Letter Sequence Other |
---|
|
|
MONTHYEARML20077N9561983-08-26026 August 1983 Proposed Tech Specs Re Event Monitoring Instrumentation & Chlorine Detection Sys Project stage: Other ML20077N9441983-08-26026 August 1983 Application for Amend to Licenses DPR-42 & DPR-60, Changing Tech Specs Re Addition of Instruments to Event Monitoring Instrumentation & Chlorine Detection Sys Project stage: Request ML20077N9221983-08-26026 August 1983 Forwards Application for Amend to Licenses DPR-42 & DPR-60, Changing Tech Specs Re Addition of Instruments to Event Monitoring Instrumentation & Chlorine Detection Sys Project stage: Request 1983-08-26
[Table View] |
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to Abb C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20134H3771996-11-0606 November 1996 Proposed Tech Specs of Appendix a Re Cooling Water Sys ML20134E4551996-10-25025 October 1996 Proposed Tech Specs Changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2591996-09-24024 September 1996 Proposed Tech Specs,Changing TS 4.12 to Incorporate Revised Acceptance Criteria for SG Tubes W/Degradation in Tubesheet Region ML20117P4311996-09-11011 September 1996 Proposed Tech Specs,Revising Plant TS Governing Cw Sys ML20117B2381996-08-15015 August 1996 Proposed Tech Specs 3.3.B.2 Re Containment Cooling Sys & Bases to Conform to Supporting Analyses ML20115G8121996-07-15015 July 1996 Proposed Tech Specs Re Moveable Incore Detector Thimble Reduction ML20095J7951995-12-14014 December 1995 Proposed Tech Specs for Conformance of Administrative Controls Section 6 to Guidance of STS ML20094S2791995-11-28028 November 1995 Proposed Tech Specs Re Radiological Effluent TS Conformance ML20087F3571995-08-0909 August 1995 Proposed Tech Specs Table TS 3.15-1,Pages 1 & 2 & Bases Page B.3.15-1 Marked Up to Implement License Amend Request 1999-08-31
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211K6241999-08-31031 August 1999 Proposed Tech Specs,Changing ISFSI License Conditions 6,7 & 8 & TS 3/4.1 by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0621999-05-13013 May 1999 Proposed Tech Specs,Removing Plant Organization Structure Requirement ML20205S3331999-04-20020 April 1999 Proposed Tech Specs Changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0351999-04-12012 April 1999 Proposed Tech Specs,Relocating Shutdown Margin Requirements from TS to COLR ML20204H3601999-03-19019 March 1999 Proposed Tech Specs Removing Dates of Two NRC SERs & Correcting Dates of One SER Listed in Section 2.C.4, Fire Protection ML20207F2901999-03-0101 March 1999 Proposed Revised Tech Specs Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A2181999-02-0505 February 1999 Proposed Tech Specs,Changing TS 4.12, SG Tube Surveillance to Incorporate Changes to Abb C-E Sleeve Design Assumptions & Installation Techniques ML20196B9721998-11-25025 November 1998 Proposed Tech Specs,Allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155G6321998-11-0303 November 1998 Proposed Tech Specs B.3.1-7 & B.3.1-7a,rev 133A Re Reactor Coolant Sys ML20154S2101998-10-23023 October 1998 Proposed Tech Specs Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20195F1391998-10-0808 October 1998 Non-proprietary Version of Rev 1 to NSPNAD-97002, Steam Line Break Methodology ML20151U3651998-09-0404 September 1998 Proposed Tech Specs TS.3.1-5,TS.4.18-1 & B.4.18-1,clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5061998-08-12012 August 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20151Z9181998-08-0303 August 1998 Rev 0 to 5AWI 6.1.2, Design Outputs,Review & Verification ML20151Z9011998-08-0303 August 1998 Rev 2 to 5AWI 6.1.0, Design Change General ML20236T6041998-07-20020 July 1998 Proposed Tech Specs Incorporating Elevated F* SG Tube Repair Criteria ML20249A7641998-06-11011 June 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20216G0371998-04-13013 April 1998 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20248M1421998-04-0606 April 1998 Draft NRC Insp Manual Temporary Instruction 2515/XXX Fire Protection Functional Insp (Fpfi) ML20216D0591998-03-0606 March 1998 Proposed Tech Specs Updating Heatup & Cooldown Rate Curves, Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217P0061998-03-0404 March 1998 Proposed Tech Specs Re Status of Relocated Requirements ML20217N9771998-03-0202 March 1998 Proposed Tech Specs 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P1431998-03-0202 March 1998 Proposed Tech Specs Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20202E5691998-02-10010 February 1998 Proposed Tech Specs 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8301998-01-15015 January 1998 Proposed Tech Specs Pages Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1,cycle 19 ML20198P0791998-01-0808 January 1998 Proposed Tech Specs Pages Re Suppl 5 to 951214 LAR on Conformance of Administrative Controls Section 6 to Guidance of STS ML20151Z9561998-01-0505 January 1998 Rev 0 to 5AWI 6.1.7, Design Change Work Orders ML20198B1471997-12-29029 December 1997 Proposed TS marked-up & Revised Pages,Incorporating Changes Associated w/951214 LAR ML20212F0471997-10-28028 October 1997 Proposed Tech Specs Pages Revising TS Section 4.12,allowing Use of voltage-based SG Tube Repair Criteria ML20151Z9441997-10-20020 October 1997 Rev 0 to 5AWI 6.1.6, Design Review & Approval ML20217F4761997-10-0303 October 1997 Suppl Proposed Tss,Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7581997-10-0101 October 1997 Proposed Tech Specs Re Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5861997-09-26026 September 1997 Proposed Tech Specs Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves Due to Inability to Complete IST Requirements ML20216E4561997-09-0404 September 1997 Proposed Tech Specs,Supporting Conformance to TS Overtime Controls to NRC Guidance Issued 950409 ML20216D1141997-09-0202 September 1997 Proposed Tech Specs,Incorporating Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20217M6191997-08-15015 August 1997 Proposed Tech Specs Incorporating C-E SG Welded Sleeve TR, CEN-629-P,Rev 1 ML20149J0251997-06-30030 June 1997 Tech Spec Change Pages B.3.8-2 & B.3.8-5 to Amend Re Spent Fuel Pool Personnel Access Doors ML20141F5011997-05-15015 May 1997 Proposed Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0871997-05-0707 May 1997 Proposed Tech Specs Re Spent Fuel Pool Special Ventilation Sys ML20137T2081997-04-10010 April 1997 Proposed Tech Specs,Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137W3621997-03-17017 March 1997 Rev 2 to Test Procedure TR-228, Three Hour Fire Test of One and Three Hour Versawrap Raceway Fire Barrier Sys for Conduits & Cable Trays ML20135F7481997-03-0707 March 1997 Proposed Tech Specs Re Cooling Water Sys Emergency Intake Design Basis ML20135A9401997-02-21021 February 1997 Proposed Tech Specs,Allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134L8901997-02-12012 February 1997 Proposed Tech Specs 3.3-3 Re Safety Injection Pump Low Temp Operations ML20134J6281997-02-0606 February 1997 Proposed Tech Specs 3.3 Re Engineered Safety Features ML20134E9421997-01-29029 January 1997 Proposed Tech Specs Revising Prairie Island Design Bases Re Cooling Water Emergency Intake ML20136H0101997-01-29029 January 1997 Rev 12 to Abnormal Procedure AB-3, Earthquakes ML20135A8251996-11-27027 November 1996 Proposed Tech Specs Incorporating New SG Tube Sleeve Designs & Installation & Exam Techniques ML20135A5091996-11-25025 November 1996 Proposed Tech Specs Implementing Mods Proposed by Suppl to License Amend Request & Revising TS Pp in Final Form to Reflect Changes Proposed by Suppl ML20138G8751996-11-0808 November 1996 Rev 2 to TN-40 Cask Unloading Procedure 1999-08-31
[Table view] |
Text
.
TS.3.13-1A REV E. Two chlorine detection systems, each consisting of two channels of instrumentation shall be operable at all times except as specified below. The alarm / trip setpoint shall be adjusted to actuate at a chlorine concentration of less than or equal to 5 ppm.
- 1. If one chlorine detection channel for one train of ventilation is inoperable, then within seven days:
- a. Restore the inoperable channel to operable status, or
- b. Operate the redundant ventilation 'systen in the normal (non-recirculation) mode, and close the outside air suction dampers for the affected train of ventilation
- 2. If both chlorine detection channels for one train of ventilation are inoperable then within six hours:
- a. Restore at least one channel to operable status, or
- b. Operate the redundant ventilation system in the normal (non-recirculation) mode and close the outside air suction dampers for the affected train of ventilation
- 3. If all chlorine monitors for both trains of ventilation are inoperable then within six hours close all Control Room ventilation outside air suction dampers.
8309130258 830826 PDR ADOCK 05000282 P PDR
.- - . _ . . _ - . _ _ - _-. - . = - _ . - - - , - - - - _ - , . -.
TABLE TS.3,15-1 . 1
. EVENT MONITORING INSTRUMENTATION - PROCESS & CONTAINMENT ..."
Required Total No. Minimum Channels Instrument of Channels Operable 1
- 1. Pressurizer Water Level 2 1
- 2. Auxiliary Feedwater Flow to Steam Generators 2/ steam gen 1/ steam gen (One Channel Finw and One' Channel Wide Range .
Level for Each Steam Generator)
- 3. Reactor Coolant System Subcooling Margin *** 2 1 i 4. Pressurizer Power Operated Relief Valve Position 2/ valve 1/ valve (One Common Channel Temperature, One Channel Limit Switch per Valve, and One Channel Acoustic Sensor per Valve *)
I 2 5. Pressurizer Power Operated Relief Block Valve 2/ valve 1/ valve Position ,
(One Common Channel Temperature, One Channel Limit Switch per Valve, and One Channel Acoustic Sensor per Valve *)
- 6. Pressurizer Safety Valve Position 2/ valve 1/ valve (One Channel Temperature per Valve j and Common Acoustic Sensor **)
i 7. Containment Water Level (wide range) 2 1 N l
- 8. Containment Hydrogen Monitor (2 sensors per Channel) 2 1 y!
4
- 9. Containment Pressure 2 1 F Un
,L
- - A common acoustic sensor provides backup position indication for each pressurizer power operated relief valve and its associated block valve.
1 .
- - The acoustic sensor channel is common to both valves. When operabl'e, the acoustic .
- , sensor may be considered as an operable channel for each valve. -
- - Fully qualified input instrumentation is being installed in accordance with the ,
- HRC's TMI Action Plan. Until installation is completed, this function will be satisfied using the plant process computer.
4 9