MONTHYEARML20210R3501999-08-13013 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,allowing Performance of CRDM & Ni Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling, While Fuel Is in Reactor Vessel ML20210Q3951999-08-0606 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3/4.6.4, Vacuum Relief, by Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers ML20209G3551999-07-14014 July 1999 Application for Amends to Licenses NPF-11 & NPF-18 to Revise TS Allowing Both LaSalle County Units to Operate at Uprated Power Level of 3489 Mwt.Proprietary Rev 2 to NEDC-32701P, Power Uprate Sar..., Encl.Proprietary Encl Withheld ML20209D3881999-07-0707 July 1999 Suppl Application for Amends to Licenses NPF-11 & NPF-18, Changing Proposed Degradation Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable,Per 981109 Application ML20209D3171999-07-0707 July 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising MCPR Safety Limit & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20206T1331999-05-19019 May 1999 Application for Amends to Licenses NPF-11 & NPF-18, Relocating TS Section 3/4.4.4, Chemistry, to UFSAR to Be Consistent with NUREG-1433,rev 1 ML20206J6921999-05-0505 May 1999 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Basis for Evaluation of Vr Exhaust Plenum Masonry Walls for Plant.With One Oversize Drawing ML20195E0471998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value in TS 3/4.3.3 & TS Table 3.3.3-2 ML20195D9931998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Add Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer Valve Rooms ML20154M4551998-10-16016 October 1998 Application for Amends to Licenses NPF-11 & NPF-18,lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect.Proprietary Rev 1,suppl 1 to NEDC-31531P,encl.Proprietary Info Withheld ML20217B5721998-04-16016 April 1998 Supplemental Application for Amend to License NPF-11, Changing Leak & Break Detection Isolation Instrumentation. Util Response to RAI & Rev 1 to Calculation L-001443,encl ML20217J2731998-03-24024 March 1998 Application for Amends to Licenses NPF-11 & NPF-18,deleting License Condition 2.C.(30)(a) in Entirety & Revising TS 6.1-3 ML20203G4871997-12-12012 December 1997 Application for Amends to Licenses NPF-11 & NPF-18,modifying Bypass Logic for Msli Valve Isolation Actuation Instrumentation on Condenser Low Vacuum as Stated in Note of TS Tables 3.3.2-1 & 4.3.2.1-1 ML20199K5181997-11-24024 November 1997 Application for Amend to License NPF-11,adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for RWCU Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms. W/Environ Assessment Statement & Calculations ML20211P9171997-10-15015 October 1997 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Unnecessary Details from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3581997-09-26026 September 1997 Application for Amends to Licenses NPF-11 & NPF-18,adding Ventilation Filter Testing Program ML20141J5521997-08-12012 August 1997 Application for Amends to Licenses NPF-11 & NPF-18,proposing Deletion of Surveillance Requirement 4.7.1.3.c & Addressing Sedimentation Concerns in Intake Structure Under Svc Water Performance Monitoring Program,Iaw GL 89-13 ML20148Q4161997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Reflect Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation ML20148U2551997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases ML20141L0311997-05-27027 May 1997 Application for Amends to Licenses NPF-11 & NPF-18, Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administration Changes ML20137W5071997-04-14014 April 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing TS to Reflect Design Change to Trip Logic for Feedwater/Main Turbine Trip Sys Actuation Instrumentation for Reactor Vessel Water Level-High,Level 8 Trip Function ML20134A1781997-01-20020 January 1997 Application for Amends to Licenses NPF-11 & NPF-18, Requesting Relocation of Alarm Only Instrumentation Surveillance Requirements & Adding or Changing Action Statement for Selected TSs ML20135E6551996-12-0202 December 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising Section 3.4.2 SRV Configuration to Include Only 13 of Current 18 SRVs ML20129J4461996-10-31031 October 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Seismic Monitoring Instrumentation Requirements ML20116A9501996-07-15015 July 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising App A,Ts,Per 10CFR50.90 to Relocate Fire Protection Requirements of Listed TS Sections ML20113C8581996-06-21021 June 1996 Application for Amends to Licenses NPF-11 & NPF-18,including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0541996-04-16016 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Selected Response Time Testing Requirements ML20107A8351996-04-0808 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Reflecting Transition of Fuel Supplier from GE to Siemens Power Corp.Nonproprietary & Proprietary Versions of EMF-94-217,Rev 1 Repts Encl.Proprietary Rept Withheld ML20097D6451996-02-0909 February 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising TS to Support Elimination of MSIV Leakage Control Sys & Instead Use MSL Drains & Condenser to Process MSIV Leakage ML20096G3261996-01-18018 January 1996 Application for Amends to Licenses NPF-11 & NPF-18,changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High ML20095K6931995-12-21021 December 1995 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS LCO 3.4.2,Action Statement B ML20093D4251995-10-0202 October 1995 Application for Amend to License NPF-11,revising SRV Safety Function Lift Setting Tolerance.Nonproprietary & Proprietary Versions of GE SRV Setpoint Tolerance Relaxation Analysis Encl.Proprietary Analysis Withheld ML20091P8901995-08-28028 August 1995 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating MSIV Leakage Control Sys & Increasing MSIV Leakage Limits,Including Request for Exemption for MSIV Leakages from Acceptance Test Criteria in App J of 10CFR50 ML20084U2921995-06-0808 June 1995 Application for Amends to Licenses NPF-11,NPF-18,NPF-72, NPF-77,NPF-37 & NPF-66.Amends Would Revise SRs & Administrative Requirements Associated W/Edgs ML20084C2221995-05-23023 May 1995 Application for Amends to Licenses NPF-11 & NPF-18, Clarifying Described Equipment out-of-svc Options ML20083P6211995-05-19019 May 1995 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Requirement That Verifies Each Fire Protection Valve in Correct Position at Least Once Per 31 Days ML20082J9261995-04-11011 April 1995 Application for Amends to Licenses NPF-11 & NPF-18,extending Specific 18 Month TS Surveillance Requirements to Allow Surveillance Testing ML20087H7851995-03-31031 March 1995 Application for Amend to License NPF-18,revising SRV Safety Function Lift Setting Tolerances.Nonproprietary & Proprietary GE SRV Setpoint Relaxation Analysis Encl. Proprietary GE SRV Setpoint Relaxation Analysis Withheld ML20078H1441995-01-30030 January 1995 Application for Amend to License NPF-18,requesting Emergency Amend to TS 3.3.1,for One Time Extension of Functional Test for Main Steam Line Isolation Valve - Closure Scram Functional Unit in RPS ML20077S2901995-01-13013 January 1995 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Pressure Alarm Setpoint Allowable Values for ECCS & RCIC Sys Keep Filled Pressure Instrumentation Channels ML20078R7031994-12-14014 December 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Minimize Unnecessary Testing & Excessively Restrictive AOT for Certain Actuation Instrumentation. Rev 3 to MDE-83-0485 & Rev 1 to RE-025 Encl.Encls Withheld ML20078B9491994-10-24024 October 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3.6.Exemption Requests from 10CFR50,App J Requirements Encl ML20069J7671994-06-0909 June 1994 Application for Amends to Licenses NPF-11 & NPF-18, Implementing Partial Application of GE ARTS Program.Ge Proprietary Rept NEDC-31531P, ARTS Improvements Program Analysis... Encl.Rept Withheld (Ref 10CFR2.790(b)) ML20065A1871994-03-22022 March 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS 3/4.6.1.5, Primary Containment Structural Integrity ML20063F3081994-01-28028 January 1994 Application for Exigent Amends to Licenses NPF-11 & NPF-18, Revising TS 3.3.1 & 3.3.4 to Extend Surveillance Test Interval from Monthly to Quarterly.Ge Proprietary TS Improvement Analysis Encl.Ge Proprietary Analysis Withheld ML20063E1631994-01-24024 January 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting Requirement for Response Time Testing Where Required Time Corresponds to Diesel Start Time from TS Table 3.3.2-3,per Line Item 5 of GL 93-05 & NUREG-1366 ML20063B2311994-01-21021 January 1994 Suppl to 931228 Application for Amends to Licenses NPF-11 & NPF-18,changing TS Bases Section B 3/4 2-6 to Include Ref to Plant LOCA Analysis Performed by GE ML20058K3371993-12-10010 December 1993 Application for Exigent Amend to License NPF-11,revising TS 3.4.2, Safety Relief Valves, Adding Footnote to Exempt Safety/Relief Valves 1B21-F013B & 1B21-F013F from Requirements of TS 4.0.3 ML20058A8661993-11-17017 November 1993 Application for Emergency Amends to Licenses NPF-11 & NPF-18,requesting NRC Approval of USQ Re Existing Condition for Which Operator Action Proposed for Tripping Mechanical Vacuum Pump in Place of Automatic Trip ML20058A2591993-11-10010 November 1993 Application for Amends to Licenses NPF-37,NPF-66,NPF-72, NPF-77,DPR-39,DPR-48,NPF-11 & NPF-18 Re Limitations on Radioactive Matl Released in Liquid Effluents,New 10CFR21 & Radioactive Matl Released in Gaseous Effluents 1999-08-06
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210R3501999-08-13013 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,allowing Performance of CRDM & Ni Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling, While Fuel Is in Reactor Vessel ML20210Q3951999-08-0606 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3/4.6.4, Vacuum Relief, by Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers ML20209G3551999-07-14014 July 1999 Application for Amends to Licenses NPF-11 & NPF-18 to Revise TS Allowing Both LaSalle County Units to Operate at Uprated Power Level of 3489 Mwt.Proprietary Rev 2 to NEDC-32701P, Power Uprate Sar..., Encl.Proprietary Encl Withheld ML20209D3171999-07-0707 July 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising MCPR Safety Limit & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20209D3881999-07-0707 July 1999 Suppl Application for Amends to Licenses NPF-11 & NPF-18, Changing Proposed Degradation Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable,Per 981109 Application ML20206T1331999-05-19019 May 1999 Application for Amends to Licenses NPF-11 & NPF-18, Relocating TS Section 3/4.4.4, Chemistry, to UFSAR to Be Consistent with NUREG-1433,rev 1 ML20206J6921999-05-0505 May 1999 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Basis for Evaluation of Vr Exhaust Plenum Masonry Walls for Plant.With One Oversize Drawing ML20195E0471998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value in TS 3/4.3.3 & TS Table 3.3.3-2 ML20195D9931998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Add Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer Valve Rooms ML20154M4551998-10-16016 October 1998 Application for Amends to Licenses NPF-11 & NPF-18,lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect.Proprietary Rev 1,suppl 1 to NEDC-31531P,encl.Proprietary Info Withheld ML20217B5721998-04-16016 April 1998 Supplemental Application for Amend to License NPF-11, Changing Leak & Break Detection Isolation Instrumentation. Util Response to RAI & Rev 1 to Calculation L-001443,encl ML20217J2731998-03-24024 March 1998 Application for Amends to Licenses NPF-11 & NPF-18,deleting License Condition 2.C.(30)(a) in Entirety & Revising TS 6.1-3 ML20203G4871997-12-12012 December 1997 Application for Amends to Licenses NPF-11 & NPF-18,modifying Bypass Logic for Msli Valve Isolation Actuation Instrumentation on Condenser Low Vacuum as Stated in Note of TS Tables 3.3.2-1 & 4.3.2.1-1 ML20199K5181997-11-24024 November 1997 Application for Amend to License NPF-11,adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for RWCU Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms. W/Environ Assessment Statement & Calculations ML20211P9171997-10-15015 October 1997 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Unnecessary Details from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3581997-09-26026 September 1997 Application for Amends to Licenses NPF-11 & NPF-18,adding Ventilation Filter Testing Program ML20141J5521997-08-12012 August 1997 Application for Amends to Licenses NPF-11 & NPF-18,proposing Deletion of Surveillance Requirement 4.7.1.3.c & Addressing Sedimentation Concerns in Intake Structure Under Svc Water Performance Monitoring Program,Iaw GL 89-13 ML20148U2551997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases ML20148Q4161997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Reflect Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation ML20141L0311997-05-27027 May 1997 Application for Amends to Licenses NPF-11 & NPF-18, Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administration Changes ML20137W5071997-04-14014 April 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing TS to Reflect Design Change to Trip Logic for Feedwater/Main Turbine Trip Sys Actuation Instrumentation for Reactor Vessel Water Level-High,Level 8 Trip Function ML20134A1781997-01-20020 January 1997 Application for Amends to Licenses NPF-11 & NPF-18, Requesting Relocation of Alarm Only Instrumentation Surveillance Requirements & Adding or Changing Action Statement for Selected TSs ML20135E6551996-12-0202 December 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising Section 3.4.2 SRV Configuration to Include Only 13 of Current 18 SRVs ML20129J4461996-10-31031 October 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Seismic Monitoring Instrumentation Requirements ML20116A9501996-07-15015 July 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising App A,Ts,Per 10CFR50.90 to Relocate Fire Protection Requirements of Listed TS Sections ML20113C8581996-06-21021 June 1996 Application for Amends to Licenses NPF-11 & NPF-18,including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0541996-04-16016 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Selected Response Time Testing Requirements ML20107A8351996-04-0808 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Reflecting Transition of Fuel Supplier from GE to Siemens Power Corp.Nonproprietary & Proprietary Versions of EMF-94-217,Rev 1 Repts Encl.Proprietary Rept Withheld ML20097D6451996-02-0909 February 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising TS to Support Elimination of MSIV Leakage Control Sys & Instead Use MSL Drains & Condenser to Process MSIV Leakage ML20096G3261996-01-18018 January 1996 Application for Amends to Licenses NPF-11 & NPF-18,changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High ML20095K6931995-12-21021 December 1995 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS LCO 3.4.2,Action Statement B ML20093D4251995-10-0202 October 1995 Application for Amend to License NPF-11,revising SRV Safety Function Lift Setting Tolerance.Nonproprietary & Proprietary Versions of GE SRV Setpoint Tolerance Relaxation Analysis Encl.Proprietary Analysis Withheld ML20091P8901995-08-28028 August 1995 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating MSIV Leakage Control Sys & Increasing MSIV Leakage Limits,Including Request for Exemption for MSIV Leakages from Acceptance Test Criteria in App J of 10CFR50 ML20084U2921995-06-0808 June 1995 Application for Amends to Licenses NPF-11,NPF-18,NPF-72, NPF-77,NPF-37 & NPF-66.Amends Would Revise SRs & Administrative Requirements Associated W/Edgs ML20084C2221995-05-23023 May 1995 Application for Amends to Licenses NPF-11 & NPF-18, Clarifying Described Equipment out-of-svc Options ML20083P6211995-05-19019 May 1995 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Requirement That Verifies Each Fire Protection Valve in Correct Position at Least Once Per 31 Days ML20082J9261995-04-11011 April 1995 Application for Amends to Licenses NPF-11 & NPF-18,extending Specific 18 Month TS Surveillance Requirements to Allow Surveillance Testing ML20087H7851995-03-31031 March 1995 Application for Amend to License NPF-18,revising SRV Safety Function Lift Setting Tolerances.Nonproprietary & Proprietary GE SRV Setpoint Relaxation Analysis Encl. Proprietary GE SRV Setpoint Relaxation Analysis Withheld ML20078H1441995-01-30030 January 1995 Application for Amend to License NPF-18,requesting Emergency Amend to TS 3.3.1,for One Time Extension of Functional Test for Main Steam Line Isolation Valve - Closure Scram Functional Unit in RPS ML20077S2901995-01-13013 January 1995 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Pressure Alarm Setpoint Allowable Values for ECCS & RCIC Sys Keep Filled Pressure Instrumentation Channels ML20078R7031994-12-14014 December 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Minimize Unnecessary Testing & Excessively Restrictive AOT for Certain Actuation Instrumentation. Rev 3 to MDE-83-0485 & Rev 1 to RE-025 Encl.Encls Withheld ML20078B9491994-10-24024 October 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3.6.Exemption Requests from 10CFR50,App J Requirements Encl ML20069J7671994-06-0909 June 1994 Application for Amends to Licenses NPF-11 & NPF-18, Implementing Partial Application of GE ARTS Program.Ge Proprietary Rept NEDC-31531P, ARTS Improvements Program Analysis... Encl.Rept Withheld (Ref 10CFR2.790(b)) ML20065A1871994-03-22022 March 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS 3/4.6.1.5, Primary Containment Structural Integrity ML20063F3081994-01-28028 January 1994 Application for Exigent Amends to Licenses NPF-11 & NPF-18, Revising TS 3.3.1 & 3.3.4 to Extend Surveillance Test Interval from Monthly to Quarterly.Ge Proprietary TS Improvement Analysis Encl.Ge Proprietary Analysis Withheld ML20063E1631994-01-24024 January 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting Requirement for Response Time Testing Where Required Time Corresponds to Diesel Start Time from TS Table 3.3.2-3,per Line Item 5 of GL 93-05 & NUREG-1366 ML20063B2311994-01-21021 January 1994 Suppl to 931228 Application for Amends to Licenses NPF-11 & NPF-18,changing TS Bases Section B 3/4 2-6 to Include Ref to Plant LOCA Analysis Performed by GE ML20059E2681993-12-30030 December 1993 Amends 57,57,45,45,93,77,152 & 140 to Licenses NPF-37, NPF-66,NPF-72,NPF-77,NPF-11,NPF-18,DPR-39 & DPR-48, Respectively.Amends Change Instantaneous Limits for Radioactive Liquid & Gaseous Effluent Release Rates ML20058K3371993-12-10010 December 1993 Application for Exigent Amend to License NPF-11,revising TS 3.4.2, Safety Relief Valves, Adding Footnote to Exempt Safety/Relief Valves 1B21-F013B & 1B21-F013F from Requirements of TS 4.0.3 ML20058A8661993-11-17017 November 1993 Application for Emergency Amends to Licenses NPF-11 & NPF-18,requesting NRC Approval of USQ Re Existing Condition for Which Operator Action Proposed for Tripping Mechanical Vacuum Pump in Place of Automatic Trip 1999-08-06
[Table view] |
Text
e
(:ommonwe.nlth I Aliwn (}omlun)
,/
, ieaiic ( cncraung sanon
, 2601 N, orth list Rox!
M.trsedles. H. 613 6 l >>~5
rei sis 3svni August 6,1999 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D C 20555 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374
Subject:
Request for a Change to the Technical Specifications, " Vacuum Relief System" In accordance with 10 CFR 50.90, Commonwealth Edison (Comed) Company requests a change to Appendix A, Technical Specifications (TS), Facility Operating Licenses NPF-11 and NPF-18. The proposed change is to the TS Section 3/4.6.4," Vacuum Relief System." This proposed change is consistent with the Improved Standard Technical Specifications (ISTS) as documented in NUREG-1433, Revision 1,
" Standard Technical Specifications, General Electric Plants, BWR/4." l The proposed change is subdivided as follows.
- 1. Attachment A gives a description and safety analysis of the proposed changes.
- 2. Attachment B includes the marked-up Technical Specification pages with the proposed changes indicated.
- 3. Attachment C describes Comed's evaluation performed in accordance with 10 CFR 50.92(c), which supports a finding of no significant hazards !
consideration.
- 4. Attachment D provides information supporting an Environmental Assessment. j We are requesting that the proposed changes, if found acceptable, be approved within six months.
I 990s160020 990006 PDR ADOCK 05000373 lh hy k ' f P PDR I A Unicom romiun>
.p 'N -
\
August 6,1999 USNRC i
. . Page 2
' The proposed changes have been reviewed by the station Plant Operations Review Committee and approved by the Nuclear Safety Review Board in accordance with station procedures.
Comed is notifying the State ofIllinois of this request for amendment by transmitting a copy of this letter and its attachments to the designated State Official. ,
If there are any questions or comments concerning this letter, please refer them to
'Mr. Frank Spangenberg, Regulatory Assurance Manager, at (815) 357-6761, extension 2383.
Sincerely, b \
J. . enjamin Site Vice President LaSalle County Station Attachments: A. Description and Safety Analysis for Proposed Changes B. Marked-up Pages for Proposed Changes C. Information Supporting a Significant Hazards Consideration D. Information Supporting an Environmental Assessment cc: Regional Administrator-NRC Region III NRC Senior Resident Inspector- LaSalle County Station Office of Nuclear Facility Safety -Illinois Department of Nuclea- Safety l
r-
,,, .,I. -
t
- STATE OF ILLINOIS Docket Nos. 50-373 1 50-374 l
, 1 l IN TIIE MATTER OF: l l
COMMONWEALTH EDISON (COMED) COMPANY LASALLE COUNTY STATION - UNITS 1 and 2 l
SUBJECT:
Request for a Change to the Technical Specifications," Vacuum Relief System" AFFIDAVIT l I affinn that the content of this transmittal is true and correct to the best of my knowledge, information and belief.
V'J. 5Arenjsnin V Site Vice President LaSalle Station i
l Subscribed and sworn to before me, a Notary Public in and for th tate above named, this t day of MAS ,1999 9
/R f 6//( /$lhl/N
- [N(taffi)ulflic[ ^
~ OFFICIAL SEAL LYNN ELLEN GASSMAN NOTARY PUBUC, STATE Of iluNOIS MV COMMISSION EXPIRES 1-24 2001
j, *1
- ATTACHMENT A Proposed Changes to Technical Specifications for
-. LaSalle County Station, Units 1 and 2 ,
I of 5 '
1 DESCRIPTION AND
SUMMARY
SAFETY ANALYSIS FOR PROPOSED CHANGES A. '
SUMMARY
OF PROPOSED CHANGES In accordance with 10 CFR 50.90, Commonwealth Edison (Comed) Company is proposing changes to Appendix A, Technical Specifications (TS), Facility Operating License Nos.
NPF-11 and NFP-18. The proposed changes are to TS Section 3/4.6.4, " Vacuum Relief," to remove specific operability requirements related to position indication for the suppression I chamber-drywell vacuum breakers and revise the action statements and the surveillance requirements to reflect the requirements in NUREG-1433, Revision 1, " Standard Technical Specifications, General Electric Plants."
The proposed changes are described in Section E of this Attachment. The marked up TS pages are shown in Attachment B.
B. DESCRIPTION OF THE CURRENT REQUIREMENTS TS Section 3/4.6.4, " Vacuum Relief," requires that all suppression chamber-drywell vacuum breakers be operable and closed. This requirement is applicable in operational conditions 1,2 and 3 (i.e., Power Operation, Startup, and Hot Shutdown). The suppression chamber-drywell vacuum breakers are verified closed at least once per 7 days. The suppression chamber-drywell vacuum breakers are demonstrated operable by performing the following surveillance tests.
. Cycling each suppression chamber-drywell vacuum breaker through at least one complete cycle of full travel at least once per 31 days.
. Performing a channel functional test on both position indications at least once per 31 days.
. Verifying the force required to open the suppression chamber-drywell vacuum breakers from the closed position is less than or equal to 0.5 psid once per 18 months.
- Performing a channel calibration on both position indications at least once per 18 months.
If one suppression chamber-drywell vacuum breaker is found inoperable and/or open, the manualisolation valves on both sides of the inoperable and/or open suppression chamber-drywell vacuum breaker shall be closed within four (4) hours. The inoperable and/or open suppression chamber-drywell vacuum breaker must be restored to operable status and be closed within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.' If the suppression chamber-drywell vacuum breaker can not be restored to operable status within this time limit the unit must be in Hot Standby within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in Cold Shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This places the unit in a mode in which the Limiting Condition for Operation no longer applies.
- g. c.
ATTACHMENT A Proposed Changes to Technical Specifice.tions for LaSalle County Station, Units 1 and 2 2 of 5 A surveillance requirement is provided to ensure that the manual isolation valves on both sides of an inoperable and/or open suppression chamber-drywell vacuum breaker is verified closed at least once per 7 days.
In addition, if one position indication o any operable suppression chamber-drywell vacuum
' breaker is found inoperable, the inoperable position indication must be restored to operable status within 14 days or a visual verification demonstrating that the suppression chamber-drywell vacuum breaker is closed must be performed at least once every 24 hoors. ir these ,
actions cannot be completed the affected suppression chamber-drywell vac~_..i breaker !
must be declared inoperable and the actions related to an incperable suppression chamber- l drywell vacuum breaker be performed. l C. BASES FOR THE CURRENT REQUIREMENTS 1
The Containment Vacuum Pelief System (CVRS) consists of four (4) suppression chamber-drywell vacuum breakers. These vacuum breakers are provided between the primary !
containment drywell and suppression chamber, to prevent exceeding the upward drywell
. floor design pressure differential of 5 psid. The vacuum breake:s are in piping that is )
outside of primary containment but form an extension of the pdmary containment boundary.
Two local manual butterfly valves, one on each side of the ocuum breaker are provided as system isolation valves should failure of the vacuum breaker occur.
Analyses were performed on a numbs of postulated loss of coolant accident events that show that the CVRS will provide sufficient relief capacity so that neither the design drywell floor upward differential pressure of 5 psid, nor the design drywell wall inward differential pressure of 5 psid will be exceeded. In the normal operating configuration of the CVRS, four vacuum breakers are available; however the analyses assumed failure of one vacuum breaker. Accordingly, the analyses show that a minimum of three containment vacuum breakers are necessary to ensure that the design differential pressures will not be '
exceeded. The worst case results show that with three vacuum breakers the maximum upward transient differential pressure across the drywell floor is less than 5.0 psid. These
. calculations also show that the maximum inward differential pressure across the drywell walls does not exceed 5.0 psid.
The vacuum breakers between the suppression chamber and the drywell must not be inoperable in the open position since this would allow bypassing of the suppression pool in case of an accident. The purpose of the manualisolation valves is to minimize the bypass leakage in the event of a vacuum breaker being inoperable in the open positio,1 D. NEED FOR REVISION OF THE REQUIREMENT Currently, one of the two position indications for the "2A" suppression chamber-dryw d vacuum breaker is inoperable. If the second position indication becomes inoperable under the current TS requirements, the "2A" suppression chamber-drywell vacuum breaker must be declared inoperable. The "2A" suppression chamber-drywell vacuum bredei would then
- g. N ATTACHMENT A Proposed Changes to Technical Specifications for LaSalle County Station, Units 1 and 2 i 3 of 5 be required to be isolated by closing both of the manualisolation valves and be restored to operable status (i 9., restore the position indication) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. If the "2A" suppression chamber-drywell vacuum breaker cannot be restored to operable status by restoring the position indication within the required time the unit must be in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in Cold Shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Accordingly, the unit would be required to shutdown even though the affected suppression chamber-drywell vacuum breaker would still be functionalin that it is capable of performing its relief function, as demonstrated by the periodic cycling surveillance requirement. The affected suppression chamber-drywell vacuum breaker could still be verified closed by alternate methods, providing assurance that the requirement to control bypass leakage can still be maintained within assumed values.
Therefore current TS actions would require unit shutdown when capability exists to verify that the design functions of the suppression chamber-drywell vacuum breaker can still be achieved.
E. DESCRIPTION OF THE PROPOSED CHANGES TS Section 3/4.6.4, " Vacuum Relief," will be revised to reflect the proposed changes that will I bring it into conformance with NUREG-1433, Revision 1. The proposed changes are as follows.
- 1. Modify TS Limiting Condition for Operation (LCO) Action 3.6.4 to read "All suppression chamber- drywell vacuum breakers shall be OPERABLE."
- 2. The LCO Action related to the inoperable position indication will be deleted, since specific indication-only equipment is not required to be operable as a condition of system or component operability in Improved Standard Technical Specifications.
- 3. TS Surveillance Requirements (SRs) 4.6.4.1.b.2 and 4.6.4.1.b.3.b related to demonstrating operability of the suppression chamber-drywell vacuum breaker position indications will be deleted.
I
- 4. TS SR 4.6.4.2 verifying the closure of the manualisolation valves of an inoperable suppression chamber-drywell vacuum breaker will be deleted.
- 5. The current LCO Action related to an inoperable and/or open vacuum breaker will be rewritten into two separate LCO Actions. The first LCO Action will deal with the case of an inoperable suppression chamber-drywell vacuum breaker not capable of opening.
This action will not require isolation of the vacuum breaker since the vacuum breaker would already be closed. The vacuum breaker will be required to be restored to operabia status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
A second LCO Action will be added, providing the actions necessary to address an open suppression chamber-drywell vacuum breaker. This will require the affected vacuum breaker to be isolated within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, and restored to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
E ..,,
y .e.
ATTACHMENT A Proposed Changes to Technical Specifications for LaSalle County Station, Units 1 and 2 4 of 5 Both of these proposed LCO Actions will require the unit be in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and be in Cold Shutdown in the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if the restoration actions can not be completed in the allowed outage time.
- 6. The frequency of TS SR 4.6.4.1.a will be changed from seven days to 14 days. In addition a note' will be added that states the SR is not required to be met for suppression chamber-drywell vacuum breakers that are open during Surveillances or when suppression chamber-drywell_ vacuum breakers are performing the pressure relief function during both normal and off-normal plant operations.
F. -SAFETY ANALYSIS OF THE PROPOSED CHANGES Deletion of the condition requiring the vacuum breakers to be closed, as outlined in change item 1, is proposed since it is redundant to the definition of operable as defined by the proposed SRs. The SRs define an operable vacuum breaker as being closed, with noted exceptions, capable of opening as demonstrated by periodic cycling, and capable of being opened within established setpoints as demonstrated by periodic testing.
Deletion of suppression chamber-drywell vacuum breaker position indication requirements, provided in change items 2 and 3 is proposed since this instrumentation does not necessarily relate directly to the respective system operability. NUREG-1433, Revision 1, does not specify indication-only equipment to be operable to suppcrt operability of a system or component. Control of the availability of, and necessary compensatory activities if not available, for indications and monitoring instruments are addressed by plant operational procedures and policies. Suppression chamber-drywell vacuum breaker position is required to be known to meet operability requirements defined by the surveillance requirements. If position indication is not available and vacuum breaker position can not be determined, then the sunteillance requirements cannot be satisfied and the appropriate actions must be taken for inoperable vacuum breakers. As a result, the requirements for the suppression chamber-drywell vacuum breaker are adequately addressed by the requirements of proposed TS 3/4.6.4 and its associated surveillance requirements and are the specific indication operability requirements are proposed to be deleted from TS 3/4.6.4.
Deletion of SR 4.6.4.2, outlined as change item 4, is proposed since this SR sentes no purpose. It requires that the manualisolation valves closed to isolate an inoperable suppression chamber-drywell vacuum breaker be verified closed every 7 days. The actions for both an inoperable and/or open suppression chamber-drywell vacuum breaker rapire restoration within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or the unit is to be placed in Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in Cold Shutdown within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Therefore thic SR would never be required to be performed, and this proposed change is the deletio.i of an unnecessary SR.
The restructuring of the current LCO Action as outlined in change item 5, into two separate LCO Actions is provided for clarification. The proposed LCO Action in which the valve is inoperable for opening (e.g., the vacuum breaker is not open and may be stuck closed or
ATTACHMENT A l Proposed Changes to Technical Specifications for l
. LaSalle County Station, Units 1 and 2 5 ors not within its opening setpoint limit, so tnat it would not function as designed during an event that depressurized the drywell), will not require isolation using the manualisolation valves.
Isolating an inoperable closed vacuum breaker, though desirable from a maintenance perspective, is not necessary if the vacuum breaker is not open. The purpose of the proposed LCO Action is to ensure that any blowdown from the drywell to the suppression pool goes into the pool, and not the airspace. With the vacuum breakers operable for opening but closed, this can not occur. The manualisolation valves will be required to be closed to isolate the vacuum breaker in the event of a vacuum breaker being open for a j reason other than performing surveillance tests or in the event the vacuum breaker is performing its intended function. This will continue to ensure that suppression chamber to drywell bypass leakage is maintained within assumed values.
An extension in the SR frequency from seven to 14 days in proposed SR 4.6.4.1.a, I specif:ad in change item 6, is consistent with the SR frequency provided in NUREG-1433, l
Revision 1. For the position verification, most other safety-related valves are verified once '
per 31 days, and since these valves cannot be permanently repositioned and are routinely i found in the proper position, extending the current SR frequency is considered justifiable. l The note added to proposed SR 4.6.4.1.a is provided to clearly define permissible l conditions when the vacuum breaker may be open. This includes periods when the vacuum l breakers are opened due to performance of routine surveillance testing or during conditions where the vacuum breakers are functioning in a pressure relief capacity, during normal and off-normal plant operations. Since these vacuum breaker openings are expected to be momentary the operability of the va;uum breakers is still maintained.
G. IMPACT ON PREVIOUS SUBMITTALS Comed has reviewed the proposed changes regarding impact on any previous submittals, and has determined that there is no impact on any outstanding previous submittals.
H. SCHEDULE REQUIREMENTS Based on the proposed changes incorporating an NRC previously approved approach provided in NUREG-1433, Revision 1, and the objective to refine a requirement that would cause an unnecessary shutdown when adequate capability exists to demonstrate system operability and functionality, Comed is requesting that this proposed change, if found acceptable, be approved within six months.
- 1. REFERENCES
- 1. NUREG-1433, Revision 1, " Standard Technical Specifications, General Electric Plants, '
BWR/4," April 1995 :
l l