Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20080R767 | 10 February 1984 | Southern Nuclear Beckham J | Responds to IE Bulletin 84-01 Re Insp for Cracks in Mark I Containment Torus Vent Header.No Apparent Cracking or Relevant Indications Found on Unit 1.No Addl Cracking Found Beyond Original Cracking on Unit 2 | Other |
ML20080N566 | 10 February 1984 | FirstEnergy Fiedler P | Forwards Drywell Coating Evaluation, Technical Data Rept, Per SEP Topic VI-1, Organic Matls & Post-Accident Chemistry | Request |
ML20087H148 | 13 March 1984 | Southern Nuclear Gucwa L | Forwards GE Repts on Metallographic Exam of Metal Samples Taken from Cracked Vent Header,Per NRC 840206 Meeting W/ Util,Bwr Regulatory Response Group & Ge.Vent Header Cracking Brittle Fracture Caused by Injection of Cold Nitrogen | Meeting |
ML20083L655 | 30 March 1984 | Exelon Daltroff S (FORMERLY PHILADELPHIA ELECTRIC | Submits Info on IE Bulletin 84-01, Entitled Cracks in BWR Mark I Containment Vent Headers. Primary Containment Drywell to Torus Bypass Tests Performed.Status of GE SIL 402 Recommended Actions Listed | Other |
ML20084L444 | 31 March 1984 | Marisa Herrera GENERAL ELECTRIC CO. Ranganath S Obermiller K | Analysis of Vent Header Cracking at Hatch 2 | Other |
ML20084R170 | 5 April 1984 | Southern Nuclear Gucwa L | Comments on Status of Recommendations of GE Svc Info Ltr 402 Re Wetwell/Drywell Inerting.Evaluation of Nitrogen Inerting Sys Design Performed & Redundant Low Temp Shutoff Valve Added | Other |
ML20083R739 | 18 April 1984 | Exelon Rybak B | Forwards Response to GE SIL 402 Generated Due to Large Crack in Torus Vent Header at Another Operating Plant Attributed to Brittle Fracture Identified During Insp of Cold Nitrogen Into Torus During Inerting | Other |
ML20084L425 | 7 May 1984 | Southern Nuclear Gucwa L | Forwards Analysis of Vent Header Cracking at Hatch 2. Analysis Shows That Observed Cracking Can Be Explained by Injection of Cold Nitrogen Into Containment & Any Cracking Expected to Be through-wall,detectable by Visual Insp | Other |
ML20091B787 | 23 May 1984 | Southern Nuclear Gucwa L | Provides Status of GE Svc Info Ltr 402 Re Vent Header Cracking Incident.Recommended Ultrasonic Testing Not Planned Due to Lack of Baseline Test Data.Cracking from Injection of Cold Nitrogen Detectable by Surface Exam | Other |
NLS8400242, Submits List of Actions Taken on Recommendations from GE 840214 Svc Info Ltr 402, Wetwell/Drywell Inerting. Evaluation of Inerting Sys Design Determined That Failure of Cold Temp Shutdown Switch Cause of Problem | 12 September 1984 | Nebraska Public Power District Pilant J | Submits List of Actions Taken on Recommendations from GE 840214 Svc Info Ltr 402, Wetwell/Drywell Inerting. Evaluation of Inerting Sys Design Determined That Failure of Cold Temp Shutdown Switch Cause of Problem | Other |
FVY-84-110, Forwards Response to NRC Request Re Actions Taken in Response to GE Significant Info Ltr 420 Concerning Hatch-2 Vent Header Crack | 14 September 1984 | VERMONT YANKEE NUCLEAR POWER CORP. Capstick R | Forwards Response to NRC Request Re Actions Taken in Response to GE Significant Info Ltr 420 Concerning Hatch-2 Vent Header Crack | Other |
BECO-84-150, Responds to IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers. Util Endorses GE Svc Info Ltr 402 Recommendations.Equipment Damage Has Not Occurred & Inerting Sys Operation Suitable | 14 September 1984 | Harrington W Eversource Energy | Responds to IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers. Util Endorses GE Svc Info Ltr 402 Recommendations.Equipment Damage Has Not Occurred & Inerting Sys Operation Suitable | Other |
ML20097E003 | 14 September 1984 | Niagara Mohawk Hooten B | Forwards Response to IE Bulletin 84-01 Re Potential for Cracking in BWR Vent Headers Using Nitrogen Inerting Sys. Nitrogen Inerting Sys Not Used at Facility.Recommendations Identified in GE Svc Info Ltr 402 Addressed | Other |
ML20098G557 | 14 September 1984 | FirstEnergy Fiedler P | Submits Supplemental Info in Response to IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers. Program Initiated to Address Concerns of GE SIL 402 & Implementation Schedule | Supplement |
ML20098A026 | 17 September 1984 | Mangan C Niagara Mohawk | Forwards Responses to Recommendations Contained in IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers & GE Svc Info Ltr 402, Wetwell/Drywell Inerting. No Anomalies Indicated in Drywell/Wetwell Pressures | Other |
ML20097H269 | 17 September 1984 | Exelon John Marshall | Forwards Response to GE Significant Info Ltr 402 & IE Info Notice 84-17 Re Nitrogen Inerting Sys | Other |
SNRC-1082, Submits Status of Evaluation Re IE Info Notice 84-17, Problems W/Liquid Nitrogen Cooling Components Below Nil Ductility Temp & GE Svc Info Ltr SIL-402, Wetwell/Drywell Inerting | 18 September 1984 | John Leonard Long Island Lighting Company | Submits Status of Evaluation Re IE Info Notice 84-17, Problems W/Liquid Nitrogen Cooling Components Below Nil Ductility Temp & GE Svc Info Ltr SIL-402, Wetwell/Drywell Inerting | Other |
ML20098F159 | 26 September 1984 | Exelon (FORMERLY PHILADELPHIA ELECTRIC Kemper J | Submits Mods Identified for Completion Prior to Liquid Nitrogen Inerting of Containment.Low Temp Switch Will Be Replaced & Relocated to Improve Response Time & Eliminate Adverse Impact of Cold Outdoor Ambient Temps | Other |
ML20098F071 | 27 September 1984 | DTE Energy Jens W | Responds to GE Svc Info Ltr 402 Re Wetwell/Drywell Temp. Design & Operation of Nitrogen Sys Provides Adequate Assurance That Impingement of Liquid or Extremely Cold Nitrogen Against Vital Plant Components Will Not Occur | Other |
ML20098G674 | 1 October 1984 | Power Authority of the State of New York J. P. Bayne | Responds to IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers. No Evidence of Outside or Inside Vent Header & Nitrogen Penetration Cracking Found.Addl Insps & Evaluations Will Be Performed | Other |
ML20098G682 | 1 October 1984 | Carolina Power & Light Co. Zimmerman S | Responds to Verbal Questions Concerning Recommendations of GE Svc Info Ltr 402 Re IE Bulletin 84-01, Cracks in BWR Mark I Containment Vent Headers. Steps Taken to Evaluate & Implement Containment Inerting Recommendations | Other |
ML20138A225 | 29 November 1985 | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) Walker R | Summarizes 851108 Mgt Meeting at Region II Ofc Re Util Response to Recommendations of Svc Info Ltr 402 in Handling Unit 1 Nitrogen Inerting & Purge Line Crack Discovered on 841215.Summary of Topics & List of Attendees Encl | Meeting |