Letter Sequence Other |
|---|
|
Results
Other: 05000366/LER-1984-001, :on 840203,personnel Detected Fracture in 66- Inch Vent Header in Bay 5.Caused by Brittle Facture of Vent Header Matl.Vent Header Will Be Repaired & Addl Changes or Sys Mod Will Be Made to Improve Sys, BECO-84-150, Responds to IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers. Util Endorses GE Svc Info Ltr 402 Recommendations.Equipment Damage Has Not Occurred & Inerting Sys Operation Suitable, FVY-84-110, Forwards Response to NRC Request Re Actions Taken in Response to GE Significant Info Ltr 420 Concerning Hatch-2 Vent Header Crack, GO2-84-512, Discuss GE Recommendations Re Hatch Unit 2 Event Concerning Large Crack in Torus Vent Header Due to Brittle Fracture,Per GE 840214 Info Ltr 402.Only Recommendations 1 & 2 Apply,As Sys Not Yet Used to Inert Containment, ML18029A151, ML20080R767, ML20083L655, ML20083R739, ML20084L425, ML20084L444, ML20084R170, ML20091B787, ML20097E003, ML20097H269, ML20098A026, ML20098F071, ML20098F159, ML20098G674, ML20098G682, ML20198P818, NLS8400242, Submits List of Actions Taken on Recommendations from GE 840214 Svc Info Ltr 402, Wetwell/Drywell Inerting. Evaluation of Inerting Sys Design Determined That Failure of Cold Temp Shutdown Switch Cause of Problem, SNRC-1082, Submits Status of Evaluation Re IE Info Notice 84-17, Problems W/Liquid Nitrogen Cooling Components Below Nil Ductility Temp & GE Svc Info Ltr SIL-402, Wetwell/Drywell Inerting
|
MONTHYEARML20080R7671984-02-10010 February 1984 Responds to IE Bulletin 84-01 Re Insp for Cracks in Mark I Containment Torus Vent Header.No Apparent Cracking or Relevant Indications Found on Unit 1.No Addl Cracking Found Beyond Original Cracking on Unit 2 Project stage: Other ML20080N5661984-02-10010 February 1984 Forwards Drywell Coating Evaluation, Technical Data Rept, Per SEP Topic VI-1, Organic Matls & Post-Accident Chemistry Project stage: Request ML20198P8181984-02-14014 February 1984 Svc Instruction Ltr 402, Wetwell/Drywell Inerting. Related Info Encl Project stage: Other 05000366/LER-1984-001, :on 840203,personnel Detected Fracture in 66- Inch Vent Header in Bay 5.Caused by Brittle Facture of Vent Header Matl.Vent Header Will Be Repaired & Addl Changes or Sys Mod Will Be Made to Improve Sys1984-03-0404 March 1984
- on 840203,personnel Detected Fracture in 66- Inch Vent Header in Bay 5.Caused by Brittle Facture of Vent Header Matl.Vent Header Will Be Repaired & Addl Changes or Sys Mod Will Be Made to Improve Sys
Project stage: Other ML20087H1481984-03-13013 March 1984 Forwards GE Repts on Metallographic Exam of Metal Samples Taken from Cracked Vent Header,Per NRC 840206 Meeting W/ Util,Bwr Regulatory Response Group & Ge.Vent Header Cracking Brittle Fracture Caused by Injection of Cold Nitrogen Project stage: Meeting ML20083L6551984-03-30030 March 1984 Submits Info on IE Bulletin 84-01, Entitled Cracks in BWR Mark I Containment Vent Headers. Primary Containment Drywell to Torus Bypass Tests Performed.Status of GE SIL 402 Recommended Actions Listed Project stage: Other ML20084L4441984-03-31031 March 1984 Analysis of Vent Header Cracking at Hatch 2 Project stage: Other ML20084R1701984-04-0505 April 1984 Comments on Status of Recommendations of GE Svc Info Ltr 402 Re Wetwell/Drywell Inerting.Evaluation of Nitrogen Inerting Sys Design Performed & Redundant Low Temp Shutoff Valve Added Project stage: Other ML20083R7391984-04-18018 April 1984 Forwards Response to GE SIL 402 Generated Due to Large Crack in Torus Vent Header at Another Operating Plant Attributed to Brittle Fracture Identified During Insp of Cold Nitrogen Into Torus During Inerting Project stage: Other ML20084L4251984-05-0707 May 1984 Forwards Analysis of Vent Header Cracking at Hatch 2. Analysis Shows That Observed Cracking Can Be Explained by Injection of Cold Nitrogen Into Containment & Any Cracking Expected to Be through-wall,detectable by Visual Insp Project stage: Other ML20091B7871984-05-23023 May 1984 Provides Status of GE Svc Info Ltr 402 Re Vent Header Cracking Incident.Recommended Ultrasonic Testing Not Planned Due to Lack of Baseline Test Data.Cracking from Injection of Cold Nitrogen Detectable by Surface Exam Project stage: Other NLS8400242, Submits List of Actions Taken on Recommendations from GE 840214 Svc Info Ltr 402, Wetwell/Drywell Inerting. Evaluation of Inerting Sys Design Determined That Failure of Cold Temp Shutdown Switch Cause of Problem1984-09-12012 September 1984 Submits List of Actions Taken on Recommendations from GE 840214 Svc Info Ltr 402, Wetwell/Drywell Inerting. Evaluation of Inerting Sys Design Determined That Failure of Cold Temp Shutdown Switch Cause of Problem Project stage: Other FVY-84-110, Forwards Response to NRC Request Re Actions Taken in Response to GE Significant Info Ltr 420 Concerning Hatch-2 Vent Header Crack1984-09-14014 September 1984 Forwards Response to NRC Request Re Actions Taken in Response to GE Significant Info Ltr 420 Concerning Hatch-2 Vent Header Crack Project stage: Other ML20097E0031984-09-14014 September 1984 Forwards Response to IE Bulletin 84-01 Re Potential for Cracking in BWR Vent Headers Using Nitrogen Inerting Sys. Nitrogen Inerting Sys Not Used at Facility.Recommendations Identified in GE Svc Info Ltr 402 Addressed Project stage: Other GO2-84-512, Discuss GE Recommendations Re Hatch Unit 2 Event Concerning Large Crack in Torus Vent Header Due to Brittle Fracture,Per GE 840214 Info Ltr 402.Only Recommendations 1 & 2 Apply,As Sys Not Yet Used to Inert Containment1984-09-14014 September 1984 Discuss GE Recommendations Re Hatch Unit 2 Event Concerning Large Crack in Torus Vent Header Due to Brittle Fracture,Per GE 840214 Info Ltr 402.Only Recommendations 1 & 2 Apply,As Sys Not Yet Used to Inert Containment Project stage: Other BECO-84-150, Responds to IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers. Util Endorses GE Svc Info Ltr 402 Recommendations.Equipment Damage Has Not Occurred & Inerting Sys Operation Suitable1984-09-14014 September 1984 Responds to IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers. Util Endorses GE Svc Info Ltr 402 Recommendations.Equipment Damage Has Not Occurred & Inerting Sys Operation Suitable Project stage: Other ML20098G5571984-09-14014 September 1984 Submits Supplemental Info in Response to IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers. Program Initiated to Address Concerns of GE SIL 402 & Implementation Schedule Project stage: Supplement ML20098A0261984-09-17017 September 1984 Forwards Responses to Recommendations Contained in IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers & GE Svc Info Ltr 402, Wetwell/Drywell Inerting. No Anomalies Indicated in Drywell/Wetwell Pressures Project stage: Other ML20097H2691984-09-17017 September 1984 Forwards Response to GE Significant Info Ltr 402 & IE Info Notice 84-17 Re Nitrogen Inerting Sys Project stage: Other SNRC-1082, Submits Status of Evaluation Re IE Info Notice 84-17, Problems W/Liquid Nitrogen Cooling Components Below Nil Ductility Temp & GE Svc Info Ltr SIL-402, Wetwell/Drywell Inerting1984-09-18018 September 1984 Submits Status of Evaluation Re IE Info Notice 84-17, Problems W/Liquid Nitrogen Cooling Components Below Nil Ductility Temp & GE Svc Info Ltr SIL-402, Wetwell/Drywell Inerting Project stage: Other ML20098F1591984-09-26026 September 1984 Submits Mods Identified for Completion Prior to Liquid Nitrogen Inerting of Containment.Low Temp Switch Will Be Replaced & Relocated to Improve Response Time & Eliminate Adverse Impact of Cold Outdoor Ambient Temps Project stage: Other ML20098F0711984-09-27027 September 1984 Responds to GE Svc Info Ltr 402 Re Wetwell/Drywell Temp. Design & Operation of Nitrogen Sys Provides Adequate Assurance That Impingement of Liquid or Extremely Cold Nitrogen Against Vital Plant Components Will Not Occur Project stage: Other ML20098G6821984-10-0101 October 1984 Responds to Verbal Questions Concerning Recommendations of GE Svc Info Ltr 402 Re IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers. Steps Taken to Evaluate & Implement Containment Inerting Recommendations Project stage: Other ML20098G6741984-10-0101 October 1984 Responds to IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers. No Evidence of Outside or Inside Vent Header & Nitrogen Penetration Cracking Found.Addl Insps & Evaluations Will Be Performed Project stage: Other ML18029A1511984-10-0505 October 1984 Forwards Responses to GE Svc Info Ltr 402 Re Wetwell/Drywell Inerting.Operating Instructions for Containment Inerting Sys & Primary Containment Sys Revised Project stage: Other ML20138A2251985-11-29029 November 1985 Summarizes 851108 Mgt Meeting at Region II Ofc Re Util Response to Recommendations of Svc Info Ltr 402 in Handling Unit 1 Nitrogen Inerting & Purge Line Crack Discovered on 841215.Summary of Topics & List of Attendees Encl Project stage: Meeting 1984-04-05
[Table View] |
Text
i
[N Commonwealth Edison l
,/ One First Nit.onti Pitta. Chicigo, ilhnog
\\
C 7 Address Reply to Post Office Box 767
\\
/ Chicago, lihnois 60690 April 18, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Quad Cities Station Units 1 and 2 Containment Inerting System Inspection Response to General Electric (G.E.) SIL 402 NRC Docket Nos. 50-254 and 50-265 Reference (a):
P.
L. Barnes letter to J. G. Keppler dated February 10, 1984.
Dear Mr. Denton:
As requested by our NRC Project Manager, we are enclosing, in the form of an attachment to this letter, our response to the referenced G.E. SIL.
That SIL was generated due to a recent event which resulted in a large crack in the torus vent header at another operating plant attributed to brittle fracture caused by the inspection of cold nitrogen into the torus during inerting.
Our review finds that that nitrogen inerting system design is such that the possibility of a similar event at Dresden Station is highly unlikely.
One signed original and forty (40) copies of this letter and its attachments are provided for your use.
Very truly yours, h.
(/
B. Ry k
Nuclear Licensing Administrator im i
cc:
NRC Resident Inspector - Quad Cities R. Bevan - NRR h
0 g
\\
PDR 8480N
F QUAD CITIES STATION UNITS 1 and 2 Response to General Electric SIL 402 Evaluation of Inerting System Design The drywell and suppression chamber are inerted utilizing liquid nitrogen that is vaporized and drawn into the containment using SBGTS or the Reactor Building Ventilation System.
Liquid nitrogren from a bulk storage tank is normally vaporized by electric vaporizers, but steam vaporizer also exists.
The vaporized nitrogen is piped via three-inch, four-inch, and eight-inch piping to an 18-inch header which will direct the nitrogen to either the drywell, or to the suppression chamber via a 20-inch line.
A temperature monitor is located on this header, and alarms in the Control Room on a low temperature of 500F.
The 20-inch nitrogen purge line penetrates the suppression chamber at the top, which is located about seven feet above the vent header inside the suppression chamber.
Based on our evaluation of the above design, the potential for introducing cold nitrogen into the suppression chamber is minimal.
Evaluation of Inerting System Operation The electric vaporizers have been very reliable.
Adequate temperature indication is provided.
Work requests have been written to calibrate and functionally test the low nitrogen temperature alarm switches TS-1 and 2 - 8741-31.
Procedures have been reviewed and found to be adequate; however, additional precautions will be added concerning the need to keep the nitrogen temperatures high so as not to introduce cold nitrogen into the containment.
Drywell/Wetwell Bypass Leakage Tests In accordance with the Technical Specifications, a drywell-suppression chamber leak test is performed during each refueling outage.
A satis factory test was recently performed on Unit 2 in February 1984, and aill be performed on Unit 1 prior to startup from the current refueling outage.
Inspection of Nitrogen Injection Line The nitrogen purge piping has been visually inspected on both units.
The inspection covered the piping runs from the vaporizer discharge lines in the 1/2 Diesel Generator Room to the drywell and suppression chamber nitrogen purge penetrations.
No abnormalities were found during these inspections.
Inspection of Containment In response to NRC I.E.Bulletin 84-01, the Unit 2 suppression chamber vent header was visually inspected.
No abnormalities were identified.
The same inspections will be conducted on Unit I during the current refueling outage.
8480N