MONTHYEARPY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations1999-09-14014 September 1999 Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations PY-CEI-NRR-2420, Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)1999-09-0909 September 1999 Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4) PY-CEI-NRR-2406, Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl1999-09-0909 September 1999 Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl PY-CEI-NRR-2430, Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons1999-09-0909 September 1999 Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons PY-CEI-NRR-2418, Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable1999-08-0404 August 1999 Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable PY-CEI-NRR-2398, Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp1999-06-17017 June 1999 Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp ML20206F5971999-05-0505 May 1999 Application for Amend to License NPF-58,authorizing CEI to Possess Dl 13.74% Undivided Ownership Interest in Pnpp PY-CEI-NRR-2362, Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl1999-03-17017 March 1999 Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl PY-CEI-NRR-2373, Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-11999-03-15015 March 1999 Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-1 PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld1999-01-18018 January 1999 Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs1999-01-0606 January 1999 Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs PY-CEI-NRR-2325, Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program1998-09-0909 September 1998 Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program PY-CEI-NRR-2319, Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 21998-09-0303 September 1998 Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 2 PY-CEI-NRR-2298, Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storag1998-09-0303 September 1998 Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storage Tank PY-CEI-NRR-2300, Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable1998-08-31031 August 1998 Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable PY-CEI-NRR-2299, Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld1998-07-22022 July 1998 Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld ML20151P1891998-07-13013 July 1998 Application for Amend to License NPF-58,revising Safety Setpoint Requirements for Srv.Proprietary Info & Affidavit Are Contained in Attachment 5.Proprietary Info Withheld ML20236H6931998-06-30030 June 1998 Application for Amend to License NPF-58,transferring Operating Authority for Pnpp from Ceic & Centerior Svc Co to New Operating Company Named Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments,Included PY-CEI-NRR-2295, Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required1998-06-30030 June 1998 Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required PY-CEI-NRR-2245, Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs1997-12-23023 December 1997 Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs PY-CEI-NRR-2230, Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers1997-10-22022 October 1997 Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers PY-CEI-NRR-2207, Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours1997-09-0808 September 1997 Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours PY-CEI-NRR-2206, Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.901997-08-28028 August 1997 Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20217F5751997-07-28028 July 1997 Application for Amends to Licenses DPR-66,NPF-73 & NPF-58, Authorizing Holders to Possess Beaver Valley Power Station, Unit 1 & Authorizes Duquesne Light to Use & Operate Beaver Valley Unit 1 in Accordance W/Procedures PY-CEI-NRR-2164, Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys PY-CEI-NRR-2165, Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria PY-CEI-NRR-2155, Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks1997-04-0909 April 1997 Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks PY-CEI-NRR-2133, Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests1997-01-31031 January 1997 Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests ML20132C7601996-12-13013 December 1996 Application for Amend to License NPF-58,authorizing Transfers of Control PY-CEI-NRR-2104, Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.21996-10-24024 October 1996 Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.2 ML20117E7821996-08-27027 August 1996 Application for Amend to License NPF-58,revising MSL Leakage Requirements & Eliminating MSIV Leakage Control Sys. Attachment 7 Provides Proprietary Dose Calculations. Attachment 7 Withheld PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process1996-04-26026 April 1996 Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process PY-CEI-NRR-2030, Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses1996-02-27027 February 1996 Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses PY-CEI-NRR-2027, Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 61996-02-17017 February 1996 Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 PY-CEI-NRR-2007, Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing1996-01-16016 January 1996 Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing PY-CEI-NRR-2013, Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 9601271996-01-10010 January 1996 Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095L2181995-12-28028 December 1995 Suppl Application for License Transfer of 12.58% Ownership Interest in Addition to 17.42% Approved on 951220 PY-CEI-NRR-2004, Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc1995-11-22022 November 1995 Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc PY-CEI-NRR-1978, Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating1995-11-0202 November 1995 Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating PY-CEI-NRR-1995, Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations1995-11-0202 November 1995 Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations PY-CEI-NRR-1997, Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies1995-11-0101 November 1995 Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies PY-CEI-NRR-1969, Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L)1995-08-29029 August 1995 Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L) PY-CEI-NRR-1961, Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements1995-06-30030 June 1995 Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements PY-CEI-NRR-1954, Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request1995-06-0909 June 1995 Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request PY-CEI-NRR-1956, Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR1995-06-0101 June 1995 Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR PY-CEI-NRR-1944, Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification1995-05-0505 May 1995 Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification PY-CEI-NRR-1932, Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements1995-05-0101 May 1995 Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements PY-CEI-NRR-1927, Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License1995-04-28028 April 1995 Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License PY-CEI-NRR-1934, Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS1995-04-28028 April 1995 Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS 1999-09-09
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARPY-CEI-NRR-2427, Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations1999-09-14014 September 1999 Application for Amend to License NPF-58,deleting License Condition 2.C.10 Re Controls Over Containment Air Locks During Plant Outages & Clarifying License Condition 2.F Re Reporting Requirements of TS & EPP Violations PY-CEI-NRR-2420, Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4)1999-09-0909 September 1999 Application for Amend to License NPF-58,increasing Present 100% Authorized Rated Thermal Power Level of 3579 Megawatts Thermal to 3758 Megawatts Thermal.Proprietary SAR Encl. Proprietary SAR Withheld,Per 10CFR2.790(a)(4) PY-CEI-NRR-2406, Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl1999-09-0909 September 1999 Application for Amend to License NPF-58,eliminating Requirement in EPP to Sample Lake Erie Sediment in Perry & Eastlake Plant Area for Corbicula.Summary & Description of Change Is Encl PY-CEI-NRR-2430, Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons1999-09-0909 September 1999 Application for Amend to License NPF-58,revising Allowables Values for CST Low Water Level Limits from Greater than or Equal to 59,700 Gallons to Greater than or Equal to 90,300 Gallons PY-CEI-NRR-2418, Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable1999-08-0404 August 1999 Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable PY-CEI-NRR-2398, Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp1999-06-17017 June 1999 Application for Amend to License NPF-58,changing SRs as Identified to Support Implementation of 24-month Operating Cycle at Pnpp ML20206F5971999-05-0505 May 1999 Application for Amend to License NPF-58,authorizing CEI to Possess Dl 13.74% Undivided Ownership Interest in Pnpp PY-CEI-NRR-2362, Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl1999-03-17017 March 1999 Application for Amend to License NPF-58,proposing Change in Plant USAR by Incorporating leak-off Line in RHR Sys, Which Will Significantly Reduce Collective Dose to Plant Operations Personnel.Annotated USAR Pages,Encl PY-CEI-NRR-2373, Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-11999-03-15015 March 1999 Application for Amend to License NPF-58,correcting Typos Found in TS Table 3.3.6.1-1 PY-CEI-NRR-2359, Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld1999-01-18018 January 1999 Suppl Application for Amend to License NPF-58,involving Rev of Main Steam Line Leakage Requirements & Elimination of Main Steam Isolation Valve Leakage Control Sys.Proprietary Calculations Encl.Proprietary Encls Withheld PY-CEI-NRR-2352, Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs1999-01-0606 January 1999 Suppl to 980909 LAR to License NPF-58,improving Licensing & Design Basis for Isolation of Feedwater Penetrations, Including Sensitivity Study Performed to Examine Radiological Significance of Leakage Through FW Sys Cvs PY-CEI-NRR-2325, Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-58,applying Addl Conservatism by Modifying MCPR Safety Limit Values,As Calculated by Ge.Proprietary Addl Info Re 1.09 Cycle Specific Slmcpr,Encl.Proprietary Info Withheld PY-CEI-NRR-2322, Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program1998-09-0909 September 1998 Application for Amend to License NPF-58,stipulating That Water Leakage from Feedwater motor-operated CIVs Will Be Added Into Primary Coolant Sources Outside of Containment Program & Valves Need Not Be Included in Test Program PY-CEI-NRR-2319, Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 21998-09-0303 September 1998 Application for Amend to License NPF-58,permitting EDG TS Action Completion Time of Up to 14 Days for Div 1 or 2 EDG & Allow Performance of EDG 24-hour TS SR Test in Modes 1 & 2 PY-CEI-NRR-2298, Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storag1998-09-0303 September 1998 Application for Amend to License NPF-58,increasing Present Div 3 DG Fuel Oil Level Requirements to Account for Rounding Error in Calculation & Unusable Vol Due to Vortex Formation at Eductor Suction Nozzles Located in Fuel Oil Storage Tank PY-CEI-NRR-2300, Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable1998-08-31031 August 1998 Application for Amend to License NPF-58,allowing Blind Flange in Inclined Fuel Transfer Sys (Ifts) Containment Penetration to Be Removed While Primary Containment Is Required to Be Operable PY-CEI-NRR-2299, Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld1998-07-22022 July 1998 Supplemental Application for Amend to License NPF-58, Revising MSL Leakage Requirements & Eliminating Msli Valve Leakage Control Sys.Proprietary & non-proprietary Rev 1 to Calculation Psat 08401T.03,encl.Proprietary Info Withheld ML20151P1891998-07-13013 July 1998 Application for Amend to License NPF-58,revising Safety Setpoint Requirements for Srv.Proprietary Info & Affidavit Are Contained in Attachment 5.Proprietary Info Withheld ML20236H6931998-06-30030 June 1998 Application for Amend to License NPF-58,transferring Operating Authority for Pnpp from Ceic & Centerior Svc Co to New Operating Company Named Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments,Included PY-CEI-NRR-2295, Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required1998-06-30030 June 1998 Application for Amend to License NPF-58,revising TS 3.1.7, Standby Liquid Control Sys to Increase Boron Concentration in Standby Liquid Control Sys for Cycle 8 Fuel Design & to Provide Margin for Future Cycles as Required PY-CEI-NRR-2245, Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs1997-12-23023 December 1997 Application for Amend to License NPF-58,revising TS 3.8.1, AC Sources - Operating, to Be Consistent W/Recommendations in GL 94-01, Removal of Accelerated Testing & Special Reporting Requirements for Edgs PY-CEI-NRR-2230, Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers1997-10-22022 October 1997 Application for Amend to License NPF-58,incorporating Temp Control Valves & Associated Bypass Lines Around Emergency Closed Cooling Sys Heat Exchangers PY-CEI-NRR-2207, Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours1997-09-0808 September 1997 Application for Amend to License NPF-58,revising TS 5.2.2.e, Organization-Unit Staff, by Removing Ref to NRC Policy Statement on Working Hours PY-CEI-NRR-2206, Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.901997-08-28028 August 1997 Application for Amend to License NPF-58,revising Pressure- Temp Limits,Per Reactor Vessel Matl Surveillance Program Requirements Contained in App H of 10CFR50.90 ML20217F5751997-07-28028 July 1997 Application for Amends to Licenses DPR-66,NPF-73 & NPF-58, Authorizing Holders to Possess Beaver Valley Power Station, Unit 1 & Authorizes Duquesne Light to Use & Operate Beaver Valley Unit 1 in Accordance W/Procedures PY-CEI-NRR-2164, Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Existing Exception to LCO 3.0.4 as Applies to LCO 3.6.1.9 for MSIV Leakage Control Sys PY-CEI-NRR-2165, Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria1997-05-0202 May 1997 Application for Amend to License NPF-58,revising Tech Specs Surveillance Requirement for MSIV Leakage Rate Acceptance Criteria PY-CEI-NRR-2155, Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks1997-04-0909 April 1997 Application for Amend to License NPF-58,revising TS Surveillance Requirements 3.9.1.1 & 3.9.2.2,extending SR Frequency on Refueling Equipment & one-rod-out Interlocks PY-CEI-NRR-2133, Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests1997-01-31031 January 1997 Application for Amend to License NPF-58,requesting Implementation of App J,Option B,Performance-based Primary Containment Leakage Rate Testing Program for Type A,B & C Leak Rate Tests ML20132C7601996-12-13013 December 1996 Application for Amend to License NPF-58,authorizing Transfers of Control PY-CEI-NRR-2104, Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.21996-10-24024 October 1996 Application for Amend to License NPF-58,modifying MCPR Reactor Core Safety Limit Contained in TS 2.1.1.2 ML20117E7821996-08-27027 August 1996 Application for Amend to License NPF-58,revising MSL Leakage Requirements & Eliminating MSIV Leakage Control Sys. Attachment 7 Provides Proprietary Dose Calculations. Attachment 7 Withheld PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process1996-04-26026 April 1996 Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process PY-CEI-NRR-2030, Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses1996-02-27027 February 1996 Application for Amend to License NPF-58 Re Drywell Personnel Air Lock Shield Door Analyses PY-CEI-NRR-2027, Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 61996-02-17017 February 1996 Application for Amend to License NPF-58,changing TS to Reflect Mod of Leakage Rate Requirements for Main Steam Lines Until End of Operating Cycle 6 PY-CEI-NRR-2007, Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing1996-01-16016 January 1996 Application for Amend to License NPF-58,revising TS Requirements for Drywell Leak Rate Testing PY-CEI-NRR-2013, Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 9601271996-01-10010 January 1996 Application for Amend to License NPF-58,requesting one-time Surveillance Interval Extension to Support Current Schedule for Refueling Outage 5,scheduled to Begin 960127 ML20095L2181995-12-28028 December 1995 Suppl Application for License Transfer of 12.58% Ownership Interest in Addition to 17.42% Approved on 951220 PY-CEI-NRR-2004, Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc1995-11-22022 November 1995 Application for Amend to License NPF-58,revising License to Reflect License Transfer for Part of Oh Edison Co Ownership Interest in Pnpp Unit 1 to Wholly Owned Subsidiary,Oes Nuclear,Inc PY-CEI-NRR-1978, Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating1995-11-0202 November 1995 Application for Amend to License NPF-58,requesting Rev to TS for Onsite Power Distribution Sys:Ts 3/4.8.3.1, Distribution - Operating PY-CEI-NRR-1995, Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations1995-11-0202 November 1995 Application for Amend to License NPF-58,revising TS Requirements for Handling Irradiated Fuel in Containment or Fuel Handling Bldg & Certain Specs Related to Performing Core Alterations PY-CEI-NRR-1997, Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies1995-11-0101 November 1995 Application for Amend to License NPF-58,providing Suppl Info That Revises License to Reflect Proposed Merger of Operating Companies PY-CEI-NRR-1969, Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L)1995-08-29029 August 1995 Application for Amend to License NPF-58,revising Tech Specs Allowable Values & Trip Setpoints for Selected Plant Process Instrumentation Using Instrument Setpoint Methodology Discussed in Util (PY-CEI/NRR-1706L) PY-CEI-NRR-1961, Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements1995-06-30030 June 1995 Application for Amends to Licenses NPF-58,reflecting One Time Extension of Performance Intervals for Certain TS Surveillance Requirements PY-CEI-NRR-1954, Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request1995-06-0909 June 1995 Application for Amend to License NPF-58.Amend Would Allow one-time Extension of Performance Intervals for Certain Srs. Application Supplements Original Request PY-CEI-NRR-1956, Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR1995-06-0101 June 1995 Application for Amend to License NPF-58,proposing Early Implementation of Control Rod Drive Scram Time Testing Consistent W/Requirements in Pnpp Improved TS LAR PY-CEI-NRR-1944, Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification1995-05-0505 May 1995 Suppl Application for Amend to License NPF-58,App a Tss. Suppl Addresses Minor Discrepancies & Items Needing Clarification PY-CEI-NRR-1932, Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements1995-05-0101 May 1995 Application for Amend to License NPF-58.Amend Would Incorporate Results of Work Performed by BWROG Re Elimination of Selected Response Time Testing Requirements PY-CEI-NRR-1934, Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS1995-04-28028 April 1995 Application for Amend to License NPF-58,proposing Extension for One Operating Cycle of Exception to LCO 3.0.4 as Applies to TS for MSIV LCS PY-CEI-NRR-1927, Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License1995-04-28028 April 1995 Application for Amend to License NPF-58 Re Removal of License Conditions for Tdi EDGs Specified by Paragraph 2.c & Defined in Attachment 2 to Operating License 1999-09-09
[Table view] |
Text
,
CENTER 00R ENERGY I Address:
Donald C. Shelton '
PERRY NUCLEAR POWER PLANT SENIOR VICE PRESIDENT 10 CENTER ROAD PERRY, OHIO 44081 NUCLEAR PERRY, OHIO 44081 (216) 259 37J7 November N1995 PY-CEl/NRR-2004L U.S. Nuclear Regulatory Commission Document Control Desk Washington,DC 20555 Perry Nuclear Power Plant Docket No. 50-440 License Amendment Request: Revise the Facility Operating License to Reflect the License Transfer for Part of Ohio Edison Company's Ownership Interest Gentlemen:
Attached is an application for an amendment to the Perry Nuclear Power Plant (PNPP) Unit Number 1 Operating License Number NPF-58. The proposed license amendment would change the operating license to reflect the license transfer for part of Ohio Edison Company's (Ohio Edison) ownership interest in PNPP Unit I to its wholly owned subsidiary, OES Nuclear Inc. (OES). 'Ihe proposed amendment would revise the license to include OES as a licensee and note and explain the subsidiary relationship between OES and Ohio Edison. Ohio Edison has requested the Nuclear Regulatory Commission's approval of the transfer under 10 CFR 50.80 in " Ohio Edison's Application For License Transfer In Connection With Sale And Related Transactions" filed November 17,1995.
Attachment I to this letter provides summary information regarding the proposed amendment.
Attachment 2 provides a copy of the marked up Operating License pages. Attachment 3 provides the Safety Assessment and Significant Ilazards Consideration.
If you have questions or require additional information, please contact Mr. J. D. Kloosterman, Manager - Regulatory Affairs, at (216) 280-5833.
Very truly y ,
fy -
b Tall:vh a kL l Attachments l cc: - NRC Project Manager NRC Senior Resident Inspector NRC Region III k i State of Ohio 0 03 l operonng compomes 280021 g\
cieseiaN Eiec'nc inumeromo ~
to eco Ea.sor 9511290299 951122 l PDR ADOCK 050 i L _ _ __ _ .00440.PDS, ,,, !
I, Donald C. Shelton, being duly sworn state that (1) I am Senior Vice President, Nuclear of the Centerior Service Company, (2).I am duly authorized to execute and file this certification on behalf of The Cleveland Electric Illuminating Company and Toledo Edison Company, and as the duly authorized agent for Duquesne Light Company, Ohio Edison Company, and Pennsylvania Power Company, and (3) the statements set forth herein are true and correct to the best of my knowledge, information and belief.
Donal( C. Shelton Sworn
/ W o and subscribed before me, the M day of At6f4d/4 - ,
~n_-
$ N./ L
(
JANE E. MOTT if0fu'PuhP,St:IOefChlo r
My Coan,n3. ,n ,u, eye:: g:t,y, gg, gy (Reced E.s is, Lg'te cc:;ng)
CODED /8838/SC
~
PY-CEl/NRR-2004L Page1of4
SUMMARY
INFORMATION REGARDING TiiE PROPOSED AMENDMENT 1
l 1
)
I l
1
l ,
2 - Attachment 1
~
,' PY-CEI/NRR-2004L Page 2 of 4 ,
l
SUMMARY
INFORMATION REGARDING THE PROPOSED AMENDMENT u
4 t
~
The following information is provided to support issuance of the requested changes to Perry Nuclear l Power Plant (PNPP), Unit Number 1, Facility Operating License Number NPF-58. l 1 !
l 1. INTRODUCTION l l The Cleveland Electric illuminating Company (CEI), Duquesne Light Company, Ohio Edison
- j. Company (Ohio Edison), Pennsylvania Power Company and the Toledo Edison Company
- (collectively the owners) and the Centerior Service Company (CSC) are holders of Facility l Operating License No. NPF-58 (the operating license) for PNPP. The operating license j authorizes the owners to possess PNPP and authorizes CEI and CSC to use and operate PNPP in accordance with the conditions, limitations, and procedures set forth in the operating license.
j i
! Pursuant to 10 C.F.R. Q 50.80, Ohio Edison has requested the Nuclear Regulatory Commission (NRC) to approve a license transfer for part of Ohio Edison's ownership interest in the Perry !
- plant to its wholly owned subsidiary, OES Nuclear Inc. (OES). Ohio Edison holds a 30% :
interest in PNPP Unit 1. It holds title to 17.42% of PNPP Unit I and leases another 12.58% of l
)
1 PNPP Unit 1 pursuant to the sale and leaseback transactions previously authorized by l j amendment 2 to the PNPP license. The proposed transactions which give rise to Ohio Edison' ,
I
! request for NRC approval concern Ohio Edison's 17.42% ownership interest in PNPP Unit 1.
!' The details of the transactions are described in " Ohio Edison's Application For License Transfer
! In Ponnection With Sale And Related Transactions" filed with the NRC on November 17,1995.
This license amendment request is made to add OES as a licensee to the PNPP operating license
- upon implementation of the above transfer. The amendment is solely administrative in nature j and invcives no significant environmental impacts or significant hazards consideration.
- 11. REOUESTED REGULATORY ACTION i
This application requests the NRC to amend the PNPP operating license upon the transfer !
' j becoming effective to add OES as a licensee to the PNPP operating license and to make any
- other conforming changes to the license deemed necessary to reflect the transfer. The requested j l changes to the beense are: j 1
l
- 1. Add "OES Nuclear, Inc." to the Title as a licensee of PNPP Unit 1.
i j i !
)
. Attachment 1 PY-CEI/NRR-2004L '
Page 3 of 4 i
- 2. Add "OES Nuclear, Inc." to Paragraph 1.A and footnote "*" of the license as a named licensee, along with adding the following footnote (") explaining the relationship between Ohio Edison and OES: :
"OES Nuclear, Inc. is a wholly owned subsidiary of Ohio Edison Company. OES Nuclear,Inc. owns a portion of the 30% interest in
- Perry Nuclear Power Plant Unit No. I attributable to Ohio Edison Company. Ohio Edison Company remains fully responsible for all costs and expenses, including decommissioning expenses, relating to the portion of the Perry Nuclear Power Plant Unit No.1 owned by OES Nuclear, Inc. for the duration of the license through completion of plant decommissioning. OES Nuclear, Inc. was added as a licensee by l Amendment No. _. to this license."
- 3. Add "OES Nuclear, Inc." to paragraphs 2,2.A. 2.B.(2), and 2.C.(3).
- 4. Add "OES Nuclear, Inc." to the Title of Appendix C.
- 5. Change "five" to "six" in Appendix C, Paragraph A, definition of" Applicants". ;
I l
A markup of the curre r aperating license for PNPP Unit I showing the requested amendment changes is included at Attachment 2.
111. NATURE OF THE AMENDMENT 1
The requested amendment consists of merely administrative changes to have the license redect l the transfer of part of Ohio Edison's interest in PNPP Unit I to OES. In Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1). CLI-92-4,35 NRC. 69,77 (1992), the Commission noted that after a license transfer is finalized, there remains a need for administrative purposes to have the license changed to reflect the name of the new licensee.
Such is the purpose of the amendment here.
IV. ANALYSIS OF NO SIGNIFICANT HAZARDS CONSIDERATION The proposed amendment involves no significant hazards consideration. In Long Island Lighting Co., the Commission noted that a license amendment reflecting an effective license transfer " presents no safety questions and clearly involves no significant hazards considerations."
35 NRC. at 77, n.6.
1 1
i
- Attachment 1
^
PY-CEI/NRR-2004L Page 4 of 4 4
The proposed amendment involves no change to PNPP, the manner in which PNPP is operated, or the personnel who operate PNPP. Further, the amendment involves no physical change to the facility itself nor any change to the plant technical specifications or plant programs, plans or procedures. Therefore, the proposed amendment involves no increase in the probability or consequences of an accident previously evaluated, does not create the possibility of a new or different kind of accident from any accident previously evaluated, or involve any reduction in a margin of safety. Accordingly, under the tests set forth in 10 C.F.R. Q 50.92(c) the proposed amendment involves no significant hazards consideration.
The determination that the proposed amendment does not involve a significant hazards consideration is described in more detail in Attachment 3.
V. ENVIRONMENTAL ASSESSMENT The proposed amendment to the PNPP license is purely administrative in nature with no environmental impacts. Accordingly, the amendment satisfies the criteria for " categorical exclusion" set forth in 10 C.F.R. 51.22(c)(10) and, pursuant to 10 C.F.R. 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with issuing the proposed amendment.
VI. EFFECTIVE DATE The purpose of the license amendment is to have the PNPP Unit I license reflect, upon finalization, the license transfer requested by " Ohio Edison's Application For License Transfer In Connection With Sale And Related Transactions" filed with the NRC on November 17,1995.
As stated in that application, upon approval by the NRC, the proposed sale by Ohio Edison to OES is to occur on or before December 31,1995. Accordingly, it is requested that the NRC issue this amendment on December 31,1995 or as soon thereafter as is practicable.
. Attachment 2 PY-CEI/NRR-2004L Page 1 of 7 MARKED-UP PAGES OF THE LICENSE SHOWING TIIE REQUESTED AMENDMENT CHANGES
Attachment 2 l PY-CEI/NRR-2004L l Page 2 of 7 g a asco, UNITED STATES y[h T t. ( ' gp, - NUCLEAR REGULATORY COMMISSION l F' h c 8 WASMNGTON, D. C. 20555 5*1 i
- CLEVELAND ELECTRIC ILLUMINATING COMPANY CENTERIOR SERVICE COMPANY l 1 DUQUESNE LIGHT COMPANY OHIO EDISON COMPANY g IQ(_, )
ES U.
PENNSYLVANIA POWER COMPANY l
TOLEDO EDIS0N COMPANY DOCKET N0. 50-440 PERRY NUCLEAR POWER PLANT, UNIT NO.1 FACILITY OPERATING LICENSE License No. NPF-58
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for license filed by the Cleveland Electric l Illuminating Company * (CEICO) and Centerior Service Company acting l
.o n their own behalf;tpd as agents for the Duquesne Light Company, M gggyg r' Ohio Edison Company, Pennsylvania Power Company and the Toledo Edison
. Company (licensees) complies with the standards and requirements of i the Atomic Energy Act of 1954, as amended (the Act), and the Comis- !
sion's regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Perry Nuclear Power Plant, Unit No. 1 (the facility) has been substantially completed in conformity with Construction Permit No. CPPR-148 and the application, as amended, the provisions of the Act, and the regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Com-mission, (except as exempted from compliance in Section 2.0 below);
D. There is reasonable assurance: (1) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR
, Chapter I (except as exempted from compliance in Section 2g@wb
- Cleveland Electric Illuminating Company and Centerior Service Company (both of D
which are wholly-owned subsidiaries of Centerior Energy Corporation) are authorized to act as agents for Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company and the Toledo Edison Company, and have exclusive responsibility and control over the physical construction, operation and ,
- maintenance of the facility. Centerior Service Company was added as a licensee by Amendment No. 36.
- N $ee nob O^ P"Y 4*
Amendment No. 36
. Attachment 2 ,
PY-CEl/NRR-2004L-Page 3 of 7 I
. Ia -
NOTE: (Paragraph 1.A footnote)
OES Nuclear, Inc. is a wholly owned subsidiary of Ohio Edison
. Company. OES Nuclear, Inc. owns a portion of the 30% interest in :
Perry Nuclear Power Plant Unit No. I attributable to Ohio Edison Company. Ohio Edison Company remains fully responsible for all costs and expenses, including decommissioning expenses, relating to the ,
portion of the Perry Nuclear Power Plant Unit No.1 owned by OES Nuclear, Inc. for the duration of the license through completion of plant decommissioning. OES Nuclear, Inc. was added as a licensee by
- Amendment No. _. to this license.
i l
4 I
1 Y
e h
4
, y ., , --
4 .
, Attachment 2 PY-CEI/NRR-2004L Page 4 of 7 i
E. The Cleveland Electric Illuminating Company is technically qualified to engage in the activities authorized by this license in accordance with the Commission's regulations set forth in 10 CFR Chapter I;
- F. The' licensees have satisfied the applicable provisions of 10 CFR Part 140 " Financial Protection Requirements and Indemnity Agreements,"
of the Commission's regulations; G.
The issuance of this license will not be inimical to the common defense and security or to the health and safety of the public; H. Af ter weighing the environmental, economic, technical and other bene- i fits of the facility against environmental and other costs and con-sidering available alternatives, the issuance of this Facility Oper-ating License No. NPF-58, subject to the conditions for protection of '
the environment set forth in the Environmental Protection Plan attached
- as Appendix B, is in accordance with 10 CFR Part 51 of the Commission's
, regulations and all applicable requirements have been satisfied; and
- I. The receipt, possession, and use of source, byproduct and special a
' nuclear material as authorized by this license will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40 and ~70.
- 2. Based on the foregoing findings regarding this facility, the Partial-Initial Decisions issued December 2, 1983 and September 3, 1985 by the Atomic i
Safety and Licensing Board in regard to this facility (affirmed by ALAB-841 dated July 25,1986) and pursuant to approval by the Nuclear Regula- M tory Connission at a meeting on November 7,1986, Facility Operating E*
License No. NPF-58, which supersedes the license for fuel loading and low T4 power testing, License No. NPF-45, issued on March 18, 1986, is hereby 9 issued to the Cleveland Electric Illuminating Company, Anterior _ Service Company, Duquesne Light Company, Ohio Edison Company,fPennsylvania Power Company and Toledo Edison Company (the licensees) to read as follows:
A. The license applies to the Perry Nuclear Power Plant, Unit No.1, a boiling water nuclear reactor and associated equipment (the facility),
i
~
owned by the Cleveland Electric Illuminating Company, Duquesne Light Company Ohio Edison Company,gPennsylvania Power Company and the JJoledoEdisoncompany. Ine facility is located on the shore of Lake CD N(b"[Mrie in Lake County, Ohio, approximately 35 miles northeast of C land, Ohio and is described in the licensees' Final Safety Analysis i Report, as supplemented and amended, and in the licensees' Environ- 1 mental Report, as supplemented and amended.
l B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:
(1) The Cleveland Electric Illuminating Company (CEICO)* pursuant I to Section 103 of the Act and 10 CFR Part 50, to possess, use and operate the facility at the designated location in Lake County, Ohio, in accordance with the procedures and limitations set forth in this license;
- The CEICO nuclear organization reports to Centerior Service Company.
l Amendment No. 36
- Attachment 2 PY-CEI/NRR-2004L
~
Page 5 of 7 i % jdu b"^t
, (2) Duquesne Light Company, Ohio Edison Company, Pennsylvania Power Company and Toledo Edison Conpany, to pcssess the facility at the designated location in Lake County, Ohio, in accordance with the procedures and limitations set forth in this license;
^
(3) CEICO, pursuant to the Act and 10 CFR Part 70, to receive, pnssess and i use at any time special nuclear material as reactor fuel, in accordance with the limitations for storace and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended;
_( 4) CEICO, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material such as sealed neutron sources for reactor startup, sealed l
sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) CEICO, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, i' possess and use in amounts as required any byproduct, source or special nuclear material without restriction as to chemical or physical form, for j sample analysis or instrument calibration or associated with radioactive apparatus or components; and
- (6) CEICO, pursuant to the i.,:t and 10 CFR Parts 30, 40 and 70, to possess, MI l but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. j (7)(a) Ohio Edison Company is authorized to transfer any portion of f its 30.07. ownership share in PNPP Unit I and a proportionate ;
share of its interest in the PNPP common facilities to certain equity investors identified in its submission of January 23, 1987, ;
i as supplemented on March 3, 1987, and at the same time to lease back from such purchasers such interest sold in the PNPP Unit I facility. The tenn of the lease is for approximately 29-1/2 1 years subject to a right of renewal. Such sale and leaseback transactions are subject to the representations and conditions (Continued on Page 3a)
C. This license shall he deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I i and is subject to all applicable provisions of the Act and to the rules, I regulations, and orders of the Connission now or hereafter in effect; and )
' is subject to the additional conditions specified or incorporated below: (
(1) Maximum Power level CEICO is authorized to operate the facility at reactor core power ;
levels not in excess of 3579 megawatts thermal (100% power) in accordance with the conditions specified herein.
4 1 Amendment No. 2
-. - - - . - . . _ _ = - _
r
. Attachment 2 PY-CEI/NRR-2004L Page 6 of 7 l
i 3
1 (2) Technical Specifications The Technical Specifications contained in Appendix A and the Environ-
' mental Protection Plan contained in Appendix B, as revised through Amendment No. 36 are hereby incorporated into this license. Cleveland ,
Electric Illuminating Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Antitrust Conditions
- a. Cleveland Electric Illuminating Company, Duquesne Light Company, I
' N Ohio Edison Company,4P ennsylvania Power Company and the Toledo d son Company shall comply with the antitrust conditions
' g 46 g) delineated in Appendix C to this license; Appendix C is hereby i ,
incorporated into this license.
- b. Centerior Service Company (CSC) shall comply with the antitrust conditions delineated in Appendix C to this license as if named therein. CEICO is responsible and accountable for the actions of CSC to the extent that CSC's actions contravene the antitrust license conditions in Appendix C to this license.
(4) Post-Fuel Loading Initial Test Program (Section 14, SSER #3)*
Any changes to the Initial Test Program described in Section 14 of the FSAR made in accordance with the provisions of 10 CFR 50.59
> shall be reported in accordance with 50.59(b) within one month M I
of such change.
4 (5) Inservice Inspection Program (Section 6.6.3, SSER #7)
Within six (6) months after exceeding 5% of rated thermal power, CEICO shall submit the Initial Inservice Inspection Program required by 10 CFR 50.55(a) for the NRC staff's review
' and approval.
(6) Fire Protection (Section 9.5, SER, SSER #1, 2, 3, 4, 7 and 8)
CEICO shall comply with the following requirements of the fire protection program: CEICO shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report as amended, for the Perry Nuclear Power Plant and as approved in the Safety Evaluation Report (NUREG-0887) dated May 1982 and Supplement Nos.1 thru 10 thereto, subject to the following provisions:
- a. CEICO may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
~ '
- The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report (SER) and/or its supplements wherein the license condition is discussed.
Amendment No. 36 4
..- ,-~ _ . - _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _
. Attrchment 2 PY-CEI/NRR-2004L' Page 7 of 7 November 13, 1986 i
- APPENDIX C PERRY NUCLEAR POWER PLANT, UNIT NO. 1 NPF-58 ANTITRUST CONDITIONS f.0R i CLEVELAND ELECTRIC ILLUMINATING COMPANY DUQUESNE LIGHT COMPANY
~
OHIO EDISON COMPANY 065 NaCLEb PENNSYLVANIA POWER COMPANY TOLEDO EDISON COMPANY 4
A. The licensees are subject to the following antitrust conditions:
Definitions Applicants shall mean the companies listed above, m, S4 Entity shall mean any electri eneration and/or distribution system or municipality or cooperative with a statutory right or privilege to engage in either of these functions.
Wheeling shall mean transportation of electricity by a utility over its
' lines for another utility, including the receipt from and delivery to another system of like amounts but not necessarily the same energy.
Federal Power Commission, The 1970 National Power Survey, Part 1,
- p. I-24-8.
Licensing Conditions l 1
(1) Applicants shall not condition the sale or exchange of wholesale power or coordination services upon the condition that any other entity: j (a) enter into any agreement or understanding restricting the use of or alienation of such energy or services to any customers or territories; (b) enter into any agreement or understanding requiring the receiving entity to give up any other power supply alternatives or to deny 1 itself any market opportunities; (c) withdraw any petition to intervene or forego participation in any proceeding before the Nuclear Regulatory Comission or refrain from instigating or prosecuting any antitrust action in any other forum.
- Attachment 3 PY-CEI/NRR-2004L Page 1 of 3 SAFETY ASSESSMENT AND SIGNIFICANT HAZARDS CONSIDERATION l
l t
e t
u A
i I
4
. Attachment 3 PY-CEI/NRR-2004L e
Page 2 of 3 SAFETY ASSESSMENT AND SIGNIFICANT IIAZARDS CONSIDERATION T.itic Proposed Revision Of Facility Operating License Number NPF-58 For The Perry Nuclear Power Plant, Unit 1 To Reflect Transfer Of License For A Portion Of Ohio Edison Company's Ownership Interest In Unit 1 To Its Wholly Owned Subsidiary, OES Nuclear Inc.
Descriotion of Proposed License Amendment Ohio Edison Company (Ohio Edison) has requested the Nuclear Regulatory Commission (NRC), in
" Ohio Edison's Application For License Transfer In Connection With Sale And Related Transactions" filed with the NRC on November 17,1995, to approve the license transfer for a portion of Ohio Edison's
- ownership interest in the Perry Nuclear Power Plant (PNPP) Unit I to its wholly owned subsidiary, OES Nuclear Inc. (OES). The reason for the transfer is for Ohio Edison to reduce its fixed operating costs in anticipation of a more competitive marketplace for electricity.
The purpose of the proposed license amendment is to change the operating license to reflect the above transfer. The proposed amendment would revise the license to include OES as a licensee and note and explain the subsidiary relationship between OES and Ohio Edison.
Effects On Safety The proposed license amendment reflecting the transfer is wholly administrative in nature. It will not impact the operation of PNPP by Cleveland Electric illuminating Company (CEI) and Centerior Service Company (CSC). The proposed amendment involves no physical changes to the facility. Further, the -
proposed amendment will not affect PNPP's Technical Specifications, license conditions, or the organization, personnel and practices of CEI and CSC. CEI and CSC will continue to be responsible for the operation and maintenance of PNPP and the CEI and CSC management organization and technical
- personnel so responsible will not be affected by the proposed license amendment. The proposed ,
amendment will also have no affect on the PNPP quality assurance program, security program, training !
program or emergency planning.
Because the proposed changes are administrative, it is concluded that they would have no adverse effect f.
on safety.
P G
2 d
,-= v m -e. - ,- n - - ~ , , w w e- - , - r
.. Attachment 3
! PY-CEI/NRR 2004L 1
^ I Page 3 of 3 l
l Significant Ha7ards Consideration The standards used to arrive at a determination that a request for amendment involves no significant hazards considerations are included in the Commission's Regulations at 10 C.F.R. Q 50.92. These .
standards are whether the operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously l
evaluated, (2) create the possibility of a new or different kind of accident from any previously evaluated,
. or (3) involve a significant reduction in a margin of safety.
t
- 1. ' The proposed changes do not involve a significant increase in the probability or consequences of ,
an accident previously evaluated.
1 4 The proposed changes to the PNPP Operating License are administrative and have no effect on the PNPP facility, programs, personnel or any plant systems. All Limiting Conditions for j Operation, Limiting Safety Systems Settings, and Safety Limits specified in the Technical l
Specifications will remain unchanged. This change meets one of the examples of a change not ,
L likely to involve a significant hazards consideration in that it is a purely administrative change.
48 Fed. Reg. 14,864 (1983).
! 2. The proposed changes do not create the possibility of a new or different kind of accident from
. any accident previously evaluated.
4 l The proposed changes to the PNPP Operating License are administrative and have no effect on !
the PNPP facility, programs, personnel or any plant systems. PNPP's design and design bases will remain unchanged as will All Limiting Conditions for Operation, Limiting Safety Systems Settings, and Safety Limits specified in the Technical Specifications. This change meets one of ;
J the examples of a change not likely to involve a significant hazards consideration in that it is a l purely administrative change. 48 Fed. Reg. 14,864 (1983).
- 3. The proposed changes do not involve a significant reduction in the margin of safety.
l
- The proposed changes to the PNPP Operating License are administrative and have no effect on -
the PNPP facility, programs, personnel or any plant systems. All Limiting Conditions for Operation, Limiting Safety Systems Settings, and Safety L.imits specified in the Technical Specifications will remain unchanged. This change meets one of the examples of a change not ;
l l likely to involve a significant hazards consideration in that it is a purely an administrative ,
change.' 48 Fed. Reg. 14,864 (1983). j l l 3