ML20081D347
| ML20081D347 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/24/1983 |
| From: | GEORGIA POWER CO. |
| To: | |
| Shared Package | |
| ML20081D340 | List: |
| References | |
| TAC-49076, TAC-49077, NUDOCS 8311010150 | |
| Download: ML20081D347 (22) | |
Text
.
ATTACINENr 3 NIC DOCITT 50-321 OPERATING LICENSE DPR-57 EEWIN I. HNIGI NUCLEAR PLANP UNIT 1 PROPOSED CHANGE 'IO TECHNICAL SPECIFICATIOb5 Replace the following pages of the Unit 1 Appendix "A"
Technical Specifications with the enclosed pages.
The revised pages are identified by amendment number and contain a vertical line indicating the area of change.
Remove Page Insert Page 6-1 6-1 6-2 6-2 6-3 6-3 6-6 6-6 6-7 6-7 6-8 6-8 6-9 6-9 6-11 6-11 6-12 6-12 6-13 6-13 8311010150'831024 PDR ADOCK 05000321 P
6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The General Manager shall be responsible for overall unit operation l
and shall delegate in writing the succession to this responsibility during his absence.
6.2 ORGANIZATION OFFSITE 6.2.1 The offsite organization for unit management and technical support shall be as shown on Figure 6.2.1-1.
l,
I UNIT STAFF 6.2.2 The unit organization shall be as shown on Figure 6.2.2-1 and:
a.
Each on duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2.2-1.
i l
b.
At least one licensed Operator shall be in the control room for l
each reactor containing fuel.
i c.
At least two licensed Operators shall be present in the control room for each reactor in the process of start-up, scheduled reactor shutdown and during recovery from reactor trips.
d.
An individual qualified to impiment radiation protection procedures shall be on site when fuel is in either reactor.
e.
All CORE ALTERATIONS shall be directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
f.
A Fire Team of at least five members shall be maintained onsite at all times.
The Fire Team shall not include the minimum shift crew necessary for safe shutdown of Units 1 and 2 or any personnel required for other essential functions during a fire emergency.
IIATCil - UNIT 1 6-1 L
.g_
'\\
s t
~'
PRESIDENT y
EXECUTIVE VICE ~ PRESIDENT -
(
POWER SUPPLY i:
SAFETY REVIEW TECIINICAL SENIOR VICE PRESIDENT BOARD SUPPORT POWER GENERATION 3
I s:
1 I
l 3
I i
I l
g' GENERAL MANAGER OF l
I I
l VICE PRESIDENT L
.L_
QUALITY ASSURANCE l
& GENERAL MANAGER AND RADIOLOGICAL l
NUC EAR GENERATION llEALTH AND SAFETY l
r 1
I I
IIATCil MANAGER
- REVIEW QUALITY ASSURANCE yt:CIEAA GEIE. RATION MANAGER 6 AUDIT s
i l
I 3
l 4
I l
CENERAL 11ATCH L---------------------
MANAGER QUALITY ASSURANCE PLANT llATCil SITE MANAGER LINES OF RESPONSIBILITY
--_ _- LINES OF COMMUNICATION
's
- CURRENTLY VACANT j
FIGURE 6.2.1-1 0FFSI'[E ORGANIZATION
,\\
\\ \\
i
\\
g i
3 6-2 IIATCH UNITS 1&2
- d?
i f
a... :.ua
.. _ _ +
.-g a
CMERAL MANAl. LS ii g
I I
4 Aft'4 QtZlff?
DIFETY g.--=.-----
455 tram 2 3171 W
I '
GEMEBAL MATAGER w
a ASST. 0,A,,S,T2 Se., Q.A ma i
mtm Sm,,
I I
Ln-w
^
WAMCFE M
DCim E g p ISC i
I I
l l
l l
l 1
u_
i-u a
m I,
SL'PER TYTfX) TNT sLFEB1NTD3DT St'FERTNTtxDDT
'N N
- NIMN8T Sm p tN-11E:Est SUM t fir'1 N?t NT JF MTERM OF @ALITT WNTMCE WiW E B IE EETMIT IW IN' E-E ETNFERInc CONTROL OFFAAf!ONS Sm 3VISca erv.utAfogy alc UfD SERVICES LuScis ps up I
I I
I W
a i-
\\
MATERIALS SDICB QCALITT E 9CtM t3 f MG gaa tNTt nAMG reng2tAs CDNTROL PLA NT SmBVISOR SmBVISOR SP E.CI ALISTS ERCINER
\\
l I
I i
l i
MATD LALS g
MAINTIEAM[I IIM SC6EDULING &
FERSONNEL FLANutuG FOREMAN lSMCDLMT h
l I
u_
m G
INSTROENTS gg SUPDTISOR SUPERVISOR l
l l
m t s.-
a'-
l l
i, Sutc3 Sunrf Spion '
tit 1L413
. IMEERIM avCCuTCar SEC1ATORT COMPLEAMEI I
WNTNCg DWMS ADTISOR SPA 'ALIST St1TSVISog
& CONTROLS pogggg
="^"
I I
f-I r
u_
m u_
m m
, a i
DGINEERIMG FIA NT FantTDURE yy yy Q
Q ggg
,g UN#8 II^#I EncIwas SMCIALIST g ucInts MAINTrmuts M SOES SPEC MIST
& CONTROLS FERSOMME TECHNICIANS
- h.,
i I
I l
s W
MAaAcabN Q
mucD ERALTE FNYSICS ADMIEISTRATIVE,
NASAJ E mau:Ea CPERAT10ilS FIRANCI AW TRAINING
& CEEMISTti Pts.a g e% Wort e l
1 I
I I
w a
u_
t_1._
t __
u_
0FREATIONS BIf!LDINGS &
NtiLEAR REALTB FNTSICS ggg g gyft NDE NT SCFElfMTtittBT SUPRAINTUDEN*
CtoCMDS SECURITY SUPERINTENDDT FINANCIAL yuNT SUPDFISol SCFDINTINDDT SERVICES ADNINTITRATICH I
I I
I i
i-e u_
u_
u_
u._
u_
II SkTWIRInc OPERATICIES BUILDINGS &
NLCLEAR LABORATDgf CFFICI CMTRE '
CE E RAMON SMRTISon SUPERTISOR GROUNDS SECURITY SUPERVISOE 48'CGCNTANT.
Sm BTIS00 SUM BTISOB FOREMAN SUPLIVESOg 1
I I
I u_
i t_2_
m w
IABORATURY talFT ICIEMAN IM SUPUF150R f uh.tws3 i,
IN I
I, I
I I
u_
i u_
L.,.s'L SUM ATISon SEM NTSOR t,,,LL
,8*Eine 7
C""2C^'
"^tn rWr$rCS urr FtANT
,,GTw RADIAT10ll )
Am TRAIN 1BG TRAIETNG OPEEATOR StTFE RVISol yggggggg3,gg l
I I
a I
u _.
i-u._
I i =
l
- Ss. utmel &
rafatseWr' Simufos L LL T,
L.2._
ASSiSm TsA sstnc nCnNICzAs amGrmre t
,,ty, PLANT Puff CMMTSI SMCIALIST FNTSICIST cPERArne EsGTISitS I
l I
y o
4 I
u_
w
~
.s 1
i 4
y, SAFETY &
ELMAN IMTEUCTOS gng pygyg y
i OrEman,a S MCtAttST
,,,8,,L,",
c7,,,7,k,
Hatch Unit 1 6-3 g
Flut 6.2.2 3 j
e ne unti enWtt2Aftet k
AMINTSTRATIVE CONTPOTS
/
6.3 UNIT STAFF OUALIFICATIONS 1
6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for emparable positions except for the Health Physics Superintendent who shall meet or exceed the qualifications of 4
i Regulatory Guide 1.8, September 1975, and the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineering discipline with specific trainirg in plant design, and response and analysis of the plant for transients and accidents.
6.4 TRAINHE 6.4.1 A retraining and replacement training program. for the unit staff shall be maintained under the direction of the Senior Methods and Training 1
Specialist and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55.
i 6.4.2 A training program for fire prot.ection shall be maintained under the direction of the Senior Regulatory Specialist and shall meet or exceed the requirements of Section 27 of the NFPA Code-1975, except for fire protection l
training sessions which shall be held at -least once per 92 days.
6.5 REVI N AND AUDIT 6.5.1 PLANP REVIN BOARD (PRB)
FUtCTION 6.5.1.1.The PRB shall function to advise the General Manager on all matters l
related to nuclear safety.
COMPOSITION 6.5.1.2,The Plant Review Board chall be conposed of the:
Chairman *:
General Manager Member:
Deputy General Manager Member:
Superintendent of Operations'
' Member:
Superintendent of Maintenance Member:
Health Physics Superintendent Member:
Superintendent of Quality Control i
Member:
Superintendent of Plant Engineering Services-
)
Member Superintendent of Regulatory Conpliance' Member (non-voting):
Representative of Site Quality Assurance
- General Manager to designate chairman from voting PRB membership as necessary.
ALTERNATES 6.5.1.3 All alternate members shall' be appointed. in' writing ' by the 'PRB Chairman to serve on a temporary basis; however, no more' than. two-alternates shall participate as voting members in PRB activities -at any one,
time.
HA'ICH - UNIT 1 6-6 o
._m W
r 9
g
g INISTRATIVE CONTROLS MEETING FREQUENCY 6.5.1.4 The PR8 shall meet at least once per calendar month and as convened by the PR8 Chaiman or his designated alternate.
QUORlN 6.5.1.5 The minimum quorum of the PR8 necessary for the perfomance of the PRB responsibility and authority provisions of these Technical Specifications shall consist of the Chaiman or designated Chairman and l
three mmbers including alternates.
RESPONSIBILITIES
- 6. 5.1. 6 The Plant Review Board shall be responsible for:
a.
Review of (1) all procedures required by Specification 6.8 and changes thereto, (2) any other proposed procedures or changes thereto as detemined by the General Manager to affect nuclear l
safety.
b.
Review of all proposed tests, and experiments that affect nuclear
- safety, c.
Review of all proposed changes to Appendix "A"
Technical Specifications.
d.
Review of all proposed changes or modifications to unit systems or equipment that affect nuclear safety.
e.
Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering evaluation and recommendations to prevent recurrence to the Manager of Nuclear Generation or the Vice President and General Manager Nuclear Generation and to the Safety Review Board (SRB).
f.
Review of events requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> written notification to the Commission.
g.
Review of unit operations to detect potential nuclear safety hazards.
h.
Performance of special review, investigations or analyses and reports thereon as requested by the General Manager or the SRB, l
HATCH-UNIT 1 6-7
4 ADMINISTRATIVE CONTROLS RESPONSIBILITIES (Continued) i 1.
Review of the Security Plan and implementing procedures and shall submit recommended changes to the SRB, J.
Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the SRB.
AUTHORITY
}
6.5.1.7 The PRB shall:
Recommend in writing to the General Manager approval or disapproval a.
of items considered under 6.5.1.6(a) through (d) above.
b.
Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a) through (e) above constitutes an unreviewed safety question.
c.
Provide written notification with 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Manager of Nuclear Generation or the Vice ~ President and General Manager i
Nuclear Generation and the Safety Review Board of disagreement i
between the PRB and the General Manager; however, the General i
Manager shall have responsibility for resolution of such j
disagreements pursuant to 6.1.1 above.
1 RECORDS 6.5.1.8 The Plant Review Board shall maintain written minutes of each PRB meeting that, at a minimum, document the results of all PRB activities performed under the responsibility and authority provisions of these Technical Specifications.
Copies shall be provided to the Manager of Nuclear Generation or the Vice President and General Manager Nuclear Generation and the Safety Review Board.
6.5.2 SAFETY REVIEW BOARD (SRB)
FUNCTION 71 T
6.5.2.1. The SRB shall function to provide independent review and audit of designated activities in the areas of:
a.
Nuclear power plant operations,'
b.
Nuclear engineering, c.
Chemistry and radiochemistry.-
HATCH'- UNIT 1 6-8
.i
,n.
.. ~,
.~.
l ADMINISTRATIVE CONTR01S FUNCTION (Continued) d.
Metallurgy, e.
Instrumentation and control, f.
Radiological safety, g.
Mechanical and electrical engineering, h.
Quality assurance practices.
COMPOSITION 6.5.2.2 The SRB shall be composed of a minimum of seven persons who as a group provide the expertise to review and audit the operation of a nuclear power plant.
The Chairman and Vice Chairman and other merr.bers shall be appointed by the Executive Vice President - Power Supply or such other l
person as he shall designate.
The composition of the SRB shall meet the requirements of ANSI N18.7-1976.
ALTERNATES 6.5.2.3 All alternate representatives shall be appointed in writing by the absent member to serve on a temporary basis; however, no more than two alternates shall participate in SRB activities at any one time and alternate representatives shall not have voting privileges.
CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the SRB Chairman or Vice-Chairman to provide expert advice to the CB.
MEETING FREQUENCY 6.5.2.5 The SRB shall meet at least once per calendar quarter during the initial year of unit operation following fuel loading and at least once per six months thermfter.
9 HATCH - UNIT l'
' 6-9 f
v I
1 ADMINISTRATIVE CONTROLS AUDITS 6.5.2.8 Audits of unit activities shall be performed under the cognizance of the SRB.
Each inspection or audit shall be perfomed within the specified time interval with:
1.
A maximum allowable extension not to exceed 25% of the inspection or audit interval.
2.
A total maximum combined interval time for any 3 consecutive inspection or audit intervals not to exceed 3.25 times the specified inspection or audit interval.
These audits shall encompass:
a.
The conformance of unit operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.
b.
The performance, training and qualifications of the entire unit staff at least once per 12 months.
c.
The results of actions taken to correct deficiencies occurring in unit equipment, structures, systems or method of operation that affect nuclear safety at least once per 6 months.
d.
The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix "B",10 CFR 50, at least once per 24 months.
e.
The Emergency Plan and implementing procedures at least once per 24 months.
f.
The Security Plan and implementing procedures at lmst once per 24 months.
g.
Any other area of unit operation considered appropriate by the SRB or the Senior vice President Power Supply.
h.
The Fire Protection Program and implementing procedures at least once per 24 months.
1.
An independent fire protection and -loss prevention inspection and
~
audit shall be perfomed annually utilizing either qualified offsite licensee personnel or an outside fire protection firm.
J.
An inspection and audit of the fire protection and loss prevention-program shall be performed by an outside qualified fire consultant at intervals no greater than 3 years. - During the year.in which the inspection or audit occurs,: the -requirements of _ 6.5.2.81 can be affected concurrently.
AUTHORITY 6.5.2.9 -The SRB shall report to and advise the Executive Vice president -
Power Supply on those areas of responsibility specified in Sections 6.5.2.7 HATCH - UNIT 1 6-11
ADMINISTRATIVE CONTROLS RECORDS 6.5.2.10 Records of SRB activities shall be prepared, approved and distributed as indicated below:
a.
Minutes of each SRB meeting shall be. prepared, approved and fowarded to the Executive Vice President-Power Supply within 14 l
days following each meeting.
b.
Reports of reviews encompassed by Section 6.5.2.7 above, shall be
- prepared, approved and forwarded to the Executive Vice l
President-Power Supply within 14 days following completion of the review.
c.
Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Executive Vice President-Power Supply and to the l
managenent positions responsible for the areas audited within 30 days after completion of the audit.
6.6 REPORTABLE OCCURRENCE ACTION 6.6.1 The following actions shall be taken for REPORTABLE OCCURRENCES.
a.
The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.9 b.
Each REPORTABLE OCCURRENCE requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the Commission shall be reviewed by the PR8 and submitted to the SRB and the Manager of Nuclear Generation or the Vice President and General Manager Nuclear Generation.
6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:
a.
The unit shall be placed in at least HOT SHUTDOWN within two hours.
b.
The Safety Limit violation shall be reporteo to tne Commission, the Manager Nuclear Generation or the Vice President and General Manager Nuclear Generation and to the SRB within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
HATCH - UNIT 1 6-12
HADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION (Continued) c.
A Safety Limit Violation Report shall be prepared.
The report shall be reviewed by the PRB.
This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems or structures, and (3) corrective action taken to prevent recurrence, d.
The Safety Limit Violation Report shall be submitted to the Commission, the SRB and the Manager of Nuclear Generation or the Vice President and General Manager of Nuclear Generation within 14 days of the violation.
6.8 PROCEDURES 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:
a.
The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978.
b.
Refueling operations, c.
Surveillance and test activities of safety related equipment.
d.
Security Plan implementation.
e.
Emergency Plan implenentation.
f.
Fire Protection Program implementation.
6.8.2 Each procedure of 6.8.1 above, and changes thereto, shall be reviewed by the PRS and approved by the General Manager prior to implementation and reviewed periodically as set forth in administrative procedures.
6.8.3 Temporary changes to procedures of 6.8.1 above may be made provided:
a.
The intent of the original procedure is not altered.
b.
The change is approved by two members of the plant management staff, at least one of whom holds a Senior Reactor Operator's License on the unit affected, b.
The change is documented, reviewed by the PRB and approved by the General Manager within 14 days of implenentation.
HATCH - UNIT 1 6-13
ATPAGNENT 4 NRC DOCKEP 50-366 OPERATING LICENSE NPF-5 ENIN I. HATCH NUCLEAR PIANP UNIT 2 PROPOSED CHANGE 10 TECHNICAL SPECIFICATIONS Replace the followirg pages of the Unit 2 Appendix "A".
Technical Specifications with the enclosed pages.
The revised pages are identified by amendment ntsnber and contain a vertical line indicatirg the area of change.
Remove Page Insert Page 6-1 6-1 6-2 6-2 6-3 6-3 6-5 6-5 6-6 6-6 6-7 6-7 6-8 6-8 6-10 6-10 6-11 6-11 6-12 6-12
6.0 ADMINISTRATIVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The General Manager shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence.
6.2 ORGANIZATION OFFSITE 6.2.1 The offsite organization for unit management and technical support shall be as shown on Figure 6.2.1-1.
UNIT STAFF 6.2.2 The unit organization shall be as shown on Figure 6.2.2-1 and:
a.
Each on duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2.2-1.
b.
At least one licensed Operator shall be in the control room for cach reactor containing fuel, c.
At least two licensed Operators shall be present in the control room for each reactor in the process of start-up, scheduled reactor shutdown and during recovery from reactor trips.
d.
An individual qualified to impiment radiation protection procedures shall be on site when fuel is in either reactor.
e.
All CORE ALTERATIONS shall be directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.
f.
A Fire Team of at least five members shall be maintained onsite at all times.
The Fire Team shall not include the minimum shift crew necessary for safe shutdown of Units 1 and 2 or any personnel required for other essential functions during a fire mergency.
i
~
6-1 llATCil - UNIT 2
PRESIDENT
{
l EXECUTIVE VICE PRESIDENT POWER SUPPLY SAFETY REVIEW TECHNICAL SENIOR VICE PRESIDENT BOARD SUPPORT POWER GENERATION I
I i
\\ 8 I
l l
i i
I I
GENERAL MANAGER OF I
I VICE PRESIDENT l
L--__.---_.L_______
QUALITY ASSURANCE RAL MANAGR AND RADIOLOGICAL l
NUCLEAR GENERATION l
HEALTH AND SAFETY l
l l
l HATCH MANAGER
- REVIEW QUALITY ASSURANCE NUCLEAR GENERATION
& AUDIT MANAGER l
l l
1 l
ENERAL HATCH L---------------------
MANAG R QUALITY ASSURANCE PLANT HATCH SITE MANAE R LINES OF RESPONSIBILITY
LINES OF COMMUNICATION
- CURRENTLY VACANT FIGURE 6.2.1-1 0FFSITE ORGANIZATION HATCH UNITS 1&2 6 -
1
'~ S ~"E*
- I
- TkJ_:_ __ _ __ _
a CE4t9AL MAN Act R I
I I
NATCN QUALITT 8"eAL Mr.ActX r-------- asseu=3 stra W
L.:._
Cf1st
""I II O' FIII8
j A$,$7. O,A,$ tTE m
,0, Wmiterm I
I t_f._
u_
9%ALFS I
08G L N tit I nc I
I I
I I
l l
l La-_
i i-a w
a 5tTt314TTN3FMT SUFtt1NTINDr47 SUFtt!ETDTUT
' NIIO M E8 ION 'T Sm s trit pr e st gryl a tr*t W Wy JF MATERIA 3 0F QUALITT MA1BTDA9CE ERClerIBIMC BEleWIT FM Et a
- I W.tWi t thG
%p, g,roey CONTROL OrtpAftons Br7t evisog ggggu M HRVICES L t Asr*
wy l
l I
i i
t__
w
- ATER I ALS 5D103 QCALIT) '
E 4C(W Fe tpC g ggg ggg3 FORDIAN CONTROL FtAy; SUM BVISOE 3CFtBVIS05 IFECIALIST5 31stegg I
I I
u_
- t. ::_.
a W
urutALs STAFF SCWDtf[,tJeg &
M ir'T EANCI FEASOKhtL FLANu tug F08t M A S FE CIAlf5 F l
I u_
u asTnDDTs MADTUANCE bNM SL'FEEY!508 5UFMVISOE I
I I
m u._
l l
sEstot $31FT 3D10E Rf CtfLATURT DCtWTHING gNCIMERIMC O
- ggggg, RICULATORT COMFLIAgr1 Sm 8VT50R MAINTDAMCE IN5M61 grFpftSDB ADTIsot SPECLALIST SUPERTISOE C
OLS FMDAN g
l l-I i
i 1
I m
m m
a sarT N8 N?
N" tzG!s"la twEEntNC TECEETCAL facTECTi(#
rssinDDT S RCIALIST InctW E B gAINTDANCI y
ADVISORS BFECIALtfT g ggg FEASONNEL TENCWS I
I I
l u
u u_
mua uncu stALTE FMT5tCS AI44tWISTRATIVE,
MAAg t unAcu FthAW MA tutnG OFMA!!ONt 1..AW
& CHDISTRT
.v I
1 I
I I
i -
w a
w u_
u._
cFnAftoms settatsCS a auCuan REALM FUTSIC5 ImalmsDEM Sm ETNTIEt rf SUPDtKftNDENT CEODDS SECURITT SUPERDTENDUT FinaaCIAL PLArt SUPUTISot ICPERINTUDENT SERTTCt3 ADertWISTRAT!ns I
l l
I t u_
m u_
u_
L.2_
u_
u_
u._
I*E 3 BCCM H RECTWTt fEC OPERATIONS SUTLDINGS &
NUCLEAR ua0RA10tY OFFIG N
"E EA UN smBTISOE
$UFIEVISOS CactNDS SECURITT stygmytsom SITE RTISCG ACCOL1rTANT.
SCPERVISOE FORDAN SUPERTtSOR I
I I
I I h u._
L L A.
$N1FT LABORATORY Ik""I 5L71871508 FCEDAll tactWIB I
I I
I I
I u_
u_
i-u_
W sCweitsoa sm ovis 0e u
C 6 I FustnAs anatros CnDICAL mAttu PnstCS Furf E 4CT,,,ING BADIAft0N AED TRAIBtBG TRA! WING orERATM SUPT av1S03 TECMMICtAWS I
I I
I u_
tr u _.
I I
1 L_1 L 3_
i*
sa. minces 6 TusTsum rr' sincutoa sNtSA QT N"'
"E'L" T
fuwT Centst gFrnAtep suctantes PNT1tCIST l
l l
l l
u_
u_
u_
u_
,_,0, SAFETY &
EtMAR
!aEftUC100 p
9
,y,L",
CSEm 0FuAiva s rtCtAtut O
L Hatch Unit 2 6-3 fIME 6.2.2-1 gult saunlZallas
c ArNTNTSTRATIVE RM'POIS 6.3 UNITSTAFFOUALIFETIOtS 6.3.1 Each member of the unit staff shall meet or exceed the minimum qualifications of AISI N18.1-1971 for comparable positions except for the Health Physics Superintendent who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975, and the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engineerim discipline with cpecific training in plant design, and response and analysis of the plant for transients and accidents.
6.4 TPAINItU 6.4.1 A retraining and replacement training program for the unit staff shall be maintained under the direction of the Senior Methods and Training Specialist and shall meet or. exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55.
6.4.2 A training program for fire protection shall be maintained under the direction of the Senior Regulatory Specialist and shall meet or exceed the requirements of Section 27 of the NFPA Code-1975, except for fire protection training sessions which shall be held at least once per 92 days.
6.5 REVIEW AND AUDIT 6.5.1 PIANI' REVIEW BOARD (PRB)
F_utCTION 6.5.1.1 The PRB shall function to advise the General Manager on all matters l related to nuclear safety.
REPOSITION 6.5.1.2 The Plant Review Board shall be ccuposed of the:
Chairman *:
General Manager Member:
Deputy General Manager Member:
Superintendent of Operations Member:
Superintendent of Maintenance Member:
Health Physics Superintendent Member:
Superintendent of Quality Control Member:
Superintendent of Plant Engineering Services Member Superintendent of Regulatory Compliance Member (non-voting):
Representative of Site Quality Assurance
- General Manager to designate chairman from voting PRB membership as necessary.
ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PPB Chairman to serve on a temporary basis; however, no more than two j
alternates shall participate as voting members in PRB activities at any one time.
HNICII - UNIT 2 6-5
ADMINISTRATIVE CONTROLS MEETING FREQUENCY 6.5.1.4 The PRB shall meet at least once per calendar month and as convened by the PRB Chairman or his designated alternate.
QUORUM
- 6. 5.1. 5 The minimum quorum of the PRB necessary for the performance of the PRB responsibility and authority provisions of these Technical Specifications shall consist of the Chairman or designated Chairman and l
three members including alternates.
RESPONSIBILITIES
- 6. 5.1. 6 The Plant Review Board shall be responsible for:
a.
Review of (1) all procedures required by Specification 6.8 and changes thereto, (2) any other proposed procedures or changes thereto as determined by the General Manager to affect nuclear safety.
b.
Review of all proposed tests and experiments that affect nuclear safety.
c.
Review of all proposed changes to Appendix "A"
Technical Specifications.
d.
Review of all proposed changes or modifications to unit systems or equipment that affect nuclear safety, e.
Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering evaluation and recommendations te prevent recurrence to the Manager of Nuclear Generation or the Vice President and General Manager Nuclear Generation and to the Safety Review Board (SRB).
f.
Review of events requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> written notification to the Commission.
g.
Review of unit operations to detect potential nuclear safety hazards.
h.
Performance of special review, investigations or analyses and reports thereon as requested by the General Manager or the SRB.
HATCH-UNIT 2 6-6
ADMINISTRATIVE CONTROLS RESPONSIBILITIES (Continued) 1.
Review of the Security Plan and implementing procedures and shall submit recommended changes to the SRB, J.
Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the SRB.
AUTHORITY 6.5.1.7 The PRB shall:
a.
Recommend in writing to the General Manager approval or disapproval of items considered under 6.5.1.6(a) through (d) above, b.
Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a) through (e) above constitutes an unreviewed safety question.
c.
Provide written notification with 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Manager of Nuclear Generation or the Vice President and General Manager Nuclear Generation and the Safety Review Board of disagreement between the PRB and the General Manager; however, the General Manager shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.
RECORDS 6.5.1.8 The Plant Review Board shall maintain written minutes of each PRB meeting that, at a minimum, document the results of all PRB activities performed under the responsibility and authority provisions of these Technical Specifications.
Copies shall be provided to the Manager of Nuclear Generation or the Vice President unu beneral Manager Nuclear Generation and the Safety Review Board.
6.5.2 SAFETY REVIEW BOARD (SRB)
FUNCTION 6.5.2.1 The SRB shall function to provide independent review and audit of designated activities in the areas of:
a.
Nuclear power plant operations, b.
Nuclear engineering, c.
Chemistry and radiochemistry.
HATCH - UNIT 2 6-7
ADMTNISTRATIVE CONTROLS FUNCTION (Continued) d.
Metallurgy, e.
Instrumentation and control, f.
Radiological safety, g.
Mechanical and electrical engineering, h.
Quality assurance practices.
COMPOSITION 6.5.2.2 The SRB shall be composed of a minimum of seven persons who as a group provide the expertise to review and audit the operation of a nuclear power plant.
The Chairman and Vice Chairman and other members shall be Power Supply or such other l
appointed by the Executive Vice President person as he shall designate.
The composition of the SRB shall meet the requirenents of ANSI N18.7-1976.
ALTERNATES 6.5.2.3 All alternate representatives shall be appointed in writing by the absent member to serve on a temporary basis; however, no more than two alternates shall participate in SRB activities at any one time and alternate representatives shall not have voting privileges.
CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the SRB Chairman or Vice-Chairman to provide expert advice to the SRB.
MEETING FREQUENCY 6.5.2.5 The SRB shall meet at least once per calendar quarter during the initial year of unit operation following fuel loading and at least once,per -
six months thereafter.
t
'HATCil - UNIT 2 6-8 d.
- #% 7 b
b
,,,s
i O
ADMINISTRATIVE CONTROLS AUDITS 6.5.2.8 Audits of unit activities shall be performed onder the cognizance of the SRB.
Each inspection or audit shall be performed within the specified time interval with:
1.
A maximum allowable extension not to exceed 25% of the inspection or audit interval.
2.
A total maximum combined interval time for any 3 consecutive inspection or audit intervals not to exceed 3.25 times the specified inspection or audit interval.
These audits shall enempass:
a.
The conformance of unit operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.
b.
The performance, training and qualifications of the entire unit staff at least once per 12 months.
The results of actions taken to correct deficiencies occurring in c.
unit equipment, structures, systems or method of operation that affect nuclear safety at least once per 6 months.
d.
The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix "B",10 CFR 50, at least once per 24 months.
The Emergency Plan and imp 1menting procedures at least once per 24 e.
months.
f.
The Security Plan and implementing procedures at least once per 24 months.
g.
Any other area of unit operaticn considered appropriate by the SRB or the Senior vice President Power Supply.
h.
The Fire Protection Program and impimenting procedures at least once per 24 months.
1 1.
An independent fire protection and loss prevention inspection and audit shall be performed annually utilizing either qualified offsite licensee personnel or an outside fire protection firm.
J.
An inspection and audit of the fire protection and loss prevention program shall be performed by an outside qualified fire consultant at intervals no greater than 3 years.
During the year in which the inspection or audit occurs, the requirements of 6.5.2.81 can be affected concurrently.
AUTHORITY 6.5.2.9 The SRB shall report to and advise the Executive Vice president -
]
Power Supply on those areas of responsibility specified in Sections 6.5.2.7 IIATCH - UNIT 2 6-10
ADMINISTRATTVE CONTROLS RECORDS 6.5.2.10 Records of SRB activities shall be prepared, approved and distributed as indicated below:
a.
Minutes of each SRB meeting shall be. prepared, approved and fowarded to the Executive Vice President-Power Supply within 14 l
days following each meeting.
b.
Reports of reviews enccmpassed by Section 6.5.2.7 above, shall be
- prepared, approved and forwarded to the Executive Vice l
President-Power Supply within 14 days following completion of the review.
t c.
Audit reports encompassed by Section 6.5.2.8 above, shall be
~'
forwarded to the Executive Vice President-Power Supply and to the l
management positions responsible for the areas audited within 30 days after completion of the audit.
6.6 REPORTABLE OCCURRENCE ACTION 6.6.1 The following actions shall be taken for REPORTABLE OCCURRENCES.
i The Commission shall be notified and/or a report submitted pursuant a.
to the requirements of Specification 6.9 l
b.
Each REPORTABLE CCCURRENCE requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the Commission shall be reviewed by the PRB and submitted to the SRB and the Manager of Nuclear Generation or the Vice President and General Manager Nuclear Generation.
6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:
a.
The unit shall be placed in at least HOT SHUTDOWN within two hours.
b.
The Safety Limit violation shall be reported to the Commission, the Manager Nuclear Generation or the Vice President and General Manager Nuclear Generation and to the SRB within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
9 HATCH - UNIT 2 6-11 1
l I
(
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION (Continued) c.
A Safety Limit Violation Report shall be prepared.
The report shall be reviewed by the PRB.
This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems or structures, and (3) corrective action taken to prevent recurrence.
d.
The Safety Limit Violation Report shall be submitted to the Commission, the SRB and the Manager of Nuclear Generation or the Vice President and General Manager of Nuclear Generation within 14 days of the violation.
6.8 PROCEDURES 6.8.1 Written procedures shall be established, implmented and maintained covering the activities referenced below:
a.
The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February 1978.
b.
Refueling operations.
c.
Surveillance and test activities of safety related equipment.
d.
Security Plan implementation, e.
Emergency Plan implementation.
f.
Fire Protection Program implementation.
6.8.2 Each procedure of 6.8.1 above, and changes thereto, shall be reviewed by the PRB and approved by the General Manager prior to implmentation and l
reviewed periodically as set forth in administrative procedures.
6.8.3 Temporary changes to procedures of 6.8.1 above may be made provided:
a.
The intent of the original procedure is not altered, b.
The change is approved by two members of the plant management staff, at least one of whom holds a Senior -Reactor Operator's License on the unit affected.
b.
The change is documented, reviewed by the PRB and approved by the General Manager within 14 days of implementation.
l l
l HATCH - UNIT 2 6-12
_ _.