{{#Wiki_filter:.-,-------------.-;--- - a Q g -c g ~ ( t RECORD OF TELEPHONE CONVERSATION it g*. 'g g k M l PROJECT: t e ., h DATE:

d. Q RECORDED BY:

M CLIENT: TALKED WITH: k. Enc & W OF C.O b ROITIE TO: INFORMATION ACTION L.Bd\\ev- ' ~1

3. Nocck

,wd W. E, f.f MAIN SUBJECT OF CALL: )\\scrvcru ed cit nea( bb .,1 p3 . f y _. ITEMS DISCUSSED: bvb4 l( insoet ino cylnor hen / ne i e v ') [ cn Evic.icson dtscoverb a Lele in ne. vlant 4))3elow Sna! I t OfCl R. Oh a.o cchio n Gooyox.12 [eeY toesh

e. NW cn(ner k e M. Y e_ n aIe cet3V2. in El armeter ad

=. en.sereo i ' 2. 2 in C Ch an was kcuch'd e b /ec'I-{ b~ ...' b?w ovey o a 4 SeTViCR. WG ( i nR., p: ~ C.PCo ousonnei wrLb Encnen AE m<& encdi. ~ $ n t CGU$e. d

4. C9ev1 o e W2,(t o ime.hQGk On (ego (

Ncr. h - 9m a im.1sconthe ah O Co be. G W ed bo d eu W G(4. (4Cinq ~~b repe/h-u a v v s Xen Mob OnC. e. c. bit (b S 4 o(d 15 con 630W O t IhC LCGhe b We,WC0 b U ). uC%D h e5 hCCESSay0) Mn. i XG o Onde/hdnd 'k Coust t 4 C. on 3UGob E WC owd te resoih a LWMD e.L.. h <& 4, sidue.Jo<~ll N 3 e ih} . bdM.. Dr. p. s Con g 62.z.le t b UEvh c4IW.\\wdicohd Qco sQ.j Q wa 'i' bac4)W.r asp 4 6% 4.re.yk.b g y,Q,3 wng,s uavaled Nums wet y ,, 3gg.,, g,,, g top

  • 4 wwhoo and,,,cg..d med b exca A. Q.0,ej

,j 7,

  • )

0408140373 840718 ~~ ~ - - ~ - - - - - PDR FOIA =: 8 " l' RICE 84-96 PDR "u,:

g* *'8&q$' [ UNITED STATES g NUCLEAD HEEULATORY COMMISSION y 'g j CECION lll \\ g t g\\,,).,

  1. r s

799 coosevect n:Ao Q, -({,m[,g [ on.EN ELLYN, ILLINols 60137 February 2, 1982 !!EHORANDUM FOR: C. C. Williams, Chief, Plant Systems Section FROM: Charles E. Morelius, Director, Division of Engineering and Technical Inspection ~

SUBJECT:

INSPECTION PLANS FOR UNDERPINNING ACTIVITIES FOR SOILS WORK AT THE MIDLAND SITE This is to confirm our discussions that *we plan to dedicate Ross Landsman as the Region III inspector responsible for conducting the inspection of underpinning activities at the Midland site. In connection with this assignment, I request that you do the following-1. Prepare a special inspection plan outlining thu types of inspections and frequency of inspections to be performed at the-Midland site. This plan should be developed in conjunction- - with NRR to assure that it covers the. unique technical issues they foresee in this project, and should be tied to the planned work schedule which has been received from Midland. This plan should include the types of specialized inspections we anticipate which may require other types of technical specialists. 2. .Even at such times as specialists are involved, I would ikke for' Ross to participate in such inspections to assure continuity-throughout this entire project. 3. As part of the cchedule you propose, I would like an estimate of the time you think that w.411 be required to carry out this inspection effort. $lA $. Charles E. Norelius, Director Division of Engineering and Technical Inspection cc: E. Jordan, IE G. Gallagher, IE J. Gilray, NRR J. Knight, NRR f R. Tedesco, NRR R. Spessard, RIII B. Davis, RIII W. Little, RIII o i /m /, D S'9 S u m'- ~

p

b. a&-

,e- .kets\\ze OISTRIBUTION: Docket Nos. 50-329/330 LB #4 r/f JKane pG g \\ DEisenhut JRinaldi EAdensam RLandsman DHood GLear Docket Hos: 50-329 OM, OL MDuncan LHeller and 50-330 Ott, OL SHanauer ACappucci RTedesco WPaton APPLICANT: Consumers Power Company RVollmer JKnight TMurley JKeppler FACILITY: Midland Plant, Units 1 & 2 RMattson RHartfield, MPA bec: TERA

SUBJECT:

TELECON

SUMMARY

OF JULY 23, 1981 OELD NRC/PDR OIE (3) Lccal PDR TIC NSIC On July 23, 1981 Messrs. G. Kelley, T. Sullivan and 'O. Budzik of Consumers Power Conpany (CPC) called D. Hood to ask or state several points. Replies were made by return call this same day. ~ (1) The information regarding surcharging of the BWST valve pits and associated crack monitoring requested July 15, 1981 by D. Boyd and J. Kane is being forwarded by cover letter dated July 21, 1981. Express copies to NRR and IE-RIII will be delivered today and are being mailed to the U.S. Army Corps of Engineers, Detroit District. ~ This matter is impacting construction and expedited review is requested by CPC. A. If the Corps receives its copy by July 27, 1981, Mr. J. Kane and others will provide staff coninents on July 23 letter by telecon on July 30, 1981. - (2) The borings and sar:pling for' the reviseo location of the eight interceptor dewatering wells for the Service Water Structure have been completed. What information does the staff need for its review? A. CPC should. provide a letter stating the results and its. coaclusions as to whether the material encountered is adequately protected by the filter pack on the basis of the visual and lab test classification results. Summary of the lab results should be enclosed with the letter. (3) CPC stated that the same technical specification QC instructions and CPC overinspection plan used for the twelve interceptor wells previously approved by 14RC will also be used for the balance of the plant area dewatering wells. Other than documentation of this statement, what information does NRC need for approaval of well installations of these remaining area dewatering wells? A. tir. Kane questioned the applicant's need for an additional partial approval (well installation) as compared to over- ) all resolution of the permanent dewatering system design. CPC will reply in a forthcoming letter. In order to "'"'h.................. ..n>' - =ceu re oc semeu os.o OFFICIAL RECORD COP'i._G 'v 'o' M o 5 *3ff n"a N '5-J i u v y__

I o' ' AUG 16 respond, Mr. Kane indicated that past staff coments on the pemanent dewatering system review should be checked, particularly 50.C4(f) Request 47 and from the draft Corps letter of April 16, 1981 provided CPC during the oral deposition of J. Kane..The NRC would also need reasonable assurance that the gradations of foundation materials within the depth interval where the remaining well screens are to be placed are adequately protected by the filter pack. A more complete NRC reply will be provided about August 21, 1981. (4) When will the draft 4/16/81 letter request of the Corps (which is being revised based upon the nieeting of May 5-7, 1981) be issued? A. At the moment, Mr. Kane's higher project priorities include hearing support, seismic spectra reviews, BWST surcharge, dewatering installation, and dike and CGB boring / sampling resul ts. Issuance of the revised letter requests are not expected until af ter mid-September. (5) CPC's report on crack analysis requested by the Naval Surface Weapons Center and due July 20, 1981 will be delayed until August 10, 1981. (6) The staff requested that a visit by its Caseload Forecast Panel to asshss overall completion schedules be scheduled about August 25-27, 1981. Discussions should be held at a location readily accessible to the public. (7) Discussions also included the general status of the overall OL review. Darl Hood, Project Manager Licensintj Brant.n No. 4 Division of Licensing cc: See next page t

  • NOTE: SEE PREVIOUS WHITE FOR CONCURRENCE

= > " > 9k ;.L,B,,,(4,,,,,, Md LB,(,4,,,,,, Dh ;1 B,,(,4,,,,,,,N,RR ;,0E,;HG,E,B, ~ m w w...A m..........tx m as a..... x =.......... ""> gagB.E.T.u.n./n........... u. m n........ v. m n........................... .u:g iT6ht'e~obeu uo _ OFFICIAL RECORD COPY "*2"*-q"y

- -. _ ~. - -:r--

3. Gw4 i

p g .%cW\\za, ' DISTRIBUTION: Docket Nos. 50-329/330 LB #4 r/f JKane DEisenhut JRinaldi $G g EAdensam RLandsman DHood Glear Docket Hos: 50-329 OM, OL MDuncan LHeller -and 50-330 OH, OL SHanauer ACappucci RTedesco WPaton APPLICANT: Consumers Power Cog any RVollmer JKnight TMurley JKeppler FACILITY: Midland Plant, Units 1 & 2 RMattson RHartfield, MPA bec: TERA

SUBJECT:

TELECON SUMftARY OF JULY 23, 1981 OELD NRC/PDR OIE (3) Local PDR TIC NSIC On July 23, 1981 Messrs. G. Kelley, T. Sullivan and 'D. Budzik of Consumers Power Conpany (CPC) called D. Hood to ask or state several points. Replies were made by return call this same day. ~ (1) The i') formation regarding surcharging of the BWST valve pits and associated crack monitoring requested July 15, 1981 by D. Boyd and J. Kane is being forwarded by cover letter dated July 21, 1981. Express copies to NRR and IE-RIII will be delivered today and are being mailed to the U.S. Army Corps of Engineers, Detroit District. This matter is impacting construction and expedited review is requested by CPC. A. If the Corps receives its copy by July 27, 1981, Mr. J. Kane and others will provide staff coments on July 23 letter by telecon on July 30, 1961. (2) The borings and sar.pling for' the reviseo location of thie eight interceptor dewatering wells for the Service Water Structure have been completed. What information does the staff need for its review? A. CPC should. provide a letter stating the results and its. conclusions as to whether the material encountered is adequately protected by the filter pack on the basis of the visual and lab test classification results. Summary of the lab results should be enclosed with the letter. (3) CPC stated that the same technical specification QC instructions and CPC overinspection plan used for the twelve interceptor wells previously approved by hRC will also be used for the balance of the plant area dewatering wells. Other than documentation of this statement, what information does NRC need for approaval of well installations of these remaining area dewatering wells.? A. tir. Kane questioned the applicant's need for an additional partial approval (well installation) as compared to over-all resolution of the permanent dewatering system design. CPC will reply in a forthcoming letter. In order to ......................................... j .........*..*.......I aft) w eocu m oceeieeue:4c OFFICIAL RECORD COPY

    • "*-'3"3

--}}