r Attschment to hH 95-00C Page i of 111 l

WOLF CREEK GENERATING STATION P.O. Box 411, Burlington Kansas 66839 INSERVICE INSPECTION REPORT Date of Report Completion: January 26,1995 Commercial Service Date: September 3,1985 Operating Capacity: 3565 MWt Refueling Outage: 7 Intenal: 1 Period: 3 Prepared By:

Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, Kansas 66839 9501310337 950126 PDR O ADOCK 05000482 PDR

r Attcchm:nt to WM 95-0005 Page 2 of ill TABLE OF CONTENTS Page introduction . . . . . . . . . . 3 Examination Results . . . . . . . . . 6 Examinations . . . . . . . . . . 22 System Pressure Testing . . . . . . . . 66 Steam Generator Tubing Inservice Inspection . . . . . . 70 Appendix A Form NIS-1 Owner's Report for Inservice Inspections . . . . . . . 73 Appendix B Repair / Replacement Summt.ry Index . . . . . 101

I Attachment to WM 95-0005 Page 3 of ill INTRODUCTION l

l l

@ l

.,yI! ' 'Attachmant to WM 95-0005 C Page 4 of 111 m

INTRODUCTION 4 Wolf Creek huclear Operating Corporation is reporting the examinations, tests,  ;

and repair / replacements conducted on ASME Class 1, 2, and 3 components for the -!

seventh refueling - outage. These activities are performed to ensure the. 'l structural integrity of safety-related components and to comply with both the Code of Federal Regulations and the ASME Code,Section XI.

This report contains specific information pertaining to the following:

  • Inservice Inspections  ;
  • System Pressure Testing  !
  • Repair / Replacement Activity l

HQTEl The Authorized Nuclear Inservice Inspector performing the ASME Code required +hird party inspection activity was Jeff Winkel, who -

was assisted oy Carl Thompson and Gerald Mayher. They are employed l by Arkwright Mutual Insurance company / Factory Mutual Engineering Association of Norwood, MA.  ;

i Inservice Tnapaction (ISI)  ;

The. examinations performed for ISI are ' accomplished pursuant to the ISI [

Program Plan. It includes-volumetric, surface and visual examinations. This [

plan adherers to the requirements of ASME Section XI, 1980 Edition, W'81 i Addenda. The ISI Program Plan . is administrated by Wolf Creek Generating }

Station (WCGS) Engineering Support - ASME Group.

ISI. examinations producing indications or limited examinations have been specifically identified and addressed in the " Examination Results" section of this report.

System Pressure Testing The system pressure tests are also based on ASME Section XI, 1980 Edition, W'81 Addenda. These tests were conducted on ASME Class 1, 2, and 3 systems and received visual (VT-2) examination by WCGS Quality Control personnel.

S tenst Generator Tube Tnmoection The steam generator tubes are inspected in accordance with WCGS Technical [

Specification 4.4.5.  ;

l l

1 i

Attcchm:nt to WM 95-0005 I Page 5 of 111 l Espair/ Replacement l The repairs, replacements and/or modifications of ASME Code Class 1, 2 and 3 l components and component supports are made in accordance with the Repair / Replacement Program.

WCGS Maintenance and Modifications personnel or their subcontractors performed the repair / replacement activities on ASME Code Class components.

WCGS Quality Control personnel or their subcontractors performed the nondestructive examinations (aOE) required for repair / replacement items to re-establish baseline data for the 101 Program.

(

Attachment to WM 95-0005 Page 6 of ill EXAMINATION RESULTS

Attachment to WM 95-0005 y Page 7 of-111' I t

EXAMINATION RESULTS  ;

EXAM INDICATION:

I g TYPE CODE CODE ISI PL&M CO$ 0 MENT ID REAM CAT. SECTION COMPONENT DESCRIPTION ,

i 83A1699 EJ 2-S027-C PT C-F C5.11 Residual Heat Removal Heat y Exchanger "B" Outlet Line, g 10" Pipe to 10" Elbow .

r Condition: Three linear indications were found on the surface of the weld. All of the indications were sized and found acceptable. This examination was performed for growth ~and trending of these. indications which were identified in the fifth refueling outage. No growth was apparent for any of the indications.

Corrective Action: None. The component will be inspected during the 2nd 10-Year Inspection Interval as defined by the Inservice Inspection Program EXAM INDICATION:

TYPE CODE . CODE ISI. PLAN COMPONENT ID EIAM CAT. SECTION COMPONENT DESCRTPTTON 83A1699 EJ-03-FW304 PT C-F C5.11 Residual Heat Removal Heat Exchanger "B" to Safety Injection Pump Suction, 8" Pipe to 8" Elbow condition: One linear indication was found on the surface of the weld. The indication was sized and found acceptable. This examination was performed for growth and trending of indications identified in the fifth refueling outage.

However, the results were inconclusive.

Corrective Action: Re-examine in the eighth refueling outage for growth and trending.

EXAM INDICATION:

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1699 PEJ01A-SUP-1 PT C-C C3.30 Residual Heat Removal Pumn "A", Support Leg Integral Attachment L -

)

'bttechment to WM 95-0005 Page 8 of 111 i

condition: Four indications were found on the exar.ination surface. All of the indications were sized and found acceptable with no indication of growth identified from previous examinations.

Corrective Action: None, The component will be inspected during the 2nd 10-Year Inspection Interval as defined by.the Inservice Inspection Program. L l

EXAM INDICATION: f TYPE CODE CODE I ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION

Condition: Laminar type reflector identified in weld. This indication was sized and found acceptable.

Corrective Action: None. Successive examination is not required (IWC-2420) . The component will be inspected during the 2nd 10-Year Inspection ,

Interval as defined by t,he Inservice Inspection Plan.

EXAM INDICATION:

TYPE CODE CODE i ISI PLAN COMPCNENT ID EXAM CAT. SECTION COMkONENT DESCRIPTION 83A1700 BB-01-F104 PT B-J B9.11 Reactor Coolant Loop 1, I 29" x 31" Elbow to Steam Generator A Inlet Nozzle Condition: Linear indication identified in weld examination area. The indication was sized and found acceptable.

l Corrective Action: None. Successive examination is not required (IWB-2420) . The component will be inspected during the 2nd 10-Year Inspection Interval as defined by the Inservice Inspection Plan.

f l

L ,__ _ _ _ _ . _

- - ~. .

Attachment to WM 95-0005 6 Page 9 of 111 EXAM LIMITATION:

TYPE CODE CODE IS.I. PLAN COMPANENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION ,

83A1694 EP-02-F022A UT N/A N/A -Accumulator Safety Injection Loop 3, 6" Pipe to Valve EPV8818C ,

Condition: The volumetric examination of the subject weld is limited due to geometry (pipe to valve configuration) and material construction. 32.1% of the weld required volume cannot be examined i~ two beam directions for a perpendicular scan. However, the averags coverage obtained from all beam angles and scan directions was approximately 92.0 percent.

None. Wolf Creek invokes Code Case N-460 which has been approved '

Corrective Action:

by the NRC and incorporated for use on this site. This code case ,

establishes that an examination with an averag coverage of ninety percent or more meets the intent of ASME Section XI requirements when interferences preclude a one hundred percent examination.

EXAM LIMITATION:

TYPE CODE CODE ISI PLAN CONPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1694 EP-02-FW303 UT C-F C5.21 Accumulator Safety Injection Loop 2, 10" Valve EPHV8808B to 10" Pipe Condition: The volumetric examination of the subject weld is limited due to geometry (pipe to valve configuration) and material construction. 84.6% of the weld required volume cannot be examined in two beam directions for the t perpendicular scan. The average coverage obtained from all beam angles and i scan directions was approximately 78.9 percent. l Corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination.

m i

i l

l i

1 l

l

Attcchment to WM 95-0005 Page 10 of 111 i

EXAM LIMITATION:

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION ,

83A16 9/ EP-02-R020 PT C-C C3.20 Accumulator Safety "

Injection Loop 3, Integral Attachment - 8 Lugs i

Condition: The surface examination of the subject weld is limited due to the j obstruction of a hanger located adjacent to integral attachments. 29.4% of '

the requirea examination area for 4 of the 8 lugs cannot be examined.  !

I corrective Action: A request will be submitted to the NRC asking that relief be i

9. Ated for this limited examination. r EXAM LIMITATION:

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1697 AB-01-S032-S UT N/A N/A Main Steam Loop 3, 12" ,

Outlet on Main Steam Header to 12" Pipe ,

Condition: The volumetric examination of the subject weld is limited due to the obstruction of a weldolet adjacent to the weld. 8.9% of the weld required  ;

volume receives no angle beam coverage from a perpendicular scan. However, the average coverage obtained from all beam angles and scan directions was approximately 95.6 percent.

Corrective Action: None. Wolf Creek invokes Code Case N-460 which has been approved by the NRC and incorporated for use on this site. This code case establishes that an examination with an average coverage of ninety percent or. more meets the intent of ASME Section XI requirements  ;

when interferences preclude a one hundred percent examination. i i

EXAM LIMITATION:

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1698 BG-01-FW691 N/A UT N/A Charging Line, 3" Elbow to 3" Pipe

Attechment.to WM 95-0005 Page 1I of 111 Condition: The volumetric examination of the subject weld is limited due to the  !

obstruction of a box hanger located adjacent to the weld. 25.7% of the weld required volume cannot be examined in two beam directions for the "

perpendicular scan. However, the average coverage obtained from all beam angles and scan directions was approximately 93.6 percent. i t

corrective Action: None. Wolf Creek invokes Code Case N-460 which has been approved i by the NRC and incorporated for use on this site. This code case '

establishes that an examination with an average coverage of ninety percent or more meets the intent of ASME Section XI requirements when interferences preclude a one hundred percent e:tamination.  :

t EXAM LIMITATION: .

I

^

TYPE CODE CODE ISI PLAN COMEQNENT ID EIAM CAL. SECTION COMPONENT DESCRIPTION B3A1698 BG-01-FW311 UT F/A N/A Charging Line, Valve l BGHV8106 to 3" Pipe i condition: The volumetric examination of the subject weld is liinited due to geometry ,

(pipe to valve configuration) and material construction. 46.4% of the weld  ;

required volume is examined in one beam direction, 0% of the weld required-  ;

volume is examined in two beam directions for the perpendicular scan. The ,

average coverage obtained from all beam angles and scan directions was approximately 61.6 percent. l corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination.

EXAM LIMITATION:

i TYPE CODE CODE ISI PLAN COMPONENT ID EXAM R SECTION COMPONENT DESCRIPTION 83A1698 BG-01-F023 UT N/A N/A Charging Line, 3" Pipe to Valve BGHV8106 Condition: The volumetric examination of the subject weld is limited due to geometry (pipe to valve configuration) and material construction. 46.4% of the weld required volume is examined in one beam direction, 0% of the wel5 required volume is examined in two beam directions for the perpendicular scan. The average coverage obtained from all beam angles and scan directions was approximately 61.6 percent.

l 2

l Attcchment'to WM- 95-0005 Page 12 of 111 i

L Corrective Actions A request will be submitted to the NRC asking that relief be granted for this limited examination.

P EXAM LIMITATION:

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1698 BG-01 .F024 UT N/A N/A Charging Line, Valve ,

BGHV8105 to 3" Pipe  !

t I

condition: The volumetric examination of the subject weld is limited due to geometry (pipe to valve configuration) and material construction. 46.4% of the weld  !

required volume is examined in one beam direction, 0% of the weld required volume is examined in two beam directions for the perpendicular scan. The -

average coverage obtained from all beam angles and scan directions was approximately 61.6 percent.

Corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination.

EXAM LIMITATION: #

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 4

83A1698 BG-01-F025 UT N/A N/A Charging Line, 3" Pipe to Valve BGHV8105 i

I Condition: The volumetric examination of the subject weld is limited due to geometry (pipe to valve configuration) and material construction. 46.4% of the weld required volume is examined in one beam direction, 0% of the weld required volume is examined in two beam directions for the perpendicular scan. The average coverage obtained from ~ all beam angles and sean directions was approximately 61.6 percent. r corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination.

i n

l i

Attechm:nt to WM 95-0005 Page _13 of 111 l 1

EXAM LIMITATION:

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1698 BG-01-FW322 UT N/A N/A Charging Line, 3" Pipe to 3" Pipe Condition: The volumetric examination of the subject weld is limited due to weld crown ,

geometry causing lift off of the ultrasonic transducer. 36.3% of the weld required volume cannot be examined in two beam directions, 7.6% of the weld required volume recei.es no angle beam coverage from a perpendicular scan.

The average coverage obtained from all beam angles and scan directions was j

approximately 72.7 percent.

Corrective Action: A request will be. submitted to the NRC asking that relief be granted for this limited examination.

EXAM LIMITATION:

TYPE CODE CODE ISI PLAN COMEONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1698 BG-01-FW321 UT N/A N/A Charging Line, 3" Pipe to ,

3" Pipe Condition: The volumetric examination of the subject weld is limited due to weld crown geometry causing lift off of the ultrasonic transducer. 36.3% of the weld required volume cannot be examined in two beam directions, 7.6% of the weld required volume receives no angle beam coverage from a perpendicular scan.

The average coverage obtained from all beam angles and scan directions was approximately 72.7 percent.

Corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination.

r EXAM LIMITATION:

TYPE CODE CODE

^

ISI PLAN COMPONENT ID EXAM CAT. EXCIIDH COMEQHEHI_DEECRIPTION 83A1698 BG-01-F026 UT N/A N/A Charging Line, 3" Pipe to 3" Pipe ,

i

o Attcchment to WM 95-0005 Page 14 of 111 Condition: The volumetric examination of the subject weld is limited due to weld crown ,

geometry causing lift off of the ultrasonic transducer. 36.3% of the weld required volume cannot be examined in two beam directions, 7.6% of the weld required volume receives no angle beam coverage from a perpendicular scan.

The average coverage obtained from all beam angles and scan directions was ,

approximately 72.7 percent.

t Corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination.

EXAM LIMITATION:

i TYPE CODE CODE ISI PLAN COMPONENT ID EX&M CAT. SECTIQH COMPONENT DESCP.IPTION 83A1698 BG-01-FW313 UT N/A N/A Charging Line, Flued Head [

(P-80) to 3" Pipe Condition: The volumetric examination of the subject weld is limited due to weld crown geometry causing lift off of the ultrasonic transducer. 36.3% of the weld required volume cannot be examined in two beam directions, 7.6% of the weld required volume receives no angle beam coverage from a perpendicular scan. l The average coverage obtained from all beam angles and scan directions was approximately 72.7 percent.

Corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination.

l EXAM LIMITATION:

TYPE CODE CODE ,

ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION  ;

83A1699 EJ-02-S035-D-LU UT C-F C5.22 Residual Heat Removal Train "B", 10" Pipe '

Longitudinal Seam Upstream condition: The volumetric examination of the subject weld is limited due to the obstruction of a hanger located adjacent to the weld. 50% of the weld r required volume cannot be examined by two beam path directions for the parallel scan. The average coverage obtained from all beam angles and scan directions was approximately 87.5 percent.

i

s

' Att;chment to WM 95-0005 3 Page 15 of 111 I r

Corrective Action: A request will be submitted to the NRC asking that reliaf be granted for this limited examination.

r EXAM LIMITATION: -

r TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION

{

83A1699 EJ-02-Fr51 UT C-F C5.21 Residual Heat Removal to Safety Injection System, 10" Pipe to Valve EJHV8840 Condition: The volumetric examination of the subject weld is limited due to geometry (pipe to valve configuration) and material construction. 68.3% of the weld required volume is examined in one beam direction, 18.5% of the weld required volume is examined in two beam directions, and 13.2% of the weld ,

required volume receives no angle beam coverage from a perpendicular scan.  ;

The average coverage obtained from all beam angles and scan directions was approximately 63.8 percent.

Corrective Action: A request will be submitt'ed to the ' NRC asking that relief be granted for this limited examination.  !

EXAM LIMITATION:

TYPE CODE CODE '

ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1699 EJ-01-C013 PT C-C C3.20 Residual Heat Removal-Train A, Integral Attachment - 8 Lugs Condition: The surface examination of the subject weld is limited by the obstruction of small metal tabs welded to the component support clamp that these integral attachment are in support of. 8% of the required examination area for 2 of the 8 lugs cannot be examined.

Corrective Action: None. Wolf Creek invokes Code Case N-460 which has been approved by the NRC and incorporated for use on this site. This code case  !

establishes that an examination with an average coverage of ninety percent or more meets the intent of ASME.Section XI requirements when interferences preclude a one hundred percent examination.

I l

_____._ +

l Attechrtent to HM 95-0005

'Page 16'.of'111 EXAM LIMITATION: ,

TYPE CODE CODE ISI PL'\R COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION f

83A1699 EEJ01A-SEAM-1-W UT C-A C1.10 Residual Heat Removal Heat Exchanger "A" Bonnet Flange to Channel Weld ,

condition: The volumetric examination of the subject weld is limited due to the  ;

obstruction of the bonnet flange. 100% of the weld required volume cannot be examined by two beam path directions, 95.6% of the weld required volume is examined in one beam path direction for the perpendicular scan. The average coverage cbtained from all beam angles and scan directions was approximately 73.9 percent.

Corrective Action: A request will be submitted to the NRC asking that relief

  • be granted for this limited examination.

EXAM LIMITATION:

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1700 BB-01-S101-7 UT L-J B9.31 Reactor Coolant System Loop 1 Cold Leg, 10" Nozzle to 27 1/2" ID Tipe Condition: The volumetric examination of t.he subject weld is limited due to gsometry l (pipe branch connection configuration) and material construction.

i Examination of this weld was limited to the pipe side only; therefore, 100% -

of the we'ld required volume cannot be examined in two beam directions for a perpendicular scan. The average coverage obtained from all team angles and scan directions was approximately 75.0 percent.

Corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination.

l Attechment to WM 95-0005 Page 17 of 111 ]

4 4

. EXAM LIMITATION:

TYPE CODE CODE

'ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION ,

83A1700 BB-01-S302-3 UT B-J B9.31 Reactor Coolant System i Loop 3 Hot Leg, 6" Nozzle to 29" ID Pipe condition: The volumetric examination of the subject weld is limited due to geometry (pipe branch connection configuration) and material construction.

Examination of this weld was limited to the pipe side only; therefore, 100%

of the weld required volume cannot be examined in two beam directions for a  !

perpendicular scan. The average coverage obtained from all beam angles and scan directions was approximately 75.0 percent.

Corrective Action: Relief was previously granted for this limited examination.

However, technology has changed since the initial examination of this weld and therefore - the limitations have changed. A request will be submitted to the NRC asking that relief be granted for this ,

limited examination.  ;

EXAM ;TMITATION:

TYPE CODE CODE ISIPN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION t

83A1700 BB-01-S402-3 UT B-J B9.31 Reacter Coolant System Loop 4 Hot Leg, 14" Nozzle to 29" ID Pipe condition: The volumetric examination of the subject weld is limited due to geometry (pipe branch connection configuration) and material construction. '

Examination of this weld was limited to the pipe side only; therefore, 100%

of the weld required volume cannot be examined in two beam directions for a perpendicular scan. The average coverage obtained from all beam angles and scan directions was approximately 75.0 percent. ,

Corrective Action: Relief was previously granted for this limited examination.

However, technology has changed since the initial examination of this weld and therefore the limitations have changed. A request will be submitted to the NRC asking that relief be granted for this limited examination.

i I

, Attcchment to WM 95-0005 Page 18 of 111 EXAM LIMITATION:~

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1700 BG-09-W805 UT N/A N/A Reactor Coolant Pump "C" Seal Injection, 2" Pipe to Orifice Flange FE-143 i

Condition: The volumetric examination of the subject weld is limited due to geometry (pipe to flange configuration) and material construction. 46.1% of the weld required volume is examined in one beam direction, 28.9% of the weld required volume is examined in two beam directions, and 25.0% of the weld required volume receives no angle beam coverage from a perpendicular scan.

The average coverage obtained from all beam angles and scan directions was approximately 80.3 percent. t Corrective Action: A request will be submitted to the NRC asking that relief be i granted for this limited examination. l I

t EXAM LIMITATION:

TYPE CODE CODE i ISI PLAN COMPONENT ID REAM R SECTION COMPONENT DESCRIPTION l

83A1700 BG-09-W804 UT N/A N/A Reactor Coolant Pump "C" [

Seal Injection, Orifice l Flange FE-143 to 2" Pipe Condition: The volumetric examination of the subject weld is limited due to geometry .

(pipe to flange configuration) and material construction. 52.2% of the weld required volume is examined in one beam direction, 25.3% of the weld  !

required volume is examined in two beam directions, and 22.5% of the weld required volume receives no angle beam coverage from a perpendicular scan.

The average coverage obtained from all beam angles and scan directions was approximately 82.4 percent.  !

Corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination.

i 6

6 e

-Attechment to WM 95-0005

'Page 19 of 111 EXAM LIMITATIOT:

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1700 BG-09-W817 UT N/A N/A Reactor Coolant Pump "B" Seal Injection, 2" Pipe to Orifice Flange FE-144 Condition: The volumetric examination of the subject weld is limited due to geometry (pipe to flange configuration) and material construction. 45.5% of the weld required volume is examined in one beam direction, 33.7% of the weld required volume is examined in two beam directions, and 20.8% of the weld required volume receives no angle beam coverage from a perpendicular scan.

The average coverage obtained from all beam angles and scan directions was approximately 81.2 percent.

Corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination.

EXAM LIMITATION:

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1700 BG-09-W816 UT N/A N/A Reactor Coolant Pump *B" Seal Injection, orifice Flange FE-144 to 2" Pipe Condition: The volumetric examination of the subject weld is limited due to geometry (pipe to flange configuration) and material construction. 44.5% of the weld required volume is examined in one beam direction, 31.4% of the weld required volume is examined in two beam directions, and 24.1% of the weld required volume receives no angle beam coverage from a perpendicular scan.

The average coverage obtained from all beam angles and scan directions was approximately 80.1 percent.

Corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination, i

l l

Attachment to WM 95-0005 Page 20 of 111 j l

I EXAM LIMITATION  :

l TYPE CODE CODE COMPONENT ID COMPONENT DESCRIPTION ISI PLAN EX&M CAT. SECTION 83A1701 FC-01-F028 UT N/A N/A Auxiliary Feedwater Pump Turbine Supply, 4" Pipe to Valve FCV025 .

Condition: The volumetric examination of the subject weld is limited due to the  ;

obstruction of a hanger lug adjacent to the weld. 99.0% of the weld required volume is examined in one beam direction, 97.5% of the weld  ;

required volume is examined in two beam directions, and 1. 5 % of the weld required volume receives no angle beam coverage from a perpendicular scan.

However, the average coverage obtained from all beam angles and scan i directions was approximately 99.4 percent.

Corrective Action: None. Wolf Creek invokes Code Case N-460 which has been - approved l by the NRC and incorporated for use on this site. This code case establishes that an examination with an average coverage of ninety percent or more meets the intent of ASME Section XI requirements ,

when interferences preclude a one hundred percent examination.

EXAM LIMITATION:

TYPE' CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83AWC01 BN-01-F041 UT N/A N/A Refueling Water Storage, Valve BNHV8812A to 14" Pipe Condition: The volumetric examination of the subject weld is limited due to geometry (pipe to valve configuration) and material construction. 26.2% of the weld p d cu a scan However, the v ra coverage obtained from all be f angles and scan directions was approximately 93.4 percent. j Corrective Action: None. Wolf Creek invokes Code Case N-460 which'has been approved by the NRC and incorporated for use on this site. I This code case establishes that an examination with an average coverage of ninety ,

percent or more meets the intent of ASME Section XI requirements I when interferences preclude a one hundred percent examination. t i,

i 5

.Attcchment to WM 95-0005 Page 21 of 111 EXAM LIMITATION:  !

l i

TYPE CODE CODE  :

ISI PLAN COMPONENT ID EX&M CAT. SECTION COMPONENT DESCRIPTION 83AWC01 BN-01-F043 UT N/A N/A Refueling Water Storage, 12." Pipe to Valve BNHV04 condition: The volumetric examination of the subject weld is limited due to geometry (pipe to valve configuration) and material construction. 78.6% of the weld required volume cannot be examined in two beam directions for the perpendicular scan. The average coverage obtained from all beam angles and scan directions was approximately 80.4 percent.  ;

Corrective Action: A request will be submitted to the NRC asking that relief be granted for this limited examination.

EXAM LIMITATION:

TYPE CODE CODE ISI PLAN COMPONENT ID REAM CAT. SECTION COMPONENT DESCRIPTION  ;

83AWC01 EN-02-F007A UT N/A N/A Containment Spray, 14" Elbow to Pump PEN 01B Inlet >

Condition: The volumetric examination of the subject weld is limited- due to geometry ,

(pipe to, pump configuration) and material construction. 48.4% of the weld ,

required volume cannot be examined in two beam directions for the perpendicular scan. The average coverage obtained from all beam angles and scan directions was approximately 87.9 percent.

Corrective Action: A request will be submitted to the NRC asking that relief be '

granted for this limited examination.

Attachment to WM 95-0005 Page 22 of 111 l

EXAMINATIONS f

f f

&e l

i i

Attachment to WM 95-0005 Page 23 of 111 EXAMINATION ISI SURFACE EXAMS ACCUMULATOR SAFETY INJECTION SYSTEM (EP)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAL SECTION COMPONENT DESCRIPTION 83A1694 EP-01-S007-D-LU PT C-F C5.12 Accumulator Safety Injection Loop 4, 10" Elbow Longitudinal Seam Upstream 83R1694 EP-01-S007-D PT C-F C5.11 Accumulator Safety Injection Loop 4, 10" Elbow to Pipe 83A1694 EP-01-S007-D-LD PT C-F C5.12 Accumulator Safety Injection Loop 4, 10" Pipe Longitudinal Seam Downstream 83A1694 EP-01-S014-C-LU PT C-F C5.12 Accumulator Safety Injection Loop 4, 10" Pipe Longitudinal Seam Upstream 83R1694 EP-01-S014-C PT C-F C5.11 Accumulator Safety Injection Lcop 4, 10" Pipe to Elbow 83A1694 EP-01-S014-C-LD PT C-F C5.12' Accumulator Safety Injection Loop 4, 10" Elbow Longitudinal Seam Downstream 83A1694 EP-01-C002 PT C-C C3.20 Accumulator Safety Injection Loop 4, Integrally Welded Lugs on 10" Pipe 83R1694 EP-02-S010-B PT B-J B9.32 Accumulator Safety Injection Loop 3, 2" Sockolet to 6" Pipe 83A1694 EP-02-F022A PT C-F C5.21 Accumulator Safety Injection Loop 3, 6" Pipe to Valve EP8818C 83A1694 EP-02-FW303 PT C-F- C5.21 Accumulator Safety Injection Loop 2, Valve EPHV8808B to 10" Pipe 83A1694 EP-02-FW303-LD PT C-F C5.22 Accumulator Safety Injection Loop 2, 10" Pipe Longitudinal Seam Downstream 83A1694 EP-02-8002-G-LU PT C-F C5.22 Accumulator Safety Injection Loop 2, 10" Elbow Longitudinal Seam Upstreact 83A1694 EP-02-S002-G PT C-F C5.21 Accumulator Safety Injection Loop 2, 10" Elbow to Pipe .

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - - . _ -__.--_ _. - _ - __ _. _ - ~ _ _ ._ -.._ . ._ _ . . . _ _ _ _ . . _ _ _ _ _ _ . . ~ _

Attachment to WM 95-0005 Page 24 of 111 EXAMINA'.? ION ISI SURFACH EXAMS ACCUMULATOR SAFETY INJECTION SYSTEM (EP) , (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1694 EP-02-S002-G-LD PT C-F C5.22 Accumulator Safety Injection Loop 2, 10" Pipe Longitudinal Seam Downstream 83A1694 EP-02-S007-J-LU PT C-F C5.22 Accumulator Safety Injection Loop 3, 10" Elbow Longitudinal Seam Upstream 83A1694 EP-02-S007-J PT C-F C5.21 Accumulator Safety Injection Loop 3, 10" Elbow to Pipe 83A1694 EP-02-S007-J-LD PT C-F C5.22 Accumulator Safety Injection Loop 3, 10" Pipe Longitudinal Seam Downstream 83A1694 EP-02-S007-N-LU PT C-F C5.22 Accumulator Safety Injection Loop 3, 10" Elbow Longitudinal Seam Upstream 83A1694 EP-02-S007-N PT C-F C5.21 Accumulator Safety Injection Loop 3, 10" Elbow to Pipe 83A1694 EP-02-S007-N-LD PT C-F C5.22 Accumulator Safety Injection Loop 3, 10" Pipe Longitudinal Seam Downstream 03A1694 EP-02-RO2O PT C-C C3.20 Accumulator Safety Injection Loop 3, Integrally Welded Lugs to 10" Pipe HIGH PRESSURE COOLANT INJECTION SYSTEM (EM)

TYPE CODE CODE ISI PLJhH COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTIDM 03A1695 TEM 01-4-W ,

PT C-B C2.21 Boron Injection Tank Inlet Nozzle to Bottom Head Weld 83A1695 EM-01-S027-D-LU PT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Elbow Longitudinal Seam Upstream 83A1695 EM-01-S027-D PT N/,A N/A High Pressure Coolant Injection Pump Suction Line, 6" Elbow to 6* Pipe

1 Attachment to WM 95-0005 N Page 25 of 111 EXAMINATION ISI SURFACE EXAMS HIGH PRESSURE COOLANT INJECTION SYSTEM (EN) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM R SECTION CQMPONENI_DESCRIPIIQH 83A1695 EM-01-S027-D-LD PT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Pipe Longitudinal Seam Downstream 83A1695 EM-01-FW327-LU PT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Pipe Longitudinal Seam Upstream 83A1695 EM-01-FW327 PT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Pipe to 6" Elbow 83A1695 EM-01-FW327-LD PT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Elbow Longitudinal Seam Downstream 83A1695 EM-01-SO41-E-LU PT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Elbow Longitudinal Seam Upstream 83A1695 EM-01-SO41-E PT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Elbow to 6" Pipe 83A1695 EM-01-SO41-E-LD PT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Pipe Longitudinal Seam Downstream MAIN STEAM SYSTEM (AB)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1697 AB-01-F054 PT C-F C5.21 Main Steam Loop 3, 10" Outlet on Main Steam Header to 10" Pipe 83A1697 AB-01-TOR RES-3 PT N/A N/A Main Steam Loop 3, 2" Half Coupling to Torsional Restraint 83A1697 AB-01-FW787 PT N/A $ N/A Main Steam Loop 3, 2" Half Coupling to 2" Pipe 83A1697 AB-01-W786 PT N/A N/A Main Steam Loop 3, 2" Pipe to 2" Elbow 83A1697 AB-01-W785 PT N/A N/A Main Steam Loop 3, 2" Elbow to 2" Pipe r

~

Attachment to WM 95-0005 Page 26 of 111 EXAMINATION ISI SURFACE EXAMS NAIN STEAM SYSTEM (AB) (Continued)

TYPE CODE CODE ISI PLAN CQMEQHENT ID EIAM CAT. SECTION COMPONENT DESCRIPTION 83A1697 AB-01-W784 PT N/A N/A Main Steam Loop 3, 2" Pipe to 2" Elbow 83R1697 AB-01-W783 PT N/A N/A Main Steam Loop 3, 2" Elbow to 2" Pipe 83A1697 AB-01-W782 PT N/A N/A Main Steam Loop 3, 2" Pipe to 2" Elbow 83A1697 AB-01-FW781 PT N/A N/A Main Steam Loop 3, 2" Elbow to 2" Pipe 83A1697 AB-01-W780 PT N/A N/A Main Steam Loop 3, 2" Pipe to 2" Elbow 83A1697 AB-01-FW331 PT N/A' N/A Main Steam Loop 3, 2" Elbow to 2" Pipe 83A1697 AB-01-FW778 PT N/A N/A Main Steam Loop 3, 2" Pipe to Valve ABV222 83A1697 AB-01-FW777 PT N/A N/A Main Steam Loop 3, Valve ABV222 to 2" Pipe 83A1697 AB-01-FW776 PT N/A N/A Main Steam Loop 3, 2" Pipe to Valve ABHV21 83A1697 AB-01-FW775 PT N/A N/A Main Steam Loop 3, Valve ABHV21-to 2" Pipe 83R1697 AB-01-FW774 PT N/A N/A Main Steam Loop 3, 2" Pipe to Valve ABV221 83R1697 AB-01-FW773 PT N/A N/A Main Steam Loop 3, Valve V221 to 2" Pipe 83A1697 AB-01-W772 PT N/A N/A Main Steam Loop 3, 2" Pipe to 2" Elbow 83A1697 AB-01-W771 PT N/A N/A Main Steam Loop 3, 2" Elbow to 2" Pipe 83A1697 AB-01-FW770 PT - N/A N/A Main Steam Loop 3, 2" Pipe to 2" Elbow 83A1697 4B-01-FW332 PT N/A N/A Main Steam Loop 3, 2" Elbow to 2" Pipe 83A1697 AB-01-W768 PT N/A N/A Main Steam Loop 3, 2" Pipe to 2" Elbow 83A1697 AB-01-W767 PT N/A N/A Main Steam Loop 3, 2" Elbow to 2" Pipe

Attachment to WM 95-0005 Page 27 of 111 EXAMINATION ISI SURFACE EXAMS MAIN STEAM SYSTEM (AB) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COREPONENT DESCRIPTION 83A1697 AB-01-FW766 PT N/A N/A Main Stean Loop 3, 2" Pipe to 2" Half Coupling 83A1697 AB-01-S032-N PT N/A N/A Main Steam Loop 3, 2" Half Coupling to 28" Main Steam Header 83A1697 AB-01-TOR RES-4 PT N/A N/A Main Steam Loop 4, 2" Half Coupling to Torsional Restraint 83A1697 AB-01-FW721 PT N/A N/A Main Steam Loop 4, 2" Half Coupling to 2" Pipe 83A1697 AB-01-W720 PT N/A N/A Main Steam Loop 4, 2" Pipe to 2" Elbow 83A1697 AB-01-W719 PT N/A N/A Main Steam Loop 4, 2" Elbow to 2" Pipe 83A1697 AB-01-W718 PT N/A N/A Main Steam Loop 4, 2" Pipe to 2" Elbow 83A1697 AB-01-W717 PT N/A N/A Main Steam Loop 4, 2" Elbow to 2" Pipe

, 83R1697 AB-01-W716 PT N/A N/A Main Steam Loop 4, 2" Pipe to 2" Elbow 83A1697 AB-01-FW715 PT N/A N/A Main Steam Loop 4, 2* Elbow to 2" Pipe 83A1697 AB-01-W714 PT N/A N/A Main Steam Loop 4, 2" Pipe to 2" Elbow 83A1697 AB-01-W713 PT N/A N/A Main Steam Loop 4, 2" Elbow to 2" Pipe 83A1697 AB-01-FW712 PT N/A .N/A Main Steam Loop 4, 2" Pipe to Valve ABV216 83A1697 AB-01-FW711 PT N/A N/A Main Steam Loop 4, Valve ABV216 to 2" Pipe 83A1697 AB-01-FW710 PT N/A N/A Main Steam Loop 4, 2 Pipe to Valve ABHV12

K Attachment to WM 95-C005 P&ge 28 of 111 EXAMINATIJN IS% SURFACE EXAMS CHEMICAL & VOLUME CONTROL SYSTEM (BG)

TYPE CODE CODE ISI. PLAN COMPONENT ID EIAM CAT. SECTION COMPONENT DESCRIPTION l 83A1700 BG-09-W812 PT N/A N/A Reactor Coolant Pump "C" Seal Water Injection Containment

( Penetration, 2" Pipe to 2" Tee 83A1700 BG-09-FW813 PT N/A N/A Reactor Coolant Pump "C" Seal Water Injection Containment Penetration, 2" Tee to 2" Pipe 83A1700 BG-09-W872 PT N/A N/A Reactor Coolant Pump *C" Seal Water Injection Containment Penetration, 2" Pipe to 2"x1" Reducer 83A1700 BG-09-W811 PT N/A N/A Reactor Coolant Pump "C" Seal Water Injection Containment Penetration,'2" Tee to 2" Pipe 81A1700 BG-09-W723 PT N/A N/A Reactor Coolant Pump "C" Seal Water Injection Containment Penetration, 2" Pipe to 2"x2"x3/4" Tee 83A1700 BG-09-W737 PT N/A 'N/A Reactor Coolant Pump "C" Seal Water Injection Contaiteent Penetration,~2" Pipe to 2"x2"x3/4" Tee 83A1700 BG-09-FW809 PT N/A N/A ~ Reactor Coolant Pump "C" Seal Water Injectiora C%tainment Penetration, 2" Pipe to Valve BGHV8351C 83A1700 BG-09-FW808 PT N/A N/A Reactor Coolant Pump *C" Seal Water Injection Containment Penetration, Valve HV-8351C to 2" Pipe 83A1700 BG-09-W889 PT N/A N/A Reactor Coolant Pump "C" Seal Water Injection Colatainment Penetration, 2" Pipe to 2" Pipe t

83A1700 BG-09-W805 PT N/A N/A Reactor Coolant Pump *C" Seal Water Injection Containment Penetration, 2" Pipe to 2" Orifice Flange FE-143 83A1700 BG-09-W804 PT N/A N/A Reactor Coolant Pump *C" Seal Water Injection Containment Penetration, Orifice Flange FE-143 to 2" Pipe 83A1700 BG-09-W803 PT N/A N/A Reactor Coolant Pump "C" Seal. Water Injection Containment Penetration, 2" Pipe to 2"x1 1/2" Reducer

Attachment to WM 95-0005 Page 29 of 111 EXAMINATION ISI SURFACE EXAMS CHEMICAL & VOLUME CONTROL SYSTItM (BG) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EIBM CAT. SECTION COMPONENT DESCRIPTION 83A1700 BG-09-PW3301 PT N/A N/A Reactor Coolant Pump "C" Seal Water Infection Containment Penetration, Valve V200 to 1 1/2" Pipe 83A1700 BG-09-W806-0A PT N/A N/A Reactc,2 Coolant Pump "C" Seal Water Injection Containment-Penetration, 1 1/2" Pipe to 2"x1 1/2" Reducer 83A1700 BG-09-W695 PT N/A N/A Reactor Coolant Pump "C" Seal Water Injection Containment Penetration, 2"x1 1/2" Reducer to 2" Pipe 83A1700 BG-09-FW820 PT N/A N/A Reactor Coolant Pump *B" Seal Water Injection Containment Penetration, Valve BGHV8351B to 2" Pipe 83A1700 BG-09-W890 PT N/A N/A Reactor Coolant Pump *B" Seal Water Injection Containment r:.netration, 2" Pipe to 2" Pipe 83A1700 BG-09-W817 PT N/A N/A Reactor Coolant Pump *B" Seal Water Injection Containment Penetration, 2" Pipe to Orifice Flange FE-144 83A1700 BG-09-W816 PT N/A N/A Reactor Coolant Pump *B" Seal Water Injection Containment Penetration, Orifice Flange FE-144 to 2" Pipe 83A1700 BG-09-W815 PT N/A N/A Reactor Coolant Pump *B" Seal Water Injection Containment Penetration, 2" Pipe to 2"x1 1/2" Reducer 83A1700 BG-09-W814-0A PT N/A N/A Reactor Coolant Pump *B" Seal Water Injection Containment Penetration, 2"x1 1/2" Reducer to 1 1/2" Pipe 83A1700 BG-09-PW3296 PT N/A N/A Reactor Coolant Pump."B" Seal Water Injection Containment Penetration, 1 1/2" Pipe to Valve BGV199 83A1700 BG-09-PW3297 PT N/A N/A Reactor Coolant Pump *B" Seal Water Injection Containment Penetration, Valve BGV199 to 1 1/2" Pipe 83A1700 BG-09-W696-0A PT N/A N/A Reactor Coolant Pump "B" Seal Nater Injection Containment Penetration, 1 1/2" Pipe to 2"x1 1/2" Reducer

__ - _ _ , . _ . . _ _ . _ . _ . _ . _ _ - . _ . - . , - . . . . . _ . - - _ _ . . . . . ~ __ - _ . _ _ . _ . . - . _ . . - , . . . - . , . . . _ _ _ . _ . , ,

e Attachment to WM 95-0005 Page 30 of 111 EXAMINATION ISI SURFACE EXAMS CHEMICAL sk VOLUME CONTROL SYSTEM (BG) (Continued)

TYPE CODE CODE ISI PLAN COMPOMENT ID EXAM CAL. SECTION COMPONENT DESCRIPTION 83A1700 BG-09-W818 PT N/A N/A Reactor Coolant Pump *B" Seal Water Injection Containment Penetration, 2"x1 1/2" Reducer to 2" Pipe RESIDUAL HEAT REMOVAL SYSTEM (EJ)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1699 EJ-01-S004-F-LU PT C-F C5.12 Residual Heat Removal Train "A", 14" Pipe Longitudinal Seam Upstream 33A1699 EJ-01-S004-F 17 C-F C5 .1 Residual Heat Pemoval Train "A", 14" Tee to 14" Pipe 83A1699 EJ-04-FW343 PT C-F C5.11 Residual Heat Removal Train 'A", 14" Pipe to 14" Flange 83A1699 EJ-01-C013 PT C-C C3.20 Residual Heat Removal Train "A", Integral Attachment -

8 Lugs 83A1699 EJ-01-SO28-D-LU PT C-F C5.12 Residual Heat Removal Train "A", 10" Pipe Longitudinal Seam Upstream 83A1699 EJ-01-SO28-D PT C-F C5.11 Residual Heat Removal Train "A", 10" Pipe to 10" Orifice i Flange FE-618 2

83A1699 EJ-01-C016 FT .C-C C3.20 Residual Heat Removal Train "A", Integral Attachment -

8 Lugs 83A1699 EJ-01-S025-B-LU PT C-? C5.12 Residual Heat Removal To Refueling Water Storage Tank, 10" Pipe Longitudinal Seam Upstream 83A1699 EJ-01-SO25-B PT C-F C5.11 Residual Heat Removal To Refueling Water Storage Tank, 10" Pipe to 10* Elbow 83A1699 EJ-01-S025-B-LD PT C-F C5.12 Residual Heat Removal To Refueling Water Storage Tank, 10" Elbow Longitudinal Seam Downstream

Attachment to WM 95-0005 Page 31 of 111 EXAMINATION ISI SURFACE EXAMS RESIDUAL HEAT REMOVAL SYSTEM (EJ) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EZAM CAT. SECTION COMPONENT DFSCRIPTION 83A1699 EJ-01-F034-LU PT C-F C5.12 Residual Heat Removal To Refueling Wacer Storage Tank,-

10" Elbow Longitud.inal Seam Upstream 83A1699 EJ-01-F034 PT C-F C5.11 Residual Heat Removal To Refueling Water Storage Tank, 10" Elbow to 10" Pipe 83A1699 EJ-01-F034-LD PT C-F C5.12 Residual Heat Removal To Refueling Water Storage Tank, 10" Pipe Longitudinal Seam Downstream 83A1699 EJ-01-FW311B-LU PT C-F C5.12 Residual Heat Removal Train "A", 12" Elbow Longitudinal Seam Upstream 83A1699 EJ-01-FW311B PT C-F C5.11 Residual Hea' Removal Train "A", 12" Elbow to 12" Pipe 83A1699 EJ-01-FW311B-LD PT C-F C5.12 Residual Heat moval Train "A", 12" Pipe Longitudinal Seam Downstream 83A1699 EJ-01-C002 PT C-C C3.20 Residual Heat Removal Train "A", Integral Attachment -

8 Lugs 83A1699 EJ-01-R033 PT C-C C3.20 Residual Heat Removal Train "A", Integral Attachment -

8 Lugs 83A1699 EJ-01-R003 PT C-C C3.20 Residual Heat Removal Train "A", Integral Attachment -

8 Lugs 83A1699 EJ-02-R032 PT C-C C3.20 Residual Heat Removal Train *A", Integral Attachment -

8 Lugs 83A1699 EJ-02-F040 PT C-F C5.11 Residual Heat Removal Train "B", Valve EJHV8809B to 10" Pipe 83A1699 EJ-02-F040-LD PT C-F C5.12 Residual Heat Removal Train *B", 10" Pipe Longitudinal Seam Downstream 83A1699 EJ-02-S035-D-LU PT C-F C5.22 Residual Heat Removal Train "B", 10" Pipe Longitudinal Seam Upstream l

___ ____ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ . _ _ _ _ , ~. _ _. _ . . _ _ _ - - - _ - .__ _ _ . _ . _ . _ . _ . _ _ _ .

4 Attachment to WM 95-0005 Page 32 of 111 ,

EXAMINATION ISI SURFACE EXANS REJIDUAL HEAT REMOVAL SYSTEN (EJ) (Continued)

TYPE CODE CODE

! ISI PLAN COMPONENT ID EXAN CAT. SECTION COMPONENT DESCRIPTION 83A1699 EJ-02-S035-D PT C-F C5.21 Residual Heat Removal Train *B", 10" Pipe to 10" Elbow 83A1699 EJ-02-S035-D-LD PT C-F C5.22 Residual Heat Removal Train *B", 10" Elbow Longitudinal Seam

! Downstream 83A1699 EJ-02-F041-LU PT C-F C5.22 Residual Heat Removal Train "B", 10" Elbow Longitudinal-Seam Upstream H 83A1699 EJ-02-F041 PT C-F C5.21 Residual Heat Removal Train "B", 10" Elbow to Flued Head P-27 l 83A1699 EJ-02-F029 PT C-F C5.11 Residual Heat Removal To Safety Injection System, Valve.  ;

EJHV8716B to 10" Pipe 83A1699 EJ-02-F029-LD PT C-F C5.12 Residual Heat Removal To Safety Injection System, 10" Pipe Longitudinal Seam Downstream 83A1699 EJ-02-F042 PT C-F C5.11 Residual Heat Removal To Safety Injection System, 10" Tee to 10" Pipe 83A1699 EJ-02-F042-LD PT C-F C5.12 Residual Heat Removal To Safety Injection System, 10" Pipe

Longitudinal Seam Downstream  ;

I 83A1699 EJ-02-SO37-A PT C-F C5.11 Residual Seat Removal To Safety Nnjection System, 10" Flange to 10" Pipe 83A1699 EJ-02-S037-A-LD PT C-F C5.12 Residual Heat Removal To Safety Injection System, 10" Pipe Longitudinal Seam Downstr 83A1699 EJ-02-S037-D-LU PT C-F C5.12 Residual Heat Removal To Sai .njection System, 10" Elbow i Lo.7gitudinal Seam Upstream 83A1699 EJ-02-S037-D PT C-F C5.11 Residual Heat Removal To Safety Injection System, 10" Elbow to 10" Pipe

__ _ _ _ _ _ _ _ _ _ . _ _ _ . - . _ - _ _ _ _ _ _ _ . . _ . _ - _ _ _ . . _ _ - _ - . _ _ _ _ - . _ . - . . - - - - _ - , - _ _ . __.--_ -_.-.~.___.-----_.._._-..a - . _ _ - -

i Attachment to WM 95-0005' Page 33 of 111 EXAMINATION ISI SURFACE EXAMS RESIDUAL HEAT REMOVAL SYSTEK (RJ) (Continued)

TYPE CODE CODE ISI PLAN COMPOMENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1699 EJ-02-S037-D-LD PT C-F C5.12 Residual Heat Removal To Safety Injection System, 10" Pipe Longitudinal Seam Downstream 83A1699 EJ-02-F043A-LU PT C-F C5.12 Residual Heat Removal To Safety Injection System, 10" Elbow Longitudinal Seam Upstream 83A1699 EJ-02-F043A PT C-F C5.11 Residual Heat Removal To Safety Injection System, 10" Elbow to 10" Pipe 83A1699 EJ-02-F043A-LD PT C-F C5.12 Residual Heat Removal To Safety Injection System, 10" Pipe Longitudinal Seam Downstream 83A1699 EJ-02-H018 PT C-C C3.20 Residual Heat Removal To Safety Injection System, Integral

! Attachment - 4 Lugs 83A1699 EJ-02-C019 PT C-C C3.20 Residual Heat Removal To Safety Injection System, Integral Attachment - Stanchion 83A1699 EJ-02-C012 PT C-C C3.20 Residual Heat Removal To Safety Injection System, Integral Attachment - 8 Lugs 83A1699 EJ-02-F049-LU PT C-F C5.12 Residual Heat Removal To Safety Injection System, 10" Pipe Longitudinal Seam Upstream 83A1699 EJ-02-F049 PT C-F C5.11 Residual Heat Removal To Safety Injection System, 10" Pipe to 10" Elbow 83A1699 EJ-02-F049-LD PT C-F C5.12 Residual Heat Removal To Safety Injection System, 10" Elbow Longitudinal Seam Downstream l

l 83A1699 EJ-02-S027-C PT C-F C5.12 Residual Heat Removal Heat Exchanger "B", 10" Pipe to

! 10"x10"x8" Tee 83A1699 EJ-02-SO44-C-LU PT C-F C5.12 Residual Heat Removal To Safety Injection System, 10" Pipe Longitudinal Seam Upstream

__ _____ __ - _ . _ _. - . - . . . . . _ _ _ - . _ . ~ . - _ - _ --- _ _ - _ . - . . _ , _ .- . , _ , _ , . _ _ . _ --

Attachment to WM 95-0005 Page 34 of 111 EXAMINATION ISI SURFACE EXAMS RE3IDUAL HEAT REMOVAL SYSTEN (EJ) (Continued)

TYPE CODE CODE i 2.SI PLAN COMPOMENT ID EIAM CAT. SECTTON COMPONENT DESCRIPTION 83A1699 EJ-02-SO44-C PT C-F C5.11 Residual Heat Removal To Safety Injection System, 10" Pipe to 10" Elbow 83A1699 EJ-02-SO44-C-LD PT C-F C5.12 Residual Heat Removal To Safety Injection System, 10" Elbow Longitudinal Seam Downstream 83A1699 EJ-02-F050-LU PT C-F C5.12 Residual Heat Removal To Safety Injection System, 10" Elbow

83A1699 EJ-02-C016 PT C-C C3.20 Residual Heat Removal To Safety Injection System, Integral Attachment - 8 Lugs 83A1699 EJ-03-FW304 PT C-F C5.11 Residual Heat Removal To Safety Injection System, 8" Pipe to 8" Elbow 83A1699 EEJ01A-SKIRT-W PT C-C- C3.10 Residual Heat Removal Train "A", Heat Exchanger Integral Attachment - Skirt Weld f

i

_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . , _ _ . ~ . . ~ - , , _ . . _ . _ , . . , _ _ . _ , . . _ . . . . . - . _ . _ _ , , _ _ _ . _ , _ . . . _ _ . , _ _ . , _ , _ . . . . . . . . . - s_ ._ . _ ., . _ . _ _

I Atte.chment to WM 95-0005 Page 35 of 111 EXAMINATION ISI SURFACE EXAMS REACTOR COOLANT SYSTEM (BB)

TYPE CODE CODE ISI PLAN CQMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION S3A1700 BB-09-F001A PT N/A N/A Reactor Coolant Pump "C" Seal Water Injection Containment Penetration, Flued Head P-39 to 2" Pipe s

83A1700 PBB01C-FLYWHEEL PT/MT N/A N/A Reactor Coolant Pump *C' Flywheel, Motor S/N 3S87P408 83A1700 BB-01-S101-7 PT B-J B9.31 Reactor Coolant Loop 1 Cold Leg, 10" Nozzle to 27 1/2" I.D.

Pipe 83A1700 BB-01-F104 PT B-J B9.11 Reactor Coolant Loop 1 Hot Leg, 29"x31" Elbow Steam Generator "A" Inlet Nozzle 83A17CO BB-01-F101 PT B-J E9.11 Reactor Coolant Loop 1 Cold Leg, Reactor Coolant Pump "A" Outlet to 27 1/2" I.D. Pipe 83A1700 BB-01-F107 PT B-J B9.11 Reactor Coolant Loop 1 Crossover Leg, 31" Pipe to Reactor Coolant Pump "A" Inlet 83A1700 BB-01-F105 PT B-J B9.11 Reactor Coolant Loop 1 Crossover Leg, Steam Generator *A" Outlet Nozzle to 31" Elbow 83A1700 BB-01-S302-3 PT B-J B9.31 Reactor Coolant' Loop 3 Hot Leg, 6" Nozzle to 29" I.D. Pipe 83A1700 BB-01-S402-2 PT B-J B9.11 Reactor Coolant Loop 4 Hot Leg, 29" I.D. Pipe to 29"x31" Elbow 83A1700 BB-01-S402-3 PT B-J B9.31 Reactor Coolant Loop 4 Hot Leg, 14" Nozzle to 29" I.D. Pipe REFUELING WATER STORAGE SYSTEM (BN)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAL. SECTION COMPONENT D3ESCRIPTION 83AWC01 BN-01-F041 PT N/A N/A Refueling Water Storage, Valve HV8812A to 14" Pipe 83AWC01 BN-01-F041-LD PT N/A N/A Refueling Water Storage, 14" Pipe Longitudinal Seam Downstream

Attachment to WM 95-0005 Page 36 of 111 EXAMINATION ISI SURFACE EXAMS RCFUELING WATER STORAGE SYSTEM (BN) (Continued)

TYPE CODE CODE ISI PLAN CQMEOMENT ID EXAM CAT. SECTION COMPONEr! DESCRIPTION 83AWC01 BN-01-F011-LU PT N/A N/A Refueling Water Storage, 24"x16" Reducer Longitudinal Seam T/pstream 837.WC01 BN-01-F011 PT N/A N/A Refueling Water Storage, 24"x16" Reducer to 16" Pipe 83AWC01 BN-01-F011-LD PT N/A N/A Refueling Water Storage, 16" Pipe Longitudinal Seam Downstream 83AWC01 BN-01-S012-D-LU PT N/A N/A Refueling Water Storage, 16" Pipe Longitudinal Seam ,

Upstream 83AWC01 BN-01-S012-D PT N/A N/A Refueling Water Storage, 16" Pipe to 16"x8" Reducer 83AWC01 BN-01-S012-D-LD PT N/A N/A Refueling Water Storage, 16"x8" Reducer Longitudinal Seam Downstream 83AWC01 BN-01-F042 PT N/A N/A Refueling Water Scorage, 16"x12" Weldolet to 12" Pipe 83AWC01 BN-01-F042-LD PT N/A N/A Refueling Water Storage, 12" Pipe Longitudinal Seam Downstream 83AWC01 BN-01-SO26-J-LU PT N/A N/A Refueling Water Storage, 12" Blbow Longitudinal Seam Upstream 83AWC01 BN-01-S026-J PT N/A N/A Refueling Water Storage, 12" Elbow to 12" Pipe ,

83AWC01 BN-01-S026-J-LD PT N/A N/A Refueling Water Storage, 12" Pipe Longitudinal Seam Downstream 83AWC01 BN-01-F043-LU PT N/A N/A Refueling Water Storage, 12" Pipe Longitudinal Seam Upstream 83AWC01 BN-01-F043 PT N/A N/A Refueling Water Storage, 12" Pipe to Valve BNHV04

- - . _ . . . . _ _ _ . . . . . ~ . _ - ~. .__ - _. ._ _ - . _ . _ --- .. _ _-_ _ _,,, - . , . , _ _ - , . , . .-. . __. _ __

Attachment to WM 95-0005 Page 37 of 111 EXANINATION ISI SURFACE EXANS CONTAINNENT SPRAY SYSTEN (EN)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAN CAT. SECTION COMPONENT DESCRIPTION 83AWC01 EN-02-FW325-LU PT N/A N/A Containment Spray Train "B", 12" Elbow Longitudinal Seam Upstream 83AWC01 EN-02-FW325 PT N/A N/A Containment Spray Train "B", 12" Elbow to 12" Pipe 83AWC01 EN-02-FW325-LD PT N/A N/A Containment Spray Train *B", 12" Pipe Longitudinal Seam Downstream 83AWC01 EN-02-FW301-LU PT N/A N/A Containment Spray Train "B", 12" Pipe Longitudinal Seam Upstream 83AWC01 EN-02-FW301 PT N/A N/A Containment Spray Train "B", 12" Pipe to 12" Pipe 83AWC01 EN-02-FW301-LD PT N/A N/A Containment Spray Train *B", 12" Pipe Longitudinal Seam Downstream 83AWC01 EN-02-F007A-LU PT N/A N/A Containment Spray Train "B", 14" Elbow Longitudinal Seam Upstream 83AWC01 EN-02-F007A PT N/A N/A Containment Spray Train *B", 14" Elbow to Pump PEN 01B Inlet

Attachment to WM 95-0005 Page 38 of 111 EXAMINATION ISI VOLUMETRIC EXAMS

, STEAK GENERATOR BLONDOWN SYSTEM (BM)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION ,

83A1693 BM-02-F004 UT N/A N/A Steam Generator "C" Blowdown Line, 4" Fluer. Head (P-12) to Valve BMV024 83A1693 BM-02-F022 UT N/A N/A Steam Generator "C" Blowdown Line, Valve BMV024 to 4" Pipe 83A1693 BM-02-F021 UT N/A N/A Steam Generator "C" Blowdown Line, 4" Pipe to Valve BMHV3 83A1693 BM-02-F001 UT N/A N/A Steam Generator "B" Blowdown Line, 4" Flued Head (P-11) to Valve BM'/013 83A1693 BM-02-F011 UT N/A N/A Steam Generator "B" Blowdown Line, Valve BMV013 to 4" Pipe-83A1693 BM-02-F010 UT N/A N/A Steam Generator "B" Blowdown Line, 4" Pipe to Valve BMHV2 83A1693 BM-02-F009 UT N/A N/A Steam Generator "B" Blowdown Line, Valve BMHV2 to 4" Pipe 83A1693 BM-02-F009 UT N/A N/A Steam Generator "B" Blowdown Line, 4" Pipe to 4" Pipe 83A1693 BM-02-F007 UT N/A N/A Steam Generator "B" Blowdown Line, 4" Pipe to 4" Pipe 83A1693 BM-02-F033 UT N/A N/A Steam Generator "B" Blowdown Line, 4" Pipe to Isolation Restraint 83A1693 BM-02-F030 UT N/A N/A Steam Generator "B" Blowdown Line, Isolation Restraint to 4* Pipe ACCUMULATOR SAFETY INJECTION SYSTEM (EP)

TYPE CODE CODE ISI PLAN COMPONENT ID EIAM CAT. SECTION COMPONENT DESCRTPTION 83A1694 EP-01-S014-C-LU UT C-F C5.12 Accumulator Safety Injection Loop 4, 10" Pipe Longitudinal Seam Upstream 83A1694 EP-01-S014-C UT C-F C5.11 Accumulator Safety Injection Loop 4, 10" Pipe to Elbcw 4

--,m- . - ~ . , - - - - - --w - , . . . . , - w .. --

w- =-s,.- , - - . - y v. -w- - veew-

"~

Attachment to WM 95-0005 Paga 39 of 111 EXAMINATION ISI VOLUMETRIC IXAMS ACCUMULATOR SAFETY INJECTION SYSTEM (EP) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPOMENT DESCRIPTION 03A1694 EP-01-S014-C-LD ITT C-F C5.12 Accumulator Safety Injection Loop 4, 10" Elbow Longitudinal Seam Downstream 83A1694 EP-02-F022A UT C-F C5.21 Accumulator Safety Injection Loop 3, 6" Pipe to Valve EPV8818C 83A1694 EP-02-FW303 UT C-F C5.21 Accumulator Safety Injection Loop 2, Valve EPHV8808B to 10" Pipe 83A1694 EP-02-FW303-LD UT C-F C5.22 Accumulator Safety Injection Loop 2, 10" Pipe Longitudinal Seam Downstream 83A1694 EP-02-S002-G-LU UT C-F C5.22 Accumulator Safety Injection Loop 2, 10" Elbow Longitudinal Seam Upstream 83A1694 EP-02-S002-G UT C-F C5.21 Accumulator Safety Injection Loop 2, 10" Elbow to Pipe 83A1694 EP-02-S002-G-LD UT C-F C5.22 Accumulator Safety Injection Loop 2, 10" Pipe Longitudinal Seam Downstream 83A1694 EP-02-S007-J-LU UT C-F C5.22 Accumulator Safety Injection Loop 3, 10" Elbow Longitudinal Seam Upstream 83A1694 EP-02-S007-J UT C-F C5.21 Accumulator Safety Injection Loop 3, 10" Elbew to Pipe 83A1694 EP-02-S007-J-LD UT C-F C5.22 Accumulator Safety Injection Loop 3, 10" Pipe Longitudinal-Scam Downstream 83A1694 EP-02-S007-N-LU UT C-F C5.22 Accumulator Safety Injection Loop 3, 10" Elbow Longitudinal Seam Upstream 83A1694 EP-02-S007-N UT C-F C5.21 Accumulator Safety Injection Loop 3,-10" Elbow to Pipe

83A1694 EP-02-S007-N-TD UT C-F C5.22 Accumulator Safety Injection Loop 3, 10" Pipe Longitudinal Seam Downstream

Attachmen?. to WM 95-0005 Page 40 of 111 EXAMINATION ISI VOLUNETRIC EEAMS HIGH PRESSURE COOLANT INJECTION SYSTEM (EN)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAL SECTION COMPONENT DESCRIPTION 83A1695 TEM 01-4-W UT C-B C2.21 Boron Injection Tank Inlet Nozzle to Bottom Head Weld-83A1695 EM-01-S027-D-LU UT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Elbow Longitudinal Seam Upstream 83A1695 EM-01-SO27-D UT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Elbow to 6" Pipe 83A1695 EM-01-S027-D-LD UT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Pipe Longitudinal Seam Downstream 83R1695 EM-01-FW327-LU UT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Pipe Longitudinal Seam Upstream 83A1695 EM-01-FW327 UT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Pipe to 6" Elbow 83A1695 EM-01-FW327-LD UT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Elbow Longitudinal Seam Downstream 83A1695 EM-01-SO41-E-LU UT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Elbow Longitudinal Seam Upstream 83A1695 EM-01-SO41-E UT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Elbow to 6" Pipe 83A1695 EM-01-SO41-E-LD UT N/A N/A High Pressure Coolant Injection Pump Suction Line, 6" Pipe Longitudinal Seam Downstream NAIN FEEDWATER SYSTEM (AE)

TYPE CODE CODE ISI PLAN CQMRQNINT ID EXAM CAT. SECTION COMPONENT DESCRIPTION i 83A1696 AE-05-F016 UT N/A N/A Main Feedwater Loop 3, 14" Elbow to Torsional Restraint

Attachment to WM 95-0005 Page 41 of 111 EXAMINATION ISI VOLUMETRIC EXAMS MAIN FEEDWATER SYSTEM (AE) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1696 AE-05-F017 UT N/A N/A Main Feedwater Loop 3, Torsional Restraint to FE-530 83A1696 AE-05-S024-A UT N/A N/A Main Feedwater Loop 3, Handhole to FE-530 83A1696 AE-05-S024-B UT N/A N/A Main Feedwater Loop 3, Handhole to FE-530 83A1696 AE-05-F018 UT N/A N/A Main Feedwater Loop 3, FE-530 to 14" Pipe 83A1696 I.E-05-F019 UT N/A N/A Main Feedwater Loop 3, 14" Pipe to Valve AEFV41 83A1696 AE-05-F020 UT N/A N/A Main Feedwater Loop 3, Valve FV41 to 14" Pipe 83A1696 AE-05-F021 UT N/A N/A Main Feedwater Loop 3, 14" Pipe to 14" Pipe 83A1696 AE-05-F022 UT N/A N/A Main Feedwater Loop 3, 14" Pipe to 14" Pipe 83A1696 AE-05-FW317 UT N/A N/A Main Feedwater Loop 3, 14" Pipe to 14" Pipe 83A1696 AE-05-FW318 UT N/A N/A Main Feedwater Loop 3, 14" Pipe to Flued Head (P-8) 83A1696 AE-05-S014-A UT N/A N/A Main Feedwater Loop 3, 14" Pipe to 14"x4" Weldolet 83A1696 AE-05-F037 UT N/A N/A Main Feedwater Loop 3, 4" Weldolet to 4" Pipe 83A1696 AE-05-S025-A UT N/A N/A Main Feedwater Loop 3, 4" Pipe to 4" Elbow 1

83A1696 AE-05-FW900 UT N/A N/A Main Feedwater Loop 3, 4" Elbow to 4" Pipe 83A1696 AE-05-F033 UT N/A N/A Main Feedwater Loop 3, 4" Pipe to Valve AEV127 83A1696 AE-05-FW902 UT N/A N/A Main Feedwater Loop 3, 14"x3" Weldolet to 14" Pipe 83A1696 AE-05-F043 RT N/A N/A Main Feedwater Loop 3, 4"x3" Weldolet to Valve AEV327 83A1696 AE-05-F006 UT N/A N/A Main Feedwater Loop 4, 14" Pipe to 14" Pipe

- - _m_ _______--_A _ ma ww+., e .,s.-,m.- ey.w -e4,e--v.-g.6A .M+T e Nwa y e. erg. ymw + -._wg , , _ , - _ _,, m....- ,,___wv,.y,, _..,, ._ ,,. ,7_.

Attachment to WM 95-0005 Page 42 of 111 EXAMINATION ISI VOLUMETRIC EXAMS MAIN FEEDWATER SYSTEM (AE) (Continued)

TYPE CODX CODE ISI PLAN COMPONENT ID EIAM CAT. SECTION COMPONENT DESCRIPTION 83A1696 AE-05-F007 UT N/A N/A Main Feedwater Loop 4, 14" Pipe to 14" Pipe 83A1696 AE-05-FW320 UT N/A N/A Main Feedwater Loop 4, 14" Pipe to 14" Pipe 83A1696 AE-05-FW319 UT N/A N/A Main Feedwater Loop 4, 14" Pipe to 14" Pipe 83A1696 AE-05-F008 UT N/A N/A Main Feedwater Loop 4, 14" Pipe to Flued Head (P-5) 83A1696 AE-05-FW901 UT N/A N/A Main Feedwater Loop 4, 14"x3" Weldo}et to 14" Pipe 83A1696 AE-05-F041 RT N/A N/A Main Feedwater Loop 4, 4"x3" Weldolet to Valve AEV328 MAIN STEAM SYSTEM (AB)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1697 AB-01-F054 UT C-F C5.21 Main Steam Loop 3, 10" Outlet on Main Steam Header to 10" Pipe 83A1697 AB-01-F053 UT N/A N/A Main Steam Loop 3, 28" Pipe to Torsional Restraint 83A1697 AB-01-F052 UT N/A N/A Main Steam Loop 3, 28" Torsional Restraint to Valve ABHV20 j 83A1697 AB-01-F051 UT N/A N/A Main Steam Loop 3, Valve ABHV20 to 28" Pipe 83A1697 AB-01-S032-S UT N/A N/A Main Steam Loop 3, 12" Outlet on Main Steam Header to 12" Pipe 83A1697 AB-01-S032-W UT N/A N/A Main Steam Loop 3, 12" Pipe to 12" Pipe Cap 83A1697 AB-01-S032-M UT N/A' N/A Main Steam Loop 3, Extruded Outlet on 28" Main Steam Header to 4" Cap 83A1697 AB-01-S032-L UT N/A N/A Main Steam Loop 3, 6" Outlet on Main Steam Header to 6" Flange

. .- _ , . . - . _ _ _ _ _. . _ . _ _ _ _ _ - ~ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _

Attachment to WM 95-0005 Page 43 of 111 .

EIANINATION ISI VOLUMETRIC EIAMS MAIN STEAM SYSTEM (AB) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPOMENT DESCRIPTION 83A1697 AB-01-S032-K UT N/A N/A Main Steam Loop 3, 6" Outlet on Main Steam Header to 6" Flange 83A1697 AB-01-S032-J UT N/A N/A Main Steam Loop 3, 6" Header on Main Steam Header to 6" Flange i

83A1697 AB-01-S032-H UT N/A N/A Main Steam. Loop 3, 6" Outlet on Main Steam Header to 6" Flange 83A1697 AB-01-S032-G UT N/A N/A Main Steam Loop 3, 6" Outlet on Main Steam Header to 6" Flange 83A1697 AB-01-S034-C UT N/A N/A Main Steam Loop 3, 10" Pipe to 10" Elbow 83A1697 AB-01-S034-D UT N/A N/A Main Steam Loop 3, 10" Elbow to 10" Pipe 83A1697 AB-01-F055 UT' N/A N/A Main Steam Loop 3, 10" Pipe to Valve ABV029 83A1697 AB-01-F056 UT N/A N/A Main Steam Loop 3, Valve ABV029 to 10" Pipe 83A1697 AB-01-S035-B UT N/A N/A Main Steam Loop 3, 10" Pipe to 10" Elbow 83A169? AB-01-S035-C UT N/A N/A Main Steam Loop'3, 10" Elbow to 10"x8" Reducer 83A1697 AB-01-F057 UT N/A N/A Main Steam Loop 3, 10"x8" Reducer to Valve ABPV3 83A1697 AB-01-F050 UT N/A' N/A Main Steam Loop 3, 28" Main Steam Header to Flued Head (P-4) 83A1697 AB-01-S032-Z UT N/A N/A Main Steam to Auxiliary Feedwater Turbine System, 4" Weldolet to 28" Main Steam Header ';

83A1697 AB-01-F059 UT N/A N/A Main Steam to Auxiliary Feedwater Turbine System, 4" Pipe to 4" Weldolet

_ . . .~_ . _ .-. - - _ - _ - - - - ~ . - - ~ . _ . - - . - - , . . . . _ , . . - - . . _ . - - - - . . - . - . - . . - - _ - - . - _ . - ~ . - . _ . . _ _ _ . -

Attachment to WM 95-0005 Pagn 44 of 111 EXAMINATION ISI VOLUMETRIC EXAMS MAIN STEAM SYSTEM (AB) (Continued)

TYPE CODE CODE ISI PLAN COMPONEKr ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1697 AB-01-FW323A UT N/A N/A Main Steam to Auxiliary Feedwater Turbine System, 4" Pipe to 4" Elbow 83A1697 AB-01-S037-D UT N/A N/A Main Steam to Auxiliary Feedwater Turbine System, 4" Elbow to 4" Pipe 83A1697 AB-01-S037-E UT N/A N/A Main Steam to Auxiliary Feedwater Turbine System, 4" Elbow to 4" Pipe 83A1697 AB-01-FW324 UT N/A N/A Main Steam to Auxiliary Feedwater Turbine System, 4" Pipe to 4" Elbow 83A1697 AB-03 -FW325 UT N/A N/A Main Steam to Auxiliary Feedwater Turbine System, 4" Pipe to 4" Elbow 83A1697 AB-01-F061 UT N/A N/A Main Steam to Auxiliary Feedwater Turbine System, Valve ABV087 to'4" Pipe.

83A1697 AB-01-F062 UT N/A N/A Main Steam to Auxiliary Feedwater Turbine System, 4" Pipe to Valve ABHV6 83A1697 AB-01-F063 UT N/A N/A Main Steam to Auxiliary Feedwater Turbine System, Valve ABHV6 to 4" Pipe CHEMICAL & VOLUME CONTROL SYSTEM (BG)

TYPE CODE CODE ISI PLAN COMPOHENT ID EXAM N SECTION COMPONINT DESCRIPTION 83A1698 BG-01-FW690 Ur N/A N/A Charging Line Containment Penetration, 3" Pipe to 3" Elbow 83A1698 BG-01-FW691 UT N/A N/A Charging Line Containment Penetration, 3" Elbow to 3" Pipe 83A1698 BG-01-FW311 UT N/A N/A Charging Line Containment Penetration, Valve BGHV8106 to 3* Pipe

, -a

Attachment to WM 95-0005 Page 45 of 111 EXAMINATION ISI VOLUMETRIC EXAMS CNENICAL & VOLUNE CONTROL SYSTEM (BG) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1698 BG-01-F023 UT N/A N/A Charging Line Containment Penetration, 3" Pipe to Valve BGHV8106 83A1698 BG-01-F024 UT N/A N/A Charging Line Containment Penetration, Valve BGHV8105 to 3" Pipe 83A1698 BG-01-F025 UT N/A N/A Charging Line Containment Penetration, 3" Pipe to Valve BGHV8105 83A1698 BG-01-FW322 UT N/A N/A Charging Line Containment Penetration, 3" Pipe to 3" Pipe 83A1698 BG-01-FW321 TJT N/A N/A Charging Line Containment Penetration, 3" Pipe to 3" Pipe 83A1698 BG-01-F025 UT N/A N/A Charging Line Containment Fenetration, 3" Pipe to 3" Pipe 83A169C BG-01-FW313 UT N/A N/A Charging Line Containment Penetration, Flued Head (P-80)'to 3" Pipe 83A1700 BG-09-W812 UT N/A N/A Reactor Coolant Pump *C" Seal Water Injection Containment Penetration, 2" Pipe to 2" Tee 83A1700 BG-09-FW813 UT N/A- N/A Reactor Coolant Pump "C" Seal Water Injection Containment i Penetration, 2" Tee to 2" Pipe 83A1700 BG-09-W872 'UT N/A N/A Reactor Coolant Pump "C" Seal Water Injection Containment Penetration, 2" Pipe to 2"x1" Reducer 83A1700 BG-09-W811 LT N/A N/A Reactor Coolant Pump *C" Seal Water Injection Containment Penetration, 2" Tee to 2" Pipe 83A1700 BG-09-W723 UT N/A N/A Reactor Coolant Pump *C" Seal Water Injection Containment Penetration, 2" Pipe to 2"x2"x3/4" Tee 83A1700 BG-09-W737 UT N/A N/A Reactor Coolant Pump "C". Seal Water Injection Containment Penetration, 2" Pipe to 2"x2"x3/4" Tee l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - . . - -. - . _ . . _ _ _ _ _ . . _ . __ . ~ ,

Attachment to WM 95-0005 <

Page 46 of 111 EXAMINATION ISI VOLUMETRIC EEAMS CHEMICAL & VOLUME CONTROL SYSTEM (BG) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID E3&M R SECTION COMPONENT DESCRIPTION 83A1700 BG-09-W889 UT N/A N/A Reactor Coolant Pump "C" Seal Water Injection Containment Penetration, 2" Pipe to 2" Pipe 83A1700 BG-09-W805 UT N/A N/A Reactor Coolant Pump "C" Seal Water Injection Containment Penetration, 2" Pipe to 2" Orifice Flange FE-143 83A1700 BG-09-W804 UT N/A N/A Reactor Coolant Pump "C" Seal. Water Injection Containment Penetration, Orifice Flange FE-143 to 2" Pipe 83A1700 BG-09-W803 UT N/A N/A Reactor Coolant Pump'*C" Seal Water Injection Containment Penetration, 2" Pipe to 2"x1 1/2" Reducer 83A1700 BG-09-W695 UT N/A N/A Reactor Coolant Pump "C" Seal Water Injection Containment Penetration, 2"x1 1/2" Reducer to 2" Pipe 83A1700 BG-09-W890 UT N/A N/A Reactor Coolant Pump *B" Seal Water Injection Containment Penetration, 2" Pipe to 2" Pipe 83A1700 BG-09-W817 UT N/A N/A Reactor Coolant Pump "B" Seal Water. Injection Containment Penetration, 2" Pipe to Orifice Fla'ge FE-144 83A1700 BG-09-W816 UT N/A N/A Reactor Coolant Pump "B" Seal Water Injection Containment Penetration, Orifice Flange FE-144 to 2" Pipe 83A1700 BG-09-W815 UT N/A N/A Reactor Coolant Pump *B" Seal Water Injection Containment Penetration, 2" Pipe to 2"x1 1/2" Reducer 83A1700 BG-09-W818 UT N/A N/A Reactor Coolant Pump "B" Seal Water Injection Containment Penetration, 2"x1 1/2" Reducer to 2" Pipe RESIDUAL HEAT REMOVAL SYSTEM (EJ)

TYPE CODE CODE ISI PLAN COMPONENT ID EEAM CAT. ERCTION COMPONENT DESCRIPTION 83A1699 EJ-02-F040 UT C-F C5.11 Residual Heat Removal Train "B", Valve.EJHV8809B to 10" Pipe

L Attachment to hN 95-0005 Pcge 47 of 111 EXAMINATION ISI VOLUMETRIC EXAMS RESIDUAL HEAT REMOVAL SYSTEM (RJ) (Continued)

TYPE CODE CODE ISI. PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1699 EJ-02-F040-LD UT C-F C5.12 Residual Heat Removal Train "B", 10" Pipe Longitudinal Seam Downstream 83A1699 EJ-02-S035-D-LU UT C-F C5.22 Residual Heat Removal Train *B", 10" Pipe Longitudinal Seam Upstream 83A1699 EJ-02-S035-D UT C-F C5.21 Residual Heat Removal Train "B", 10" Pipe to 10" Elbow 83A1699 EJ-02-S035-D-LD UT C-F C5.22 Residual Heat Removal Train *B", 10" Elbow Longitudinal Seam Downstream 83A1699 EJ-02-F041-LU UT C-F C5.22 - Residual Heat Removal Train "B", 10" Elbow Longitudinal Seam Upstream 83A1699 EJ-02-F041 UT C-F C5.21 Residual Heat Removal Train "B", 10" Elbow to Flued Head P-27 83A1699 EJ-02-F051-LU UT C-F C5.22 Residual Heat Removal To Safety Injection System, 10" Pipe Longitudinal Seam Upstream 83A1699 EJ-02-F051 UT C-F C5.21 Residual Heat Removal To Safety Injection System, 10" Pipe to Valve EJHV8840 83A1699 EEJ01A-SEAM-1-W UT C-A C1.10 Residual Heat Removal Train *A", Heat Exchanger Bonnet Flange to Channel Weld 83A1699 EEJ01A-SEAM-2-W UT C-A C1.20 Residual Heat Removal Train "A", Heat Exchanger Channel to Head Weld REACTOR COOLANT SYSTEM (BB)

TYPE CODE CODE IS1 PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1700 BB-09-F001A Ur N/A N/A Reactor Coolant Pump "C" Seal Water Injection Containment Penetration, Flued Head P-39 to 2" Pipe

.. . ,~, .. -. . .- - , . , , - , . - -- - - - - - . . . . . - - . - .

Attachment to WM 95-0005 Page 48 of 111 EXAMINATION ISI VOLUMETRIC EXAMS REACTOR COOLANT SYSTEM (BB) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM E SECTION COMPONENT DESCRIPTION 83A1700 PBB01C-FLYWHEEL UT N/A N/A Reactor Coolant Pump "C" Flywheel, Motor S/N 3S87P408 83A1700 PBB01D-FLYWHEEL UT N/A N/A Reactor Coolant Pump "D" Flywheel, Motor S/N 4586P767 83R1700 PBB01B-BOLT UT B-G-1 B6.180 Reactor Coolant Pump "B", Pump Main Flange Bolts (24)

AUXILIARY FREDWATER PUNP TURBINE SUPPLY SYSTEM (FC)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1701 FC-01-S021-C UT N/A N/A Auxiliary Steam Supply From Main Steam Loop 3, 4" Pipe to 4" Elbow 83A1701 FC-01-SO21-B UT N/A N/A Auxiliary Steam Supply From Main Steam Loop 3, 4" Elbow to 4" Pipe 83A1701 FC-01-F028 ITT N/A N/A Auxiliary Steam Supply From Main Steam Loop 3, 4" Pipe to Valve FCV025 83A1701 FC-01-F027 UT N/A N/A Auxiliary Steam Supply From Main Steam Loop 3, Valve FCV025 to 4" Pipe 83A1701 FC-01-F026 UT N/A N/A Auxiliary Steam Supply From Main Steam Loop 3, 4" Pipe to Valve V002 83A1701 FC-01-F025 UT N/A N/A Auxiliary Steam Supply From Main Steam Loop 3, Valve FCV002 to 4

  • Pipe REFUELING WATER STORAGE SYSTEM (BN)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83AWC01 BN-01-F041 UT N/A N/A Refueling Water Storage, Valve BNHV8812A to 14" Pipe

,_ . , , , . .. . , - - - - , - ---,4- - --.. --, = - - - - - - - - m- - - - - --- - - - - ---- --- --

Attachment to WM 95-0005 Page 49 of 111 EXAMINATION ISI VOLUMETRIC EXAMS REFUELING WATER STORAGE SYSTEM (BN) (Continued)

TYPE CODE CODE ISI PLAN COhiPONENT ID EXAM CAT. SRCTION COMPONENT DESCRIPTION 83AWC01 BN-01-F041-LD UT N/A N/A Refueling Water Storage, 14" Pipe Longitudinal Seam Downstream 83AWC01 BN-01-F011-LU UT N/A N/A Refueling Water Storage, 24"x16" Reducer Longitudinal Seam, Upstream 83AWC01 BN-01-F011 UT N/A N/A Refueling Water Storage, 24"x16" Reducer to 16" Pipe 83RWC01 BN-01-F011-LD UT N/A N/A Refueling Water Storage, 16" Pipe Longitudinal Seam Downstream 83AWC01 BN-01-S012-D-LU UT N/A N/A Refueling Water Storage, 16" Pipe Longitudinal Seam Upstream 83AWC01 BN-01-S012-D UT N/A N/A Refueling Water Storage, 16" Pipe to 16"x8" Reducer 83AWC01 BN-01-S012-D-LD UT N/A N/A Refueling Water Storage, 16"x8" Reducer Longitudinal Seam Downstream 83AWC01 BN-01-F042 UT N/A N/A Refueling Water Storage, 16"x12" Weldolet to 12" Pipe 83AWC01 BN-01-F042-LD UT N/A N/A Refueling Water Storage, 12" Pipe Longitudinal Seam Downstream 83RWC01 BN-01-SO26-J-LU UT N/A N/A Refueling Water Storage, 12" Elbow Longitudinal Seam Upstream 83AWC01 BN-01-S026-J UT N/A N/A Refueling Water Storage,-12" Elbow to 12" Pipe 83AWC01 BN-01-S026-J-LD UT N/A N/A Refueling Water Storage, 12" Pipe Longitudinal Seam' Downstream 83AWC01 BN-01-F043-LU UT N/A N/A. Refueling Water Storage, 12" Pipe Longitudinal Seam Upstream 83AWC01 BN-01-F043 UT N/A N/A Refueling Water Storage, 12" Pipe to Valve BNHVO4

,_. _ _ _ _ - . - - - _ . . . - _ . . . . . _ - -_, _ _ . _ . . _ , . - __ . .. - - _ . - - ~ . _ -... . . _ . _ _ _ _ - _ _ _ _ _ _

Attachment to WM 95-0005 Page 50 of 111 EXAMINATION ISI VOLUMETRIC EXAMS CONTAINMENT SPRAY SYSTEM (EN)

TYPE CODE CODE ISI PLAN COMPOMENT ID EIAM CAT. SECTION COMPOMENT DESCRIPTION 83AWC01 EN-02-FW325-LU UT N/A N/A Containment Spray Train "B", 12" Elbow Longitudinal Seam Upstream 83AWC01 EN-02-FW325 UT N/A N/A Containment Spray Train "B", 12" Elbow to 12" Pipe 83AWC01 EN-02-FW325-LD UT N/A N/A Containment Spray Train "B", 12" Pipe Longitudinal Seam Downstream 83AWC01 EN-02-FW301-LU UT N/A N/A Containment Spray Train "B", 12" Pipe Longitudinal Seam Upstream 83AWC01 EN-02-FW301 UT N/A N/A Containment Spray Train "B", 12" Pipe to 12" Pipe 83AWC01 EN-02-FW301-LD UT N/A N/A Containment Spray Train "B", 12" Pipe Longitudinal Seam Downstream 83AWC01 EN-02-F007A-LU UT N/A N/A Containment Spray Train "B", 14" Elbow Longitudinal Seam Upstream 83AWC01 EN-02-F007A UT N/A N/A Containment Spray Train "B", 14" Elbow to Pump PEN 01B Inlet

Attachment to WM 95-0005 Page 51 of 111 EXAMINATION ISI VISUAL EXAMS ACCUMULATOR SAFETY INJECTION SYSTEM (EP) l TYPE CODE CODE ISI PLAN COMPONENT ID EXAM N SECTION COMPONENT DESCRIPTION 83A1694 EP-01-8956D-b VT-1 B-G-2 B7.70 Accumulator Safety Injection Loop 4, Valve EP8956D Bolting 83A1694 EP-01-BB894BD-b VT-1 B-G-2 B7.70 Accumulator Safety Injection Loop 4, Valve BB8948D Bolting 83A1694 EP-02-8818C-b VT-1 B-G-2 B7.70 Accumulator Safety Injection Loop 3, Valve EP8818C Bolting 83A1694 EP-02-BB8948C-b VT-1 B-G-2 B7.70 Accumulator Safety Injection Loop 3, Valve BB8948C Bolting HIGH PRESSURE COOLANT INJECTION SYSTEN (EM)

TYPE CODE CODE ISI PLAN COMPONENT ID EEAM N SECTION COMPONENT DESCRIPTION 83A1695 TEM 01-SUPPORT-4 VT-3 F-A F1.30 High Pressure Coolant Boron Injection Tank Support 83A1695 EM-03-FE-924-FL-b VT-1 B-G-2 B7.50 High Pressure Coolant Boron Injection Tank Header, Flange FE-924 Bolting 83A1695 EM-03-BB-8949B-b W-1 B-G-2 B7.70 High Pressure Coolant Safety Injection Pumps to Reactor Coolant System, Valve BB8949B Bolting 83A1695 EM-03-BB-8949B-SURF VT-3 B-M-2 B12.50 High Pressure Coolant Safety Injection Pumps to Reactor Coolant System, Valve BB8949B Internal Pressure Surface 83A1695 EM-03-EJ-8841A-b VT-1 B-G-2 B7.70 High Pressure Coolant Safety Injection Pumps to Reactor.

Coolant System, Valve EJ8841A Bolting 83A1695 EM-03-FE-927-FL-b VT-1 B-G-2 B7.50 High Pressure Coolant Boron Injection Tank Header, Flange FE-927 Bolting CHEMICAL te VOLUME CONTROL SYSTEM (BG)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1698 BG-21-BB-8378A-b VT-1 B-G-2 B7.70 Normal Charging Line (Loop 1), Valve BBV8378A Bolting

Attachment to WM 05-0005 Page 52 of 111 EXAMINATION ISI VISUAL EXAMS CHEMICAL & VOLUME CONTROL SYSTEM (BG) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM N SECTION COMPONENT DESCRIPTION 83A1698 BG-21-BB-8378B-b VT-1 B-G-2 B7.70 Normal Charging Line (Loop 1), Valve BBV8378B Bolting RESIDUAL HEAT REMOVAL SYSTEM (EJ)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1699 EJ-04-HV-8701A-b VT-1 B-G-2 B7.70 Residual Heat Removal Train "A", Valve EJHV8701A Bolting 83A1699 EJ-04-BB-PV8702A-b VT-1 B-G-2 B7.70 Residual Heat Removal Train "A", Valve EJPV8702A Bolting 83A1699 EEJ01A-SKIRT-W VT-3 C-C C3.10 Residual Heat Removal Train "A", Heat Exchanger Skirt (Support) 83A1699 EEJ01A-SUP-1 VT-3 D-B D2.20 Residual Heat Removal Train "A", Heat Exchanger Support and F-A F1.10 Support Lug to Shell Weld i

83A1699 EEJ01A-SUP-2 VT-3 D-B D2.20 Residual Heat Removal Train "A", Heat Exchanger Support and F-A F1.10 Support Lug to Shell Weld l

83A1699 EEJ01A-SUP-3 VT-3 D-B D2.20 Residual Heat Removal Train "A", Heat Exchanger Support and F-A F1.10 Support Lug to Shell Weld 83A1699 EEJ01A-SUP-4 VT-3 D-B D2.20 Residual Heat Removal Train "A", Heat Exchanger Support and F-A F1.10 Support Lug to Shell Weld 83A1699 EEJCIA-SUP-5 VT-3 D-B D2.20 Residual Heat Removal Train "A", Heat Exchanger Support and l F-A F1.10 Support Lug to Head Weld REACTOR COOLANT SYSTEM (BB)

TYPE CODE CODE COMPONENT ID ISI PLAN EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1700 PBB01A-SUP-1 VT-3 F-B F2.30 Reactor Coolant Pump "A" Tie Rod Support

Attachment to WM 95-0005 Pagn 53 of 111 EXAMINATION ISI VISUAL EXAMS REACTOR COOLANT SYSTEM (BB) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1700 PBB01A-SUP-3 VT-3 F-B F2.30 Reactor Coolant Pump "A" Tie Rod Support 83A1700 PBB01A-SUP-3A VT-3 F-B F2.30 Reactor Coolant Pump "A" Column Support 83A1700 RBB01-04 VT-3 F-B F2.40 Reactor Vessel Pad Support 63A1700 CRDMPL-SUP-5 VT-3 F-C F3.30 Reactor Vessel Control Rod Drive Mechanism Seismic Support 83A1700 CRDMPL-SUP-6 VT-3 F-C F3.30 Reactor Vessel Control Rod Drive Mechanism Seismic Support f' 83A1700 BB-02-8010B-FL-b VT-1 B-G-2 B7.50 Pressurizer Safety Valve BBV8010B Flange Bolting 83A1700 BB-02-8010B-b VT-1 B-G-2 B7.70 Pressurizer Safety Valve BBV8010B Bonnet Bolting 83A1700 BB-U4-PCV-455C-b VT-1 B-G-2 B7.70 Pressurizer Spray Line, Valve BBPCV455C Bolting 83A1700 BB-04-PCV-455B-b VT-1 B-G-2 B7.70 Pressurizer Spray Line, Valve BBPCV455B Bolting 83A1700 BB-09-FL1-b VT-1 B-G-2 B7.50 Reactor Coolant Pump "C" Seal Water Injection Line, 1 1/2" Flange Bolting 83A1700 BB-11-FL1-b VT-1 B-G-2 B7.50 Reactor Coolant Pump *B* Seal Water Injection Line, 1 1/2" Flange Bolting CONTAINMENT COOLING SYSTEM (GN) l TYPE CODE CODE

- ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1703 M-620-003-09 VT-3 D-B D2.20 Containment Cooling Cooler Coil Supply and Return Header Pipe Support - Integral Attachment

  • 83A1703 M-620-003-10 VT-3 D-B D2.20 Containment Cooling Cooler Coil' Supply and Return Header

, Pipe Support - Integral Attachment

Attachment to WM 95-0005 Pz,gs 54 of 111 EXAMINATION ISI VISUAL EXAMS CONTAINMENT COOLING SYSTEM (GN) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1703 M-620-003-11 VT-3 D-B D2.20 Containment Cooling Cooler Coil Supply and Return Header Pipe Support - Integral Attachment 83A1703 M-620-003-12 VT-3 D-B D2.'" Containment Cooling Cooler Coil Supply and Return Header Pipe Support - Integral Attachment 83A1703 M-620-003-13 VT-3 D-B D2.20 Containment Cooling Cooler Coil Supply and Return Header Pipe Support - Integral Attachment 83A1703 M-620-003-14 VT-3 D-B D2.20 Containment Cooling Cooler Coil Supply and Return Header Pipe Support - Integral Attachment 83A1703 M-620-003-15 VT-3 D-B D2.20 Containment Cooling Cooler Coil Supply and Return Header Pipe Support - Integral Attachment 83A1703 M-620-003-16 VT .s D-B D2.20 Containment Cooling Cooler Coil Supply and Return Header Pipe Support - Integral Attachment ESSENTIAL SERVICE WATER SYSTEM (EF)

TYPE CODE CODE ISI PLAN COMPONENT ID EX&li CAT. SECTION COMPONENT DESCRIPTION 83A1707 EF-02-A010 VT-3 D-B D2.20 Essential Service Water Train "A" Supply, Pipe Support -

Integral Attachment 83A1707 EF-03-C016 VT-3 D-B D2.20 Essential Service Water Train "A" Return, Pipe Support -

Integral Attachment  !

83A1707 EF-03-R020 VT-3 D-B D2.20 Essential Service Water Train "A" Return, Pipe Support -

Integral Attachment 83A1707 EF-06-A015 VT-3 D-B D2.20 Essential Service Water Train "A" Supply, Pipe Support -

Integral Attachment

- - _ - - - - - --- .o e v - --------_s

Attachment to WM 95-0005 Page 55 of 111 EXANINATION ISI VISUAL EXANS EOSENTIAL SERVICE WATER SYSTEN (EF) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1707 EF-07-AOO1 VT-3 D-B D2.20 Essential Service Water Train *A* Supply and Return, Pipe Support - Integral Attachment 83A1707 EF-07-A002 VT-3 D-B- D2.20 Essential Service Water Train "A" Supply and Return, Pipe Support - Integral Attachment 83A1707 EF-03-C002 VT-3 D-B D2.20 Essential Service Water Train "A" Return, Pipe Support -

Integral Attachment 83A1707 EF-03-R021 VT-3 D-B D2.20 Essential Service Water Train "A" Return, Pipe Support.-

Integral Attachment PRESSURIZER (TBB03)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION CpMPONENT DESCRIPTION 83A1709 TBB03-LUG-A-W VT-3 F-A F1.10 Pressurizer Seismic Lug Support 83A1709 TBB03-LUG-D-W VT-3 F-A F1.10 Pressurizer Seismic Lug Support l

_. y

~

Attachment to WM 95-0005 Page 56 of 111 EXAMINATION ISI VISUAL EXAMS Sample Plan Compontut Supports MAIN STEAM SYF/EM (AB)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION meth0 MENT DESCRIPTION 83A1715 AB01-H501-145 VT-3 F-C N/A Variable support on Line 302, Steam Generator 'C" to Turbine MAIN FEEDWATER SYSTEM (AE)

TYPE CODE CODE ISI PLAN COMPONENT ID EIAM CAT. SECTION COMPONENT DESCRIPTION 83A1715 AE05-RO10-135 VT-3 F-C N/A Sway strut on Line 37, Auxiliary Feedwater to Steam Generator "C" 83A1715 AE04-R004-242 VT-3 F-C N/A Two snubbers on Line 81, Main Feedwater to Steam Generator "B"

I Snubber on Line 81, Main Feedwater to Steam Generator r 83A1715 AE04-R013-252 VT-3 F-C N/A "B" 83A1715 AE04-R020-251 VT-3 F-C N/A Snubber on Line 82, Main Feedwater to Steam Generator "A" 83A1715 AE05-R013-251 VT-3 F-C N/A Snubber on Line 79, Main Feedwater to Steam Generator *D" 83A1715 AE05-R022-242 VT-3 F-C N/A Two snubbers on Line 80, Main Feedwater to Steam Generator

'C' AUKILIARY FEEDWATER (AL)

TYPE CODE CODE ISI PLAN COMPONENT ID EIAN CAT. SECTION COMPONENT DESCRIPTION j 83A1715 ALO2-C003-135 VT-3 F-C N/A Two sway struts on Line 20, Motor Driven Auxiliary Feedwater Pump "A" Discharge 83A1715 PLO3-A001-135 VT-3 F-B N/A Anchor on Line 13, Motor Driven Auxiliary Feedwater Pump *B" Discharge

Attachment to WM 95-0005 Page 57 of 111 EXAMINATION ISI VISUAL EXANS Sample Plan Component Supports REACTOR COOLANT SYSTEM (BB)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1715 BB02-H006-261 VT-3 F-C N/A Constant support on Line 82, Pressurizer to Pressurizer Relief Tank 83A1715 BB04-R035-241 VT-3 F-C N/A Snubber on line 3, Reactor Coolant System Loop 1 Cold Leg to Pressurizer '

83A1715 BB01-R004-231 VT , F-C N/A Snubber on Line 68, Reactor Coolant System Loop 4 Hot Leg to Pressurizer 83A1715 BB02-R019-261 VT-3 F-C N/A Two snubbern on Line 85, Pressurizer to Pressurizer Relief Tank 83A1715 BB04-R018-261 VT-3 F-C N/A Snubber on Line 238, Reactor Coolant System Loop 2 Cold Leg to Pressurizer 83A1715 BB09-R002-232 VT-3 F-C N/A Snubber on Line 178- Seal Water Injection to Reactor Coolant Pump "C" CHEMICAL & VOLUME CONTROL SYSTEM (BG)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAL F'CTION COMPONENT DESCRIPTION 83A1715 BG02-C013-122 VT-3 F-C N/A Two sway struts On Line 146, Centrifugal Charging Pumps "A" & *B" maximum flow lines 83A1715 BG03-R005-133 VT-3 F-C N/A Two sway struts on Line 441, Letdown Flow to Letdown Heat Exchanger 83A1715 BG05-H005-132 VT-3 F-C N/A Sway strut on line 139, Letdown Flow to Volume Control Tank 83A1715 BG05-R007-132 VT-3 F-C N/A Sway strut on line 206, Seal Water Heat Exchanger to Volume Control Tank t

- . _ . ~ . , . . . - - - - ,, , - , . , - - . . . -. - , , . .- . , . .

y

-t 1

Attachment to'WM 95-0005' -

Page 58 of 111 marTu1 TION -

ISI VISUAL wr m [

Sample Plan Cot 7ponent Supports CREMICAL & VOLUBE CONTROL SYSTEM (BG) (Continued)

TYPE CODE CODE -: ;

ISI PLAM COMPOMENT ID EIAII C&T. SECTION COMPQMENT DESCRIPTIOW 4 . .

83A1715 BG11-R003-111 VT-3 F-C N/A Sway strut on line 29, Letdown Heat Exchanger to Reactor j Coolant Filter 83A1715 BG35-H507-112 VT-3 F-C N/A Sway strut on Line 233, Boric Acid Storage Tank *B" to Level-Transmitter BGLT105 .

83A1715 BG03-C503-113 VT-3 F-C N/A PG-3 support on Line 36, Letdown Heat Exchanger to Mixed Bed Demineralizer BSA1715 BG09-C505-121 VT-3 F-C N/A PG-3 support on Line 163, Seal Water Injection to Seal Water  !

Injection Filter 83A1715 BG09-C526--123 VT-3 F-C N/A PG-3 support on Line 154 Seal Water Injection to Reactor Coolant Pump *A" 83A1715 BG09-C539-133 VT-3 F-C. N/A PG-20 support on Line 173, Seal Water Injection to Reactor 'i Coolant Pump *D" 83A1715 BG10-C514-121 VT-3 F-C N/A PG-3 support on Line 154, . Seal Water Injection to Seal Water I Injection Heat Exchanger ,

83A1715 BG10-C522-122 VT-3 F-C N/A PG-3 support on Line 154, Seal Water Injection to Seal Water Injection Heat Exchanger l

83A1715 BG18-C501-132 VT-3 F-C N/A PG-14 support on Line 255, Reactor Make-Up Water to Letdown Reheat Heat Exchanger

, 83A1715 BG18-C504-132 VT-3 F-C N/A PG-20 support on Line 244, Reactor Make-Up Water to ,

Positive T>isplacemeny ,oump j

-83A1715 BG02-A004-132 VT-3 F-B N/A Anchor on Line 145, Volume Control Tank to Safety Injection Pumps *A" & *B" Suction 83A1715 BG02-A006-121 VT-3 F-B N/A Anchor on Line 479, Positive Displacement Pump to Boron '

s Injection Tank

  • Attachment to WM 95-0005 Page 59 of 111 EXAMINATION ISI VISUAL EXAMS Sample Plan Component Supports CHEMICAL & VOLUME CONTROL SYSTEM (BG) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1715 BG18-A501-132 VT-3 F-C N/A Anchor on Line 244, Reactor Make-Up Water to Positive Displacement Pump 83A1715 BG09-H524-131 VT-3 F-C N/A Variable support on Line 164, Chemical And Volume Control System 83A1715 BG22-R018-232 VT-3 F-C N/A Snubber on Linr. 1, Reactor Coolant System Letdown Delay Pipe STEAM GENERATOR BLONDOWN SYSTEM (BM)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONINT DESCRIPTION l

83A1715 BM03-R504-231 VT-3 F-C N/A PG-4 support on Line 6, Steam Generator "A" Blowdown to Steam Generator Drain Pumps l

83A1715 BM03-R507-231 VT-3 F-C N/A PG-4 support on Line 18, Steam Generator "B" Blowdown to Steam Generator Drain Pumps j 83A1715 BM19-R504-252 VT-3 F-B N/A PG-60 support on Line 33, Steam Generator *C" Blowdown l to Steam Generator Drain Pumps l

83A1715 BM01-R016-231 VT-3 F-C N/A Snubber on Line 38, Steam Generator "D" Blowdown to Steam Generator Drain Pumps 83A1715 BM17-R506-241 VT-3 F-C N/A Snubber on Line 9, Steam Generator "A" Blowdown to Steam Generator Drain Pumps 83&l715 BM17-R508-231 VT-3 F-C N/A Snubber on Line 5, Steam Generator "A" Blowdown to Steam Generator Drain Pumps l

83A1715 BM18-R510-252 VT-3 F-C N/A Snubber on Line 21, Steam Generator "B" Blowdown to Steam Generator Drain Pumps

. _ _ _ _ _ _ _ __ _ - - . . _ . _.~. . , _ , . - _ . . - - _ _ _ _ . , _ _ _ _ _ _. . _ _ _ _- _

Rttachment to WM 95-0005 i Page 60 of 111 EXAMINATION ISI VISUAL EXAMS Sample Plan Component Supports STEAM GENERATOR BLONDOWN SYSTEM (BM) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EIAM N SECTION COMPONENT DESCRIPTION 83A1715 BM01-C019-231 VT-3 F-C N/A Snubber on Line 38, Steam Generator "D" Blowdown to Steam Generator Drain Pumps 83A1715 BM17-R505-241 VT-3 F-C N/A Snubber on Line 9, Steam Generator "B" Blowdown to Steam Generator Drain Pumps i

83A1715 BM20-R514-231 VT-3 F-C N/A Snubber on Line 41, Steam Generator "D" Blowdown to Steam Generator Drain Pumps SPENT FUEL POOL COOLING (EC)

TYPE CODE CODE ,

ISI PLAN COMPONENT ID EXAN CAT. SECTION COMPONENT.9ESCRIPTION 83A1715 EC04-R020-621 VT-3 F-C N/A Sway strut on Line 11, Fuel Pool Cooling And Cleanup Train "B" 83A1715 EC04-H008-611 VT-3 F-C N/A Variable support on Line 2, Fuel Pool Cooling Pump "A" Inlet 83A1715 EC04-H012-611 VT-3 F-C N/A variable support on Line 10, Fuel Pool Cooling Pump "B" Inlet ESSENTIAL SERVICE WATER SYSTEM (EF)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1715 EF02-R009-134 VT-3 F-C N/A Two sway struts on Line 57, Essential Service Water Train

'A" Supply 83A1715 EF02-R011-112 VT-3 F-C N/A Two sway struts on Line 37, Essential Service Water Train "A" Supply to Centrifugal Charging Pump Room Cooler 83A1715 EF06-H001-114 VT-3 F-C N/A Sway strut on Line 99, Essential Service Water Train "A" &

Attachment to WM- 95-0005 Page 61 of 111 EXAMINATION

.ISI VISUAL EXAMS Sample Plan Component Supports ESSENTIAL SERVICE WATER SYSTEM (EF) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT.ID IIAM CAT. SECTION CCMPONENT DESCRIPTION 83A1715 EF06-H010-135 VT-3 F-C N/A Sway strut on Line 78, Essential Service Water Train "B" Return 83A1715 EF07-C009-311 VT-3 F-C N/A Two sway struts on Line 75, Essential Service Water Train

  • A" from Diesel Generator "A" Lube Oil Cooler 83A1715 EF15-R003-341 VT-3 F-C N/A Two sway struts on Line 115, Essential Service Water Train "A" to Class IE Switchgear A/C Condenser 83A1715 EF06-C017-114 VT-3 F-B N/A Box hanger on Line 108, Essential Service Water Train "B" Return from Auxiliary Feedwater Pump *B" Room Cooler 83A1715 EF06-R013-144 VT-3 F-C N/A U-bolt on Line 100, Essential Service Water Train "B" Supply 83A1715 EF09-R509-134 VT-3 F-C N/A PG-3 support on Line 53, Essential Service Water Train "A" Supply to Fuel Pool Cooling Pump *A" Room Cooler 83A1715 EF02-A010-122 VT-3 F-B N/A Anchor on Line 35, Essential Service Water Train "A"  !

Supply 83A1715 EF04-A005-111 VT-3 F-B N/A Anchor on Line 85, ential Service Water to Residual Heat Removal Pump *B" Room Cooler COMPONENT COOLING WATER SYSTEM (EG)

TYPE CODE CODE ISI PLAN COMPONENT ID EZAM CAT. SECTION COMPONENT DESCRIPTION 83A1715 EG02-H005-133 VT-3 F-C N/A Sway strut on Line 224, Residual Heat Removal Heat Exchanger Train "B" Crossover to Fuel Pool Cooling Heat Exchanger

. _ . _ _ . _ _ . _ - - _ _ _ - _ - _ - . , _ . . _ . . _ . . ~ . _, _ _ , . . ..._ - - ,-___ _ , . . _ . - . - . . _ , . - - . - . . , - , _ _ ,,_ ~ .. _ ___. __-,__- . . . . _.

Attachment to WM 95-0005 Page 62 of 111 EXAMINATION ISI VISUAL EXANS Sample Plan Component Supports COMPONENT COOLING WATER SYSTEN (EG) (Continued)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1715 EG05-C001-141 VT-3 F-C N/A Two Sway struts on Line 227, Fuel Pool Cooling Heat Exchanger Train "B" to Component Cooling Water Heat exchanger 83A1715 EG18-H003-611 VT-3 F-C N/A Sway strut on Line 226, Fuel Pool Cooling Heat Exchanger +

Train 'A" to Component Cooling Water System 83A1715 EG24-R004-121 VT-3 F-C N/A Sway strut on Line 36, Component Cooling Water to Centrifugal Charging Pump Oil Cooler 83A1715 EG09-R001-231 VT-3 F-B N/A Partial box hanger on Line 299, Component Cooling Water Return to Containment Penetration 76  ;

83A1715 EG09-R004-242 VT-3 F-B N/A Box hanger on Line 236, Component Cooling Water Supply-to Reactor Coolant Pump *B" 83A1715 EG12-C004-242 VT-3 F-B N/A Box hanger on Line 237, Component Cooling Water Supply to Reactor Coolant Pump *B" 83A1715 EG28-C503-142 VT-3 F-C N/A PG-15 support on Line 337, Component Cooling Water Piping i

i 83A1715 EG02-A003-132 VT-3 F-B N/A Anchor on Line 226, Fuel Pool Cooling Heat Exchanger to Heat Exchanger Crossover 83A1715 EG03-H005-141 VT-3 F-C N/A Variable support on Line 296, Residual Heat Removal Heat Exchanger *B* to Component Cooling Water Heat Exchanger "B" ,

83A1715 EG18-H006-611 VT-3 F-C N/A Variable support on Line 227, Residual Heat Removal Train j "B" Heat Exchanger to Component Cooling Water System  !

I I

I

. --.-.. , - , , , , - - , , ~ . - ~ , , , . - , . ~ ~ . + - . - - - , . . . . - ~ . . . . _ .mm., ._m_.. .. .- r-.., . . .- . ., . . _ . . ,

Attachment to WM 95-0005 Page 63 of 111 EXAMINATION ISI VISUAL EXAMS Sample Plan Component Supports RESIDUAL HEAT REMOVAL SYSTEM (EJ)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAli CAT. SECTION COMPONENT DESCRIPTION 83A1715 EJ03-A505-122 VT-3 F-C N/A Anchor on Line 35, from Residual Heat Removal Heat Exchanger Train "A" to Chemical And Volume Control Letdown 83A1715 EJ03-C501-122 VT-3 F-C N/A Variable support on Line 35, Residual Heat Removal Heat Exchanger Train "A" to Chemical And Volume Control Letdown 83A1715 EJ04-R008-232 VT-3 F-C N/A Two snubbers on Line 42, Safety Injection System to Reactor Coolant System Loop 2 Hot Leg i HIGH PRESSURE COOLANT INJECTION SYSTEM (EN)

TYPE CODE CODE ISl_ PLAN COMPONENT ID EXAll CAI. SECTION COMPONENT DESCRIPTION G3A1715 EM02-R007-114 VT-3 F-C N/A Two sway struts on Line 74, Centrifugal Charging Pump *A" to Boron Injection Tank e

83A1715 EM01-C027-122 VT-3 F-B N/A Box hanger on Line 6, Safety Injection Pump *A" to Reactor Coolant System Hot Legs 2 & 3 83A1715 EM02-H002-134 VT-3 F-B N/A Stanchion on Line 80, Boron Injection Tank to Reactor Coolant System Hotlegs 1, 2, 3, &4 83A1715 EM08-C532-121 VT-3 F-C N/A PG-15 support on Line 44, High Pressure Coolant Injection 83A1715 EM04 o06-231 VT-3 F-C N/A Snubber on Line 50, Accumulator Injection to Reactor Coolant System Loop 3 Cold Leg 83A1715 EM05-R002-231 VT-3 F-C N/A Snubber on Line 71, Safety Injection Pumps to Residual Heat Heat Removal /High Pressure Coolant Injection I

Attachment to WM 95-0005 Page 64 of 111 EXAMINATION ISI VISUAL WT m sample Plan Component Supports CONTAINNENT SPRAY SYSTEN (EN)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1715 ENO3-C003-261 VT-3 F-B N/A Combination support / restraint on Line 43, Containment Spray 83A1715 ENO3-C005-262 VT-3 F-B N/A Box hanger on Line 50, Containment Spray 83A1715 ENO3-C029-261 VT-3 F-B N/A Box hanger on Line 51, Containment Spray 83A1715 ENO3-C043-262 VT-3 F-B N/A Box hanger on Line 52, Containment Spray 83A1715 ENO3-C065-261 VT-3 F-B N/A Box hanger on Line 53, Containment Spray 83A1715 ENO3-C069-261 VT-3 F-B N/A Box hanger on Line 53, Containment Spray 83A1715 ENO3-C074-262 VT-3 F-B N/A Box hanger on Line 55, Containment Spray 83A1715 ENO3-C106-262 VT-3 F-B N/A Box hanger on Line 47, Containment Spray 33A1715 ENO3-C108-262 VT-3 F-B N/A Box hanger on Line 47, Containment Spray 83A1715 ENO3-C135-261 VT-3 F-B N/A Box hanger on Line 44, Containment Spray 83A1715 ENO3-C157-262 VT-3 F-B N/A Box hanger on Line 45, Containment Spray 83A1715 EN05-C015-281 VT-3 F-B N/A Box hanger on Line 43, Containment Spray 83A1715 EN05-H001-231 VT-3 F-B N/A Partial box hanger on Line 43, Containment Spray 83A1715 EN01-C009-134 VT-3 F-C N/A Variable support on Line 3, Containment Spray Pump "A" Discharge to Containment Spray Header 83A1715 EN02-H005-133 VT-3 F-C N/A Variable support on Line 7, Containment Spray Pump *B" Discharge to Containment Spray Header

Attachment to WM 95-0005 Page 65 of 111 EXhKINATION ISI VISUAL EXAMS Sample Plan Component Supports CONTAINMENT COOLING SYSTEK (GN)

TYPE CODE CODE ISI PLAN COBEPONENT ID IIAM CAT. SECTION CQMPONENT DESCRIPTION 83A1715 GN02-C026-251 VT-3 F-C N/A 'Two sway struts on Line 50 Essential Service Water Supply to Containment Cooler "D" 83A1715 GN01-C017-242 VT-3 F-B N/A Box hanger on Line 55, Containment Coolers "A" & "C" Essential Service Water Return 83A1715 GN01-C016-242 VT-3 F-B N/A Box hanger on Line 45, Containment Cooling Train *A*

ENERGENCY FUEL OIL SYSTEK (JE)

TYPE CODE CODE ISI PLAN COMPONENT ID EXAM CAT. SECTION COMPONENT DESCRIPTION 83A1715 JE03-C503-511 VT-3 F-C N/A PG-3 support on Line 12, Diesel Generator Train "B" to Emergency Fuel Oil Day Tank *B" 83A1715 JE03-C507-511 VT-3 F-C N/A PG-3 support on Line 12, Diesel Generator Train *B" to Emergency Fuel Oil Day Tank *B" 83A1715 JE03-C508-511 VT-3 F-C N/A PG-3 support on Line 12, Diesel Generator Train *B" to Emergency Fuel Oil Day Tank "B" 83A1715 JE03-A503-511 VT-3 F-C N/A Ai.:: hor on Line 4, Emergency Fuel Oil Day Tank *B" Inlet EMERGENCY DIESEL GENERATOR SYSTEM (KJ)

TYPE CODE CODE ISI. PLAN COMPOEDIT ID EX&M CAT. SECTION COMPONENT DESCRIPTION 83A1715 M-018-0504-008-511 VT-3 F-B N/A Hook support on 1.5" Diesel Engine Fuel Oil Line 83A1715 M-018-0674-111-511 VT-3 F-B N/A U-bolt support on 1.5" Diesel Engine Lube Oil Line

..~._ _ ._ _ __..

i l

Attachment to KM 95-0005 Page 66 of 111 i

l i

SYSTEM PRESSERE  :

TESTING 6

l l

i

. . . - - - ..- - -. .- - _ . ~ . .- .-.--.~.._-.. ~ -

t "I

Attachment to WM 95-0005 Page 67 of 111 PRESSURE TESTS PERFORMED SINCE THE SIKTH REFUELING OUTAGE l I

D .  !

STS PE-021A Train "A" Emergency Diesel Puel Oil and Keep l Warm System Pressure Test  !

't STS PE-021D Train "B" Emergency Diesel Puel Oil and Keep r Warm System Pressure Test STS PE-021C Train "A" Emergency Diesel Fuel Oil, Lube Oil, Jacket Water, Intercooler, Rocker Arm, Crankcase  ;

Vacuum, Air Intake, and Air Exhaust Systems i Pressure Test l STS PE-021D Train "B" Emergency Diesel Fuel Oil, Lube Oil, l Jacket Water, Intercooler, Rocker Arm, Crankcase Vacuum, Air Intake, and Air Exhaust Systems [

Pressure Test j E

STS PE-021G Train "A" Emergency Diesel Air Start System >

Pressure Test l STS PE-021H Train "B" Emergency Diesel Air Start System .

Pressure Test j i

STS PE-040A Reactor Coolant System Pressure Test l

)

STS PE-040B Reactor Coolant System Pressure Test STS PE-041A Steam Generator System Pressure Test -

STS PE-041B Steam Generator. System Pressure Test i'

STS PE-041C Blowdown System P-78 Pressure Test STS PE-042A Chemical and Volume Control System Normal l (W/E Of BTRS Portion) Letdown Line to Volume Control Tank Pressure l Test STS PE-042B Chemical and Volume Control System volume l Control Tank and Charging Pump Suction Header  !

Pressure Test {

STS PE-042C Chemical and Volume Control System Positive l Displacement Pump Discharge Header Pressure Test i STS PE-042D Chemical and Volume Control System Centrifugal  !

Charging Pump "A" Discharge Header Pressure Test STS PE-042E Chemical and Volumt Control System Centrifugal Charging Pump "B" Discharge Header Pressure Test

)

l

-r-e- -

+-,r- ---->r T' *- - N '

~ .

' Attachment to WM 95-0005  !

"Page 68 of 111  ;

i STS PE-042F Chemical and Volume Control System Charging Pump Common Discharge and Reactor Coolant System ~ l Charging Lines Pressure Test  ;

STS PE-042I Chemical and Volume Control System Boric Acid  ;

Tank "A". Transfer Pump *A" Pressure Test [

t STS PE-042J Chemical and Volume Control System Boric Acid l Tank *B". Transfer Pump *B" Pressure Test STS PE-042K Chemical and Volume Control System Miscellaneous Pressure Tests l r

STS PE-043A Residual Heat Removal System Cold Leg Injection f' Pressure Test E

STS PE-043B Residual Heat Removal System Hot Leg Discharge f and Centrifugal Charging Pump / Safety Injection ,

Pump Cross Connection Pressure Test  ;

STS PE-044C High Press Safety Injection System Pressure Test j STS PE-044D High Press Safety Injectici. System Pressure Test  ;

)

STS PE-045 Containment Spray System Pressure Test  !

,f STS PE-046 Safety Injection Accumulator Pressure Test {

STS PE-047A Compressed Air System Auxiliary Feedwater ,

Control / Main Steam Atmospheric Relief Valves ,'

Accumulator Pressure Test i

STS PE-047B Compressed Air System P-30 and KANV-30 i Pressure Test l t

I STS PE-0481. Pbel Pool Cooling System Pressure Test - Trains "A" and "B" l l

STS PE-04BC Refueling Pool Skimmer System Pressure Test STS PE-049A Essential Service Water System "A" Train j Pressure Test 4

STS PE-049B Essential Service Water System "B" Train l Pressure Test  ;

STS PE-050A Component Cooling Water System 'A" Train and Outside Containment Service Loop Pressure Test STS PE-050B Component Cooling Water System PEG 01C Pressure Test l

l l

\

l 4

n: 1 l

1 Attachm:nt to WM 95-0005 Page 69 of 111 ST9 PE-050C Component Cooling Water System "B" Train Pressure Test i STS PE-050D Component Cooling Water System PEG 01D Pressure Test i STS PE-052A Auxiliary Feedwater Pump Turbine Pressure Test ,

Using Main Steam

~

STS PE-053B Auxiliary Feedwater Pressure Test Using Turbine !

Driven Auxiliary Feedwater Pump STS PE-053D Auxiliary Feedwater Pressure Test Using Condensate Storage Tank l STS PE-055A Pressure Test of Reactor Make-Up Water Piping Through P-25 6

STS PE-055E Pressure Test of Containment Hydrogen Control Piping Thru P-101 and P-97 to Hydrogen Analyzer SGS02A, SGD03S & SGS065A STS PE-055F Pressure Test of Containment Hydrogen Control l Piping Thru P-99 and P-56 to Hydrogen Analyzer l SGS02B, SGS03B & SGS065B STS PE-055I Pressure Test of Containment Shutdown Purge Supply Piping Through V-161 t

STS PE-055J Pressure Test of Containment Air Purification ,

and Cleanup Piping Through V-161 to Containment Purge Exhaust STS PE-055Q Pressure Test of Floor and Equipment Drain l Piping Between LFHV-105 and LFIN-106 i

l Attachment to WM 95-0005 Page 70 of 111 )

1 1

STEAM GENERATOR TUBING INSERVICE INSPECTION 1

l

[

h I

-1 Attachment to WM 95-0005 Page 71 of 111 1 7

STEAM GENERATOR TUBE INSERVICE ISSPECTION The sixth Steam Generator Tube Inservice Inspection of steam generators was completed by Westinghouse Nuclear Energy Services, Nuclear Services Division during the seventh refueling outage. This inspection-included 100 percent full length bobbin coil inspection of Steam Generator "A" and *D" tubes. It also; included a Motorized Rotating Pancake Coil of four factory installed bare hole plugs and 685 9p of tubesheet inspections (626 in the hot leg and 59 in the cold leg) in Steam Generator "A". This war the third inservice inspection for both Steam Generator "A" and "D".

The results of the sixth inspection showed 36 tubes (28 in the hot leg and 8 in the cold leg) in Steam Generator "A" and 58 tubes (57 in the-hot leg and 1 in the cold leg) in Steam Generator *D" that had indications greater than or equal to 20 percent and less than 40 percent degraded and must be inspected during the next inspection of these Steam Generators.

Mechanical plug (Inconel 600) replacement was performed on Steam Generator *D" in response to NRC Bulletin No. 89-01. A total of 34 plugs were removed'from seventeen tubes (17 in the hot leg and 17 in the cold leg). Of the 17 tubes that had the mechanical plugs removed, all of them were full length bobbin coil inspected. As a result of the bobbin coil inspection, 6 tubes were put back into service and the. remaining 11 tubes were replugged with Inconel 690 mechanical plugs. The location of the Inconel 600 mechanical plugs removed are as follows:

Steam Generator 'D" RQH COLUMN RQH COLUMN 41 20 42 20 43 20 43 21 43 22 44 22 45 22 47 24 48 25 48 27 50 28 47 29 45 58 49 60 44 72 50 95 48 .98 ,

This completes the replacement of the Inconel 600 mechanical tube plugs as required by NRC Bulletin No. 89-01,

  • Failure of Westinghouse Steam-Generator Tube Mechanical Plugs," for all steam generators at  ;

Wolf Creek Generating Station.

i e

r sew _T e - *-W- ==ew=*w1-* seeeree-wee- ee-he'T- p +-- -e41-97-- - + - -f"t't-Ww= *-e-*-ae m-sP' - - ' --w- ww-mte m-We-emaiir e.we- l e -*-P'enNA- *- e -w+-e---m. 4t- ee--v w :gr a _.u - __w -,

Attachment to WM 95-0005 Page 72 of 111 STEAM GENERATOR TUBE INSERVICE INSPECTION l

Degraded tubes as well as 26' stub tubes were plugged with Inconel 690 mechanical plugs. One degraded-factory installed bare hole plug was removed and replaced with an Inconel 690 welded plug. The following is a breakdown by steam generator of the number of tubes plugged.

Steam Generator *A"< Tube Plugging

    • Tubes plugged resulting from degradation detected by bobbin coil inspection: 9
    • 26" Stub Tubes: 5 (1 in the hot leg and 4'in the cold leg)
    • Welded Plugs: 1 (replaced the degraded factory bare hole plug in the cold leg)

Steam Generator "D" Tube Plugging

    • Tubes plugged resulting from degradation detected by_' bobbin coil inspection: 24
    • Tubes replugged as a result of Inconel 600 mechanical plug replacement: 11 With the completion of the seventh refueling outage, Steam Generator "A" has 21 tubes (this includes factory installed bare hole plugs and 26" stub tubes) plugged and Steam Generator *D" has 37 tubes plugged.

t L

.,n.-,, n- n.- , -. ,- ,-<->,,,e..o >.,,--,*,.e--- ,,-n,-.+. , . . ,-w,.v..w - ..,,,-.-=-,-.--,e, am-,, . . - - , .n,--...~..,,,,-r.- - - , - . - - - - - - - - - _ . -. - - - - - - . - - - - - - - -

i Attachment to WM 95-0005 Page 73 of 111 ,

l i

APPENDIX A FORM NIS-1 ,

OWNER'S REPORT FOR INSERVICE INSPECTIONS !

t l

I l

l

1 l

. Attachment to WM 95-0005 Page 74 of 111

~

FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS i

As required by the Provisions of the ASME Code Rules ll l l l l l l l

1. Owner Wolf Creek Nuclear Operating Corporation, P. O. Box 411 Burlington, Kansas 66839 (Name and Address of Owner) r
2. Plant Wolf Creek Generating Station,- 1550 Oxen Lane, NE, Burlington, Kansas 66839 (Name and Address of Plant)
3. Plant Unit 1 4. Owner Certificate of Authorization (if required) N/A  !
5. Commercial Service Date 9/3/85 6. National Board Number ior Unit N/A 7, Components inspected Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No. :

See Attached Note: Supplemental sheets in form oflists, sketches, or drawings may be used provided (1) size is 8% in. x 11 in.,  ;

(2) information in items I through 6 on this data report is included on each sheet, and (3) each si.eet is numbered  ;

and the number of sheets is recorded at the top of this form.

l This form (E00029) may be obtained from the Order Dept., ASME,345 E. 47th. St., New York, NY 10017 l

Attcchm:nt to WM 95-0005 Page 75 of 111 FORM NIS-1 (back)

8. Examination Dates 5/15/93 to 10/30/94 9. Inspection Interval from 9/3/85 to 9 2/95
10. Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.

See Examination Section in ISI Summary Repon.

I1. Abstract of Conditions Noted.

See Examination Results Section in ISI Summary Report.

12. Abstract of Corrective Measures Recommended and Taken.

See Examination Results Section in ISI Summary Repon.

We cenify that the attachments made in this repon are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Date Q,, ou 7 0 19 75 Signed Wolf Creek Nuclear Operating Corp. By [ * /

g/ ,

(/

owner Certi0 cation of Authorization No. (if applicable) N/A Expiration Date N/A CERTIFICATE OF INSERVICE INSPECTION 1, the undersignal, holding a valid commission issued by the National Board of Boiler and Pressure Vessel and employed by

  • Inspectors and'or the State or Province of Kansas of Norwood, MA have inspected the components described in this Owners' Data Report during the period 5/15/93 to 10/30/94 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this cenificate neither the inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Data Report. Funhermore, neither the Inspector not his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date 3A .

19 h,,(/ Commissions National Board, State. Province and No.

/ 3pec' lor's Signatu e i

  • Atkwright Mutual Insurance Company / Factory Mutual Engineering Association I

i

, , _ . . _ _ . _ . _ . . .- _ _ _ __ __ _ . _ __~ _ . _ _ _

i i

~

M' 'Attschment to 104 95-0005

[

Paga 75 of '111 f' i

i FORM NIS-1 (back) l I

9, inspectionIntervalfrom 9/3/85' to 9/2/95 l

8. Examination Dates - 5/15/93 to 10/30/94 .I
10. Abstract of Examinations. Include a list of examinations and a statement concerning status'of work required for . [

current interval.

See Examination Section in ISI Summary Report.

i

11. Abstract of Conditions Noted. }!

See Examination Results Section in ISI Summary Report.

r

12. Abstract of Corrective Measures Recommended and Taken, See Examination Results Section in ISI Summary Report.

i We certify that the attachments made in this report are correct and the examinations and corrective f measures taken conform to the rules of the ASME Code,Section XI.

Date bm uv 2 0 19 95 Signed Wolf Creek Nuclear Opersing Com. By

  1. /

M- .

i y ' Owner Certification of Authorization No. (if applicable) N/A Expiration Date N/A \ :i i

r CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler

  • and Pressure Vessel and employed by Inspectors and/or the State or Province of _ Kansas of Norwood, MA ' have inspected the components described in this Owners' Data Report to 10/30/94 , and state that to the best of my knowledge and belief, the .

during the period 5/15/93

[

Owner has performed examinations and taken corrective measures described in this Owners' Data Report in  ?

accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or imp l concerning the examinations and corrective measures described in this Owners' Data Report. Furthermore, neithe [

the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a any kind arising from or E- mi with this inspection. .

-i Date M- 19 5 l

,, .b Commissions Nanonal Board, State, Province and No.  !

""-+? -:.r's Sign =^=4 I J ,

  • ' Arkwright Mutual Insurance Company / Factory Mutual Engineermg Association s

i I

Attachment to WM 95-0005 Page 76 of 111 Component ==aufacturer or Tnataller Serial Mo. State No. Board Mo.

AB-01-F050 Daniel International Corporation N/A N/A N/A AB-01-F051 Daniel International Corporation N/A N/A N/A AB-01-F052 Daniel International Corporation N/A N/A N/A.

AB-(,1- F0 5 4 Daniel International Corporation N/A N/A N/A AB-01-F055 Daniel International Corporation N/A h.3 N/A AB-01-F056 Daniel International Corporation N/A N/A N/A AB-01-F057 Daniel International Corporation N/A N/A N/A AB-01-F059 Daniel International Corporation N/A N/A N/A AB-01-F061 Daniel International Corporation N/A N/A N/A AB-01-F062 Daniel International Corporation N/A N/A N/A AB-01-F063 Daniel International Corporation N/A N/A N/A AB-01-FW323A Daniel International Corporation N/A N/A N/A AB-01-FW324 Daniel International Corporation N/A N/A N/A AB-01-FW325 Daniel International Corporation N/A N/A N/A AB-01-FW331 Daniel International Corporation N/A N/A -N/A i

AB-01-FW332 Daniel International Corporation N/A N/A N/A l

l l

s Attachment to WM 95-0005 Page 77 of 111 i- Camponent === facturer or T== taller Serial Mo. State No. Board En.

! AB-01-FW710 Daniel International Corporation N/A N/A .N/A AB-01-FW711 Daniel International Corporation N/A N/A N/A AB-01-FW712 Daniel International Corporation N/A N/A N/A AB-01-FW715 Daniel International Corporation -N/A N/A N/A 3

AB-01-FW721 Daniel International Corporation N/A N/A N/A AB-01-FW766 Daniel International Corporation N/A N/A N/A AB-01-FW770 Daniel International Corporation N/A N/A N/A AB-01-FW773 Daniel International Corporation N/A N/A' .N/A' AB-01-FW774 Daniel International Corporation N/A N/A N/A.

AB-01-FW775 Daniel International Corporation N/A N/A N/A AB-01-FW776 Daniel International Corporation _ N/A N/A N/A AB-01-PW777 Daniel International Corporation N/A N/A N/A f

AB-01-FW778 . Daniel International Corporation N/A N/A N/A Ar-01-FW787 Daniel International Corporation N/A N/A N/A i

, AB-01-S032-G Dravo Corporation 15145 N/A N/A f

. ~ --

Attachment to WM 95-0005

~

Page 78 of 111 i

Component Manufacturer or Installer Serial Mo. State No. Board Mo.

AB-01-S032-H Dravo Corporation 15145 N/A N/A AB-01-S032-J Dravo Corporation. 15145 N/A N/A i

l AB-01-S032-K Dravo Corporation 15145 N/A N/A AB-01-S032-L Dravo Corporation 15145 N/A N/A AB-01-S032-M Dravo Corporation 15145 N/A N/A

, AB-01-S032-N Dravo Corporation 15145 N/A N/A .

AB-01-S032-S Dravo Corporation 15145 N/A N/A AB-01-S032-W Dravo Corporation 15145 N/A N/A

< AB-01-S032-Z Dravo Corporation 15145 N/A N/A AB-01-SO34-C Dravo Corporation 18074 N/A N/A

AB-01-S034-D Dravo Corporation 18074 N/A N/A i

AB-01-S035-B Dravo Corporation 18075 N/A N/A AB-01-S035-C Dravo Corporation 18075 N/A N/A AB-01-S037-D Dravo Corporation 15146 N/A N/A AB-01-S037-E Dravo Corporation N/A N/A N/A I

j

9 Attachment to WM 95-0005 Page 79 of 111 .,

-i Comeponent M==nfacturer or Tnme=11er Serial Eto. State No. Board No. 6 AB-01-TOR-RES-3 Daniel International Corporation N/A -N/A N/A AB-01-TOR-RES-4 Daniel International Corporation N/A N/A 'N/A AB-01-W713 Daniel International Corporation N/A N/A N/A t

AB-01-W714 Daniel International Corporation N/A N/A N/A i +

3 AB-01-W716 Daniel International Corporation N/A N/A N/A AB-01-W717 Daniel International Corporation N/A N/A N/A A*3 W718 Daniel International Corporation N/A N/A 'N/A-1 AB-01-W719 Daniel International Corporation. N/A N/A N/A AB-01-W720 Daniel International rarporation N/A N/A N/A l AB-01-W767 Daniel International Corporation N/A N/A N/A AB-01-W768 Daniel International Corporation N/A N/A 'N/A '!

AB-01-W771 Daniel International Corporation N/A N/A N/A .i t

AB-01-W772 Daniel International Corporation N/A N/A N/A i

AB-01-W780 Daniel International Corporation N/A N/A N/A AB-01-W781 Daniel International Corporation N/A N/A N/A i i

i i

~ . . . . - . . . . . . - . . - _ . - . . . . . - . . - - . . . . ~ . . . . . . . - . . .. . . . . .. . - . - . . - - - - . . - . . . - . - - . . . - . . . . .. . . . . -. ....a

.+.

Attachment to WM 95-0005 Page F0 of 111-Campo.sent h afacturer or Tn=*=11er serini Iso. State No. Board No.

AB-01-W782 Daniel International Corporation N/A N/A'- N/A :

AB-01-W783- Daniel International Corporation N/A N/A N/A AB-01-W784 Daniel International Corporation' N/A -N/A 'N/A.

AB-01-W785 Daniel International Corporation N/A N/A N/A.

AB-01-W786 Daniel International Corporation N/A N/A N/A AB01-H501-145 Corner & Lada Company 1-AB01-H501/145Q - N/A N/A ITT Grinnell M1445 N/A N/A-

]

AE-05-F006 Daniel International Corporation N/A N/A' .N/A AE-05-F007 Daniel International Corporation N/A - N/A N/A AE-05-F008 Daniel International Corporation N/A N/A N/A AE-05-F018 Daniel International Corporation N/A N/A N/A AE-05-F019 Daniel International Corporation N/A N/A .-N/A AE-05-F020 Daniel International Corporation N/A N/A- -N/A AE-05-F021 - Daniel International Corporation N/A N/A N/A AE-05-F022 Daniel International Corporation N/A N/A N/A AE-05-F033 Daniel International Corporation N/A. N/A N/A a

. . , , - , , _ - - ,..w-.- - ,. -,, -m,- .---- ~ . . , .. ,-m-. , - . . .- , - ~ , _ , . - - -- v..---m --.., , < m , --. ., -- w~ - . - - --_. -, - . . - . . . .

i Attachment to WM 95-0005 Page 81 of 111 Component Manufacturer or Tn= taller Serial No. State No. Board No. ,

, AE-05-F037 Daniel International Corporation N/A N/A N/A AE-05-F041 Daniel International Corporation N/A N/A .N/A' AE-05-F043 Daniel International Corporation N/A N/A -N/A '

AE-05-FW317 Daniel International Corporation N/A N/A N/A' AE-05-FW318 Daniel International Corporation N/A N/A N/A.

AE-05-FW319 Daniel International. Corporation N/A N/A ~N/A AE-05-FW320 Daniel International Corporation N/A N/A N/A 3 AE-05-FW900 Daniel International Corporation N/A N/A 'N/A AE-05-FW901 Daniel International' Corporation N/A N/A N/A AE-05-FW902 Daniel International Corporation N/A N/A N/A~

AE-05-S014-A Pullman Power Products 1-AE-05-S-014/145 N/A N/A AE-05-S024-A Permutit N-1507 'N/A 210 AE-05-S024-B Permutit N-1507 N/A 210 AE-05-S025-A Pullman Power Products 0-AE-05-S-025/145 N/A N/A AE04-R004-242 Bergen Paterson D013958 N/A _N/A Pacific Scientific 1769 N/A N/A Pacific Scientific 1970 N/A N/A-

z .-

Attachment to WM 95-0005 Page 82 of 111 Component haufacturer or Tn= taller Berial No. State Mo. Board No.

AE04-R013-252 Bergen Paterson 1-AE-R013/242Q N/A N/A t Pacific Scientific 1949 - N/A N/A l

AE04-R020-251 Bergen Paterson D013295 N/A N/A'.

Pacific Scientific 1974 N/A N/A'. .

AE05-R010-135 Corner & Lada Company 0-AE05-RO10/135Q N/A N/A.

AE05-R013-251 Bergen Paterson 1-AE05-R013/251Q N/A N/A-Pacific Scientific 11675 N/A N/A AE05-R022-242 Bergen Paterson D013639 N/A N/A ALO2-C003-135 ITT Grinnell A3764 N/A N/A ALO3-A001-135 Daniel International Corporation N/A N/A N/A BB-02-9010B-b Crosby Valve & Gage Company N60446-00-0001 N/A 537 i

BB-02-8010B-FL-b Crosby Valve & Gage Company N60446-00-0001 N/A 537 I

BB-04-PCV-455B-b Fisher Controls Company 6449036 N/A 5223 BB-04-PCV-455C-b Fisher Controls Company 6449035 N/A 5222 BB-09-F001A Daniel International Corporation N/A N/A- N/A BB-09-FL1-b Daniel International Corporation N/A N/A N/A .

BB01-R004-231 Western Piping L-5832 N/A N/A [

Pacific Scientific 11690 N/A N/A'  ;

1

- - ,-- -- ,, -. + . . - . r -.. ,mw4 .-*_ - - - ,- '~r- w n , i + -, .-,---g- - -e--r-w A e -. ..w-. ,. --w. - . & .4+ --,, 1 v.< . - - - ,

Attachment to WM 95-0005 Page 83 of 111 Component =-~ Facturer or T== taller serial No. Riate No. Board No.

BB02-H006-261 Bergen Paterson A002392 N/A N/A BB02-R019-261 Bergen Paterson 1-BB02-R019/261 N/A N/A Pacific Scientific 7584 N/A N/A Pacific Scientific 7583 N/A N/A BB04-RO18-261 Pacific Scientific d' ~~ N/A N/A BB04-R035-241 Pacific Scientific 16269 N/A N/A BB09-R002-232 Pacific Scientific 18373 N/A N/A BB11-FL1-b Daniel Internationsl Corporation N/A N/A N/A BG-01-F023 Daniel Intcrnational Corporation N/A N/A N/A BG-01-F024 Daniel International Cor,, oration N/A N/A N/A BG-01-F025 Daniel International' Corporation N/A N/A N/A BG-01-F026 Daniel International Corporation N/A N/A N/A BG-01-FW311 Daniel International Corporation N/A N/A N/A BG-01-FW333 Daniel Internation&l Corporation N/A N/A N/A BG-01-FW321 Daniel International Corporation N/A N/A N/A BG-01-FW322 Daniel International Corporation N/A N/A N/A

Attachment to WM 95-0005 Page 84 of 111 '

Component ===Facturer or Tnataller serial No. State No. Board No.

BG-01-FW690 N/A N/A N/A Daniel International Corporation 3 BG-01-FW691 Daniel International Corporation N/A N/A' N/A BG-09-FW808 Daniel International Corporation N/A N/A N/A BG-09-FW809 Daniel International Corporation N/A N/A N/A BG-09-FW813 Daniel International Corporation N/A N/A N/A BG-09-FW820 Daniel International Corporation N/A N/A N/A i

BG-09-PW3296 WCNOC N/A N/A N/A BG-09-PW3297 WCNOC N/A N/A N/A BG-09-PW3301 WCh0C N/A N/A N/A i

BG-09-W6?5 Daniel International Corporation N/A N/A N/P BG-09-W696-0A WCNOC N/A N/A' N/A BG-09-W723 Daniel International Corporation N/A N/A _ N/A BG-09-W737 Daniel International Corporation. N/A N/A N/A BG-09-W803 Daniel International Corporation N/A N/A N/A BG-09-W804 Daniel International Corporation N/A N/A N/A

%.w. -

.r-i.w.= .c. .--w-w=>e---e.n=~r,--..-w,-,t- e, . . . w--- --en -*---,-+-wr-e------&-,--$- '- - - s - - * -< - e mi -v'r'-ew.-.4.-++ == w,-m'- e +-= "..e+4 et<s en s - n- <7e+tevt-w-a--e -, ww .vw wr=re. 5 -e n e,,si-

Attachment to WM 95-0005 Page 85 of 111 4

Component h-Facturer or Tn= taller Serial Mo. State No. Board No.

I BG-09-W805 Daniel International Corporation N/A N/A N/A

! - BG-09-W806-0A WCNOC N/A N/A N/A l

BG-09-W811 Daniel International Corporation N/A N/A N/A 8

BG-09-W812 Daniel International Corporation N/A N/A N/A

, BG-09-W814--0A WCNOC N/A N/A N/A BG-09-W815 Daniel International Corporation N/A N/A N/A BG-09-W816 Dar.Ml International Corporation N/A N/A N/A BG-09-W817 Daniel Intcmational Corporation N/A N/A N/A BG-09-W818 Daniel International Corporation N/A N/A N/A BG-09-W872 Daniel International Corporation N/A N/A N/A BG-09-W889 Daniel International Corporation N/A N/A N/A BG-09-WB90 Daniel International Corporation N/A N/A N/A I

BG-21-BB-8378A-b Westinghouse Electric Company 03001CS880000D000W750009 N/A W12062

} BG-21-BB-8378B-b Westinghouse Electric Company 03001CS880C00D000W750003 N/A W12056 4

BG02-A004-132 Daniel International Corporation N/A N/A N/A

Attachment to WM 95-0005 Page 86 of 111 :

I .

Cggiocnent Manufacturer or Tnataller Serial Eto. State No. Board No.

BG02-A006-121 Daniel International Corporation N/A N/A N/A .

4 BG02-C013-122 ITT Grinnell 2670 N/A N/A i

BG03-C503-113 Daniel International Corporation N/A N/A N/A l

BG03-R005-133 Bergen Paterson 1-BG03-R005/133 N/A 'N/A Bergen Paterson D014932 N/A N/A  !

BG05-H005-132 Bergen Paterson 4047-03-173 N/A N/A BG05-R007-132 ITT Grinnell A2693 N/A N/A ,

BG09-C505-121 Daniel International Corporation N/A N/A N/A 4 BG09-C526-123 Daniel International Corporation N/A N/A N/A i

BG09-C539-133 ITT Grinnell M1439 N/A N/A ITT Grinnell H6405 N/A N/A i

BG09-H524-131 Corner & Lada Company 1-BG09-H524/131Q N/A N/A  ;

BG10-C514-121 Daniel International Corporation N/A N/A N/A BG10-C522-122 Daniel International Corporation N/A N/A N/A BG11-R003-111 ITT Grinnell 8046 N/A N/A BG18-A501-132- ITT Grinnell E4165 N/A N/A i ITT Grinnell E4149 N/A N/A i

I

  • >w,w en ,s-w,,--- - mw --,,ve-,w, swr--~ . - ~ v.m,-w-- w w eer-+,cw,-e,m6s-+,o,,---mw---avm . v e-.m m,mw w.m -_w--e-- s .w-, _ e --we-m .v-e-e-me n-e, , , -w-,-,-~m-ww.vw-.--a me-,,>.a --,,n~,,, --,-m , _ , , -___ _

, >g

?

Attachment to WM 95-0005 Page 87 of 111 l Component ===nfacturer or Tnataller Serial No. State Mo. Board Mo.

1 BG18-C501-132 ITT Grinnell J857 N/A N/A ITT Grinnell B8727 N/A N/A ITT Grinnell E3023 N/A N/A BG18-C504-132 ITT Grinnell K2655 N/A N/A ITT Grinnell J875 N/A N/A BG22-R018-232 Bergen Paterson 1-BG22-R018/232 N/A N/A

, Pacific Scientific 4393 N/A N/A BG35-H507-112 Corner & Lada Company 0-BG35-H507/112 N/A ' N/A f BM-02-F007 Daniel International Corporation N/A N/A N/A BM-02-F008 Daniel International Corporation . N/A N/A N/A

, BM-92-F009 Daniel International Corporation N/A N/A. N/A 4

BM-02-F010 Daniel International Corporation N/A N/A N/A BM-92-F011 Daniel International Corporation N/A N/A N/A

! BM-02-F021 Daniel Internation.nl Corporation N/A N/A N/A BM-02-F022 Daniel International Corporation N/A N/A N/A BM-02-F030 Daniel International Corporation N/A N/A N/A BM-02-F033 Daniel International ~ Corporation N/A N/A N/A 4

i t

- . _ - - . . - - . - . , ~ . - . - - . - ~ . . _ . . , . - . . . . ,,..i-,---.--..,m-,-_._-,.- . .- ~ , , - - . .,,-. . ~ , - . , ~ . . . . , . . . . - _ . . . . . . . . - . ..._._.-..,,._-_.m

Attcchment to WM 95-0005 Page 88 of 111 4

Component ==== Facturer or Tn= taller serial No s State No. Board En.

BM01-C019-231 Bergen Paterson 1-BM01-C019/231Q N/A N/A Pacific Scientific 21283 N/A N/A BM01-R016-231 Bergen Paterson 1-BM01-R016/231 N/A N/A

, Pacific Scientific 18438 N/A N/A BM03-R504-231 Daniel International Corporation N/A N/A N/A BM03-R507-231 Daniel International Corporation N/A N/A N/A i

BM17-R505-241 Bergen Paterson 1-BM17-R505/241Q N/A N/A I

Bergen Paterson D014345 N/A N/A Pacific Scientific 27583 N/A N/A BM17-R506-241 Bergen Paterson 1-BM17-R506/241Q N/A N/A Pacific Scientific 26146 N/A N/A .

BM17-R508-231 Bergen Paterson 1-BM17-R508/231Q N/A N/A Pacific Scientific 26156 N/A N/A BM18-R510-252 Bergen Paterson 1-BM18-R510/252Q N/A N/A N/A Pacific Scientific 26151 N/A BM19-R504-252 Daniel International Corporation N/A N/A N/A BM20-R514-231 Bergen Paterson 1-BM20-R514/231Q N/A N/A Pacific Scientific 4397 N/A N/A t

BN-01-F011 (&LU,LD) Daniel International Corporation N/A N/A N/A 1

a t

b

---rww ._.wrv w- u- 11,w=-=emin~,,---r-n-----.er. - em- ,---,=w,v-- -,-=%,,n,--------,----,-rw- -m w w - -w w w

-m-v- w.,w-r-vve -- -- w =.o.,..---een---r-ww-- = w .w.v ..- _u-i _ _ _ _ _ _ _ _ _ _

Attachment to WM 95-0005 i Page 89 of 111 i

Component h nfacturer or Tnataller Serial No. State No. Board No.

l BN-01-F041 (&LD) Daniel International Corporation N/A N/A N/A BN-01-F042 (&LD) Daniel International Corporation N/A N/A N/A BN-01-F043 (&LU) Daniel International Corporation N/A N/A ?i/A l

BN-01-F043 (&LU) Daniel International Corporation N/A N/A N/A BN-01-S012-D (&LU,LD) Dravo Corporation N/A N/A N/A t BN-01-S026-J (&LU,LD) Dravo Corporation 13447 N/A N/A BN-01-S026-J (&LU,LD) Daniel International Corporation N/A N/A N/A t CRDMPL-SUP-5 Speedway Machine & Tool Company 5 N/A 9 CRDMPL-SUP-6 Speedway Machine & Tool Company 6 - N/A 9 EC04-H008-611 Corner & Lada Company 1-EC04-H008/611Q - N/A N/A EC04-H012-611 Corner & Lada Company 1-EC04-H012/611Q N/A N/A

, EC04-R020-621 Corner & Lada Company 1-EC04-R020/621Q N/A N/A EEJ01A-SEAM-1-W Joseph Oat Corporation 2289-C N/A 957 EEJ01A-SEAM-2-W Joseph Oa-t Corporation 2289-C N/A 957 EEJ01A-SKIRT-W Joseph Oat Corporation 2289-C N/A 957

. . . _ . . . . . . . -,.w---i.-t... . =e., - - - - .w.,--, ..,w-4em, - - - . - - , - , .

..-# .-w,- ise m, w,4 4 - - - , e-,---.n.m m - e ---,w,e. . - - - - - - - , - ..w , e , e. r.-- ,4 ,+..+,.~-,m-3,-. --.-..u- - - ww.-. -- -, ,

Attachment to WM 95-0005 Page 90 of ill

Camponent Maanfacturer or in= taller Serial Mc. State Mo. Board No.

EEJ01A-SUP-1 Joseph Oat Corporation 2289-C N/A 957 I EEJ01A-SUP-2 Joseph Oat Corporation 2289-C N/A 957 l EEJ01A-SUP-3 Joseph Oat Corporation 2289-C N/A 357 i EEJ01A-SUP-4 Joseph Oat Corporation 2289-C N/A 957 EEJ01A-SUP-5 Joseph Oat Corporation 2289-C N/A 957 EF-02-A010 Daniel International Corporation N/A N/A N/A 4

EF-03-C002 Daniel International Corporation N/A N/A N/A 5 EF-03-C016 Daniel International Corporation N/A N/A N/A EF-03-RO20 Daniel International Corporation N/A N/A N/A EF-03-R021 Daniel International Corporation N/A N/A N/A EF-06-A015 . Daniel International Corporation N/A N/A N/A EF-07-A001 Daniel International Corporation .N/A N/A N/A EF-07-A002 Daniel International Corporation N/A N/A N/A  :

EF02-A010-122 Daniel International Corporation N/A N/A N/A EF02-R009-134 ITT Grinnell 2712 N/A N/A '

1 r .., , , --. . -., , , -- . - , - - - . , , +.,n. - , , -, , , + , , --ann -- ,~. ----,.,---,,,~-.,,...,---.,-..w,.w.. - - - - -- , - - - - , , , - , , ,.-.,,,...,,,-,,,_,,,nn,,-..- , _ . - - - , , , , , . .. . . - . . -

Attachment to WM 95-0005 Page 91 of 111 Component h - Facturer or Tn= taller Serial No. State No. Board Mo.

EF02-R011-112 Corner & Lada Company 0-EF02-RO11/112Q N/A N/A .

4 EF04-A005-111 Bergen Paterson 1-EF04-A005/111 N/A N/A  ;

EF06-C017-114 Daniel International Corporation N/A N/A N/A EF06-H001-114 Bergen Paterson 1-EF06-H001/114 N/A N/A EF06-H010-135 Corner & Lada Company 0-EF06-H010/135Q N/A N/A Corner & Lada Company 1-BM19-H507/232Q N/A- N/A.

EF06-R013-144 Daniel International Corporation N/A N/A N/A 1

i EF07-C009-311 ITT Grinnell 8061 N/A N/A' EF09-R509-134 - Daniel International Corporation N/A N/A N/A' EF15-R003-341 Bergen Paterson 1-EF15-R003/341 N/A N/A Bergen Paterson 1-EG17-C003/241 N/A N/A EG02-A003-132 Daniel International Corporation N/A N/A 'N/A EG02-H005-133 Bergen Paterson 1-EG02-H005/133 N/A N/A EG03-C007-141 Bergen Paterson EG03-C007/141 N/A N/A Bergen Paterson 1-BM02-H011/232 N/A N/A a

EG03-H005-141 Bergen Paterson 1-EG03-H005/141 N/A N/A EG05-C001-141 Bergen Paterson 1-EG05-C001/141 N/A N/A ,

w__.__.___-_ _ ---__-_m__. .. %..- ,. . e..,.,,u.--~. .-.r. ,. - , ..w..- - - - - .- ,m e - a w,,, , u--,_.e - wr ---,, , =,m w,, . ,, .W wes , %w,,,,5mm,.,.mv.,mer,. -...m.-.. . , , , , , , . , - , .

Attachment'to WM 95-0005 -

Page 92 of 111 Component h e facturer or Tn= taller Serial No. State No. Board No.

EG09-R001-231 Daniel International Corporation N/A N/A N/A EG09-R004-242 Daniel International Corporation N/A N/A 'N/A EG12-C004-242 Daniel International Corporation N/A N/A N/A EG18-H003-611 Bergen Paterson 1-EG18-H003/611 N/A N/A EG18-H006-611 Bergen Paterson 1-EG18-H006/611 N/A N/A l

EG24-R004-121 ITT Grinnell A7972 N/A N/A EG28-C503-142 ITT Grinnell B5149 N/A N/A ITT Grinnell B5160 N/A N/A ITT Grinnell J878 N/A N/A EJ-01-C002 Daniel International Corporation N/A N/A N/A EJ-01-C013 Daniel' International Corporation N/A N/A N/A EJ-01-C016 Daniel International Corporation N/A N/A N/A EJ-01-F034 (&LU,LD) Daniel International Corporation N/A N/A N/A EJ-01-FW311-B (&LU,LD) Daniel International Corporation N/A N/A N/A ,

EJ-01-FW345 Daniel International Corporation N/A N/A N/A EJ-01-R003 Daniel International Corporation N/A N/A N/A

+

m.. - --...-.,-~...------~n.... .--n ...~.~.r-,- . , , - + ---,-,-a, -w.w, -w.- n-r,-- e.,,~-n.,.n~-+n---,-,--.n.- ,- n , ,,- - - - , . . ,. . - , - - - - -,.v.-,--.n,....?,.n.----,- , , . . - . - . . . .

Attachment to WM 95-0005 Page 93 of 111 ,

Component Manufacturer or Installer Serial No. State Iso. Board Eks.

+

EJ-01-R033 Daniel International Corporation N/A N/A N/A j EJ-01-S004-F (&LU) Dravo Corporation 13538 N/A N/A i

EJ-01-S025-B (&LU,LD) Dravo Corporation 13559 N/A N/A EJ-01-S028-D (&LU) Dravo Corporation 13562 N/A N/A EJ-02-C012 Daniel International Corporation N/A N/A N/A  !

EJ-02-C016 Daniel' International Corporation N/A N/A N/A EJ-02-C019 Daniel International Corporation N/A N/A N/A EJ-02-F029 (&LD) Daniel International Corporation N/A N/A N/A EJ-02-F040 (&LD) Daniel International Corporation N/A N/A N/A EJ-02-F041 (&LU,LD) Daniel International Corporation N/A N/A N/A EJ-02-F042 (&LD) Daniel International Corporation N/A N/A N/A EJ-02-F043A (&LU,LD) Daniel International Corporation N/A N/A N/A EJ-02-F049 (&LU,LD) Daniel International Corporation N/A N/A N/A EJ-02-F050 (&LD) Daniel International Corporation N/A N/A N/A l

EJ-02-F051 (&LU) Daniel International Corporation N/A- N/A N/A P

. _ . _ _ _ _ _ _ _ _ . . _ - _ _ . _ . . - . . . _ _ . ~ . . - . - . _ . _ . _ ~ . . - _ . . , _ . _ . . . . - _ _ _ - _ . _ ~ . . . _ _ - - ,. _. . . _ _ u ._.___. .__. _ ..._.._._..__.___.._>

~.1 Attachment to WM.95-0005 Page 94 of ill CQMDonent u = *Facturer or Tn=*m11er Serial No. State No. Board No.

EJ-02-H018 Daniel International Corporation N/A N/A N/A EJ-02-R008 Daniel International Corporation N/A N/A N/A' EJ-02-R032 Daniel International Corporation N/A N/A .N/A EJ-02-S027-C Dravo Corporation 13599 N/A _N/A EJ-02-S035-D (&LU,LD) Dravo Corporation 13607 N/A N/A EJ-02-S037-A (&LD) Dravo Corporation 13609 N/A N/A l EJ-02-S037-D (&LU,LD) Dravo Corporation. 13609 N/A N/A 1

l EJ-02-SO44-C (&LU,LD) Dravo Corporation 13616 N/A N/A EJ-03-FW304 ~ Daniel International Corporation N/A N/A N/A EJ-04-BB-PV-8702A-b Westinghouse Electric Company 12002GM88SEHOF000W750002 N/A W18088 i

EJ-04-HV-8701A-b Westinghouse Electric Company 12002GM88SEHOD000W750003 N/A W17501 j EJ03-A505-122 ITT Grinnell' E4143 N/A N/A

! ITT Grinnell E4139. N/A N/A EJ03-C501-122 Corner & Lada Company 1-EJ03-C501/123Q N/A N/A e

i

.__m___m__ -,.,m~. ..w.. ,s, +-.=mv -.e.c=-.~%---e-.-- ---,-w. ,,e-.w. -w.- .w--r.-- .----e-v--3 ,rr v -=-+--v -w ev v---~ '-ev----v ow , 3-mm-=w *--v-e-- w r,t-rw.--,,- v,=-ww--ws,--.-- - - - ~ - - - - - - - . - - - -

e Attachment to WM 95-0005 Page 95 of 111 h ment M=aufac-.mer or Tn= taller Serial Mo. State Mo. Board Mo.

I EJ04-R008-232 Bergen Paterson 1-EJ04-R008/232 N/A N/A Pacific Scientific 10386 N/A N/A j Pacific Scientific 10387 N/A- N/A

j. EM-01-FW327 (&LU,LD) Daniel International Corporation N/A N/A N/A l EM-01-S027-D (&LU,LD) Dravo Corporation 13666 N/A N/A EM-01-SO41-E (&LU,LD) Dravo Corporation 13680 N/A N/A
EM-03-BB-8949B-b Westinghouse Electric Company 06001CS990000D000W750016 N/A W17570.

t EM-03-BB-8949B-SURF Westinghouse Electric Company 06001CS990000D000W750016 N/A W17570 i

EM-03-EJ-8841A-b Westinghouse Electric Company 06001CS990000D000W750012 N/A W17566 EM-03-FE-924-FL-b Daniel International N/A N/A N/A EM-03-FE-927-FL-b Daniel International N/A N/A N/A EM01-C027-122 Daniel International Corporation N/A N/A N/A

]

EM02-H002-134 Daniel International Corporetion N/A N/A N/A.

EM02-R007-114 . Corner & Lada Company 1-EM02-R007/114Q N/A N/A J

EM04-C006-231 Pacific Scientific 20367 N/A N/A EM05-R002-231 Bergen Paterscn 1-EM05-R002/231 N/A N/A

< Pacific Scientific 6551 N/A N/A i

.~ ._ _ . _ _ _ _ _ _ - _ _ .. . . . _ . _ _ . _ _ _ . . . . _ - . . _ _ _ . . . _ . . _ _ _ . . . _ _ . . . _ . _ _ . . _ . ~ . ~ . _ _ _ . _ _ _ _ .

i Attachment ~to WM 95-0005 Page 96 of 111; Comeponent M -*Facturer or Tnataller Serial No. Stat.a Mo. Board Mo.

EM08-C532-121 ITT Grinnell H1648 N/A N/A ITT Grinnell J5049 N/A N/A ITT Grinnell J6907 N/A N/A EN-02-F007A (&LU) Daniel International Corporation N/A N/A N/A EN-02-FW301 (&LU,LD) Daniel International Corporation N/A N/A N/A EN-02-FW325 (&LU,LD) Daniel International Corporation N/A N/A N/A

, EN01-C009-134 Corner & Lada Company 1-EN01-C009/134Q N/A N/A Corner & Lada Company 0-EN01-C009/134Q N/A N/A l

i EN02-H005-133 Corner & Lada Company 1-EN02-H005/133Q N/A N/A 4

ENO3-C003-261 Daniel International Corporation N/A N/A N/A' ENO3-C005-262 Daniel International Corporation N/A N/A N/A

ENO3-C029-261 Daniel International Corporation N/A N/A N/A ENO3-C043-262 Daniel International Corporation N/A N/A N/A ENO3-C065-261 Daniel International Corporation N/A N/A N/A i

ENO3-C069-261 Daniel International Corporation N/A N/A N/A ENO3-C074-262 Daniel International Corporation .N/A N/A N/A ENO3-C106-262 Daniel International Corporation N/A. N/A N/A i

_ . . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . _ . . . - . . . . . . _ . . . . _ . . . . _ . . . , _ . . , . . ~ _ _ . - . . _ _ . , _ _ _ . . _ . _ _ . . _ , _ . _ . . . _ _ _ .

Rttachment to WM 95-0005 i

Page 97 o2 111

?

j Component u = dacturer or Tnataller Serini Mo. State No. Board No.

ENO3-C108-262 Daniel International Corporation N/A N/A N/A.

I 2

ENO3-C135-261 Daniel International Corporation N/A N/A N/A ENO3-C157-262 Daniel International Corporation N/A N/A N/A i EN05-C015-281 Daniel International Corporation N/A N/A N/A EN05-H001-231 Daniel International Corporation N/A N/A ~ N/A EP-01-8956D-b Westinghouse Electric Company 10001CS990000D000W750016 N/A W18276 EP-01-BB8948D-b Westinghouse Electric Company 10001CS990000D000W750015 N/A W18275 EP-01-C002 Daniel International Corporation N/A N/A N/A i EP-01-S007-D (&LU,LD) Dravo Corporation 16661 N/A- N/A EP-01-S010-B Dravo Corporation 16423 N/A N/A EP-01-S014-C (&LU,LD) Dravo Corporation 18710 N/A N/A i~

EP-02-8818C-b Westinghouse Electric Company 06001CS990000D000W750013 N/A W17567 t

EP-02-BB8948C-b Westinghouse Electric Company 10001CS990000D000W750011 N/A W18271 EP-02-F022A Daniel International Corporation N/A . N/A N/A EP-02-FW303 (&LD) Daniel International Corporation N/A N/A N/A 1

-wu----etr- + . ---.c-mm%-,-.r.-~ew--,-s ,w-s-~w,----e*,- r e wm w w=3,r+w-- = - e- e mu----wemww,, m%--e em-eew s c --go--ve--v'w-=* -t erwe< w- em - w ae o1-~. .- --%+-sew- -+-r----+----------s,-.1 .-,-w ,..-wur-,=-resm---,weem- r --,

Attachment to WM 95-0005 Page 98 of 111 Cceponent M=- facturer or Tnataller Serial No. State Mo. Board No.

EP-02-R020 Daniel International Corporation N/A N/A N/A EP-02-S002-G (&LU,LD) Dravo Corporation 16133 N/A N/A' EP-02-S007-J (&LU,LD) Dravo Corporation 16142 N/A N/A EP-02-S007-N (&LU,LD) Dravo Corporation 16142 N/A N/A FC-01-F025 Daniel International Corporation N/A N/A N/A FC-01-F026 Daniel International Corporation N/A N/A N/A FC-01-F027 Daniel International Corporation N/A N/A N/A =

FC-01-F028 Daniel International Corporation. N/A N/A N/A.

FC-01-S021-B Dravo Corporation 23664 N/A N/A FC-01-S021-C Dravo Corporation 23664 N/A N/A GN01-C016-242 Daniel International Corporation N/A N/A N/A GN01-C017-242 Daniel International Corporation N/A N/A N/A GN02-C026-251 Corner & Lada Company 0-GN02-C026/251Q N/A N/A JE03-A503-511 ITT Grinnell F4318 N/A N/A ITT Grinnell F4337 N/A N/A JE03-C503-511 Daniel International Corporation N/A N/A N/A i

l

Attachment to WM 95-0005 Page 99 of 111 Component = ==Facturer or Tnataller Serial No. State Mo. Board No.

JE03-C507-511 Daniel International Corporation N/A N/A' N/A' JE03-C508-511 Daniel International Corporation N/A N/A N/A M-018-0504-008-511 Colt Industries N/A N/A N/A i

i M-018-0674-111-511 Colt Industries N/A- N/A N/A M-620-003-09 American Air Filter Company Inc. N-2893-8R-7 N/A 1710 M-620-003-10 American Air Filter Company Inc. N-2893-8R-7 N/A 1710 M-620-003-11 American Air Filter Company Inc. N-2893-8S-7 N/A 1518 ,

1 M-620-003-12 American Air Filter Company Inc. N-2893-8S-7 N/A 1518 M-620-003-13 American Air Filter Company Inc. N-2893-6S N/A 1455 M-620-003-14 American Air Filter Company Inc. N-2893-6S-7 N/A 1455 4

M-620-003-15 American Air Filter Company Inc. N-2893-6R-7 N/A 1563

~

M-620-003-16 American Air Filter Company Inc. N-2893-6R-7 N/A 1563 PBB01A-SUP-1 LAMCO Industries 1372 N/A N/A PBB01A-SUP-3 LAMCO Industries 1353 N/A N/A

. . . _ - . _..____a_-._.,_, . . _ . _ _ . . - . _ . _ . _ - . . _ _ . . . . .,. - - . , . _ . . . . _ . _ _ _ . . _ . . . _ . _ . . , - . - _ _ _ . _ . . . . . - . _ - . _ . - _ . _ . - _ _ . - . . _ - -

Attachment to WM 95-0005 Page 100 of 111 Component Manufacturer or Installer Sprial No. State No. Board No.

PBB01A-SUP-3A LAMCO Industries 1522 N/A N/A PBB01B BOLTING Westinghouse Electric Corporation 2-9744D36G01 N/A W26592 PBB01D FLYWHL Westinghouse Electric Corporation 4-9744D36G01 N/A W26594 PEJ01A-SUP-1 Pacific Pump Division 51744 N/A 332 RBB01-04 Westinghouse Electric Company 11373 N/A 22244 TBB03-LUG-A-W Westinghouse Electric Company 2281 N/A W20688 TBB03-LUG-D-W Westinghouse Electric Company 2281 N/A W20688 TEM 01-4-W Southwest Fabricating & Welding, Inc. 0047 N/A 366 TEM 01-SUPPORT-4 Southwest Fabricating & Welding, Inc. 0047 N/A 366

Attachment to WM 95-0005 Pege 101 of 111 l

l APPENDIX B REPAIR / REPLACEMENT

SUMMARY

INDEX 7

l l

l l

Attachment to WM 95-0005 Page 102 of 111 REPAIR / REPLACEMENT

SUMMARY

INDEX CO3tPONENT DESOtIPTION TYPE Df4Glil" TION DOC 1' MENT Spare Valve S/N ND-38576-03B 30" Butter 0y Valve Repair Excavated corroded and pitted areas on valve body and 91-057 repaired by welding.

Spare Valve SN ND-38576-03A 30" ButterDy Valve Repair Escavated corroded and pitted areas on valve body and 91-058 repaired by welding.

BBVCD65 RCS Loop 4 to CVCS Excess Letdown lleat Replacement Replaced bonnet assembly and bonnet hydro plug and ground head off or 91 105 Exchanger Isolation Valve Modification hydro plug.

Spare Coil S/N 906897-A3 Spare Containment Cooler Coil Repair Repaired the weld at the upper nozzle to cooling coil headerjoint 92-003 and cut and capped the two bottom tube rows in the cooling coil at the inlet and outlet headers.

EFV0343 2" Valve Modification Modified lines by cutting and installing fianges, replacing the rest of each 92-036 EFV0341 2" Valve line with SB462 Alloy 20/SB464 material and redesignate EF26711BC-2" 2" Chemical AdJition Line as EF2671IUC-2"& EF26811UC-2". Installed a c. niical addition EF2681IBC-2" 2" Chemical Addition Line nozz!c and replaced the two carbon steel valves with s'ain! css steel ones.

Spare Primary Manway Stud / Nut Stud / Nut Assembly Repair Polished face of nut to remove a surface scratch.93-088 Assembly S/N MS.

BMV0016 2" Globe Valve Repair Removed and reinstalled existing seal weld due to leakage. 93 094 BG8118 l-1/2" Relief Valve Replacement Replaced ,alve BG8118 with new spare valve.93-143 EFV0374 I" Valve Modification Performed welding to modify IIBC-1" drainlines downstream of,alves93-145 EFV0375 1" Valve EFV0176 and EFV0180, added valves EFV0374 and EFV0375, and added IIET-I" drainline downstream of EFV0176 1" Pipe new instrument and tubing supports for EFPDIGIII and IIBC-1" drainline downstream of EFV0180 1" Pipe EFPDI0ll2.

EFPDIOlII instrument Support Instrument support EFPD10112 Instrument Support Instrument support ,

J-14EFII Q PD10lli 15 tubing support 3/8" Tube support J-l4EFil Q PD10llt 16 tubing support 3/8" Tube support J-14EFII Q PD10ll215 tubing support 3/8" Tube support J-14EF1I Q PDI0l1216 tubing support 3/8" Tube support J-14EFII Q PD10ll217-2 tubing support 3/8" Tube support BGV0490 I" Globe Valve Replacement Performed welding to re-install body to bonnet seal weld and bonnet to plug 93-147 seal weld.

J04EG4815 EG-FT-66 W-1 3/8" Tube Support Modification Performed welding to install a new tube support for EGFT0066 93-149 SGK04A Control Room IIVAC Unit 'A' Replacement Replaced the chiller unit Essential Service Water (ES%) inlet and outlet 93-155 transition pieces.

Attaciunent to WM 95-0005 Page 103 of 111 COMPONENT DESCRIPTION TYPE DESCRIPTION DOCt' MENT EFVCM6 2-1/2' Swing Check Valve Modification Replaced valve disc with optional valve disc made out of stainless steel.93-156 Replacement EFV Q76 2-1/2" Swing Check Valve Modification Replaced valve disc with optional valve disc made out of stainless steel.93-158 Replacement ABPV0002 8* Globe Control Valve Replacement Installed a new pilot plug. main plug, one bonnet stud, and one bonnet nut 93-159 during rework of v alve, M-lCilG35A-C523/l12 1" Pipe / Instrument Support Modification Performed welding to install new ASME supports in place of non- 93-160 M-18BG15A-C525/l12 ASME supports which were installed during construction.

M-l8BG35A-C527/112 M-18BG35A-C531/II2 PKJ03A PKJ03A Lube Oil Suction and Discharge Piping Replacement Replaced two bolts on each flange (suction and discharge) which were too 93-165 short to obtain full thread engagement.

SGKNB Control Room IIVAC unit 'B' Replacement Replaced chiller unit ESW inlet and outlet transition pieces.93-167 EC04-R010/61i Fuel Pool Cooling Pump Inlet Piping Restraint Replacement Replaced shims on pipe restraint by welding to obtain desired clearances93-168 PSL-98A JMKJ01 Q KJPSL-98A Instrument Support Modification Perfermed welding to replace KJPSL-98A KJPSL-98B,93-171 PSL-98B JMKJ01 Q KJPSL-98B instrument Support KJPSL-198A and KJPSL-198B instrument supports with a new PSL-198A J04KJ01 Q KJPSL-198A Instrument Support design support and to relocate KJPI-98A and KJPI-198A PSL-1988 J04KJ01 Q KJPSL-98B Instrument Support instrument and tubing supports G-SAP-J04KJ01 Q FW-01016 KJPI-98A Tubing Support G-SAP-J04KJOI Q FW-011 16 KJPI-98A Tubing Support G-SAP-J04KJOI Q FW-01216 KJPI-98A Tubing Support G-SAP-J04KJ01 Q FW-01616 KJPI-198A Tubing Support G-SAP-J04KJ01 Q FW-017 lb KJPI-198A Tubing Support G-SAP-J04KJ01 Q FW-01816 KJPI-19&A Tubing Support Valcor Drawing No. V52600-6M2-1 S/N 15 Spare 1" Valcor Solenoid Valve Replacement Performed welding to allow rework of valve internals and replacement of 94402 valve safe-ends.

ALIIV0030 ESW 'B' to Motor Driven Auxiliary Feedwater Modification Replaced valve AtilV0030 with a new design valve per Plant Modification 94-003 Pump 'B' isolation Valve Replacement Request (PMR) 04692 and replaced valve to flange connection bolting material.

ALIIV0031 ESW *A' to Motor Driven Auxiliary Feedwater Modification Replaced valve ALIIV0031 with a new design valve per PMR 04692 and 94-0M Pump 'A' Isolation Valve Replacement replaced val:e flange botting material.

ALIIV0032 ESW 'A' to Turbine Driven Auxiliary Feedwater Modification Replaced valve ALIIV0032 with a new design valve per PMR 04692 and 94-005 Pump Isolation Valve Reptavment replaced studs on valve to flange connection.

ALIIV0033 ESW 'B' to Turbine Driven Auxiliary Feedwater Modification Replaced valve ALIIV0033 with a new design va!ve per PMR 04692 and 94-006 Pump Isolation Valve Renlacement replaced studs on valve to flange connection.

Spare PSA-l/2 Snubber S/N 17780 Spare Pipe Support Snubber Replacement Replaced rod & bearing assembly in spare PSA-l/2 snubber S/N 17780.94-011

Attachment to WM 95-0005 Page 104 of 111 CO%fPONENT DESCRllTION TYPE DESCRIPTIQ3 DOCL MENT Spare PSA-100 Snubber SN 1123 Spare Pipe Support Snubber Replacement Replaced Torque Carrier Assembly with new parts.94-012 SGL10B Residual IIcat Removal (RllR) Pump Room Cooler 'B' Replacement Performed brazing to install jumpers over 6 tubes.94-013 SGLIIB Component Cooling Water (CCW) Pump Room Replacement Performed brazing to replace leaking fittings.94-014 Cooler 'B' EM01-R032/1II 5nubber on line EM-047-CCB-4' Replacement Replaced snubber S/N 8745 with spare snubber SN I4990.94-015 AB01-C009/145 Snubber on line AB-226-DBB-10' Replacement Replaced snubber SN 18380 with spare snubber S,N 17986.94-016 AB01-ROI4/145 Snubber at valve AIIV0005 Replacement Replaced snubber SN 6471 with spare snubber SN 15019.94-017 AB08-R531/145 Snubberonline AB-130-DBB-l'at ABLV0008 Replacement Replaced snubber SN 20132 with spare snubber SN 7594.94-018 AE04-R018/242 Snubberonline AE-145-EBB-3' Replacement Replaced snubber SN 21289 with spare snubber S/N 18383.94-019 BB02-R034/26l Snubber on line BB-084-BCA-3* Replacement Replaced snubber S/N 4946 mith spare snubber S/N 5807.94-020 Bill 1-R004/232 Snubber on line BB-157-BCB-2" Replacement Replaced snubber SN 13151 with spare snubber S/N I8437.94-021 BG03-R018/l33 Snubber on valse BGIIV8I$2 Replacement Replaced snubber S/N 26160 with spare snubber S/N 43%.94-022 BG21-R024/242 Snubber at valve BGilV8147 Replacement Replaced snubber S/N 27563 mith spare snubber S/N 93%.94-023 BG22-R016/232 Snubber on line BG-001-BCA-3' Replacement Replaced snubber S/N I8369 with spare snubber SN 20272- 94-024 BG26-R501/242 Snubber on line BG -284-BCB-l' Replacement Replaced snubber S/N 25906 mith spare snubber S/N 25911.94-025 BM01-C017/23i Snubber on line BM-038-DBB-4' Replacement Replaced snubber S/N 13150 with spare snubber S/N 9387.94-026 BM02-R003/232 Snubber on line BM-014-DBB-4' Replacement Replaced snubber S/N I8276 with spare snubber S/N 4400.94-027 BM19-R509/252 Snubber on line BM-033-DBB-2' Replacement Replaced snubber S/N 26386 with spare snubber SN 18372.94-028 BM20-R508/231 Snubber on line BM-04IDDB-2* Replacement Replaced snubber S/N 19068 with spare snubber S/N 7597.94-029 EF03-R001/142 Snubber on line EF-205-IIBC-24' Replacement Replaced snubber S/N 14066 with spare snubber S/N 10369.04-030 EG07-C018/134 Snubber on line FO-175-IIBB-12' Replacement Replaced snubber S/N 14488 with spare snubber S/N 10378.94-031 EG07-R030/134 Snubber on line EG-333-IIBC-4' Replacement Replaced snubber S/N 21515 with spare snubber S/N 7578,94-032 EJ01-R028/124 Snubber on line EJ-017-ECB-10' Replacement Replaced snubber S/N 27593 with spare snubber S/N 27564.94-033 EM05-R003/231 Snubber on line EM-020-BCA-2' Replacement Replaced snubber S/N 3090 with spare snubber SN 10367.94-034

w. .- - - . - _ _ - . _ _ _ - _ .

Attachment to WM 95-0005 Page 105 of 111 COMPOSENT DESCRIPTION TYPE DESCRII' TION DQCUMENT EMOS-R512/I12 Snubber on sahe EMiiV8814B Replacement Replaced snubber SN 20365 with spare snubber SH 8151. 94435 EMi1-R502/231 Snubber on valve EMllV8890B Replacement Replaced snubber SN 17785 with spare snubber SN 17809. 036 EP08-R508/242 Snubber on line BM-035-DBB-1" Replacement Replaced snubber SN 16454 mith spare snubber SN 25931.94-037 FC02-R503/125 Snubber on line FC-005-DBC-1" Replacement Replaced snubber SN I1786 with spare snubber SN 12251.94-038 GSO4-R501/134 Snubber on trne GS-020-IICB-l* Replacement Replaced snubber SN 25922 with spare snubber SN 27900. 94439 EP02-R005/232 Snubber on line EP-005-BCB-10" Replacement Replaced snubber SN I168I with spare snubber SN 12034. 94442 BGV0100 Charging Pump Discharge ficader to Seal Water Replacement Removed and reinstalled the body to bonnet seal weld and also ground off 94445 Injection Filter Isolation Valve Modification the head of the bonnet hydro plug per ConGguration Change Package (CCP) 05159.

E105-11003/133 ESW T Train Return Line Supports Modification Remove deleted support from the system due to piping modification 94-047 EF05-II004/133 per PMR 04478.

EF03-II001/134 ESW 'A' Train Return from Containment Coolers Modification Deleted pipe support per PMR 04478.94-048 Piping Support EFl!V0047 ESW *A' Train Return Line from Containment Modification Removed valve EFIIV0047 (S/N 7455149) from the system.94-049 Cooler Bypass isolation Valve EFilV0048 ESW 'B' Train Return Line from Containraent Modification Removed valve EFilV0048 (SN 7455150) from the system.94-050 Cooler Bypass isolation Valve EP02-R021/232 Piping Support on Line EP-030-BCA-6' Replacement Disassembled and reassemble pipe clamp using new botting matenal  % 05I AB01-C011/145 Piping Support on Line AB-228-DBB-10" Replacement Disassembled and reassemble pipe clamp using new bolting material 94 052 BG01-C016/134 Pipe Support for BG-021-BCD-3' Modification Ground off portion of upper honzontal member to allow 94-053 disassembly of piping.

AB01-il502/145 Pipe support on line AB-302-DBB-2' Replacement Replaced clamp botting material mhile clamp was disassembled for Inservice 94-057 Inspection (151).

AB01-11508/145 Pipe suppnet on line AB-303-DBB-2* Replacement Replaced clamp bolting material =hile clamp was disassembled for 151.94-058 GKV0770 SGK04B ESW Inlet Relief Valve Replacement Replaced relief va!ve with new valve S/N TII-75126.94-059 SOLO 9B Safety Injection Pump Room Cooler 'B' Replacement Replaced original cooling coil =ith a new cooling coil unit.94-062 BG01-R010/132 Pipe support on line BG-020-IICD-4' Modification Replaced snubber with rigid sway strut per PMR 04580.94-064 EF03-R026/142 Pipe support on line GL-087-IIBC-4" Modification Replaced snubber with rigid sway stmt per PMR 04580.94-065

Attachment to WM 95-0005 Page 106 of 111 COMPONENI DESCRllilON TYPE DESCRIPTION DOCUMENT EF03-K027/112 Pipe support on line GL-113-ilBC-4" Modification Replaced snubber with rigid sway strut per PMR 04580. 54466 EF03-R029/144 Pipe support on line EF-1484tBC-21/2" Modification Replaced snubber with rigid sway strut per PMR 04580.94-067 EF03-R031/112 Pipe support on line GL-113-ilBC-4" Modification Replaced snubbers with rigid sway struts per PMR 04580.94-068 FF03-R033/122 Pipe support on line GL-101-IIBC-4" Modification Replaced snubber with rigid sway strut per PMR 04580.94-069 EF15-R002/34i Pipe support on line EF-115-IIBC-4" Modification Replaced snubbers with rigid suay struts per PMR 04580.94-070 EG08.ROI2/151 Pipe support on valve-EGLV0002 Modification Replaced snubbers with rigid sway struts per PMR 04580.94-071 BG03-R012/113 Pipe suppmt on line BG-012-ECB-3" Modification Replaced snubbers with rigid sway struts per PMR 04580. 94472 EG05-R017/I32 hpe support on line BG-206-IICB-3" Modification Replaced snubbers with rigid sway struts per PMR M580.94-073 EG05-R018/132 Pipe support on tire BG-206-ilCB-3" Modification Replaced snubber with rigid sway strut per PMR 04580.94-074 BG05-R501/132 Pipe support on line BG-133-ilCB-2" Modification Replaced snubber with rigid sway strut per PMR M580.94-075 BG05-R508/I32 Pipe support on line BG-133-IICD-2" Modification Replaced snubber with rigid sway strut per PMR 04580. 94476 EG10-R501/121 Pipe support on line BG-195-IICB-2" Modification Replaced snubber with rigid sway strut per PMR M580.94-077 BGI5-R014/131 Pipe support on line BG-217-IICC-3" Modification Replaced snubber with rigid sway strut per PMR 04580.94-078 BG15-R015/Il2 Pipe support on valre BGIIV8104 Modification Replaced snubber with rigid sway strut per PMR 04580.94-079 BG15-R503/112 Pipe support on line BG-241-IICC-2" Modification Replaced snubber with rigid sway strut per PMR 04580.94-080 BN01-Rol2/011 Pipe support on line BN-007-IICB-24" Modification Replaced snubber with rigid sway strut per PMR 04580.94-081 JE03-R005/521 Pipe support on line JE-063-IIBC-4" Modification Replaced snubbers with rigid su ay struts per PMR 04580.94-083 EF02-R020/144 Pipe support on line EF-147-IIBC-21/2" Modification Replaced snubbers with rigid sway struts per PMR 04580.94-084 JE02-R005/521 Pipe support on line JE-062-IIBC-4" Modification Replaced snubbers with rigid su ay struts per PMR 04580.94-085 EF02-R019/144 Pipe support on line GL-089-ilBC-3" Modification Replaced snubber with rigid sway strut per PMR 04580.94-086 '

Illl8378A Chemical and Volume Control System (CVCS) Normal Replacernent Removed welded bonnet seal cap and replaced bonnet, studs and nuts.94-087 Charging Check Valve BB8378B CVCS Normal Charging Check Valve Replacement Removed welded bonnet seal cap and replaced bonnet, studs and nuts.94-088 GN01-S001/231 ESW 'A' Train Supply to Containment Coolers Modification Modified pipe spool by removing a piece of pipe and replacing it with a 94-001 Ionger piece of pipe and a fiange per PMR M478.

4

Attachment to WM 95-0005 Page 107 of 111 COMPONENT DESCRil'IlON TYPE DESCRIPTION DOCUMENT EF02-S017/134 ESW 'A' Train Supply to Containment Coolers Modification Modified pipe spool by removing section of pipe immediately downstream 94-092 of valve EFIIV0031 and replacing it with a longer piece of pipe and a flange per PMR M478.

GN01-S030/231 ESW 'A' Train Retum from Containment Coolers Modification Modified pipe spool by removing a section of pipe and replacing it with a 944)93 longer section of pipe and a flange per PMR 04478.

EF05-5024/133 ESW 'B' Train Return from Containment Coolers Modification Modified pipe spool by replacing it in it's entirety with a pipe and flange 944)94 per PMR M478.

EF04-5020/133 ESW 'B' Train Supply to Contaimnent Coolers Modification Modified pipe spool by replacing a piece of pipe immediately downstre:.m 94-095 of valve EFilV0032 with a new piece of pipe and a flange per PMR M478.

EF03-5018/134 ESW 'A' Train Return from Containment Coolers Modification Modified pipe spool by replacing it in it's entirety with a pipe and flange 94-096 per PMR 04478.

GN02-S001/231 ESW 'B' Train Supply to Containment Coolers Modification Modified pipe spool by removing a section of pipe and replacing it with a 94-097 longer section of pipe and a flange per PMR 04478.

GM02-S036/231 ESW 'B' Ytain Return from Containment Coolers Modification Modified pipe spool by removing a piece of pipe immediately downstream 94-098 of EFilV0046 and replacing it with new pipe and a flange per PMR 04478.

BGV0102 Seal Water injection Filter 'A' Outlet Isolation Replacement Replaced valve BGV0102, added a coupling downstream of the valve and 94-100 Valve replaced a short section of pipe on each side of the valve.

BB8010A Pressurizer Safety Relief Valve 'A' Replacement Replaced BB8010A with spare valve .94-101 BB8010C Pressurizer Safety Relief Valve 'C' Replacement Replaced BB8010C with spare valve .94-102 BB8010B Pressurizer Safety Relief Valve 'B' Replacement Replaced BB8010B with spare valve .94-103 BGV0108 Seal Water injection Filter 'A' Inlet isolation Valve Replacement Replaced bonnet assembly on valve BGV0101.94-104 BG01-R015/112 Snubber at valve BGilV8109 Replacement Replaced snubber S/N 15013 with spare snubber S/N 8535.94-105 AE05-R012/24i Snubber on line AE-079-EBB-14" Replacement Replaced snubber S/N IIII with spare snubber S/N 1376.94-106 EJ04-R019/231 Snubber on valve BBPV8702B Replacement Replaced snubber S/N 1386 with spare snubber S/N 1980.94-107 RBB01 Closure Ilead (Instrument Ports 75, Reactor Vessel Closure Ilead Instrument Port Modification Modified the core exit thermocouple nozzle assemblics on the reactor 94-109 76,77, and 78) Connectors at Penetrations 75,76,77, and 78. vessel head at penetrations: 75,76,77, and 78 per PMR 02749.

BGV0198 Reactor Coolant Pump (RCP) Seal Water Injection Modification Modified valve BGV0198 by installing a Dragon throttle valve per 94-110 Throttle Valve PMR 04437.

BGV0199 RCP Seal Water injection Throttle Valve Modification Modified valve BGV0199 by installing a Dragon throttle valve per 94-11I PMR 04437.

Attachment to WM 95-0005 Page 108 of 111 COMPONENT DESCRII"IION TYPE DESCRIPTION IMPLTMENT BGV0200 RCP Seal Water injection Brottle Valve Modification Modified valve BGV0200 by installing a Dragon throttle valve per 94-112 PMR 04437.

BGV0201 RCP Seal Water injection Throttle N alve Modification Modified valve BGV0201 by installing a Dragon throttle valve per 94-113 PMR 04437.

GKV0772 SGK05B ESW In!ct Relief Valve Replacement Replaced r: lief valve with reworked spare valve S,N Til-75124.94-114 ICBV0202 RCP Seal Water Injection Throttic Valve and Modification Modified v alve BGV0202 by installing a Dragon throttle valve per 94-116 BG-176-BCB-2* Supply and Return Lines Repair PMR 04437, repaired an are strike on the replacement valve body and ES-177-liCD-2" Replacement replaced a reducer, a coupling and a short sc tion of pipe on each side of the valve.

DPBBOIC Air & Oil Coolers RCP 'C' Motor Air and Oil Coolers Replacement Installed spare RCP Motor air & oil coolers on DPBBOIC.94-117 BM-009-DBB-2' Blowdown Line Nonles on Steam Generators Modification Reworked nonic to line welds by grinding, blending and welding in 94-118 BM-021-DDB-2' A. B, C & D accordance with PMR 04579 to obtain the required profile for concave BM-033-DBB-2" unequal leg fillet welds as shown in ASME Secten 111 BMG-03B-2* Fig. NC-3673-2(b)-3.(D).

EJilV8804B RIIR to Safety Injection Pump 'B' Isolation Replacement Replaced the body to bonnet studs and nuts on EJ11V8804B.94-121 EF02-R017/134 Pipe Support for EF-067-IlliB-14' ESW 'A' irain Replacement Removed portion of support to allow modification per PMR 04478,94-122 Supply to Contamment Cooiers Repair repaired damage to vertical member and replaced horizontal member.

BB04-R044/232 Pipe Support for Line BB-023-BCA-4' Replacement Removed two structural members, repaired one structural member which 94-123 was gouged during disassembly and reinstalled removed members.

Steam Generator Inlet Restraints for Loops 1,2. 3 & 4 Steam Generator Inlet Restraints Modification Deleted supports from the system by removing the pipe saddles, shims and 94-124 Loops I,2,3 and 4 clamp assemblics.

EFIIV0050 ESW 'B' Train Return from Containment Coolers Modification Replaced valve EF11V0050 with a new style 14" Wafer-Sphere valve 94-125 Outside Containment Isolation Valve per PMR 04478 using new bolting materia' EFIIV0031 ESW 'A' Train Supply to Containment Coolers Mooification Replaced valve EFilV0031 with a new style 14" Wafer-Sphere Valve 94-126 Outside Containment isolation Valve per PMR 04478 using new botting material.

EFilV0032 ESW 'B' Train Supply to Containment Coolers Modification Replaced valve EFIIV0032 with a new style 14" Wafer-Sphere Valve 94-127 Outside Containment Isolation Valve per PMR 04478 using new botting material.

EFIIV0049 ESW *A' Train Return from Containment Coolers Modification Replaced valve EFilV0049 with a new style 14' Wafer-Sphere Valve 94-128 Outside Containment Isolation Valve per PMR 04478 using new botting material.

EF05-S050/133 ESW 'B' Train Return from Containment Coolers Modifications Modified piping to install a flow orifice and eliminate the 10" bypass line,94-129 EF05-5023/133

_m_____...__-__-._.--__-.------+ _ - - -

Attechment to WM 95-0005 Page 109 of 111 COMPONEST DESCRIPTION TYPE DESCRIPTION DOCCMENT EF03-5017/134 ESW 'A' Train Return from Containment Coolers Modification Modified piping to install an orifice plate and climinate the 10" bypass line.94-130 EF03-5059/134 EF03-S060/134 ECV7129 Refueling Pool Drain Isolation Valve Modification Replaced diaphragm type valve with a ball valve per PMR M703.94-131 EBBo t A, B, C & D IIydraulic Snubbers flydraulic Snubbers for Steam Generators Modification Modified 8 of the 16 Steam Generator hydraulic snubbers to make them 94-132 Snubbers 2 and 3 on EBBOI A into mechanical struts per PMR 04579.

Snubbers 6 and 7 on EBB 01B Snubbers 10 and 11 on EBBOIC Snubbers 14 and 15 on EBB 01D FFliV0033 ESW 'A' 1 rain Supply to Contamment Coolers Modification Replaced valve EFilV0033 with a new style 14" Wafer-Sphere valve 94-133 Inside Containment isolation Valve per PMR 04478 using new bolting material.

EFilV0046 ESW 'B' Train Return from Containment Coolers Modification Replaced valve EflIV0046 with a new style 14" Wafer-Sphere valve 94-134 Inside Containment isolation Valve per PMR 04478 using new bolting material.

EfilV0045 ESW 'A' Train Return from Contamment Coolers Modification Replaced valve EFilV0045 with a new style 14 Wafer-Sphere valve 94-135 Inside Containment Isolation Valve per PMR M478 using new botting material.

EFIIV0034 ESW 'B' Train Supply to Containment Coolers Modification Replaced valve EFIIV0034 with a new style 14' Wafer-Sphere valve 94-136 Inside Containment isolation Valve per PMR 04478 using new bolting material EF03-C034/134 ESW 'A' Train Support on Line EF-068-ilBB-14" Modification Modified pipe support to obtain new configuration per PMR 04478 using 94-137 Replacement new pipe clamp, strut and botting material.

ABWO57 Steam Generator 'A' Safety Relief Valve Replacement Replaced Main Steam Safety Relief Valve with a like valve.94-138 ABV0056 Steam Generator 'A' Safety Relief Valve Replacement Replaced Main Steam Safety Relief Valve with a like valve- 94-139 PBB01D Pins for Seismic Restraint Tie Rods TR-4 & TR-5 Modification Replaced Tie Rod Pins with new design pins per PMR 04649.94-140 KJXJ05B Diesel Generator 'B' Exhaust Bellows 5B Replacement Replaced a bellows cover clip by welding the clip to the bellows flange.94-141 PBB01C 1 ins for Seismic Restraint Tie Rods TR-4 & TR-5 Modification Replaced Tic Rod Pins with new design pins per PMR 04649.94-142 PBB01B Pins for Seismic Restraint Tie Rods TR-1 & TR-3 Modification Replaced Tic Rod Pins with new design pins per PMR 04649.94-143 PBB01A Pins for Seismic Restrair:t Tie Rods TR-1 & TR-3 Modification Replaced Tie Rod Pins with new design pins per PMR 04649.94-144 AFV0122 Steam Generator 'D' Feodwater inlet Check Valve Replacement Removed hinge pin encapsulations from valve body. Replaced valve disc 94-145 Repair with 2% nominal Cr alloy dise Installed new design hinge pin bonnets and Modification covers. Replaced three valve bonnet studs with new material. Repaired valve bonnet by machining to remove a defect from the pressure seal area.

Attachment to WM 95-0005 Page i10 of 111 C0%1PONENT DESCRil" TION TYPE DESCRIPTION DOCL MENT AEV0123 Steam Generator 'C' Feedwater Inlet Check Valve Repair Removed hinge pin encapsulations from valve body. Replaced valve disc W-I46 Malification with 2*6 nominal Cr alloy disc. Installed new design hinge pin bonnets and covers. Repaired gouged areas on valve body by welding.

AEV0120 Steam Generator 'B' Feedwater inlet Check Valve Replacement Removed hinge pin encapsulations from valve body. Replaced valv: disc 94-147 Modification with M4 nominal Cr alloy disc. Installed new design hinge pin bonnets and covers. Replaced all valte bonnet studs =ith new material.

PEJ01B Residual IL st Removal Pump *B* Replacement Replaced seal hotising and drilled a hole in it for an antirotation pin.94-148 Modification EF06-5018/125 ESW Supply to Auxilia, Feedwater Pump Room Replacement Replaced a one foot section of pipe and blended one linear indication 94-149 Cooler 'B' - SGF02B Repair on each side of the replaced portion of pipe.

EKJ03A Diesel Generator *A* Intercooler lleat Exchanger Replacement Removed and reworked the outlet waterbox interior small nonle welds and the 94-150 interior weld for the flange at the heat exchanger end.

EKJNA Diesel Generator 'A' Lube Oil 11 cat Exchanger Replacement Removed and reworked the outlet waterbox interior small nonle welds94-151 and the interior weld for the flange at the heat exchanger end.

EJ01-C016/132 Pipe Support on Line EJ-017-ECB-10' Replacement Replaced bolting material on lower pipe clamp on EJ01-C016/132.94-152 EF02-5016/134 ESW 'B' Train Supply to Containment Coolers Modification Deleted pipe spool 5051 and modified spool S016 by removing a section of 94-153 EF02-5051/134 pipe and replacing it with a longer section of pipe per PMR 04478.

EP8818C RIIR to Accumulator injection Line Check Valve Replacement Replaced one bonnet stud and one bonnet nut with new material.94-154 PBB01A Reactor Coolant Pump 'A' Replacement Replaced seal cartridge assembly including the No. 2 seal housing 94-155 EF04-R0ll/133 Pipe Support for Line EF-Il7-ilBC-14" Replacement Removed the horizontal W4X13 beam from the support and reinstalled,94-156 using new material, after m..AGuu of piping modification.

EF04-50lo/133 ESW 'B' Train Supply to Cvin-.4.a Coolers Modification Modified pipe spool EF04-5019 to allow deletion of EF04-SO4I and install- 94-157 EF04-SO41/133 ation of new style valse per PMR 04478.

BGVC301 CVCS letdown Orifice 'C' Outlet Throttle Valve Replacement Replaced valve stem / disc assembly with new part 94-158 EKJ04B Diesel Generator 'B' Lube Oil IIcat Exchanger Replacement Removed and reworked the outlet waterbox interior small nonic welds94-159 and the interior weld for the flange at the heat exchanger end.

EBB 01A Steam Generator 'A' llot ieg Primary Manway Replacement Replaced primary mannmy stud / nut assembly All10 on the hot leg side 94-160 Stud / Nut Assembly location All!0 primary manway with a new spare.

EG24-R009/11 I Pipe Support for Line EG-277-IIBC-2-1/2' Replacement Removed and reinstalicd pipe stypnt to allow rework of Centrifugal Charging 94-161 Pump PBG053.

l Attachraent to WM 95-0005 Page 11I cf 111 i

l CO%frONEM DESCRIPTION TYPE DESCRIPTION DOCUMENT EDB01A Bare lloie P!ug in Row 24 Column 108 Cold 1 eg Replacement Removed bare hoic pir; due to indications found during Eddy Current 94-162 Side in Stearn Generator *A' examination and replaced with a new pleg per CCP 05420.

BBliV8I57A Excess Letdown to Pressurizer Relief Tank Control Repair Repaired (modified) the surface profiles of the 1" pipe to valve we'ds to 94-163 BBlIV8137B Valves obtain the full fillet profile shown in Fig. NC-3673-2(b)-3. (D) by grinding, blending and welding per PMR M394. i i

BGIIV8357A Centrifugal Charging Pump Supp!y to Seal Infection Repair Repaired (moaified) the surface profiles of the 1* p)e to valve welds to 94-164 BGliV8357B Control Valve obtam the full fillet profile shown in Fig NC-3673-2(b)-3. (D) by grinding, blending and welding per PMR 04394.

EG06-5025/1 e 3 CCW Return from Letdown llcat Exchanger Replacement Replaced two sectbs of pipe, a 45' cibow and a 90* elbow in pipe spool 94-166 EG06-S025/113. I BGilCVOI82 Charging Pump Dischstge to Regenerative IIcat Replacemere Replaced valve plupstem assembly.94-167 Exchanger Isolation Vahe BBPCVM55A Pressuriier Power Operated Relief Valve Replacement Replaced the solenoid s alve on BBPCV0455A.94-168 EBi101D Upper i ateral Support Stims Steam Generator Upper Lateral Support ; SB-1, Replacement Removed. machined and reinstalled shims as necessary to provide 94-169 SB-l. SB-2 & SB-3 SB-2 and 50-3 adequate clearance for Steam Generator movement during heat-up.

PBB01D lie Rod S/N 1378 Reactor Coolant Pump PBB01D Tie Red IR-4 Replacement Replaced spacer plates between pump PBB01D and Tie Rod TR-4 with 94-170 Modification new material and added new shim between the spamwr nut and washer securing TR-4 to PDB01D, to maintain desired cicarances, per PMR 04649.

ITMiO4A Seal Water injettion Filter 'A' Replacement Repaired top head of filter shell by grinding and blending and replaced 94-171 Repair one closure bolt assembly.

j ABPV0003 Steam Generator 'C' Atmospheric Relief Vsive Replacement Replaced the main plug and pilot plug in valve AtlPV0003.94-172 GN02{028/25I Pipe Support on I ine GN-054-1IBC-10" Modification Replaced the paddle end on a Corner & Lada rigid strut with one 94-173 manufactured by ITT Grinnell.

l C *