Text
_
STONE & WEBSTER MICHIGAN, INC.
P.O. Box 2325. BOSTON, M AssAcHusETTs O2107 Mr. J. G. Keppler, Administrator, Region III December 13, 1983 Nuclear Regulatory Commission J.0, No. 14509 799 Roosevelt Road NRC File #83-12-13 Glen Ellyn, Illinois 60137 RE: DOCKET N0. 50-329/330 MIDLAND PLANT - UNITS 1 AND 2 OVERVIEW 0F THE CONSTRUCTION COMPLETION PROGRAM REPORT N0. 26 A copy of the Construction Implementation Overview Report No. 26 for the period December 5, 1983 through December 9, 1983, is enclosed.
This report includes evaluations of CCP activities, matrices of observations, NIRs, Hold Points and Affidavits and Resumes of newly assigned CIO Personnel.
Very truly yours, S. W. Baranow Program Manager Enclosures SWB/fs l
cc:
JJHarrison, US NRC Glen Ellyn, IL RJCook, US NRC Midland (site)
DLQuamme, CPCo Midland (site)
RAWells, CPCo Midland (site)
RBKelly, S&W APAmoruso, S&W i
DEC 20 983 8402070169 840203 PDR ADOCK 05000329 G
R: port No. 26
~
December 5,1983 through Decebiber 9,1983 Personnel on Site Stone & Webster Michigan, Inc.
A. Amoruso R. Corson W. Taylor E. Barcomb S. Baranew J. Langston J. Thompson D. Beauchamp F. Bearham C. Harrs R. Butler D. Brown J. Barr D. MacBay N. Wetherell T. Baumgartner R. Carpeggiani T. Parker S. Narayandas
.B. Kasson J. Chawla A. Smith J. Karr G. Dick W. Sienkiewicz R. Scallan D. Wells J. Ridge D. Cooke J. Seely L. Van Arsdale CIO ACTIVITIES A.
Summary 1)
Review and evaluation of Phase I and Phase II architectural and civil activities in the FCR/FCN Resolution Program.
2)
Review and evaluation of MPQAD Training records identified in NIRs 002, 003 and 004.
3)
Evaluation of Construction Training classes.
4)
Review and evaluation of Construction Training records identified in NIRs 006 and 007.
5)
Attendance at meetings.
B.
Details (Paragraphs below correspond to items above) 1)
CIO is.using the following methcdology to evaluate the FCR/FCU Resolution Program.
During Phase I, after Bechtel Power Company has identified the FCR/FCNs which are initially considered to be satisfactory and MPQAD has verified this at the 100% level, CIO performs a sampling inspection. The inspection items are based on the criteria established in Procedure FID-2.400, Revision 3 and are designed to verify the adequacy of the combined review ;rogram by BPCo and MPQAD.
During Phase II, CIO performs sampling inspections of FCRs/
FCNs which are in the resolution phase. C10 inspections are again performed after MPQAD has reviewed all of the documents and found the resolution action to be acceptable. Tne CIO inspection is then perfornec to assess tne adeaua:y of tne BPCo/MPQAD resolut::r l
l l
I JOB NO. 14509 MIDLAND NUCLEAR POWER PLANT REPORT NO. 26 PAGE 2 process. Following the Phase Il evaluation, the CIO will review the Phase III document control program. This program governs the dis-tribution, control, and posting of documents in field work locations (stick drawings, etc.).
Results of CIO reviews to date are:
Architectural Phase 1 - Sampling inspections performed were considered acceptable.
Architectural Phase II - Sampling inspections performed were considered acceptable.
Architectural Phase III - Five stations of controlled drawing sticks were sampled and considered satisfactory for QC Quality Verification and Status Assessment.
Civil Phase I - Sampling inspections performed were considered acceptable.
2)
CIO performed a sampling inspection of the training records of 39 MPQAD personnel. Records selected and examined were found to be in com-pliance with the requirements of Procedure B-3M-1, Qualification and Certification of Inspection and Test personnel. The CIO evaluations of the records sampled were considered to be satisfactory.
NIRs 002, 003 and 004 have been closed.
3)
CIO attended and evaluated the following Construction Training pre-sentations on December 5 'and 6, 1983:
a) Installation and Rework of Electrical Raceway and Supports FIE-9.002 Rev. O.
b) Verification of Electrical Raceway and Supports FIE-9.009 Rev. 1.
c)
Installation and Rework of Separation Barriers FIE-4.200 Rev. O.
d) Raceway and Support Installation Packaging and Documentation FPE-9.600 Rev. 1.
e) Rework to Scheduled Raceway and Raceway Supports FPE-9.100 Rev.1.
The presentations were in compliance with FPG-2.000 Rev. 6, Training of Construction Personnel and considered to be satisfactory. Results of the evaluation have been documented on checklist MP-MIS-034E and are available for review.
~
JOB N0. 14509 MIDLAND NUCLEAR POWER PLANT REPORT NO. 26 PAGE 3 4)
CIO performed a 100% re-inspection of the corrective actions of the Construction Training Records that were determined to be dis-crepant as noted on NIRs 006 and 007. Records were in compliance with the requirements of Procedure FPG-2.000 Rev. 6 and considered to be satisfactory.
In addition, CIO performed 100% inspection of the records of two members of Team 27/28. Records selected were examined and were found to be in compliance with FPG-2.000 Rev. 6.
The results of the CIO evaluation of the records sampled were considered to be satisfactory.
The acceptance of the training records by CIO of the two members, qualifies them to perform Status Assessment for Phase I activities.
Training records of other members of Team 27/28 will require sampling for CIO review before they will be permitted to perform Status Assessment and before NIRs 006 and 007 can be closed.
5)
Meetings attended are summarized in Attachment A.
NEW CIO OBSERVATION Tracked Information Item - #38 In reviewing a checklist developed by Bechtel Lead Field Engineers as and aid in conducting Status Assessments to Procedure FPM-7.000 Rev. 1 (Mechanical System Status and Completion), the CIO noted that the check-list does not include all of the attributes required by the procedure.
If special checklists are to be used in statusing, these lists should be addressed by an administrative procedure that provides details or. how the lists are to be prepared and used.
Consumers Power Company is being requested to provide background on this item.
l OPEN ITEMS, NONCONFORMANCES, AND HOLD POINTS Open CIO items are summarized in Attachment B.
Item 031 was closed during the reporting period.
l Open CIO Nonconformance Identification Reports (NIRs) are summarized in i
Attachment C.
NIRs 002, 003, and 004 were closed during the reporting period.
l Open CIO Hold Points are summarized in Attachment D.
Hold Point 006 was closed during the reporting period.
l c
r,e
JOB NO. 14509
- MIDLAND NUCLEAR POWER PLANT REPORT NO.'26 PAGE'4 GENERAL Mr. W. G. Dick, Construction Advisor, and Mr. J. J. Ridge, Assistant QC Engineer, were assigned to the CIO staff during this reporting period.
Signed affidavits of the two members and resume of J. J. Ridge have been transmitted to Mr. J. J. Harrison, US NRC, Glen Ellyn, Illinois. Resume of W. G. Dick will follow.
t
-+
AllACllMENT MEETING LIST y
DATE MEETING TITLE ATTENDEES DISCUSSION CONTENT.
CIO COMMENTS j
Dec. 5 & 9 Daily Staff CPCo Status of CCP activities and coordination No areas of concern v 1983 Management BPCo identified.
Meeting S&W CIO MPQAD Dec. 5 & 9 Team Meetings CPCo Restraints and BPCo preparedness to resume No areas of concern 1983 BPCo work.
identified.
S&W CIO Dec. 5 Construction CPCo Non-Quality activity in CIO Weekly Report #22. CIO discussed Non-Q obser-1983 Completion BPCo vation.
Program S&W CIO Dec. 6 QVP Status CPCo Restraints affecting resumption of work,re:
No areas of concern 1983 Asse;sment BPCo FCR/FCN review.
Identified.
Meeting MPQAD S&W CIO i
Dec. 7 8 8 Team Super--
CPCo Restraints affecting resumption of work.
No. areas of concern 1983 vision BPCo id( ntified.
Meetings MPQAD S&W CIO l[ec.9 Subcontractors BPCo Verification of corrective action.
No areas of concern i
j 1983 Meeting Site-Sub-identified.
Contractors 1
I 1
i AITACllMENT A
SiONf. f. WEllSTER MICllIGAN, INC.
MIDLAND NUCLEAR COGENERATION PLANT CIOITEMS 3011 CLASSIFI-ORIGINATING CPCo RESPONSE STATUS CLOSE-OLIT 11 0. _
CATION OBSERVATIONS DOCUMENT /DATE DOCUMENT /DATE OPEN/ CLOSED DOCUMENTJDATE 034 Tracked NIR 008 issued on November 14, 1983 Report No. 22 Open Action to address five unsatisfactory con-ditions observed during the review of 50 training levels assignments in the System Team Training Matrix of the Construction Training Program.
035 Tracked CIO observed that dielectric iso-Report No. 22 Open Action lation spacers for galvanic pro-11/14/83 tection of copper pipe to galvanized steel pipe supports were missing in some areas on this system, Small Bore (Instrument Air) KAC Systems, drawing FSK-J-30-0220 Sheet 2 Rev.7.
036 Tracked At team meeting of teams 26 and 27 Report No. 24 Open Infor-held on November 22, 1983, a decision 11/29/83 mation that FCNs would no longer be issued for "Q" items was discussed.
The nethod for controlling changes has lot been finalized.
037 Tracked CIO observed that two boards with pro-Report No. 24 Open Action truding nails lying in Cable Tray 11/29/83 1AKA019 (Q Tray) had punctured the cable jacket of a "Q" cable.
The cable is Q-channel A, 480V. MCC.
NCR C00925 was issued by MPQAD on flovember 22, 1983. CIO will track this item to assure that corrective
^
iction (repair) has been performed to approved procedures.
i i
)
ATTACHMENT B
Sluill. & WEI'SIER MIClllGAN, INC.
M10LAllli ilVClFAR COGENERATION PLANT CIO ITEMS i
l Cl. ASS I F I-ORIGillAflNG CPCo RESPONSE STATUS CLOSE-00T CAlluli UBSEltVAl l011S DOCUMENT /DATE DOCUMENT /DATE OPEN/ CLOSED DOCUMENT'/DATE l " in Iracked Need to review Vendor Equipment Report No. 5 Opea Action Verification Program - MPQAD/SMO 7/18/83 o !!
Tracked NIRs 002, 003, 004 and 005 were Report No. 16 Letter 11/21/83 Closed Report No. 26 Action issued on October 3, 1983, for dis-10/3/83 QAR RT-00011 12/13/83 e
crepancies observed in the review 10/13/83 of Training records of 6 of 45 MPQAD personnel.
i i"*
Iracked NIR 006 issued on October 27, 1983, Report No. 20 Open 4
Action to address discrepancies observed 10/31/83 during sample inspection of Con-struction Training Records of Teams 5, 6, 8, 9,12, 13, 16, 17, 19, 20, 25, 26 (27/28) 29, 30, 31, 32/33 and 8110 staff.
tracked filR 007 issued on flovember 7,1983, Report No. 21 Open i
Tction to address discrepancies observed in 11/08/83 two areas during inspection of Con-struction Training Records for Teams No. 24, Field Procurement, Subcon-tractor Management, Field Engineerint Staf f, and Construction General Services Organization.
I l
ATTACllMEllT B
SiO!!E & HEBSTER MIClllGAN, INC.
MIDLAND NUCLEAR C0 GENERATION PLANT CIO ITEMS t il fi CLASSIFI-ORIGINATING CPCo RESPONSE STATUS CLOSE-0UT IP s. _
Call 0N OBSERVATIONS DOCUMENT /DATE DOCUMENT /DATE OPEN/ CLOSED DOCUMENT /DATE
" Ut 1 racked CIO reviewed a checklist developed Report No. 26 Open Action by Bechtel Field Engineers for use 12/13/83 in conducting Status Assessment to Procedures FPN-7.000 Rev. 1.
Check-list did not include all of the attributes required by the procedurr 3
l AITACHMENI B
- lout: r. Ulcit::TI.:p titrillG Ati, Ille.
finilrtjillottlAtlCF lllEllliflCAll0N RFPORI (H!R)
SUMMARY
' iliIj AD
~
DATE
' DATE DATE i-tien !!O.
Cult timT OF DISP.
CLOSED REMARKS
,_]ARHO.
ISSUE f4PDAD l
MPQAD Memo advises
""?
QAR forms from both procedures B-3?t and 10/4/83 10/12/83 12/12/83 that starting 10/7/83 RT 00005 B-3M-1 are intermixed in training all forms required records by 03M-1 will be utilized and.cm-plated by 12/16/A3 Letter by RD Cochran 0/
3s ted hated n"'
R Vearly vision examination was exceeded 10/4/83 10/12/83 12/12/83 visualaculty test for BDHines was in files.
Verified all discrep-l '" '
QAR OJT training records not available in 10/4/83 10/12/83 12/9/83 rincies were corrected RI 00007 training records. Revision number not DJT training record listed on OJT Record.
revision initialed ind dated.
l o'
Discrepancies in three areas of 10/28/83 Construction Training Records involving CCP Teams.
Discrepancies in two areas of Construc-tion Training Records for the following 11/7/83 teams No. 24, Field Procurement, Sub-
' Contractor Management. Field Engineering i
Staff and Construction General Services Organization five unsatisfactory conditions were observed in training level assigments during the review of the adequacy of the 11/14/83 construction training matrices ATTACllNEllT C
SlullE & WEDSIER lIICillGAll, IllC.
11010 P0llii SUMf1ARY ORIGillAllNG CPCo RESP 0flSE STA10S CLOSE-Olli U0 SUHJECT DOC /DATE DOC /DAIE OPEN/ CLOSED DOC /I)AIE on5 CPCo has comnitted to develop a Vendor Equipment Report No. 18 Open Verification Program. Program is required 10/17/83 before implementation of Phase II.
00'.
NIRs 002, 003, 004 and 005 issued October 3,1983 Report No. 18 Letter Closed CIO Letter to address discrepancies observed during a 10/17/83 11/21/83 to CPCo a sample inspection of Training Records of 6 of QAR R100011 NRC 45 MPQAD personnel. Corrective action must be 10/13/83 12/14/83 completed before any inspection can be per-formed by the 45 personnel in question.
401 Evaluation of Management Review of results of Report No. 19 Open i
Please I activities. Evaluation is required 10/24/83 before implementation of Phase II.
AITAClif1ENT D
STONE t, W[llSTER MIClllGAN, INC.
l101.0 POINT
SUMMARY
ORIGINAL!NG CPCo RESPONSE STATUS CLOSE-001 NO*
SUBJECT DDC/DATE DOC /DAIE OPEN/ CLOSED DOC /DA1E __
on8 NIR 006 has been issued on October 27, 1983 to Report No. 20 Open address discrepancies observed during the 10/31/83 sample inspection of 2,054 Construction Training records of 31 members of Teams 5, 6, 8, 9, 12, 13, 16, 17, 19, 20, 25, 26, (27/28), 29, 30, 31.
(32/33) and Bil0 staf f.
Corrective action must be coupleted before any walkdown assessments can be performed by the personnel in question.
4 On't NIR 007 has been issued on November 7, 1983 to Report No. 21 Open address discrepancies observed during sample 11/7/83 inspection of 834 Construction Training records of 18 members of Team 24, Field Procurement, Sub-Contractor Management, F. E. staff and Construction General Services Organization.
t Corrective action must be completed before any-walkdown, assessments can be performed by the 4
i personnel in question.
ATTACliMENf D
SiONE & WEBSTER MIC!!IGAN, INC.
5 IIDLD POINT SUTIMARY ORIGINATING CPCo RESPONSE STATUS CLOSE-Olli llo.
SUBJECT DOC /DATE DOC /DATE OPEN/CI.0 SED DOC /DATE 010 NIR 008 has been issued on November 14, 1983 Report No. 22 Open to address upgrading five items in the System 11/14/83 Team Training Matrix of the Construction Training Program.
Corrective action must be completed before any walkdown assessments can be performed by the i
personnel involved in these training activities.
3 1
1 011 Prior to lifting of Stop Work Orders relating Report No. 23 Open to the FCR/FCN Review and Resolution Program, 11/21/83 CIO has established a Hold Point at the conclusion of Phase 11 activities to evaluate the adequacy of MPQA0 performance during Phase I a
and Phase II activities. The lloid Point i
encompasses all the Stop Work Orders with the i
exception of Stop Work Order No. FSW-36 which has been lifted by MPQAD. This lloid Point does not apply to Phase III.
J l
i i
l j
ATTACHMENT D i