46 prioritized separate work activities in accordance with the NRC/CPCo Work Authorization Procedure i of August 12, 1982. During this review of the initial ten items, our f inspector concluded that he was being asked: (a) to review drawings and procedures which personnel had not previously looked at before giving to him, let alonkreviewed for adequacy; (b) to review' revisions of drawings that personnel knew were being revised; (c) to review I ] drawings which apparently were not ready for construction to begin because all the details were not worked out yeb; and (d) to approve 5 activities on the premise that the inspector's concerne will be incorporated during the construction of the activity. L. ) These conclusions were based upon reviewing the following activities: h SWPSdeep-seatedbenchmaks-DdringC-2004, Revision 1 7, a. (1) The strap spacing for holding the benchmark riser pipes
- 9 rigid during underpinning was not on the drawing. Subsequently, Bechtel Field Engineering indicated that revision 2 of the drawing was arpire beAj t'556. tid W which picked this up.
j
L ' '~ ' - - . _ ;--- -,- -- 3_ ; ;;. J.. h'
- jl (2) Four out of the six benchmarks appea' red to be loacted
~ b;j in the permanent underpinning wall. Personnel were asked if any thought went into protecting the riser pipes either during instr.11ation or while actually digging the underpinning walls. The cognizant field engineer t' stated, "I have no idea."
- I (3) The top locations (elevations) of the benchmarks werenotkearlydelineatedonthedrawing.
I (4) There was no provision on the drawing to ensure that 2 7 during coring of the bottom Sk'PS slabs the hole would 5 P not blow in, i.e., remove underlying soil from the c. Personnel indicated that they were planning J structure. to install a standpipe before coring all the way through n l 5 the floor, but no actual details had been worked out to L date. 1 (5) Four of the benchmarks were to be read off the floor of the pumphouse. The inspector was informed that the next revision of the drawing would illustrate all readings dei Wod.} beff4 a s l ef 'the walls of the pump structure. 1 SWPS construction dewatering - Drawing C-1320, Revision 1, b. C-1320-1, Revision 1 and C-;121, Revision 0; J t S " * " ~+ -~
.r.---- -..a-.. u.x .~ t l (1) Theddrawings illustrated two gradations of filter sand to be used in the devatering well-construction. However, they did not indicate which filter sand gradation went into which well. (2) There was no method specified to install the filter sand r in the smaller interior dewatering wells, e' ( (3) Notesonthedrawingsindicatektoinstallastandpipe before coring all the way through the bottom slab to balance the hydraulic pressure. However,thenotesd6d notindicatethattobalancetfhhydraulicpressure,a column of water inside the standpipe greater th'an the 2 j water level outside the structure must be maintained. 1 ? c. SWPS to CWIS hydraulic seal - Drawing C-2038 Revision 0 (1) Thedrawingindicatedthatinstallationis"Q". However,therelhfahandwrittennoteonthedrawing . contrary to this indicating that only the inspection of the work be "Q". The inspector requested to see an official FCN, DCN, FCR, etc. that changes the drawing, not an informal note. ? ,i j 4 s
[.- .: - m.... _ a.- . m.. u. a._.1.. _.. -.. e- '] d. FIVP four point jacking - Drawing C-1494, Revision 2 (1) Notes on the drawing indicatednot to exceed 1820 kips for each unit, theyalsoindicatedthat if shims a,t any location become loose, further jacking shall stop and the the RSE notified. They go on to say that shim tightness shall be checked to determine whether shims come-loose or not during jacking. The notes fail to document the main purpose of the proof load test; to determine if the as-built temporary supports can support the entire weight of the FIVP. If lif toff of all four corners does not occur, we have no assurance that we are supporting the entire weight of the FIVP. In sunmary, the NRC will not continue to serve as a consultant to CPCo management. Remaining work activities will be reviewed and approved by CPCo management prior to issuance to the NRC for authorization. It is your responsibility to ensure that in the future all information provided to the NRC is complete and reviewed. \\ R. F. Warnick, Acting Director Office of Special Cases t Landsman /ls Gardner Shafer Warnick
- 8. ;
W
~ - - ~ - e ic-cee0 s ag a%w PL t =
r'- ...-~- - ~ ~ 3 0 0 f/Ril II-(Lfe.) t 6 M S / VS yp D 'l n_ jjI,-) ,J.(p. e.. ;. r.. yp,. gi r1 L
gwe e a weWG+ O h O 5, O t >P = o It'ic I L .' 7 A
- 'I p
- ~
4 i e I a l i !. 4 F
7 g .,p.;_ 5' E Ma g .4- ) 0 - i . j - s
- f.
e I W 6 e i O 9 .-j f' N j 4 J 6 Q VA% S fil-WN .J -(v c) % g') & L J a_.L_L_ - w d p t h i. J., A w h ) l I / e-s a.e (, b ) {
- f
$ ' }lh *,$ yGJr"% / v } ' C *~ 6 adha,. '.N r. ., g s.'n,' ,,4 e-w,, w e -b,+ ,w.- 6v.,o,
.( ee ,? e. i I 1 i 1 2
- O
~ C W.) C C f A U p u L A W~d P- - (ap c) s e w_. N~ c., n y 9 w a l PI~ 4 s 4 4 I z - (C f C.') ViJui.y r,y.;mb / ; /; 9/2 Y's c e 4 e p .vv r-y y e 7 f -r-%-w ,-----y,-w --y-w'
h r 8 I 5 t '~ Y ,a
- p Y
6 g gg (. ga py m e e ( l . CCf k" 7 vhe $f m .e w e m e 4e m' e
- - +
er e e b .. - <.. - + - - r-. ~ '~ * " " a w a m e m*.eemm em -e-e 9 9 6e 4 enum e--
====me e+-
- =.=-m
- r N *-' *""******
= + +. * --. m e-t- er' T7
~ csa cz. 9 > e? z, .ae)2.z.c = w a e a 4 4 -g m m - - e - --a-go-em m-ema-M -e.- em m ab em m. e 64 m w a w ewm--me eGe abe nw awm p-m %M9e o - mam m-e + wwm-e=a-w-~- w -
'~~~L-- _. v, e, e a a g .g m. e-ee **
- e=
l' i-O F<. a Lv w - O -e 5 e t 6 s V e 4 A e e O a f + o 4e ee.- ym, m am e.e e6
i - ..i l '.. a...~ r~
- .~.... -...
= 0 G O ? B Bf SbAudGY 99 13 ' 4 9-C' r <lg b t/- (dec) Ibcvf /2e-)=roJih t e s,. ,_m-
~ ~ ' - - lK n. +.-n +.L. V-- s2.a ' 's 5. 1 I L Mms. - Tcm3 rta ip yndt,A & yd c/Cc)) krkrk . k.MO.V' i s-I i-[ 1 () a ~ ~ Tc l$ r l -l '.. ' :. ' ^ ' .: G.. .Nsas .,o ? m .,.w l(, & n c). ;) y ik.r a & g jg c (Stil' &p) yA fiU JN 0 --. 0 ~. S h O CEo ae A W 63 f I I ...w. M phe es 6 ' me M M. h. O m o eg eis
- '**me6 w.e,
"*MM.+eme o- +
- a
-w.- 9,,,, _,.9_p-. 5., y. .m.,_____-i..,.7_.pqq
M_ >_ e.,w. wa. - <- <. ~ s. x.awmme. nn e. n-zu s.- ,s t 4 '_r L C y'. t. f
- 9 wE4*e f
a F s k f E = lf0f$e). hl J.ff s% I t. ' & Qe W c. I&S)c.To Y O '/ 7 S V S b l3 -({E rt j t. l. o ' Cer.m L~ f f (TEP.h) F M M q r'hc.VP )dc) p n ja O.s2=6Y V1. +pptWeS*en E F 4 . ame.,.e= e -as.== M
- 3-4 ap.*
e k F
- ~
' '~~ ~=~~< ,n., m p.-m_ .----+--ww y--- + 4 e-P 99 e---- a w r g'
I L. 1 f gg , we m *- Se e I - M w..) o w ouaud 'n $ %u) Czo Q' d 23 L i b b b 3- } {:0 &&k 79-c e l j ft:? (D h e y(,a J O.$ ..h& 9 - e 7 L b C.&t v 9-f s n TINA {p-Of{c) ,rt\\.3L b -~ +. ,ws-w+-- + ye. e--y www4--.ayy7- -y y+- -m-e-.-- ,-m-.'
h.. -rp ,4 ._-M S-6. h-O
- -*4**
g h /c2 S / e W h en. s d rs Et 1 /// 3o / 31 C. ARC E 2c 4 I 4 h-g h. e-6 4 mmum , ump = - e. Mme-Og e -m .m wg e+ + .wew
m e.me- .mee,.M b l e v v ~ ("Cfff~C/) [Lce7gicg (^W)} nRR P.-b a, 2 (o Q R, &. /, M 1 a 5 L' ? m O 4 e.. e e .--en-
- M %ma e
e e m - -me.-+- w,w p. w %,www -ew - -,e e
eu.V, -,6 wh a .e-p h l'- M_ Y '- 9 1 .w O ,.h ' y- - j(- 14u[cro ( ,# 3/ /- T 4 + ~ 5 6 A e i 3 r-7a u. - m,,x 3,-,s a a a m.,
- l. '
O r t .[/ A '. [ b* MW 7 J . j E 2 J .1 i I l. \\ 1 \\- uh &MW ew Ne .g. J Y+
- f.
- _
r
- MWAe.>%-oV wmy
'd'hh9**w' 6 -me. r
- ',*be e
-m,s. m-iv.w. y.--r--w4-e,m= 'm---e-ey--7mgr'3-' y se vgvpvy i. -,.ef WW7 54W-w*M'TW'N*T99W*YW1' 'M'W"+MMY 4*4-M*# TWW'"W 7t' "W rW FT'"""'*--"T M-rer-
m.e ,,a,w,
- +e-
.wv4w. e 4 J g ) 6 \\ l l a r e eeeyw.p. e I l i - w w+ eye. wm ye,=+ e
- meva$**.m.
e s M &m ammagina.m.:. 4 4.se . heme <wn.st-,. . _.mo m.,--m ,_ eeep..m mem=* ew e w. se wM& m. I i l 1-14 .O. ll# N 050 fO ~ r
n. - :.=.= = .. a.- ::-. -...a.=-. .. m :.. ;.. 2 v B e e s ?-6 l I a i 9 ' s l \\ D s W i At Te&% ) Y LQ (b gec ) fa W. C e f -(Seu) C7c (% + 439 t/.d .) Q D p!%W.Le. t 54 u)- tr o //r,z L 1 i 4 f &fg C.4-
- f. YY "
'd - $h "O )f ( t-r e 9 *--ve.~_e..~, ---T-r hi*-----MN T
- Prm'"4
+ yw %g,, 92 +- = e .e--+
'"MI ap4 m gug, l 9 {b N Te - }] '. $$ _ fu o I C.T o m.M [ J 2 S[-[hd U) Scpnx 4: &JhL;, 23-or , - cc kO 6 st9-Nitc) '),qe,5:M e) F 1 p. q f ' $.- Lc bu %J 2 c 2 c 3 I f a f 4 s - mwe e
- Wimp 4ee t
646ew e+ee ) I ..~
__._m . _ -,. _ _.= _.-,_._.-m., s O I p e 3\\ - ]S4M) CIO f i i 4 6 3 w [x W y b'f . fl y & q "e J ~. efci -A GML" il (cfc. Tc f TC t) 4 i t o ?
- 1 i
i i I 1 ..,.. ~... t h I s D' l i A I !If 4 l' a t. L.'. i l }
- ""-%4Wm*:w p.57-.
e -3
== l'
- e-,
,-.._-..t-=r,v s- --+-. r--~-- +---,J-e-- f f ,3 n b- = w ve. '-r. w r --ye -e. +ew-- 5 L
- - -.. - ~ l i =
- W
-, w. m-- ee + em m e ehengre*+we+ eure - 16-6/(c) k ' ~ ofrlw / e, acL rpta / i 16 - Tt2 A) ZhC.V pt.ur.wm -(Tce A) Yb c v' M apyh, M yd e he 9 e 9 -m e mammmme me m. ye es 4 W e 4
i -:. r j i T.-' e is L. 1 h f J 0 l l 1-Cfdo t 11 .C PC c ) s uo - #/t!C -(cPe.) 'If f al.'b/a c- . C.i u,.,, i a Eo u, m >s>.u -r. 1>.,.s.; . C (C4 f.'G C.. 6W.t.J. ( ~ r L.) - g (., -$9Cd 9: ' CLCd ~%L'O i- .c f C ]. xi.o l'(lb -QG .r. ..n..~ /c,,' ' y.,( 'i u; e inu. s - c s e c. v h O S i ? ) t .L + N%"* 3%.- e - w 4-p a.._
' *~ ^ '~*~~ s - L -m e. 'g a e 4 f ) w e. Os e e.. e e *
- Og h..
. mm e e em me-d 8MF M _ 6 N k I m-e N N eemose i 5(S4D) CIo 2 #aE (GAD h sddd # /e/0 f -**.e%..
~*' '~ ^ *~-
- 4m.
j + ee 0 P + e ) r + i 1 1 r l I. f 6mMMN6* f,- h .~. -. -- g .w+ e -r-
.:.. - a... .--~.u-.. ..w. -. .2. . : 2:.. .:a 1 ^. I 8 1 4-e .'t l G. += a. mm +.e emme - ~ I .4 .w...., . ~ e4 .h -em.&..we o (seulcro u,#,2.3 9 y t,- m b 1 9 - e . J #J/ - M-s+0 c.ro . se o) f, GAPA .m - ames. ..m. .--o, w- .. + = + +
==*s -e = h I --s.em
y____ e e ew
- 4
- ga p-
.eM e A ,/ (sm) c r o p# n. w- (ran uA MAM; bpA dho) /wex 8 h.iGrry.Ecu /6- - (cMd & A k y 6 Da u) NIA 00'/ n-(/#d Trej fQ b,q p1 nu1LA d41c% d (sm)) cruo g (L c a (c f tc 3A-b % we<pu fi;ud '.[ . See 6h e. O e
- e e4em al- (NAc) omb - h7 vat 0 Lt t
--e_
La.i. LLna. ;il.17. V s; _,; 6- ~ ?= . ~ [..- e!.l'p o k s. t . - e w.. e W c v' f %Ei~q ~e~2 L
- (ren) 5-Lde1) LL L ab l~;.LYL 4 u,(
E 'y) ( ) t e 6 .o. e .. * ** e l ' 9 - 01ee) L..a 7,7 w Bd i-a.uL~,
- We
"-+m W.'essi me -ep w ,4 a- ,,.s , +.. ,~..-, -e-.+e----e,- r
-'we-4.- n. , _E. M. W b.. s -me = = = =. ..--e.m.. v i. L l
- O W
cA ::, / c. v L kW ~ j 4 ) W e r ' = ,e+w+ (m.-.-a. emy&,.ee< o go -+.. m-pe w w y
f.:xu~ - ~ ~ w.. ..~ jc d. a 1 1-k l n e mme=em m m w usee 9 p. g ? - t/ k C. 04 m.LL-kU L _ -(340) c.n b (d f n v I A D _ Q.- {i!LG OSw _..:(54 u) 0 Io d< 4 O .. -(L.tc c ) 6~Lh. e N 4 i-emP 6 ++ ae m = e me 4 9 e emme.-. e,= me-em -e..e .e m--*e
- em em
- o.
-m. n- ([s40)Q S A M(gh.gp# C-I o i A 18. - TER j
..m--' e.w= =. 4 %w --w -en-m-- h 4 i I i -wei>+ - 9 e.
==e. -...-w .w m. q ~~ + cec) % Q ~~~ wd a &&[cf., u= rm ..ne)adu r CAL at -(ne) uL g uru a a u e, 5 '6/4c).%ebt. b) m .e'[' Ib c v,rrA. [ 6n.0 r a o &< n A k.s 'l f. lo - n 5 L 6.)EL:te !esv - /R..dv e; D M b.J [cw O d S &. h A:, - C v.> & k WWf puA .2.10b ee o e 4 6' er NMe-48D*@e@m enliW 6 N@ ^' - " ' "N"' WN mem 'wensweem-
7... .. :_ _ _e.__z. n ] 1 l. Q* f.--- MMM MO O e 6 ( t wm m a 4 -v
== e b e eem.memee es a 6 e 9e s .e $66mNep 9 e&*p@44+*e4 E e he WTw e r e aum64meaeae+ e e
- 6 e
e .ao e me M
- 4*
O N *e -t** me 9 ,,,m--. r+., ..-em..~~1-
- ~ ~
a_.._m... o 1 ah h h,9.k. -. ~ J 5 - N p1 4 m,l/rtt W .Am' 26 -(CPCd dA e-[l. %lG,503 --.-v .3,
- 3. _g _.,,
n 0 ~ w _., D e l Q i O' Y me 3-MkI 54-U h,re..( n 30 IS40) CD / (ac.) cro P> me p,,, g w- --e --w-+ y .yy.-, c ..-+ay-em- -m-ye - - --gn-,c e,.ee.-rw-"'- r-** 7-
_._e_. L. c,
- i i
b5D. ,7 F .'5 - (NAC) 34 t.J i?vW*A x{ pu yo,,.m..- .i.0, e,v.u' c . t =... i. s A ~4 % - Ti n : a r %.H. UL. irt. : 2ACK NA T't SMfW? / 5 A,L F M. d. t n- (Yd) c.Yofd,. # l'l i, 4 s m Ge peee eO s.g,6M meg 6 6 6 e O' g e 4 4 9 k J. e.w + e - e e, m** 3e e A.geg A. w og a waw n aem-m me er + e e
uyae .m.__ ~~ ~ ~ ~ - - k NW y[H)f ^8 - W h - (NK Malh Cb63 . - Ca c),
- frybm.o j/'rr 5. ArJsN,
- (d&C.) ie r s CA.Erv e f W ':a
- . i1
- c,.wf vwr.. i 1 LIN1 - (c FG) 83-ll f ak f m - (sm) cr o R *a v 'I
- 5 l
13 - h,E L E ffaar.e n.d w. o;A G,drs Aae e M WM'M e&M^ m ae m4 "OO
- =
__,_.e.__.. _.- 0 .._,r
le.pAwdr<e, / f 83 I-(WR.c.) M Qaib n, Ls. D Y m N tr'pd 2 - G 1F~ d d R C u A. h :1 c. m r 3 +- 6-[4 AP LtICr Ffsie -(.54a)c.ro b e t, cl,J[ p s i M 6 N E.) C - t P t e i.e d D u m -_ALfk.-e# - I.t PQ c) y n- (kfkc.[ Q h rEn Cr'b C 5/ -(Te~AA) ibc / tav 3 es -4 M e-o .e-O m.m.,.
f0n) - ' ~ 21 Lskw) ^C70 Q Y /0 i f d ? 'lE M - (s 4 a ) L & l u q 4 M -#fcs) EN23 -O 7 A fhw &S Cth -Gae) Q im k rfA -ct>r.e)G,4xug&Mt/- %.w, e00 cp c.ro & - G4a) W 6 zc &ghpd -(anc) 4 ao-(aa.c) Lka 4 % w m y a wuua3 p lud - cs4 4
- e. M AA
-[CMo) h a,)?4 2+1 fr#4b, d 6&n e.o O @s '*'"**we.- c-- -w ,.m7 +,9 9m. -w - - -e
1.. ..c.- w. 4 l II
- L a htssn P ^
.ar e~ . s. f; m i,e f J A. iy c L. F A ] ,, 4% .( s ! c s.; uj c r o ts# _ J, w, ? s r i ,I."/) f @ 4 _fI J . l.) !. >d 8 = s s* - .; riff. ., c v P V / I It-fr &
- . W, saa -iL.i
,c.r..;t. q :c :^ - -:nz - I9- (16 cb %,.>,L c.- ccf , c7., d '~ - (J M ,c:.i:..>l t B '4*-'
- >+e==.,mw
-.. = -. =. -. a b s-Cf ca .b L t i:a , e,<. FL _. S ?- ~.- i.e, - D. e t.l.-' z [ e r.L. g/ -4 _; g. a c 88% a ' E f
- esp e
,pp p p d 4 Ti J
- >l, L,-L 4 b..,w
+ A D. 5..:1 ,. a :. J. e.. +. y [ .n' \\ k 'd (,,,,, l r,*,e. ".s m. ,e % i - g ) j',v%*.* ea #, & far a5 s o'x f at ( ~ ~ / s. .l. L i r..
- a s 4
or. r,,.uu p, s. > e,-n . p w,.- p, ~ w .. ~ ~ s s-C(C. j f o.30 ! (e c,r.*. T.." E ( L ~ " ~ Ja % +vI - h\\ (4 C ) 6 e / O m
=. _. .--_m~.. _ ~ - - - g,.._,..______,. r. 'P, 0 .e i 4 -. ll '. 4 g E~ , h ITJ .i-17 4' ^ '~1 . h i[ >" C < ~\\ &uw d x,x... w
- Cf, Elf s d ok 0 k:Y /
~ h' v- ~ hj? $j l1.: s.1 y L. r.) 0 ' <n, Nrt. ?' C ?v.~ J .a t -t S 4 M*- -h '.h.' d r, t / % 4 t, i i$ CCf fs "J..: ;r:' m d- %o = 0 h p-R 7 i ) L fi FR s e ~ R i 4 -.w+-*** amer- - we e ww -- m.- u.
~= i L .2 R - (JL C) ((&c.o b$ % ? A O~ W, 2 I N 54 0) CZ o pr&& =~ G N r i C. C. r / - (/// C) e.- 2 ,s y p. ,a, ,.c.1.,, ', {i-l0? " (/l$ C,'- g. Jn ,YZY a. c - !n.. .cs:.c r. L,t, o ra. ..w.:-- 1 / l L: I \\ f r. O \\ a} '(- s1. > h..~4 ,tsL es* t.* l.* n r b
- ),
, $o *.** h .Y h '* ~ s s e
- -l c l-
- e. =1 - (/lr' :.,
4 ~ 1 j
. =. -g a . ~ - . u...-a ; ..a : l o =l5- (C$(of f ra $ flAC l-1.-, 3 g_a Q.[w f., u-, o _ fr M Gb frp 2 - (7E s 6 3.L C '/ f / C f L cb c rt tw h e. > &n, O.O.cw ~. ( 0 '(t.s $ x v... . i:.AL ~ /ab.rY -n y 4
- l. a. '.
. s t I,c y-4 x::..,.,,<3-6.:.,Lc y v.y.:.r.... k,.h
- z., u..
1 0 e A /} r., .. 2m.E. - ( ~, -{ r,/ . r:.. e. ~ m.
- ..,, ia r.:
.r : r< v ~ a ,tJC,. . t- ! F
- ry ~,r
( 2 3. llf., t:n;,' r. ] ~C O Vf e.' CPC: % 3 ep:.J ~ t (h/! C.)'lik C 5 [vik'- I?]R.c O c.f TEP.4q .n C JP w u.a 2 A.c..k-) p%.. W. :d.,, > 4, A,.. :. ut-. u.. ~~ 1 o .n...p
(z;.: .1, ..a-=- ,. v. r w.-u~- -T ' y. t m 4 1 + 5- &n MB3 1 V ;...M ? ' ~ I l e (
- f. '
f p { ~ { f Y,Y, [ U,, & nT *b " C } 0 $." Q [ 1
- 3 6 - tH c.,
'.> :u.a:L. '. c i t g\\ / * * ',A' J
- u:
,1 /( s.. 'l.
- In s
i ~ -. - a s.- - ,) l ~ 1. 'J C,, , - o 4 S f e 4 4 .13.C, p a l M er; W* g l5 r c.7 - v d a 4 .m y 1 ' ' +
- 3w.-
y+-,,... _,m, g, --=y .r-, --,%9,.- -~%. y%4, w-'.-w.-=-.4ver-+e--,v y y--m.,,w-;-w-+---.9.~, -m---~+..-9 .,e,-7=.v-e., Swm t=-v-+-p+vewg-ese. --=w-*Te-=-e ---M'-
~. -e.
- ~-w.-%._
.---,--A-.. ,--Lgg,,,,,,.., 0 t \\ l a 16 - (&& W CTS Q Cl 10.0l S j f N 54 Ly CJ p y.-J$c 1 n.! /.- + h ?? l lllp ,p m v ( l} lr, F mo.A ~ n i ? i i A
- )
A /, y O A 1.>.,c n ;.1) c,xsy.. , ys..: : .c ~ n 1*-.: V s r.sm.. w %
' u..-- CCw . =... ~.. ];- C 4,_ ,__ e. ,e-^ r-t cr -
- o i
],' L I : b. p h.WJL., / 9 E 3 ( _U-i. l 3 ~ i 0 f 00 0f OYS3 I IO - Cf C, 2:[ :4. >Ys 4 e I e k P N / " ' e-b p 4 g/ 9 L k / b l. p a. W ~. ~.r [. s &WM L?c p 7 ccf nlm1 M P +i 12 ,,.e c &..>.4 I I f E, a k M T M*" 1 i - - - - - - - -. _ _ _ _ _. _ _ _ _ _, _ _ _ _ ~
..... ' k mmW6* ; y g.,., '[ _ s ~
- a-
.2 ._1 +' r.* = + -
- ig
.h b .h..' + - + t '-L' I I,. 1923 V % r. l s 0... [ 4 - /3 -p/Ac.') sexA rN J Sn 4-e. f,rtui /.r j.:.' 3L-s V 7 h, 6:-! llAL 3 y : l~ -Lw.0 tr40< 1 j
- .. '-l-(llE &
VL a l A a f W ,p l )> 9 pe ,0,5 $* . St -h1
- he
( e U I 9 8 ., ee m.. e@ - $9 ee - 4 4De b e a.- M w yep,0w we m.s-
- --r+e***==
wa-, +, -
Ou-mm ..se..#.. ., 9 A g was f ..el>,m,-e = ^ h h j 1 4 h ttS3 j ( ^ O f 4 k I A /' A e r J' h ( b ~ 6 . L. f L - ) CCf 14 4,'s.r'. m b j 18 -On c cfp rA.L ( l f a b
- h g f y*
'f k'./* t. 1 4 [,; g* \\ y t-' ( l 4 I O ~+-+=;*
f ..va.=~ s. ~... : i e .e l l, Olon!^, / fl2 ei OO g* [ p y," COf h h -(//k b gA4 N w i e \\ -s-h f f I !^ f
<l e. t I 5.1,$r(va,, ?[.3 - ( ~ V f.<.:. 'rs 42 E 4 /2 U /5- )Y& s r<, u,.u cr, i i ? I , ej su ap4 tw',cw-_ a 8 ist c ) n a c a,J.. b u/,. \\ t 9-r-*e O
- W k
e
Y-.-.--. ee ) er 'h EC.,1?2 L ? w p s' e* a /- s, a e,2.. {. 2... p,,csj.:
- w..
n:,.y
- v. n.
i z w,w,e -c = 9 t A k. i 4 .i e e f e 0 o f'. e umm.,,,,.
.. - - - ~. 0 0 yc y'ab ce,d22
== 4 'm-m
e w b b g 4s Y r L N,l'E2 T [ta1LuL );,&L, av.r,....rh,.L n- } 6 40 e a + e
l. v f ~ / a gg N 0 + / p 1 (_,. J.x (9., -r d, t ..;,, g, / f fu.tw e auw r.$ f{ &g, x,.s- .. 5- ') Y ~fMt % ~ 4 0 waeg-y
n..- mi ~ O V t 0 d _,, / 76 2. M k
- t t
f p { -e # * { g O~ Ten ' f L$w r2 a 6 e i e== o.,. e== 'N W4 +e, me, a M i I
~. Tu rJ t / M2. j m _. P sone p. g r bani b.%L.) to CFL 2 / r p m Y n a ; A.y : : d !.: k A fY ll h ~ k s -m , em e e 6 4 <ma-m --A s +. - ..w...
seem eec +h-+e-m e w 9 6 e~ em. 4 4W 0 & T4 /981 A/ ~ 9 & gg \\ 2 I-(Of ) 0 / 'Mnft &, rf* f A ~ jb wu.i t; @e4 9- ++ e he p 4-g
- wwM m
.m.. ame m e-E.% -.d
== * --um-
- =w-a
%e w 2 0 p* WA YZ f'?oc // YTB fNO*c 4 7*, 4.C 20 r ,3, I $s h[_ _f l 0L w. pe N6 e esee e -= enn ? e .r ,e - \\ . - -. = .' / s/ e e / = e
- s.
. ) g .-9 e f l m+ - = -m.-.m. w w 0
' k vs.f-(, i 7 - Docket No. 99900785/82-01 The Zack Company 1 ATTN: Mrs. Christene Zack DeZutel President 4600 W. 12th Place Chicago, Illinois 60650 Gentlemen: This refers to the inspection conducted by Mr. L. E. Ellershaw of this office on August 3-6, 1982, of your facility at Cicero, Illinois, associated with the manufacture of heating, ventilation and air conditioning (HVAC) systems and . to the discussions of our findings with you and members of your staff at the conclusion of the inspection. This inspection was conducted as a result of the receipt by the Nuclear Regulatory Commission (NRC) of allegations pertaining to implementation and I. enforcement of the Zack Company quality assurance program, and was performed l in conjunction with an investigation by the Chicago Field Office of the NRC Office of Investigation. Investigative findings are contained 1.: NRC Report No. 99900785/82-02. The main purposes of the inspection were to assist l the investigative staff in the evaluation of identified co.1cerns, and to establish whether HVAC system manufacture was consistent with applicable codes, contractual and regulatory requirements. To make this' determination, the primary areas selected for inspection were welding process control, nonconformances and correc-6 ,-_w. w ,w-
tiva acticn, audits, indoctrininion and training, document control, QA records, procurement document control and implementation of.10 CFR Part 21. k Areas examined and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector. l During the inspection, several instances were identified where the implementation of your QA program failed to comply with NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter. I r e l l. l { l-
7 e'. 2 9 i, The Zack Company. Please provide us within 30 days from the date of this letter a written state-ment containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the date your corrective cctions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown. e The response requested by this letter is not subject to the clearance pro-cedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511. It is apparent from the results of this inspection, that our inspectors have q established that significant deficiencies exist in the implementation of your quality assurance program relative to HVAC system manufacture. Accordingly, it is requested that you furnish to this office, in addition to the corrective action measures requested above for each identified nonconformance, a descrip-tion of those management actions that have been or will be taken to provide for future effective implementation of your quality assurance program. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you believe to be 3 exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you l (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this t
- - ~ ~
.m._. '-W ~- w--
I,* office to withhald such information. If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is claime,d that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible i into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room. 9 4 5 4 ..nw.+ --m am ..m,- - 7 . w
.s u-j_; LI-The Zack Company, Should you have any questions concerning this inspection, we wil1 be pleased to discuss them with you. Sincerely, i i ? h John T. Collins Regional Administrato~r
Enclosure:
1. Appendix A - Notice of Nonconformance 2. Appendix B - Inspection Report No. 99900785/82-01 3. Appendix C - Inspection Data Sheets (6 pages) L 5 l: s l l
- s l'
~ ~ - - - 3 7 -vc
a --,. a s.. j 1 I i* APPENDIX A The Zack Company Docket No. 99900785/82-01 l NOTICE OF NONCONFORMANCE I Based on the results of an NRC inspection conducted on August 3-6, 1982, it appears that certain of your activities were not conducted in accordance with NRC requirements as indicated below: Criterion V of Appendix B to 10 CFR Part 50 states: " Activities affecting quality shal} be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings. Instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished." i Nonconformances with these requirements are as follows: A. Section 10 of the QA Manual, Revision 3, states in part, "All welding for standard duct work, Class 1 duct work, and Seismic duct work shall be in strict accordance with these established procedures, and deviations of any kind shall not be permitted...." .n n ,e
-= = .w. -. .... =. ~ g. i W21 ding Procedure Sp:cification WPS-1, a Gas Metal Arc Welding' procedure, paragraph 13.0 states in part, "This procedure is qualified in accordance with AWS D1.1-79, Section 5, Part B...." AWS 01.1-79, Section 5, Part B, states in part, "In preparing the procedure specification, the a manufacturer or contractor shall report the specific values for the ~ essential variables that are specified.... The changes set forth in 5.5.2.1 through 5.5.2.5 shall be considered essential changes in a welding procedure and shall require establishing a new procedure by qualifica-ti on.'... " Part 5.5.2.3, Gas Metal Arc Welding (GMAW), identifies the following as essential variables: A change in electrode diameter; a change of more .i i!, than 10% above or below the specified mean amperage for each diameter electrode used, and an increase of 25% or more or a decrease of 10% or more in the rate of flow of shielding gas or mixture. WPS-1, when used for the welding of ASTM A-36 material, was qualified with a 0.045 inch diameter electrode at 195 amps and with a gas flow rate of 20 cubic feet per hour (CFH). .-me.
..m .. m _. -. m ___. ..._ _=
- ==
o \\ 2-I i Contrary to the above, the NRC inspector observed deviations being permitted and changes to essential variables being made without the procedure being requalified during GMAW of duct rings for the Midland Plant, in which the welder was using 0.035 inch diameter weld wire, 125 amps, and a gas flow rate of 30 CFH. B. Procedure QCP-29, " Plant Procedure for Welding Electrode Control," Revision 0, dated September 5, 1979, Section 5 states in part, "... The Foreman will record daily on the Weld Material Control Sheet: The welder's name and symbol; date; weld procedure to be used; type, size, and amount of rod issued; rod heat number,... and amount returned...." i Section 7 states in part, "... After electrodes have been removed from its original package, it shall be protected so that its characteristics or welding properties are not affected.... Traceability of electrodes is accomplished by checking dates on (the) specific Zack Company traveler and weld material control sheet." Contrary to the above, the following conditioins were identified: 1. Electrodes (bare wire on spools) were not being protected, in that three spools of stainless steel electrodes, each of a different type, were observed under a work bench in an uncovered condition. Further, two spools had been issued on December 17, 1981, and the other on April 16, 1982. -m-,-- n v-w e
-~ ..a 2. Traceability of th2se electrodes would be precluded when used at a time later than the issue date, in that the date of issue as shown on -the weld material control sheet would not coincide with the date of actual welding on a specific Zack Company traveler. C. QA Manual Section 6, Revision 3, dated September 26, 1977, states in part, " Fabrication instructions (s) are provided to the fabrication shop by Engineering in the form of Shop Travelers that specifically set forth 'all necessary data. This will include:... any special processes to be used such as machine rolled, welded construction, etc...." AWS D1.1, Section 2, Part A, paragraph 2.1 states in part, " Full and com- { plete information regarding location, type, size, and extent of all welds i shall be clearly shown on the drawings.... Detail drawings shall clearly indicate by welding symbols or sketches the details of groove welded joints and the preparation of material required to make them...." t l' f i i l' \\ \\ e l' i +
- * = = - =
.,+ -.,...
6 Contrary to the above, full and complete information pertaining to welds, weld joints, and material preparation, was not shown on shop travelers / detail drawings provided to shop personnel. The only information provided was the welding procedure specification number, which does not delineate the above information. D. QA Manual Section 10, page 2, Revision 3, dated April 1, 1981, states in part, "All welding... shall be in accordance with our established welding procedures, and subject to the requirements, tests, and inspection set forth in the welding procedures." Contrary to the above, instructions, procedures, or drawings did not include appropriate qualitative acceptance criteria for welds. Therefore, without acceptance criteria being stipulated, specific inspection require-ments were not set forth in welding procedures, t E. QA Manual Section 7, page 4, Revision 1, dated March 1, 1977, states in part, "The controlled manufacturing system is continued in the fabri-cation shop to insure that the activities employed affecting quality are being satisfactorily accomplished. l l l " Shop supervisor shall be responsible for checking all shop fabrication tickets to insure that they are complete in all respects.... "They shall be checked for method of fabrication, welded seams or machine rolled, or any other special process that is required and the extent of
~ ~ sup;rvision or insp;ction required during production." Contrary to the above, shop fabrication tickets were not complete in all respects, in that they did not address certain fabrication methods / opera-tions and their sequencing; e.g., rolling or forming, and galvanizing. F. QA Manual Section 8, page 1, Revision 2, dated September 16, 1977, states in part, "... all purchases that are made will be made by using a written purchase order. Any verbal orders shall be confirmed in writing as soon as possible." Page 2, Revision 1, dated March 1, 1977, states in part, ... For Nuclear Plant and/or seismic application, physical and chemical material certifications will be supplied by vendor. All purchase orders will contain specific statements requiring certification and physical and chemical properties of.naterials as required...." 2 Section 9, page 1, Revision 1, dated March 1, 1977, states in part, "... The plant Quality Control Inspector shall inspect the incoming material to insure that it meets the requirements of the purdhase order and that it is acceptable for its intended use...." e9
m__ Contrary to the above, the following conditions were identified: 1. Zack Company placed purchase order (PO) Number C-4199 with Central-West Machinery Company in November 1980, for 152 gallons of Hardcast FTA-20. This material was received and accepted. Subsequently, a verbal order for an additional 24 gallons was placed and received in November 1980, and as of the date of this inspection, no written confirmation has been made. 2. Zack Company placed P0 Number C-874 with Griffiths-McKillen Steel Company on July 5, 1979 for 3000 lbs., of 14 gage ASTM A-240 Type 304-28. stainless steel and 600 feet of 1 x1 x 1/8 stainless angles, ASTM A-276 Type 304 with certifications required. The received and accepted certification, dated July 18, 1979, for the ASTM A-240 material shows the following: tensile strength - 66,000 psi; phosphorus-0.38; sulfur-0.06; and nitrogen content is not addressed. The ASTM A-240 standard requires 70,000 psi tensile strength minimum; 0.045 maximum phosphorus; 0.03 maximum sulfur; and 0.10 maximum nitrogen. 3. Zack Company placed PO Number C-4458, dated July 30, 1981, with Hobart North for 30 lbs. stainless steel weld rod, 3/32" Type 308. The P0 stated " Actual or Typical Chemistry, RT (radiography), mechanicals, Charpy V notch tests." ft
,-v w
=.- u w. .. = -. -. =. - The Certified Material Test Report (CMTR) was received and accepted I by Zack. company, but did not address RT or Charpy V notch tests. I (NOTE: The material specification does not require RT or Charpy's). 4. Zack Company placed PO Number C-9433, dated August 4,1976, with Vincent Brass & Aluminum. Company for 4000 lbs. of 20 ga,ge and 2000 lbs. of 22 gage stainless coils, Type 316, ASTM A-240, with mill certi-f ~ fications required. The material was received with a certification dated August 9,1976. The 20 gage material was returned to Vincent due to damage. However, the 22 gage material was accepted, although-the certification did not 4-list a heat number and did not provide the actual chemistry. The chemistry stated on the certification was simply a reiteration of -the i chemistry requirements stated in ASTM A-240. (NOTE: This material was ordered as nonsafety related; however, this does not negate the stated requirement). 5. Zack Company placed P0 Number C-739, dated September 29, 1978, with U.S. Steel Company for 20 tons of ASTM A-527, A-525 galvanized coils. Certifications were required. The material and certifi-cations were received and accepted, showing the heat numbers as -J 74531 and J 74278. The certification did not provide physical test reports for heat J 74531. (NOTE: The ASTM material standard does not require physical properties to be reported; however, this material was purchased for use at the Clinton Power Station site and the Clinton specification did require physical properties to be reported). 4 5 6 g t .9 e,m. i.e. se -e-- - -- ~~,, - -, -,-w.,-w.-
.== - G. Section 7.1.2 of PQCP-7, Revision 8, " Plant Document Contro1" states in part, " Customer approved editions / revisions to the ZQAM ere controlled by the QAM. Such control to include as a minimum the following: 7.1.2.4 Establishment, by project, of a file of voided documents. 7.1.2.5 Documented distribution requiring written acknowledgment of receipt." i Section 7.2.2 of PQCP-7, Revision 8, states in part, "New or revised... WPS's approved by the customer, are controlled by the QAM. Such control to include as a minimum the provisions of paragraphs 7.2.1.2 through 7.1.2.5 above." Contrary to the above, the file of voided documents did not contain Revision 0 to the ZQAM (Clinton Project) nor Revisions 1, 2, 3, and 5 of Welding Procedure WPS-1. There was no documentation to show that the QC Manager at Clinton, who is on the Controlled Copy Distribution List, received a copy of WPS-1, Revision 10 (June 1, 1981) or the ZQAM, Revision 1 (September 30,1980). H. Section 19, " Audits" of the QA Manual (ZQAM-Revision 3) for LaSalle states in part, "In plant audits shall be performed a minimum of once a year by the Quality Control Department Manager...." Section 19, " Audits" of the QA Manual (ZQAM-Revision 1) for Clinton states I. in part, " Audits are performed in accordance with written procedures or check lists... Audits will be performed as follows: (1) Zack s .....e -m.-e - w -s-..
Site-Every twelve months for all sections of the Canual; (2) Plant-Every I ~ twelve months for all sections of the manual...." Section 7.0 of PQCP-17, Revision 1, " Training, Certification and Evalua-tion of Quality Assurance Auditors - Performance of Audits and Vendor / Supplier Surveys" states in part, ".. 7.3 Auditors / Lead, Auditors ~ prepare a written audit plan identifying the activity and organization to be audited.. 7.7 Audits shall be performed by use of check-lists (ZQF-86)...." Contrary to the above, a review of the internal audits conducted at the Zack plant, and the LaSalle and Clinton sites from 1979 through 1981 (no audits were performed in 1982) showed that all section of the manuals were not audited on an annual basis. There was also no evidence of 10-audit plans or 3 check lists for the 17 internal audits performed. I. Section 18, "QA Records" of the QA Manual (ZQAM-Revision 1) states in part, "All records in the home office... shall be indexed, filed, and maintained in a fireproof steel cabinet... As a minimum, records shall include:.. 5. Qualification of personnel...." i N * ' ' ' ** -e- -ww.*y,,
.. ~ l o e 1 Contrary to the above, a review of the QA record files' for both the LaSalle and Clinton projects indicated that there were no personnel qualifications maintained for one shop welder and two auditors. J. Procedure QCP-11, Revision 6, " Training Procedures for Personnel Per-nforming Quality Control Inspection" requires that QC inspection personnel i for the LaSalle project meet visual and color vision standards, and the visual requirements be verified annually by reexamination. In addition, certification forms which will be completed for each person who performs inspections, will be retained in the project files. i Procedure PQCP-11, Revision 1, " Training, Certification, and Evaluation of Quality Control Inspectors" requires that QC inspection personnel for the Clinton project have an annual examination for visual acuity, and the results of these examinations be maintained in the files. The certification is also documented on a form which is maintained in the files. In addition, the inspectors are evaluated 30 days after certification and annually thereafter, and the evaluations are documented on a form. Procedure PQCP-16, Revision 1, "On going Training" requires that QC and plant fabrication personnel receive monthly training from both the Quality Control Manager and the Production Manager, and each training session is documented and retained in the QA files. Contrary to the above, a review of the QA files for 13 QC inspectors (LaSalle), 21 QC inspectors (Clinton), and 4 welders revealed a lack
l of d:cumentatien for th2 following ite;s: 1. Annual Eye Exam - 15 (Clinton) and 6 (LaSalle) inspectors; 2. Certification Form - 13 (Clinton) and 1 (LaSalle) inspectors; 3. Performance Evaluation - 16 (Clinton) inspectors; and 4. On going Training - 8 (Clinton) inspectors and 4 welders. K. Paragraph 4.1 of "The Zack Company Procedure for Compliance with 10 CFR Part 21," Revision 0, dated December 9, 1978 states, "Any employee of the Zack Company who has reason to believe a deviation exists, is required to supply this information both verbally and in writing to his immediate supervisor. The written report shall be in accordance with the form of Appendix A (10 CFR Part 21 evaluation report). It shall be prepared within i one working day of the verbal notification. The reporting and evaluation chain is shown in Figure 1." 9 I
.._ - m . _,. _..m -.. _ - ~ -..... _. .. ~ -. k. j 4 Contrary to the above, written 10 CFR Part 21 evaluation reports had not been prepared or submitted to supervision with respect'to identified deviations. D u L. Paragraph 9.1 of Sargent & Lundy Engineers, Chicago, Illinois, Standard q. Specification J-2590 for HVAC Duct work (Form 320) states in part, "The
- ?
,] Contracter (Zack Company) shall be responsible for the leak tightness of M .1 each duct system. To assure minimum leakage, the Contractor shall seal
- 9 all joints and seams which are not gasketed with and (sic) approved material as specified in Article 3.5 for all nonnuclear applications, and shall be in accordance with Article 3.6 for all nuclear plant systems, except HVAC systems in the service building, which can be the same as 1
nonnuclear applications...." Contrary to the above, unapproved materials (Hardcast FTA-20 adhesive and duct tape) were used in sealing HVAC systems at LaSalle. M. Paragraph 7.7 of QCP-8, "NCR," Revision 4, dated October 2, 1980, requires the signature of the Project Engineer in Blank 15, of the Zack Company i Nonconformance Report (Form 2QF-11) acknowledging corrective action.taken. Contrary to the above, three NCR's (622, 776, 781, LaSalle) were initialled for the Project Engineer by an unidentified second party, and one NCR r (475, LaSalle) was unsigned. t i t .me *w . ' ' " ~ '.. ~ ' '
.~ .~ [.* ORGANIZATION: THE ZACK COMPANY CHICAGO, ILLINOIS REPORT INSPECTION INSPECTION -NO.: 99900785/82-01 DATE(S) 8/3-6/82 ON-SITE HOURS: 81 ~ CORRESPONDENCE ADDRESS: The Zack Company ATTN: Mrs. Christene Zack DeZutel President 4600 W. 12th Place Chicago, Illinois 60650 ORGANIZATIONAL CONTACT: Mrs. Christene Zack DeZutel TELEPHONE NUMBER: (312) 242-3434 PRINCIPAL PRODUCT: Heating, Ventilation, and Air Conditioning Systems (HVAC). NUCLEAR INDUSTRY ACTIVITY: Current activity consists of HVAC systems being furnished to the. Commonwealth Edison Company's LaSalle County Station, Units 1 and 2; 4 Illinois Power Company's Clinton Power Station, Unit 1; and Consumers Power Company's Midland Plant, Units 1 and 2. s ASSIGNED INSPECTOR: L. E. Ellershaw, Reactive & Component Program Date Section (R& CPS) OTHER INSPECTOR (S): J. T. Conway, R& CPS L. B. Parker, R& CPS APPROVED BY: I. Barnes, Chief, R& CPS Date INSPECTION BASES AND SCOPE: A. BASES: Appendix B to 10 CFR Part 50. B. SCOPE: This inspection was conducted as a result of the receipt by the Nuclear Regulatory Commission (NRC) of allegations pertaining to implementation and I enforcement of the Zack Company quality assurance program, and was performed in conjunction with an investigation by the Chicago Field Office of the NRC Office of Investigation. Investigative findings are contained in NRC Report No. 99900785/82-02. The main purposes of the inspection were to assist the (cont. on next page) PLANT SITE APPLICABILITY: l 50-373; 50-374; 50-329; 50-330; 50-461. l i ~... ~-
..: = .=.
- . :.:=
. =, = ~
- =
ORGANIZATION: THE ZACK COMPANY CHICAGO, ILLINOIS I REPORT INSPECTION NO.: 99900785/82-01 RESULTS: PAGE 2 of 9 SCOPE: (cont.) investigative staff in the evaluation of identified concerns, and to establish whether HVAC system manufacture was consistent with applicable codes, contractual and regulatory requirements. To make this determination, the primary areas selected for inspection were welding process control, nonconformances and corrective action, audits, indoctrination, and training, document control, QA records, procurement document control and implementation of 10 CFR Part 21. A. VIOLATIONS: n None B. NONCONFORMANCES: 1. Contrary to Criterion V of Appendix B to 10 CFR Part 50, QA Manual Section 10, and AWS D1.1-79, the NRC inspector observed deviations being permitted and changas to essential variables being made without the procedure being requalified during GMAW of duct rings for the Midland Plant, in which the welder was using 0.035 inch diameter weld wire, 125 amps, and a gas flow rate of 30 CFH. 2. Contrary to Criterion V of Appendix B to 10 CFR Part 50 and Procedure ( QCP-29, the following conditions were: identified: a. Electrodes (bare wire on spools) were not being protected, in that three spools of stainless steel electrodes, each of a different type, were observed under a work bench in an uncovered condition. Further, two spools had been issued on December 17, 1981 and the other on April 16, 1982. b. Traceability of these electrodes would be precluded when used at a time later than the issue date, in that the date of issue as shown on the weld material control sheet would not coincide with the 3 date of actual welding on a specific Zack Company traveler. 3. Contrary to Criterion V of Appendix B to 10 CFR Part 50, QA Manual Section 6, and AWS D1.1-79, full and complete information pertaining to welds, weld joints, and matsrial preparation, was not shown on shop travelers / detail drawings provided to shop personnel. The only infor-l, mation provided is the welding procedure specification number, which does not delineate the above information. I l L o $g g i,,w-e, y -g y r-3 --M-g --.-p g-,,whu -,g
~ ~ ~ ORGANIZATION: THE ZACK COMPANY CHICAGO, ILLIN0IS I REPORT INSPECTION NO.: 99900785/82-01 RESULTS: PAGE 3 of 9 4. Contrary to Criterion V of Appendix B to 10 CFR Part 50 and QA Manual Section 10, instructions, procedures, or drawings did not include appro-priate qualitative acceptance criteria for welds. Therefore, without acceptance criteria being stipulated, specific inspection requirements were not set forth in welding procedures. 5. Contrary to Criterion V of Appendix B to 10 CFR Part 50 and QA Manual Section 7, shop fabrication tickets were not complete in all respects, in that they did not address certain fabrication methods / operations and their sequencing; e.g., rolling or forming, and galvanizing. 6. Contrary to Criterion V of Appendix B to 10 CFR Part 50 and QA Manual Section 8, the following conditions were identified: a. Zack Company placed purchase order (PO) Number C-4199 with Central-West Machinery Company in November 1980, for 152 gallons of Hardcast FTA-20. This material was received and accepted. Subsequently, a verbal order for an additional 24 gallons was placed and received in November 1980, and as of the date of this inspection, no written confirmation has been made. b. Zack Company placed P0 number C-874 with Griffiths-McKillen Steel Company on July 5,1973 for 3000 lbs. of 14 gage ASTM A-240 Type 304-28 stainless steel and 600 feet of 1 x1 x U8 stainless angles, ASTM A-276 Type 304, with certifications required. 1 The received and accepted certification, dated July 18, 1979, for the ASTM A-240 material showed the following: tensile strength - 66,000 psi; phosphorus - 0.38; sulfur - 0.06; and nitrogen content was not addressed. The ASTM A-240 standard requires 70,000 psi tensile strength (minimum), 0.045 maximum phosphorus, 0.03 maximum sulfur, and 0.10 maximum nitrogen. l c. Zack Company placed PO number C-4458, dated July 30, 1981, with l Hobart North for 30 lbs., stainless steel weld rod, 3/32" l Type 308. The P0 stated " Actual or Typical Chemistry, RT L (radiography), mechanicals, Charpy V notch tests." L. l l l f - + -.. --_n en. - n n.~ ,n.
.__..;._m. _.- m. _ m i ? j ORGANIZATION: THE ZACK COMPANY j-CHICAGO, ILLINOIS I REPORT-INSPECTION NO.: 99900785/82-01 RESULTS: PAGE 4 of 9 The Certified Material Test Report (CMTR) was received and accepted by Zack Company, but did not address RT or Charpy V notch tests. (NOTE: The material specification does not require RT or Charpy's, however, it is still a PO requirement). d. Zack Company placed PO Number C-9433, dated August 4, 1976, with Vincent Brass & Aluminum Company for 4000 lbs. of 20 gage and 2000 lbs. of 22 gage stainless coils, Type 316, ASTM A-240, with mill certifications required. - The material was received with a certification dated August 9, 1976. The 20 gage material was returned to Vincent due to damage. However, the 22 gage material was accepted, although .1 the certification did not list a heat number and did not provide the actual chemistry. The chemistry stated on the certification was simply a reiteration of the chemistry requirements stated in ASTM A-240. (NOTE: This material was ordered as nonsafety related; however, this does not negate the stated requirements). e. Zack Company placed PO Number C-739, dated September 29, 1978, with US Steel Company for 20 tons of ASTM A-527, A-525 galvanized coils. Certifications were required. The material and certifications were received and accepted, showing the heat numbers as J 74531 and J 74278. The certifications did not provide physical test reports for heat J 74531. (NOTE: The ASTM material standard does not require physical properties to be reported; however, this material was purchased for use at the Clinton Power Station site and the Clinton specification did require physical pro-perties to be reported). 7. Contrary to Criterion V of Appendix B to 10 CFR Part 50 and paragraph 9.1 of Sargent & Lundy Engineers, Chicago, Illinois, Standard Specifi-p cation J 2590 for HVAC duct work (Form 320), unapproved materials (Hardcast FTA-20 adhesive and duct tape) were used in sealing HVAC systems at LaSalle. 8. Contrary to Criterion V of Appendix B to 10 CFR Part 50 and PQCP-7, " Plant Document Control," there was no documented evidence that a voided document file was maintained up-to-date for the QA Manual for Clinton and welding procedure WPS-1. ll L.p Y rwr e et$ 9 +.v--.- 6 '-w--- - ' w y wr Tw =r-- T** s -'w+-e*+-*P -*T-e-NN-* -9'm--*--==w---*e'--T-*---NN* "--N-
m. .. c. x.u s a 4 ORGANIZATION: THE ZACK COMPANY CHICAGO, ILLINOIS ~* REPORT INSPECTION NO.: 99900785/82-01 RESULTS: PAGE 5 of 9 9. Centrary to Criterion V of Appendix B to 10 CFR Part 50, Section 19, " Audits," of the QA Manuals for LaSalle and Clinton, and PQCP-17, " Training, Certification and Evaluation of Quality Assurance Auditors - Performance of Audits and Vendor / Supplier Surveys," a review of internal audits conducted from 1979 through 1981 showed all sections of the QA manuals were not audited on an annual basis, and 10 audit plan and 3 check lists were missing for the 17 internal audits performed.
- 10. Contrary to Criterien V of Appendix B to 10 CFR Part 50 and Section 18, "QA Records 2 of tne QA Manuals for LaSalle and Clinton, a review of the i
QA records files for both the LaSalle and Clinton projects indicated that there were no personnel qualifications maintained for one shop j welder and two auditors. j 11. Contrary to Criterion V of Appendix B to 10 CFR Part 50; QCP-11, " Training Procedures for Personnel performing Quality Control Inspec-tion; " PQCP-11, " Training, Certification, and Evaluation of Quality Control Inspectors;" and PQCP-16 "On going Training,",a review of the QA files for 13 QC inspectors (LaSalle), 21 QC inspectors (Clinton), and 4 welders revealed a lack of documentation for the following items: Annual eye exam - 14 (Clinton) and 6 (LaSalle) inspectors; a. b. Certification Form - 13 (Clinton) and 1 (LaSalle) inspectors; c. Performation Evaluation - 16 (Clinton) inspectors; and d. On going Training - 8 (Clinton) inspectors and 4 welders.
- 12. Contrary to Criterion V of Appendix B to 10 CFR Part 50, and paragraph 4.1 of "The Zack Company Procedure for Compliance with 10 CFR Part 21,"
written 10 CFR Part 21 evaluation reports had not been prepared or suumitted to supervision with respect to identified deviations.
- 13. Contrary to Criterion V of Appendix B to 10 CFR Part 50 and paragraph 7;7 of QCP-8, three NCR's (LaSalle) were initialled for the Project L
Enginee.r by an unidentified second party and one NCR (LaSalle) was l unsigned. [ l k s -+ v - w o m., w w--- ,w
a ORGANIZATION: THE ZACK COMPANY j CHICAGO, ILLINOIS REPORT INSPECTION NO.: 99900785/82-01 RESULTS: PAGE 6 of 9 C. UNRESOLVED ITEMS: None D. OTHER FINDINGS OR COMMENTS: 1. Review of Allegation Background This inspection was conducted at the request of the NRC Region III Office, and in conjunction with an investigation into allegations received from former Zack Company employees, pertaining to falsified / altered quality assurance documentation; namely, material certifications. aj The alleger first contacted NRC Region III, in person, on May 3, 1982, i and subsequently by telephone on May 10, 1982, and again, in person, 4 on May 19, 1982. The allegations, briefly, dealt with possible forged signatures, use of white-out to effect changes in reported results, and the adding of information to material certifications which had been received from material suppliers / manufacturers. The Zack Company had identified these conditions in letters to their customers on the following dates: (1) Bechtel Power Corporation-Midland j Plant, Units 1 and 2, August 28, 1981; (2) Baldwin Associates-Clinton Power Station, Unit 1, September 25, 1981; and (3) Commonwealth Edison Company-LaSalle County Station, Unit 1 and 2, September 25, 1981. The Zack Company was performing a review of all purchase order files, 5 including certifications, and was taking action to rectify all discovered discrepancies. One of the actions taken was to establish a formal documentation control system. In order to implement the system, additional personnel were required. A file clerk and a document control supervisor were hired on October 5,1981, and October 19, 1981, respectively. In addition to establishing and implementing the document control system, the document control supervisor was responsible for conduct-ing the review and evaluation of all the purchase order files. Sub-sequent letters (status reports) to the customers, from the document contril supervisor, reflected that corrected certifications were being received and very few discrepancies remained. l l ~... ~ _ -. l
9
x
= =. ~- ~ - -. t 7 ORGANIZATION: THE ZACK COMPANY-CHICAGO, ILLINOIS . REPORT INSPECTION NO.: 9S900785/82-01' RESULTS: PAGE 7 of 9 ~ The file clerk was laid off and the supervisor terminated on April 30, 1982. Both of these people were involved with the allegations. ,NRC Report No. 99900785/82-02 addresses the specific findings relative to the allegations. 2. Areas Inspected Welding Process Control - The NRC inspector reviewed the welding 1 a. material control system including the issuance, documentation (weld material test reports),- retrieval, and storage of welding materials. The applicable welding procedure specifications, their procedure qualification records, and shop drawings / travelers were y reviewed. In process gas metal arc welding was observed being performed on duct rings being supplied to the Midland Plant. As a result of this observation and review, nonconformances B.1, 8.2, B.3, and B.4 were identified. Additionally, nonconformance E.5 was identified, although not a specific part of this area of the inspecticn. + b. Procurement Document Control - A total of 94 procurement document files were reviewed. These files consisted of Zack Company purchase orders and supplements, shipping documentation, material test reports, certificates of conformance,rapplicable correspondence, receiving inspection reports,'and copies of nonconformance reports (if required). As a result of this review, nonconformance B.6 was identified. Further, review of Sargent & Lundy Engineers (S&L) j Standard Specification No. J 2590 and S&L's approved material list resulted in nonconformani:e B.7 being identified. The NRC inspector expressed concern over the apparent failure of the receiving inspection function to detect the discrepancies / anomalies between the purchase order requirements and the material certifications. Document Control - A review of the master file for thiQA Manuals c. and quality control and welding procedures, as well as the file on voided documents for the Clinton and LaSalle projects, resulted in the identification of nonconformance B.8. l d. Audits - A review of reports for 17 internal audits conducted at the Zack, LaSalle, and Clinton sites from 1979 through 1981 and a j review of 10 vendor / supplier audit reports conducted from s 4 October 1981 through May,1982,' resulted in the identification of i nonconformance B.9. l I e !I i ( ~ *'F s = -m%- t
.-.a - .-.L---- .a-n-. ~. 4 -~ ORGANIZATION: THE ZACK COMPANY CHICAGO, ILLIN0IS REPORT INSPECTION NO.: 99900785/82-01 RESULTS: PAGE 8 of 9 e. QA Records - A review of the QA record file for 13 QC inspectors at LaSa1H, 21 QC inspectors at Clinton, 4 welders, and 5 auditors resulted in the identification of nonconformances B.10 and B.11, A detailed evaluation of the QA program for both the LaSalle and Clinton projects, to determine if activities were being imple-mented consistent with quality commitments contained in both QA Manuals, and discussions with Zack personnel resulted in the following additional comments: The QA Manuals and applicable procedures for both the LaSalle and Clinton projects appear to require updating to satisfy the requirements of Appendix B to 10 CFR Part 50. Examples of observed discrepancies are as follows: (1) The organization chart does not identify all the onsite and offsite groups which function under the cognizance of the QA program, and the QA responsibilities of ea'ch group are not described; (2) The organizational positions with stop work authority and the individual responsible for directing and managing the site QA program are not idehtif.ied; (3) Indoctrination, training, and qualification programs are not documented; (4) Qualifications and certifications of inspectors and auditors are not being kept current; (5) The basis for selection of suppliers is not being documented and filed; (6) There was no documentation to indicate that supplier's certi-cates of conformance are periodically evaluated by audits, independent inspections, or tests, to assure they are valid; (7) There were no requirh[nents for in process inspection of work h by individuals other than those who performed or directly supervised the activity; i-c (8) Qualification records of procedures, equipment and personnel p associated with special processes (e.g., welding) had not been fully established, filed and kept current; and t. t -,.- - ~ ~.. n. . ~,..
im -v..,. ..J., "~,'-- ,J*. -wi +.... -s ORGANIZATION: THE ZACK COMPANY CHICAGO, ILLINOIS REPORT INSPECTION NO.: 99900785/82-01 RESULTS: } PAGE 9 of 9 (9) There was no requirement for management (above or outside the QA organization) to regularly assess the scope, status 4 and compliance of the QA program to 10 CFR Part 50, Appendix B. f. Implementation of 10 CFR Part 21 - The NRC inspector reviewed the vendor's procedure "The Zack Company's Procedure for Compliance ^ with 10 CFR Part 21," Revision 0, dated December 19, 1978, to verify that adequate documented measures were available to meet the reporting requirements of 10 CFR Part 21. The evaluation requirements were not followed (see nonconformance E.12). Two reports were examined for completeness and adherence to notifi- ~ c.ation requirements. These reports were: (1) a 10 CFR Part 21. report to NRC Region III on June 9, 1982, concerning fire dampers; 4 and (2) a potential 10 CFR Part 21 report to NRC Region III on Angust 2, 1982, concerning weld records. These reports met the requirements of the vendor's procedure. Observations of the employee's bulletin board verified that the above vendor's procedure and Section 206 of the Energy Reorganiza-tion Act of 1974, were properly posted. g. Nonconformances and Corrective Action - The NRC inspector reviewed .~ the following vendor's procedure and two quality assurance manual sections to determine the QA/QC requirements for the subject area at the LaSalle site: Quality Control Procedure 8, Revision 4, dated October 2, 1980, "NCR"; Section 16 of the Quality Assurance Manual (QAM), Revision 2, dated April 1,1981, " Nonconforming Material, Parts or Components"; Section 17 of the QAM, Revision 2, dated September 16, 1977, " Corrective Action." Three books of completed NCR's (300) were reviewed in the process of determining specific NCR's to be examined. Thirty-five specifir 1CR's and 20 Corrective Action Reports were examined for completeness and compliance with the above requirements. Management review of NCR corrective action was lacking on four of the NCR's examined. (See nonconformance B.13). i o D L 5; I 2 i %gg we-sew,--. m.-. -e,,r 4 - - +, m
- e
%g%. m_.. __w. .s .e .=,%, .---.,,.,ve ,-..---i-r-.
+- g' Distribution: Document Control Docket Hos. 50-329/330 OH, Ot. D NSIC PRC System OELD
- 4..
Mr. J. W. Cook ACRS (16) Vice President ELJordan, IE 3 Consumars Power Company Jf1 Taylor, IE 1945 West Parnall Road Jackson, Michigan 49201 ~........
Dear Mr. Cook:
Subject:
Caseload Forecast Panel Estimate of Construction Completion Schedule 19 21, 1983, the' HRC Caseload Forecast Panel visited the Midland 1 on April Plant to evaluate construction completion schedules. The meeting discussed in detall the basis for Consumer's revised estimates of October 1984 (Unit 2) and February 1985 (Unit 1). On April 20, 1983 the Panel con-ducted an extensive tour ofiboth units to observe construction progress. The Panel he now completed.its own evaluation of construction completion schedules for Midland Plant, Units;1 & 2. The Panel concludes that some months beyond the second quarter of 1985 is the earliest date that completion of Unit 2 can reasonably be expected. The Unit 1 is expected to be completed about 6 to 9 months thereafter. . critical pathway involves reinspection and rework of pipe supports, followed by execution of preoperational and acceptance testing. The Panel believes that Consumer's estimate of 14 months to complete preoperational and acceptance testing for both units is unduly optimistic. The record for a recent single unit to date has been about 24 months.
- e.,
Using a more realistic, but slightly optimistic, duration for two units and Consumer's present status results in a completion date in the second quarter of 1986. However, the Panel also believes that Consumer's fore-8.I- . cast does not realistically account for large uncertainties in the work which must precede start of critical path testing, and that this can be expected to add some months to Consumer's schedule. The Panel believes that completion of reinspections of large and small bore pipe hangus and the amount of rework resulting from this effort is a notable example of the items expected to delay start of : critical path testing by some months. I l 1. O,,.? ? l \\ ......~.aa ......................... ~..... .. ~. on,en .......................j........~.a. ......a. ...a ......~.. . ~.... suam ) " " a a"".aa a ..". a a a. .. j a. .aa .="a.a=== a* a.aaaaaaaa. ~~~.a a a a.=*a a. .aaa aaaa ~~.a .... a. a a a... 04Tt) OFFIC!AL RECORD COPY 3c.g.,= j 83tC f CAu att 0483) NACW 024o c..;;.w
,T, g, The Panel's estimate includes no provision for delay associated with future plant financing. iSincerely. Thomas M. Novak. Assistant Director for Licensing iElvision of Licensing ' Office of Nuclear Reactor Regulation ~ cc: see next page i .F 7 -b r \\ ? \\W4 7RW DDM1s/ do LBf4 LBs4 RH d RIII AD/L ..DHo........./j y.. W..... l..,,"...,Jff a...... Ts.....#... omeo EXd................ TMo......E......... o :ms ensam ove ace rr on va sunu * > . 5./.. . 3..... 9..78.f.......F/..Ys)....... s/8 .. 7p..../#3.........,.7..................... 5, /83 2 cmy.... OFF1ClAl. RECORD D Ny .e p :..i, u c.a ...a v. 3 un., n,. g ;....cw
-.,,g
- l( ',) 7 ABL N
p, During a discussion during the public meeting on August 5, 1982 in Midland, ILwas asked by Mr. Paton to jot down the story fof the deep Q duct kank excavation. Here it is. I When Darl Hood and Joe Kane were in Midland for the ACRS hearing, I asked for a meeting to-be held on site between NRR, Bechtel, the licensee and myself The meeting took place on a Thursday af ternoon in the Remedial Soils Trailer (May 20, 1982). The purpose of the meeting was to discuss numerous concerns that I had about ongoing work and future work. I One of the concerns discussed was a monitoring pit for what has, bc 56 come l-to be known as the deep Q duct bank. During that meeting both Joe and I expressed our concerns that what the licensee was planning was not approved, i that is: to excavate below the duct bank. Joe only approved an excavation down to a duct bank approximately 22 feet deep. This is documented in Tedesco to Cook letter dated February 12, 1982, which references a Mooney to Denton letter dated January 6, 1982. T Since the licensee usually doe 2n't know what's in the groundc where it's at, as usual the 22 foot duct bank was approximately found at 35 feet. It also wasn't in the right location as evidenced by t he sheet pfling hitting one e side of the duct. In addition, while drilling the devatering well, they inadvertently drilled through the duct bank, emptying the drilling fluid into the turbine building. ? ft w c-- C+m a e enm+.. + + A
- --
- w -
z.= -. ~. - i.- y: 2-i.. I had-no problem with the licensee taking the excavation pit down to 35 feet 4 instead of the approved 22 feet, since the methodology of the approved- !L -hole remained the same. Joe and I'did have a problem with them wanting to excavate below the duct bank down to impervious clay to seal off the water flow without.first informing NRR of their plans. All of this was discussed' during the meeting and the licensee was told that [ they could not excavate below the deep Q duct bank. The licensee indicated 1 9; that they would submit something formal to Joe for approval. 9 The following day, I reiterated this during the normal exit meeting and again during the summary at the end of that meeting. I asked if everyone understood h. what I was saying and they acknowledged. 4 i S The following week, during my inspection to allow the licensee to activate the freeze-wall, I told them ht they could not dig below the deep Q duct bank. Subsequently, af ter the activ[ation of the freeze-wall, the licensee decided i that they had to seal off the water flow beneath the duct bank and proceeded to dig below the duct bank without any NRC approval. I'm not sure when . 1 excavation began, but I was on site July 28 wh(n I discovered the excavation 3 ~ in progress. The license, when informed of my concern, issued a Stop Work Order on July 29, 1982. I wondered why they were so agreeable until I found out that g. I'Y' d-e I l a ew e. r-+, ~-%- ...m._, i--- e ~, u -me- - - --r- ---..v-1 rw-y y- .*w--t w y e -- w
- -+
m.. ( r-1 r h _3 c they already' had. the excavation down to where they wanted it (the clay). I informed the Licensee during my exit on July 30 that they were in direct violation of the Board Order and their (onstruction fermit. To make matters worse, the licensee during the exit said that they discussed this with Mr. Nood and Kane in Ann Arbor earlier that morning and had gotten " approval" for what they're doing. I informed the licensee that they missed the point (basis of concern). My concern dealt not with the adequacy of what they were doing, but rather with their requirement to notify and receive prior approval. before proceeding below the duct bank. Subsequently, Mr. Kane indicated to me that they never even talked to him about this,==d Mr. Hood indicated that they talked to him about somethinj concerning the deep Q duct bank, but he in no way had given approval. They appeared to wait for me to leave the site, when tha' began another unapproved I fire protection line excavation in Q dirt which was discovered by me on August 4, my next inspection. This excavation is along side the SWPS. I have not had time to look into it to better define the details, but as pointed out to you and Darl, they have undermined a duct bank and an unidentified pipe thrust block and appear to be along side a safety-related duct bank. Insummary,theficensee'sattitudeappearstobe: their construction schedule comes first, by the time the NRC finds out about it, we'll be done with what we want and argue about whether we had approval later. - + + --... .~.w,... ...m_..- .-_m_. --g n.y}}