Kr STONE & WEBSTER MICHIGAN, INC.
P.O. box 2325. BOSTON. M ASSACHUSETTS O2107 Mr. J. G. Keppler, Administrator, Region III December 21, 1983 Nuclear Regulatory Commission J.0. No. 14509 799 Roosevelt Road NRC File #83-12-21 Glen Ellyn, Illinois 60137 DOCKET N0. 50-329/330 CIO WEEKLY REPORT NO. 27 MIDLAND PLANT - UNITS 1 AND 2 The Construction Implementation Overview (CIO) Weekly Report No. 27 for the period December 12, 1983 through December 16, 1983, is enclosed.
This report includes a summary of CIO activities for the week and open Items, NIRs, and Hold Points.
J. u Ba, n 6/
e
[ PRINCIPAL STAFF S. W. Baranow
/
WA 4-- PRa Program Manager J/AA
~:.5 4/AA Enclosures wsP VlC
-4vEA SWB/fs Mo scs/
- fd ML cc:
- NF Fije gp JJHarrison, US NRC Glen Ellyn, IL RJCook, US NRC Midland (site)
DLQusmme, CPCo Midland (site)
RAWells, CPCo Midland (site)
RBKelly, S&W APAmoruso, S&W 8402070454 840203 DR ADOCK 05000 JAN 91984
.-,.p
-y
-r-
~
Report No. 27 December 12, 1983 through December 16, 1983 Personnel on Site Stone & Wet' ster Michigan, Inc.
A. Amoruso R. Corson W. Taylor E. Barcomb S. Baranow C. Marrs J. Thompson D. Beauchamp j
F. Bearham D. MacBay R. Butler D. Brown i
J. Barr T. Parker N. Wetherell T. Baumgartner R. Carpeggiani A. Smith S. Narayandas B. Kasson J. Chawla R. Scallan J. Karr G. Dick W. Sienkiewicz J. Seely D. Wells i
D. Cooke L. Var Arsdale J. Ridge I
CIO ACTIVITIES
}
A.
Summary
- 1) Review of architectural documents processed through the register reconciliation phase, Phase III, of the FCR/FCN Resolutica Program.
- 2) Review of Civil Documents processed through the resolution phase, Phase II, of the FCR/FCN Resolution Program.
- 3) Evaluation of Construction Non-Manual Training Records.
- 4) Attendance at meetings.
B.
Details (Paragraphs below correspond to items above)
- 1) To verify the adequacy of steps taken in the register reconciliation phase, Phase III, of the FCR/FCN Resolution Program, Architectural documents assigned to four stations were sampled. Stick files were checked to ensure that the documents selected were present. Also, the documents were checked for consistency with the document registers.
No discrepancies were found with documents that had been processed through the FCR/FCN Resolution Program. One controlled drawing, which was not affected by and FCR or FCN and, therefore, not processed through the Resolution Program, was missing from a stick file. This discrepancy was documented by NIR 009.
Similar checks will be conducted using documents from other disciplines when those documents become available.
i
o JOB NO. 14509 MIDLAND NUCLEAR POWER PLANT REPORT NO. 27 PAGE 2 I
- 2) To verify the adequacy of steps taken in the resolution phase, Phase II, of the FCR/FCN Resolution Program, civil drawings were sampled. Resolution sheets for the FCRs and FCNs associated with those drawings were reviewed. Results of the sampling were j
satisfactory, although one FCR was rejected. Resolution sheets
}
for that FCR did not indicate clearly whether one or two drawings were affected by the change. This discrepancy was documented by NIR 010.
Similar checks will be conducted for other disciplines when those documents become available.
i
- 3) To verify the adequacy of steps taken to correct the training records of construction non-manual personnel, ten records that had been processed through the corrective action program were evaluated.
No discrepancies were found.
Additional records will be reviewed as they become available.
- 4) Meetings attended are summarized in Attachment A.
l l
NEW CIO ITEMS t
- 1) Tracked Action Item - #39 To check the adequacy of the register reconciliation phase, Phase III, of the FCR/FCN Resolution Program, a sample of controlled architectural documents Peld at four stations were reviewed. Although no discrepan-cies were found with documents that had been processed through the Resolution Program, a drawing that had not been processed, A-213 at QC Station No. 55, was found missing from a stick file. NIR 009 was issued to document the deficiency. MPQAD added drawing A-213 to the file and a re-sampling was conducted. That check was satisfactory and the item and NIR were closed.
- 2) Tracked Action Item - #40 To check the adequacy of the resolution phase, Phase II, of the FCR/FCN Resolution Program, a sample of civil drawings was reviewed. Resolution sheets for one' FCR, FCR C-1526, were found to be ambiguous. The sheets were unclear as to whether the FCR affected both of the drawings listed, C-358 and C-479. Field project engineering has issued another resolu-tion sheet, which is being reviewed.
o b
JOB NO. 14509 MIDLAND NUCLEAR POWER PLANT REPORT NO. 27 PAGE 3 OPEN ITEMS, NONCONFORMANCES, AND HOLD POINTS Open CIO items are summarized in Attachment B.
Item 039 was closed f
during the reporting period.
Open CIO Nenconformance Identification Reports (NIRs) are summarized
^t in Attachment C.
NIR 009 was closed during the reporting period.
Open CIO Hold Points are summarized in Attachment D.
GENERAL Item 2 under US NRC Exit Meeting on Page 4 of CIO Weekly Report No. 20, should be corrected to read as follows:
- 2) Report RPT 8318-8319 - sixty-eight HVAC material samples were selected by the NRC and subsequently tested for chemical and physical properties which included chemical analysis, hardness, tensile, bend, and macroscopic examination of specimens. Results of the tests were satisfactory.
n..
-~---,,, -,-. >,
-r
..-r--m--
qw r
MEETING LIST r
DATE MEETING TITLE ATTENDEES DISCUSSION CONTENT CIO COMENTS Dec. 12 Daily Staff CPCo Status of CCP activities and coordination No areas of concern through Management BPCo identified.
j Dec. 16, Meeting S&W CIO 1983 MPQAD Dec. 12 Team Meetings CPCo Status of schedule restraints.
No areas of concern through BPCo identified.
Dec. 16, S&W CIO 1983 Dec. 13 QVP/ Status CPCo Status of actions to resolve Stop Work Orders.
No areas of concern 2
1983 Assessment BPCo identified.
Meeting MPQAD S&W CIO Dec. 14 &
Team Super-CPCo Status of schedule restraints at team level.
No areas of concern 15, 1983 vision BPCo identified.
1 Meetings MPQAD S&W CIO Dec. 16 Subcontractors BPCo Status of training procedures and schedules No areas of concern 1983 Meeting Site-Sub-in response to Stop Work Orders.
identified.
Contractors l
4 m
l 1
i 5
1 e
1 i
ATTACHMENT A
[
STONE & WE8 STER MICHIGAN, INC.
MIDLAND NUCLEAR C0 GENERATION PLANT CIO ITEMS ITEM CLASSIFI-ORIGINATING CPCo RESPONSE ZTATUS CLOSE-00T t
NO.
CATION ITEMS DOCUMENT /DATE DOCUMENT /DATE OPEN/ CLOSED DOCUMENT /DATE j
030 Tracked Need to review Vendor Equipment Report No. 5 Open Action Verification Program - MPQAD/SMO 7/18/83 l
j 032 Tracked NIR 006 issued on October 27, 1983, Report No. 20 Open Action to address administrative discrepan-10/31/83 cles in the Construction Training Records of Teams 5, 6, 8, 9, 12, 13, 16, 17, 19, 20, 25, 26 (27/28) 29, j
30, 31, 32/33 and BHO staff.
i j
033 Tracked NIR 007 issued on November 7, 1983, Report No. 21 Open Action to dddress administrative discrepan-11/08/83 cles in the Construction Training i
Records for Teams No. 24, Field Pro-curement, Subcontractor Management, Field Engineering Staff, and Con-l struction General Services Organi-
)
zation.
l' a
034 Tracked NIR 008 issued on November 14, 1983 Reoort No. 22 Open l
I Action to address upgrading five training 11/14/83 level codes in the System Team j
Training Natrix.
l i
j Page 1 Attachment B
STONE & WEBSTER MICilIGAN, INC.
MIDLAND NUCLEAR C0 GENERATION PLANT CIO ITEMS ITEM CLASSIFI-ORIGINATING CPCo RESPONSE STATUS CLOSE-0VT NO.
CATION ITEMS DOCUMENT /DATE DOCUMENT /0 ATE OPEN/ CLOSED DOCUMENT /DATE 035 Tracked CIO observed that dielectric iso-Report No. 22 Open Action lation spacers for galvanic pro-11/14/83 tection of copper pipe to galvanized I
steel pipe supports were missing in some areas on the Small Bore (Instru-ment Air) KAC System, drawing FSK-J-30-0220 Sheet 2 Rev.7.
1 i
j 036 Tracked At a meeting of Teams 26 and 27 Report No. 24 Open Infor-held on November 22, 1983, the als-11/29/83 mation continuance of FCNs for "Q" items was discussed.
If this change is to be implemented, new instructions are required.
)
037 Tracked CIO observed that two boards with Report No. 24 Open i
Action protruding nails lying in Cable Tray 11/29/83 1AKA019 (Q Tray) had punctured the As revised by cable Jacket of a "Q" cable. The Report No. 25 cable is Q-channel A, 480V, MCC.
12/5/83 NCR C00925 was issued by MPQAD on 1
November 22, 1983. CIO will track this item to assure that corrective action (repair) has been performed to approved procedures.
Page 2 Attachment B
..g g
STONE & WEBSTER MICillGAN, INC.
MIDLAND NUCLEAR COGENERATION PLANT CIO ITEMS ITEM CLASSIFi-ORIGINATING CPCo RESPONSE STATUS CLOSE-OllT NO.
CA110N ITEMS DOCUMENT /DATE DOCUMENT /DATE OPEN/ CLOSED DOCUMENT /DATE 038 Tracked CIO reviewed a checklist developed Report No. 26 Open Action by Bechtel Field Engineers for use 12/13/83 in conducting Status Assessment to Procedures FPN-7.000, Rev.1. Check-list did not include all of the attributes required by the procedure.
- i. -
039 Tracked NIR 009 issued on December 11, 1983, Report No. 27 Verbal Closed NIR 009 Action to address a missing controlled 12/21/83 12/13/83 drawing from Station 55.
040 Tracked NIR 010 issued on December 14, 1983 Report No. 27 FCR Resolution Open Action to address the ambiguity on the 12/21/83 Sheet of 12/15s resolution sheets of FCR C-1526 as 83 to FCR C-to which drawings were affected.
1526 1
1 l
Page 3 Attachment B
9 e....
STONE & WEllSTER HICllIG AN, INC.
i NONCONIORMANCE IDENTIFICATION REPORT (NIR)
SUMMARY
NIH MPQAD DATE DATE DATE NO.
NCR NO.
SUBJECT OF DISP.
CLOSED REMARKS QAR NO.
ISSUE MPnAn 006 Adatinistrative discrepancies in Con-10/28/83 i
struction Training Records involving j
CCP Teams, 007 Administrative discrepancies in Con-11/7/83 j
struction Training Records for the following teams: No. 24, Field Procure-1
{
ment, Subcontractor Management, Field 1
Engine 7 ring Staff, and Construction General Sersices Oraanization.
008 Need to upgrade five training level 11/14/83 codes in the System Team Training Matrix.
009 A missing controlled drawing from 12/11/83 12/12/83 12/13/83 Missing drawingadded i
Station 55.
to the controlled i
drawing stick file.
}
Re-sample verified t
i accuracy of stick file holdings.
010 An ambiguity on the resolution sheets 12/14/83 12/15/83 Field Project En-of FCR C-1526 as to which drawings were lgineering issued an affected.
' additional resolution
' sheet to clarify the j
- ambiguity.
i 1
i ATTACHMENT C
STONE & WEBSTER MlCllitiAN, INC.
HOLD POINT SUFt1ARY I
ORIGINAllflG CPCo RESP 0tiSE STATilS CI OSI ido NO.
SUBJECT j
DOC /DAIE DOC /DATE OPEN/Cl0 SED DOCfitt-n i
1 i
I l
- i e
005 CPCo has committed to develop a Vendor Equipment Report No. 18 Open j
Verification Program. Program is required 10/17/83 l
1 before implementation of Phase II.
I a
007 Evaluation of Management Review of results of Report No. 19 Open Phase I activities. Evaluation is required 10/24/83 i
before implementation of Phase 11 i
i l
l
]
]
i 6
[
Page 1 AITACHMENT D
C, r
i l
$ TONE & WEBSTER MICHIGAN, INC.
HOLD POINT SumARY j
ORIGINATING CPCo RESPONSE STATUS CLOSE-0UT 1
SUBJECT DOC /DATE DOC /DATE OPEN/ CLOSED DOC /DATE NO.
1 1
]
010 NIR 008 was issued on November 14, 1983 Report No. 22 Open to address upgrading five items in the System 11/14/83 i
Team Training Matrix of the Construction Training Program.
)
Corrective action must be completed before any walkdown assessments can be performed by the I
personnel involved in these training activities.
i l
l 011 Prior to lifting of Stop Work Orders relating Report No. 23 Open
+
to the FCR/FCN Review and Resolution Program, i 11/21/83 1
i CIO has established a Hold Point at the conclusion of Phase 11 activities to evaluate 4,
the adequacy of MPQAD perfomance during Phase'I j
and Phase II activities. The Hold Point j
encompasses all the Stop Work Orders with the i
exception of Stop Work Order No. FSW-36 which i
has been lifted by MPQAD. This Hold Point does i
not apply to Phase III.
i 1
l i
I i
l Page 2 ATTACHMENT D
2 O.
$iONE A WEBSTER MICillGAN, INC.
HOLD POINT SIM4ARY 1
3 ORIGINATING CPCo RESPONSE STATUS CLOSE-0tli j
NO*
SUBJECT j
DOC /DATE DOC /DATE OPEN/ CLOSED DOC /DATE
~
008 NIR 006 was issued on October 27, 1983, to Report No. 20 Open address discrepancies observed during the 10/31/83 sample inspection of 2.054 Construction Training records of 31 members of Teams 5, 6, 8, 9, 12, 13, 16, 17, 19. 20. 25, 26, (27/28), 29, 30, 31, (32/33) and BHO staff.
Corrective action must be completed before any
- walkdown assessments can be performed by the
~
l personnel in question.
l I
i i
009 NIR 007 was issued on November 7,1983, to Report No. 21 Open j
address discrepancies observed during sample 11/7/83 j
inspection of 834 Construction Training records of 18 members of Team 24, Field Procurement.
Sub-Contractor Management, F. E. staff and l
Construction General Services Organization.
}
Corrective action must be completed before any walkdown, assessments can be performed by the personnel in question.
I
{
e i
)
Page 3 ATTACHMENT D l
4 STONE AND WEBSTER ENGINEERING CORPORATION QCI 15.01 tac en 4.1 NONCONFORMANCE IDENTIFICATION REPORT DATE OF NONCONFORMANCE: December 11, 1983 NIR NUMBER 009 IDENTIFICATION / LOCATION OF ITEMS:
Support Services Building Q.C. Station #55 DESCRIPTION OF NONCONFORMANCE:
A sample inspection was performed of controlled Architechural drawings at 0.C.
Station No. 55. A sample size of 50 drawings representing a lot size of 224 drawings w u selected. Accept / Reject criteria is; Accept 0 Reject 1.
Drawing No. A-213 was missing from Station 55 control drawing sticks. As a result, the entire lot of the 224 drawings has been rejected.
6 This NIR describes a deficiency against the Document Control Center. A check of the Control Card for drawing A-213 does not show any FCR/FCNs as being applicable.,
I b'
uM m PROGRAM MGRA,
-19 INhilATOR \\ ~
DATE bd/h $
DATE hzpf.5 CORRECTIVE ACTION BY:
MPOAD IDENTIFY ORGANIZATION TAKING CORRECTIVE ACTION Corrective action had been accomplished by MPQAD. CIO verified that the missing dwgs had been added to the controlled stick dwgs and perfomed a sample inspection of the drawings at this station. The review was considered to be satisfactory and acceptable in meeting the requirements of FID-2.400 Rev. 3, Review and Resolution Program. Corrective Action completed on December 12, 1983.
VERIFICATION SATs# UNSAT NEW NIR#
CON (AlRRENCE I INITIATOR 2.k undM PROGRAM MG DATE
\\ t \\ \\ b 7)h DATE DATE d S//B This NIR as issued is closed as corrective action has been completed.
! REMARKS 9
, - +
+
a STONE AND WEBSTER ENGINEERING CORPORATION QCI 15.01 NONCONFORMANCE IDENTIFICATION: REPORT fttacMa,n 4.1 DATE OF NONCONFORMANCE:
December 14, 1983 NIR NUMBER 010 IDENTIFICATION / LOCATION OF ITEMS:
Civil Review Phase II FCR/FCN/ Midland-CIO Office DESCRIPTION OF NONCONFORMANCE:
The FCR/FCN C-1526 did not indicate which drawings, whether it be C-358, C-479 or both, were affected by this change. Subsequent resolution sheets did not clarify this situation. Due to these facts CIO concludes that a potential exists for FCR C-1526 to be misapplied to the drawings.
9 4
I TNM
.S. n00 m PROGRAM MGR [. [ c w p g
INI71AIOR
/
/
DATE
\\ 1. - \\% - 9 $
DATE
/2 OM:r
/
/
l CORRECTIVE ACTION BY:
MP0AD - Field Engineer IDENTIFY ORGANIZATION TAKING CORRECTIVE ACTION The Project Engineer has issued an aoditional FCR Resolution Sheet, approved by MPQAD dated December 15, 1983, to clarify the above nonconformance.
VERIFICATION
- SAT, UNSAT NEW NIR# di/A CONCURSitiCE j
PROGRAM MGR INITIATOR DATE DATE DATE F.EMARKS : This NIR was generated while the work was in proaress.
,3
~
'. FOR 1 RESOLUTION SHEET e.M jj 3
3
)s..
..m1
.. J..-
Anna. ' ~
00?
C-\\$2]p ren m~
-m cuenue- %&ca clu eurx.
foe Msec 3
=
1 i
Eumar. IxPAcT sTimerr (q ns
) tJo imNT-6ce. Ms.& S i
conazCun AcnoN:
Ft.2 L-o6z& s s PeoPdil~A kPPLu&m
~~
/
-T6 Ddd. d-4.~14(C. 6i,Jte_. n-hh cai6e.
V NONE CORRICT DISTAI3UITON MM6 TT416 'tW J!r.,
FcA2. 6Ar),rLT3
-Ihrd I CORRICT FCa EG.ws.Nd kr M+4GD v tu& /. 4~74d2 FI.ACI FC1 ON HOI.D L
id/DCP64"-MT'i M (Jf -Tidi6 (-44NI k I
uIn NCm 16 P m 6n, INVESTIGATI FUIS EE RE CONTACT (IT QUISH0NA3LE)
PREPARED ET;//'
//z [/4-FE CO RR. M. AC"IOM COMPI.I:'E DATE #
/II"JZ3 3T:
(, 4
/
I.ZAD MPQAD Acc.,e
& % eed C/A h-L *
- 7 % f*- TE.7 U
Y/4/4_ r& -A n At/? -
MOBfWoltK3
/
_,.. ?. )'...-
_ _, - -. -, -.,,.,,, - - - - - - - - - - - - - - - - - - - - - ~ - - - ' - " '
' ' ~ '
~ ~ ~ ~ ' - ' ~ ~ ~ ~ ' ' ' ' ~ ~ ~ ~
~ ~ ~ ~
FOR RESOLUTION SHEET g
Z ;3
/
hop rCR d.--!c16.
AarA C-%8)(G\\.
PROBLIM:
Proiect Encineerino's remaries do not addrecs any SPEC.
PCTINTIAL Dd2ACT STATIMINI (
NO) Nene. This chance wac r e r --
d-
- +<-
++w.
set <3 /2/s/es r-UwF5EC and M a unicue instellation.
All h DEC enfoconced did a e,cuire revisien p
f-35f/c)-
and the chance was not misacolied te thes
/ SPEC.
???.
5
~
CORRE::TIVE AC/ ION:
6
)$
/b CD blY)l'5 T ( [
~
inh)
Pnf f f fC N n ( C b W r & d f Q-Y NONE CORRICT DISTRI3CITON 8[
.O C
$ /.
E (_ d. S b b C
h etM5 )
s INITIATI CORRICT TCR r u.-
9/c 8v4 m ss7In iri4.f e
%/
%/
hs k
///3h8 sz,/,rbi jrk s PLACE TCR ON BOLD WRITE l065khdU cx chW me.,aW M ^
i 4
runszR s
Yhl7 '~$SMW h-
'M
,,, /.
J.,,
RE CONTACT (IT MSTIONABLZ)'
m.aaan A.;_2 g p
.g c/4 87 W
-""'--M n
i FIIPARE 37:
/gh
/{/!?[8.7 FI CORRECTIVE ACTION COE.T
~
~
Daz dd[ O ///.3!MLEAD RIT!I'C 3T:
DAIZ '
VIIITII3 3Y I
p
/ NAM 3 N Yy# MM72 '"* i"W l'
E FCR R.ISOL TION /WORI.31.
l of Frecosed C/A
- .d'5.5-Y.
4c.d5.mwmmw.wrg2 ~=e.:..
a+i..
j FOR RESOLUT ON SHEET '
3
- d. -/5 fl bP ra
=
m,
- Im i U oMR. O i 96c. a =cci Te h d-V79 /o) a bMacc eW ' Pe n.wcr msu n eee t Me<, ecm Aen was um-
/*/S/tt/isl4.T.
,.m.uz. ::xn= sn zuzs: @sodu]d /596C 0 d79[M
-i$-74' w.
i ap=cc'rsb ss, t n n M G.c,
c.a a s c A wac met gangetc i
ANB e o A 6 NNoe.
A iwtCU6 i u sTA LL AT:ci.M, A M I\\
NB xior QecorRA A e M A M A-4 To A i I. T4A A;:FMTA_B l
seu (Est
,a e en+e To
=ogne,w
, onex is ACCCkBANc4 of ITH TH 6 CH AM&6.
C*I2LC:"TZ l':" C3:
8ME_FM t-t-en -/
Tod
/s Wh/NLC O L>C.tL '+bb7 '
^
?
~
XC322
"'*JC"lN i
.bf b
25 a4..A 2 CC3220 '73d66. den-6 Aj# Mi O N.
f!
NS bD
@. 30 @CD -$dd b, Off \\Mb rr.ac: rca s see
- 2. N
/
A7
/
) J-4 1R =2 3C1 f - n,/ _
/Yn sz/.r/*_7 e>
^onecr aus ww w c-YNN C Y Y
,0)H Y _
if a
/Ylff"'
O \\r J O J,er tt k
II C::'.C1C"' (7 ym..:T2121,Z)
EPe *3 a,,
O r i R
et Frepoemt ClA W
f2O MfE/hN3 A
/
i m zw== b /blu inhle r=
co m eg g g g g.__
1.-
w=
h u.
~== S hl$ a M D i d %
~*
i cm..
c
- h I
0 M. a 2-*
i i
f.$
k,
$hi s..* c.N..
1
. p, _,, _
..... - -. - - -. - -. ~. -. -.. - -..... - -. -. -, - - - -
t
,e l
^
FEE w.ANGE REBEhT/IER CH.JGE NQTICE da usz Re5efore,d
,,,,,,,,,,,,1. 659-0 a
g:on_
=p me, Conc. at E 7220 C-358 - 0 M)).
1 QC enspanansv mso maris cussa ces massarunameo oara maronnom op g-/.d -((
M RSQUIRED.
c=ames ANS q
PROPOEED g
f./1P-78 t
vase acQ 4.c7 W Ne L Mn PCR@PCNC F4'C7/mm
' To facilitate construction. A constniction opening is required -
l l
in the north and south refueling canal walls to install the steam generators.
~ ~ ~ ~ - ~
ExumNG.cQNOmOE Ngs. C-357 & C-358 show the.fil horizontals 1st and 3rd layer splicing at the center of the north and south refueling. canal galls,
~
o ECE1VEg
@Y18$6 CO2P.
PO 3ECHTELjo$
j Field requests approval to inEtafi'Yp'iic.-e lengths as shown osscmmom c7 N below:
I -
7-g 9-o l
l e
e x
g n
H
' -7 saa.o a n*W J unsw wn'~
l
)
e Alors:
- W T p,es,.
seg pu, youz y
j
= 4=c45 w,,ces re D E@Co C,.4As4s A/As,L s i SKween,y s voeuc aus s FuGUAlp M $ C T.
OPP. NhevD
- 2. Pu;$.
CANhl. iM9LL
'"fesst $lM gec'o
- a. w d Interim Approval' by the Resident Engineer [2
/.4 -4 9 - 7 V e
~
amen-cnno sus:nncas, insmussawranon nsecms.cm.
rwnes wouwma on OmanE 50 8
Y Nh NOIP
/
J J
l J
.;ps m1WhatY \\
J
\\
mir'o"ptWSauart i
i I
I
,.o.cr -.
. - om FCR APPROVED YES 7 NO [ #4c/gp,hd... VW-7#
" ~ ~ rb n w r w a & s sto.,
n,gs g n e
~if 4 Jn/
1 410011 M a,
-.. =
0
.c---.-n,_
._n,,---_,
_.e
-~-.,---_._.,----,.w-,,,._
STONE & WEBSTER MICHIGAN, INC.
P.O. Box 2325. BOSTON. M AssAcHusETTs 02107 Mr. J. G. Keppler, Administrator, Region III December 28, 1983 Nuclear Regulatory Commission J.0. No. 14509 799 Roosevelt Road NRC File #83-12-28 Glen Ellyn, Illinois 60137 DOCKET NO. 50-329/330 CIO WEEKLY REPORT NO. 28 MIDLAND PLANT - UNIT 5 1 AND 2 The Construction Implementation Overview (CIO) Weekly Report No. 28 for the period December 19, 1983 through December 23, 1983, is enclosed.
This report includes a summary of CIO activities for the week and open Items, NIRs, and Hold Points.
$.O B w l f -_ J S. W. Baranow Program Manager PRINCIPAL STAFF
.tv:enp Enclosures
?/RA
- E A/RA Rv SWB/fs V 9C 2,. %yA 70 SCS#
14 3
CC:
JJHarrison, US NRC Glen Ellyn, IL MLA ML 7
I RJCook, US NRC Midland (site)
. _f1F File
..gf..
l DLQuamme, CPCo Midland (site)
RAWells, CPCo Midland (site) l RBKelly, S&W l
APAmoruso, S&W l
,u l
i
\\
[%
k A
1.' l 1
JAN 9 1984
Report No. 28 December 19,1983 through December 23, 1983 Personnel on Site Stone & Webster Michigan, II.c.
A. Amoruso D. MacBay J. Thompson E. Barcomb F. Bearham T. Parker R. Butler D. Beauchamp R. Carpeggiani A. Smith N. Wetherell D. Brown J. Chawla R. Scallan S. Narayandas T. Baumgartner i
D. Cooke J. Seely J. Karr B. Kasson R. Corson L. Van Arsdale D. Wells G. Dick C. Marrs W. Taylor J. Ridge CIO ACTIVITIES A.
Summary
- 1) Review of architectural documents processed through the register re-conciliation phase, Phase III,of the FCR/FCN Resolution Program for the remaining 29 stations.
- 2) Preparations for review of Civil documents processed through tire register reconciliation phase, Phase III, of the FCR/FCN Resolution Program.
- 3) Attendance at meetings.
B.
Details (Paragraphs below correspond to items above)
- 1) The review of architectural drawings and specifications at the re-maining 29 stations was started but was stopped when information was received that Vendor Drawings and FSKs were not included in the l
I packages being reviewed. This effort will start again when all architectural documents at each of the remaining 29 stations have been cleared by the scheduled M?QAD audit.
1 l
- 2) Sampling plans were developed to evaluate Civil drawings, speicfi-cations, vendor prints, and FSKs which are held in the stick files l
of five stations. These plans will be carried out after the docu-ments have been processed through the register reconciliation phase of the FCR/FCN Resolution Program and after MPQAD completes an audit of the Program.
I
- 3) Meetings attended are summarized in Attachment A.
7-JOB NO. 14509 MIDLAND NUCLEAR POWER PLANT REPORT NO. 28 PAGE 2 GPEN ITEMS, NONCONFORMANCES, AND HOLD POINTS Open CIO items are summarized in Attachment B.
Item 040 was closed.
during the reportino period.
Open CIO Nonconformance Identification Reports (NIRs) are summarized in Attachment C. NIR 010 was closed during the reporting period.
Open CIO Hold Points are summarized in Attachment D.
GENERAL Mr. J. R. Langston and Mr. W. C.' Taylcr completed their assignments with the CIO team and were transferred.
O q.
MEETING LIST r
DATE MEETING TITLE ATTENDEES DISCUSSION CONTENT CIO ComENTS Dec. 19 Daily Staff CPCo Status of CCP act'vities and coordination Document Control Super-through Management BPCo vision should be intensified Dec. 22, Meeting S&W CIO 1983 MPQAD Dec. 19 Team Meetings CPCo Status of schedule restraints.
No areas of concern through BPCo identified.
Dec. 22, S&W CIO 1983 Dec. 20, QVP/ Status CPCo Status of actions to resolve Stop Work Orders.
No areas of concern 1983 Assessment BPCo identified.
Meeting MPQAD S&W CIO Dec. 21 &
Team Super-CPCo Status of schedule restraints at team level No areas of concern 22, 1983 vision CPCo identified.
Meetings MPQAD S&W CIO 5
e e
9 e
ATTACHMENT A
STONE & WEBSTER MICllIGAN, INC.
MIDLAND NUCLEAR COGENERATION PLANT CIO ITEMS ITEM CLASSIF1-ORIGINATING CPCo RESPONSE STATUS CLOSE-00T NO.
CATION ITEMS DOCUMENT /DATE DOCllMENT/DATE OPEN/ CLOSED DOCUMENT /DATE 030 Tracked Need to review Veader Equipment Report No. 5 Open Action Verification Procrcam - MPQAD/SM0 7/18/83 i
~
i 032 Tracked NIR 006 issued on October 27, 1983 Report No. 20 Open Action to add.^ess administrative discrepan-10/31/83 cies in the Construction Training i
Records of Teams 5, 6, 8, 9, 12, 13, 16, 17, 19, 20, 25, 26 (27/28) 29, 30, 31, 32/33 and 0110 staff.
033 Tracked NIR 007 issued on November 7, 1983, Report No. 21 Open Action to address administrative discrepan-11/08/83 cles in the Construction Training a
i Records for Teams No. 24, Field Pro-i curement, Subcontractor Management, j
Field Engineering Staff, and Con-struction General Services Organt-zation.
i 034 Tracked NIR 008 issued on November 14, 1983 Report No. 22 Open i
\\ction to address upgrading five training 11/14/83 level codes in the System Team j
Training Matrix.
i l
j Page 1 ATTACHMENT H
STONE & WEDSTER MICllIGAN, INC.
MIDLAND NUCLEAR COGENERATION PLANT CIO ITEMS ITEM CLASSIFI-ORIGINATING CPCo RESPONSE STATilS CLOSE-0JT NO.
CATION ITEMS DOCUMENT /DATE DOCUMENT /DATE OPEN/ CLOSED DOCUMENT /DATE 035 Tracked CIO observed that dielectric iso-Report No. 22 Open Action lation spacers for galvanic pro-11/14/83 tection of copper pipe to galvanized i.
steel pipe supports were missing in some areas on the Small 8 ore (Instru-ment Air) KAC System, drawing FSK-J-
]
30-0220 Sheet 2, Rev.7.
i 036 Tracked At a meeting of Teams 26 and 27 Report No. 24 Open Infor-held on November 22, 1983, the dis-11/29/83
)
mation continuance of FCNs for "Q" items i
was discussed.
If this change is to be implemented, new instructions 1
are required.
)
037 Tracked CIO observed that two boards with Report No. 24 Open i
t.ction protruding nails lying in Cable Tray 11/29/83 IAKA019 (Q Tray) had punctured the As revised by cable jacket of a "Q" cable. The Report No. 25 cable is Q-channel A, 480V, MCC.
12/5/83 NCR C00925 was issued by MPQAD on November 22, 1983. CIO will track this item to assure that corrective action (repair) has been performed j
to approved procedures.
-1 I
Page 2 ATTACHMENT B
STONE & WEBSTER MICHIGAN, INC.
MIDLAND NUCLEAR C0 GENERATION PLANT CIO ITEMS l
ITEM CLASSIFI-ORIGINATING CPCo RESPONSE STATUS CLOSE-0VT i
NO.
CATION ITEMS DOCUMENT /DATE DOCUMENT /DATE OPEN/ CLOSED DOCUMENT /DATE i
038 Tracked CIO reviewed a checklist developed Report No. 26 Open I
Action by Bechtel Field Engineers for use 12/13/83 I
in conducting Status Assessment to Procedures FPN-7.000, Rev.1. Check-list did not include all of the attributes required by the procedure, 040 Tracked NIR 010 issued on December 14, 1983 Report No. 27 FCR Resolution Closed NIR 010
' Action to address the ambiguity on the 12/21/83 Sheet of 12/15J 12/21/83 resolution sheets of FCR C-1526 as 83 to FCR C-i to which drawings were affected.
1526 i
1 I
t i
i i
i 1
t 4
Page 3 ATTACHMENT B l
STONE & WEBSTER HICHIGAN, INC.
NONCONFORMANCE IDENTIFICATION REPORT (NIR)
SUMMARY
NIR HPQAD DATE
'DATE DATE NO.
NCR NO.
SUBJECT OF DISP.
CLOSED REMARKS QAR NO.
ISSUE MPOAG 006 Administrative discrepancies in Con-10/28/83 struction Training Records involving CCP Teams.
007 Administrative discrepancies in Con-11/7/83 struction Training Records for the following teams: No. 24, Field Procure-ment, Subcontractor Management, Field Engineering Staff, and Construction General Services Organization.
008 Need to upgrade five training level 11/14/83 codes in the System Team Training Matrix.
t 010 An ambiguity on the resolution sheets 12/14/83 12/15/83 12/21/83 Field Project En-of FCR C-1526 as to which drawings were gineering issued an additional resolutf or affected.
sheet to clarify the ambiguity.
i ATTACllMENT C I
1
STONE & WEDSTER HIClllGAll, lilG.
Il0LD PO!!al SulillAltY i
1
^
ORIGINAllilG CPCo ItESP0llSE STATilS C10St~.00 NO.
SilRJECT DOC /UAIE DOC /DAIE OPEN/CIOSED 00gDfgi 005 CPCo has committed to develop a Vendor Equipment Report No. 18 Open Verification Program. Program is required 10/17/83 before implementation of Phase II.
4 j
007 Evaluation of Management Review of results of Report No. 19 Open Phase I activities. Evaluation is required 10/24/83 before implementation of Phase II I
4 l
l 1
i Page 1 AITACllMENT D
~
$ TONE & WEBSTER MICillGAN, INC.
il0LD POINT
SUMMARY
ORIGINATING CPCo RESPONSE STATUS CLOSE-Olli NO*
SUBJECT DOC /DATE DOC /DATE OPEN/ CLOSED DOC /DATE l
008 NIR 006 was issued on October 27, 1983, to Report No. 20 Open j
address discrepancies observed during the 10/31/83 i
sample inspection of 2,054 Construction Training records of 31 members of Teams 5, 6, 8, 9, 12, 13, 16, 17, 19. 20, 25, 26, (27/28), 29, 30, 31, (32/33) and 8110 staff.
Corrective action must be completed before any walkdown assessments can be performed by the personnel in question.
009 NIR 007 was issued on November 7,1983, to Report No. 21 Open i
address discrepancies observed during sample 11/7/83 inspection of 834 Construction Training records of 18 members of Team 24, Field Procurement, Sub-Contractor Management, F. E. staff and Construction General Services Organization.
i Corrective action must be completed before any I
walkdown, assessments can be performed by the personnel in question.
a f
O' i
f.
i*
l Page 2 ATTACllMENT D
(,
8 TONE & WEBSTFR MIClllGAN, INC.
Il0LD POINT
SUMMARY
I ORIGINATING CPCo RESPONSE STATUS CLOSE-OllT NO.
SUBJECT DOC /DATE DOC /DATE OPEN/CI.0 SED DOC /DATE _
s.J 010 NIR 000 was issued on November 14, 1983 Report No. 22 Open i
to address upgrading five items in the System 11/14/83 Team Training Matrix of the Ccnstruction Training Program.
l Corrective action must be completed before any walkdown assessments can be performed by the i
personnel involved in these training activities.
i i
011 Prior to lifting of Stop Work Orders relating Report No. 23 Open to the FCR/FCN Review and Resolution Program, s.
11/21/83 4
j CIO has established a Hold Point at the conclusion of Phase 11 activities to evaluate ilg the adequacy of MPQAD performance during Phase'l and Phase 11 activities. The Hold Point j
encompasses all the Stop Work Orders with the i
exception of Stop Work Order No. FSW-36 which j
has been lifted by MPQAD. This Hold Point does j
not apply to Phase Ill.
i i
i i
I.
~
Page 3 ATTACllMENfD
STONE & WEBSTER MICHIGAN. INC.
P.O. Box 2325. BOSTON. M ASSACHUSETTs 02107
?
I i
i January 4, 1984 Mr. J. G. Keppler, Administrator., Region III J.0. No. 14509 Nuclear Regulatory Commission NRC File #84-1-4 799 Roosevelt Road Glen Ellyn, Illinois 60137 D0LKET NO. 50-329/330 CIO WEEKLY REPORT NO. 29 MIDLAND PLANT - UNITS 1 AND 2 The Construction Implementation Overview (CIO) Weekly Report No. 29 for the period December 26, 1983 through December 30, 1983, is enclosed.
This report includes a summary of CIO activities for the week and open Items, NIRs, and Hold Po^1nts.
W W
/S. W. Baranow Pregram Manager Enclosures SWB/fs cc:
JJHarrison, US NRC Glen Ellyn, IL RJCook, US NRC Midland (site)
DLQuamme, CPCo Midland (site)
RAWells, CPCo Midland (site)
RBKelly, S&W APAmoruso, S&W N
\\
c;
E Report No. 29 December 26,1983 through December 30, 1983 Personnel on Site Stone & Webster Michigan, Inc.
A. Amoruso R. Scallan E. Barcomb F. Bearham L. Van Arsdale D. Beauchamp J. Barr J. Thompson D. Brown D. Cooke R. Butler T. Baumgartner C. Marrs S. Narayandas B. Kasson
~
T. Parker D. Wells G. Dick CIO ACTIVITIES
- 1) CIO completed their preparations for a review of Civil and Architectural drawings and commenced the review of drawing stations 8, 10, 13, 24 and 26.
It is expected that the review will be completed during the week ending January 6, 1984.
- 2) CIO reviewed the status of welder qualifications'and weld procedure qualifications with ZACK. CIO monitored the establishment of parameters for Weld Procedure Qualifications. No areas of concern were identified.
- 3) Meetings attended are summaized in Attachment A.
OPEN ITEMS, NONCONFORMANCES AND HOLD POINTS No activity this report period.
Open CIO items are summarized in Attachment B.
Open CIO nonconformance Identification Reports (NIRs') are summarized in Attachment C.
Open CIO Hold Points are summarized in Attachment D.
GENERAL Mr. L. Van Arsdale completed has assignment with the CIO team and was transferred.
i l
=
1, n
n n
r r
r e
e e
c c
c n
n n
S o
o o
N c
c c
T A
f.
E f.
f.
M od od od T
M O
e e
e N
si si si E
C af af M
af O
ei ei ei H
rt rt rt C
C an an an A
I e
e e
T od od od T
Ni Ni Ni A
sr l
e d
e r
v O
e l
kr m
o a
W e
t po t
t a
T S
N s
s E
e t
t T
N n
v n
i l
i O
o a
C a
r r
s N
t e
t O
s r
se e
T S
r o
r I
t S
S e
I U
e l
s l
L C
n u
S u
d o
d G
I e
i N
D e
h t
h T
c c
c I
s a
s E
E f
f f
M o
o o
s s
s u
u u
t t
t a
a a
t t
t S
S S
SE EDN O
O O
I I
.I E
DC DC C
T oo ooA ooA T
A CCW CCQW CCQW PP&
PPPS PPP&
CBS CBME CBMS E
s L
g T
n st r
i I
T t
un e
e te p
G e
amg u
g N
M tsn Snn Ssi oi T
m
/et mit I
E a
Pse ase E
e Vse eie M
T QAM TvM 7h0 9
0 E
2 g3 2
3 t
u T
A
.o 3
.3 3
D crc 8 c8 c8 ehe9 e9 e9 DtD1 D1 D1 i
i 4
9 i
4
1 STONE & WEDSTER MIClllGAN, INC.
MIDLAND NUCLEAR COGENERAIIOil. PLANT CIOITEMS ITEM CLASSIF1-ORIGINATING CPCo RESPONSE STATilS C10SE-Olli NO.
CATION ITEMS DOCllMTNT/DATE DOCllMENT/DATE OPEN/Cl.0 SED 00CilMENT/DATE 4
030 Tracked Need to review Vendor Equipment Report flo. 5 Open Action Verification Program - MPQAD/SMO 7/18/83 032 Tracked NIR 006 issued on October 27, l'983, Report No. 20 Open Action to address administrative discrepan-10/31/83 cles in the Construction Training Records of Teams 5, 6, 8, 9, 12, 13, 16, 17, 19, 20, 25, 26 (27/28) 29, 30, 31, 32/33 and 0110 staff.
1 033 Tracked NIR 007 issued on November 7, 1983, Report No. 21 Open Action to address administrative discrepan-11/08/83 cles in the Construction Training Records for Teams No. 24, Field Pro-curement, Subcontractor Management, Field Engineering Staff, and Con-struction General Services Organi-l zation.
I 4
034 fracked NIR 008 issued on November 14, 1983 Report No. 22 Open l
Action to address upgrading five tralp'ng 11/14/83 level codes in the System Team Training Matrix.
)
1 page 1 A I IA tllM f H I 11
STONE & FEDSTER MICtllGAti, INC.
MIDLAND fulCtEAR COGENERAIl0N Pl. ANT CIO ITEUS ITEM CLASSIFI-ORIGINATING CPCo RESPONSE STATUS Ct.0SE-OllT NO.
CATION ITEMS DOCllMENT/DATE DOCllMENT/DATE OPEN/Cl.0 SED DOCilMENT/DATE 035 Tracked CIO observed that dielectric iso-Report No. 22 Open Action lation spacers for galvanic pro-11/14/83 tection of copper pipe to galvanized steel pipe supports were missing in some areas on the Small Bore (Instru-ment Air) KAC System, drawing FSK-J-30-0220 Sheet 2, Rev.7.
036 Tracked At a meeting of Teams 26 and 27 Report No. 24 Open infor-held on November 22, 1983, the dis-11/29/83 mation continuance of FClis for "Q" items was discussed.
If this change is to be implemented, new instructions are required.
037 Tracked CIO observed that two boards with Report No. 24 Open Action protruding nails lying in Cable Tray 11/29/83 IAKA019 (Q Tray) had punctured the As revised by cable jacket of a "Q" cable.
The Report No. 25 cable is Q-channel A, 480V, MCC.
12/5/83 NCR C00925 was issued by MPQAD on November 22, 1983. CIO will track this item to assure that corrective action (repair) has been performed to approved procedures.
Iwle 2 AIIACllMI:NI B
-w STONE & WEBSTER MIClllGAN, INC.
MIDLAND NUCLEAR COGENERATION PLANT CIO ITEMS ITEM CLASSIFI-ORIGINATING CPCo RESPONSE STATUS CLOSE-0UT NO.
CATI 0li ITEMS DOCUMENT /DATE DOCUMENT /DATE OPEN/ CLOSED DOCUMENT /DATE 1
038 Tracked CIO reviewed a checklist deve:oped Report No. 26 Open Action by Bechtel Field Engineers for use 12/13/83 1
in conducting Status Assessment to Procedures FPN-7.000, Rev.1. Check-list did not include all of the attributes required by the procedure.
l I
i
)
l t
i i
i l
.i 4
Page 3 ATTACllMENT D l
f*
C S
T K
N R
E A
M l
M l
E C
m R
AT TA s
l l
D E
)
R I
N
(
. n T
R EP A TSn O
AI P P
0 DD M E
C R N
3 I N 3
8 O
8 3
/
,I
/
8 4
N T 8
/
1 E
A A
2 7
/
G C E
U
/
/
1 I Y TFS I
i 0
1 1
l FR AOS 1
1 CIA D
I I TM HNM EU e
RDS r
EI ud T
g cl SE nn n
oen l
DC oi oerio e
EN Cv ChPFi vg WA
,t en l
t M
no n
d c
l i
&R iv irl t u.
n 0
n oenrn gi Ef si sfiet o na NN e
e Fmsi i r OO is is ent nT TC cd cd,goa i
SN nr nr4aCz am O
ao ao2n ra i
N T
pc pc adn te C
ee ee.Mna T
E rR rRo ag e
J c
c Nr r
vm B
sg sg o
,O ie U
in in tf ft S
di di: cfs s
n nsaae ey ei eimrt c dS va vaatSi a
ir ren v
re i
tT tTt ogr gh a
a cne pt rns r n gb i S u
tom tonur n
sia siiSel oi.
ite it w ea t
x ncT nco,nr si ul tie der iu i
mrP mrl ngn edt dtC dt oene eoa AsC AsfmEG NcM OO uNN A
QRR PCA HNQ 6
7 8
H.
I O 0
0 0
HN 0
0 0
r
~
j a
ST0flE & WEDS 1ER 111tillGAll, IllC.
ll0LD Polfli SiltittARY ORIGillAllllG CPCo RESPollSE SI AIllS C1051 seu s NO.
SilR. LECT DOC /11AlC DOC /DAIE OPffl/ CLOSED l}0C/p!! si 005 CPCo has committed to develop a Vendor Equipment Report No. 18 Open Verification Program. Program is required 10/17/83 before implementation of Phase II.
007 Evaluation of Management Review of results of Report No. 19 Open Phase I activities. Evaluation is required 10/24/83 before implementation of Phase II
'l ;
Pdge 1 AllACllM[lli D
$T0tlE & WEBSTER HICillGAN, INC.
j ll01.D P0ltlT SilhMARY NO' SilBJECT ORIGillATING CPCo RESPONSE STATUS Cl.0SE-Ollt
~
00C/DATE DOC /DATE OPEN/Cl.0 SED DOC /DATr.
008 NIR 006 was issued on October 27, 1983, to Report No. 20 Open address discrepancies observed during the 10/31/83 sample inspection of 2,054 Construction Training 4.
records of 31 members of Teams 5, 6, 8, 9, 12, 13,16,17,19,20,25,26,(27/28),29,30,31, (32/33) and 0110 staff.
i Corrective action must be completed before any
~
walkdown assessments can be performed by the personnel in question.
I l
)'I 009 HIR 007 was issued on Nove.mber 7,1983, to Report No. 21 Open address discrepancies observed during sample 11/7/83 inspection of 834 Construction Train 8 9 records of 18 members of Team 24, Field Procurement, Sub-Contractor Management, F. E. staff and i
Construction General Services Organization.
i Corrective action must be completed before any l
walkdown, assessments can be performed by the i
personnel in question.
1 j
i l
1
?
I Page 2 ATTACliMENT 0 4
'l s
(.
$T0llE & WEDSTER MICillGAll, IllC.
1101.D P0l!!I SuttilARY ORIGill4TitlG CPCo RESP 0tlSE STATilS CLOSE-Olli i:0
- StilldECT 00C/DATE DOC /DATE OPEll/CI.0 SED DOC / DALE 010 f1IR 008 was issued on flovember 14, 1983 Report No. 22 Open
.L to address upgrading five items in the System 11/14/83 Team,Trainir.g Matrix of the Construction Training Program.
~
d Corrective action must be completed before any walkdown assessments can be performed by the personnel involved in these training activities.
}.'
011 Prior to lifting of Stop Work Orders relating Report flo. 23 Open
- o the FCR/FCN Review and Resolution Program, 8 11/21/83 10 has established a lloid Point at the
- aclusion of Phase II activities to evaluate a
the adequacy of MPQAD performance during Phase'l and Phase 11 activities. The lloid Point encompasses all the Stop Work Orders with the exception of Stop Work Order No. FSW-36 which has been lifted by MPQAD. This llold Point does not apply to Phase 111.
\\
Page 3 AllACllMENT D L/